Prior art keywords
value
voltage
wind
power plant
wind power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810505866.6A
Other languages
Chinese (zh)
Other versions
CN108711883B (en
Inventor
刘永民
黄景慧
毛玉宾
刘万勋
司瑞华
张晓东
秦开明
孙思培
程昱明
贾鹏
张丽华
李甜甜
王洋
郝元钊
于琳琳
王圆圆
苗福丰
袁鹏
秦亮
刘开培
葛思扬
熊音笛
李明月
王放
蒲清昕
石维盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Wuhan University WHU
Economic and Technological Research Institute of State Grid Henan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Wuhan University WHU
Economic and Technological Research Institute of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Wuhan University WHU, Economic and Technological Research Institute of State Grid Henan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201810505866.6A priority Critical patent/CN108711883B/en
Publication of CN108711883A publication Critical patent/CN108711883A/en
Application granted granted Critical
Publication of CN108711883B publication Critical patent/CN108711883B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/386
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P9/00Arrangements for controlling electric generators for the purpose of obtaining a desired output
    • H02P9/10Control effected upon generator excitation circuit to reduce harmful effects of overloads or transients, e.g. sudden application of load, sudden removal of load, sudden change of load
    • H02P9/105Control effected upon generator excitation circuit to reduce harmful effects of overloads or transients, e.g. sudden application of load, sudden removal of load, sudden change of load for increasing the stability
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P9/00Arrangements for controlling electric generators for the purpose of obtaining a desired output
    • H02P9/10Control effected upon generator excitation circuit to reduce harmful effects of overloads or transients, e.g. sudden application of load, sudden removal of load, sudden change of load
    • H02P9/107Control effected upon generator excitation circuit to reduce harmful effects of overloads or transients, e.g. sudden application of load, sudden removal of load, sudden change of load for limiting effects of overloads
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P2101/00Special adaptation of control arrangements for generators
    • H02P2101/15Special adaptation of control arrangements for generators for wind-driven turbines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

The application provides a kind of coordinate fault traversing method of the wind power plant through flexible DC power transmission grid-connected system, the decompression of soft lineal wind farm side transverter of uniting is controlled and is combined with the flexible control of Wind turbines crowbar by the present invention, during monopole short-duration failure occurs for straight-flow system, system overcurrent is inhibited using the rectification bridge type crowbar protection circuits of double-fed fan rotor side, the real-time control to active power and electric current is realized by the adjusting to wind turbine set end voltage in control period, the maximized power delivering capability for realizing flexible direct current system non-faulting pole, avoid wind power plant off-grid, reduce the impact to AC network, it has the certain significance in Practical Project.

Description

Coordinate fault traversing method of the wind power plant through flexible DC power transmission grid-connected system
Technical field
The invention belongs to technical field of electric power system control, and in particular to a kind of wind power plant is through the grid-connected system of flexible DC power transmission The coordinate fault traversing method of system.
Background technology
For wind power plant through bipolar soft straight grid-connected system, when wherein a pole is broken down, the pole transverter is in the short time Interior locking, the electric current and power for flowing through failure pole quickly fall to 0.Since wind farm side transverter (WFVSC) is using fixed exchange Voltage controls and the control at the two poles of the earth is mutual indepedent, and after a wherein pole is latched, another pole transverter still is able to provide to wind power plant Specified voltage and frequency support, therefore that its will not be reduced in response to the failure of flexible direct current power transmission system is active defeated for wind power plant Go out.At this time active power will be transferred completely into non-faulting extremely on, cause the electric current of non-faulting pole to increase significantly, seriously threaten the pole Normal operation.So quickly reducing the active power that wind power plant is sent out so that trigger protection action is not research to straight-flow system Emphasis.
At present the wind power plant that uses both at home and abroad and soft straight joint fault traversing strategy include mainly voltage drop method, raising frequency method, The methods of communication method, these methods have respective limitation.By taking voltage drop method as an example, when an error occurs, reduce wind farm side The voltage setting value of transverter, reduces wind farm side alternating voltage to a lower value, at this time the output wattful power of wind turbine Rate will be cut down.After fault clearance, alternating voltage control is determined in the recovery of wind farm side transverter.This kind of method be not due to being related to wind turbine Internal protective device, is easy to generate powerful stress inside Wind turbines, and this side is used in the case of monopole failure Method can not limit the overcurrent of non-faulting pole, also result in the locking of non-faulting pole.In addition the big ups and downs of alternating voltage can be led Cause system it is unstable, while with this method wind power plant output power be uncontrollable.
Variable speed constant frequency wind-force based on double-fed type induction machine (double fed induction generator, DFIG) Generator is the type that current Large Scale Wind Farm Integration mainly uses.At present the rotor of DFIG have installing crowbar protection circuit with Inhibit rotor-side overvoltage.Rectifying bridge type crowbar protections electric routing resistance --- thyristor branch and diode rectifier bridge structure At, by the triggering to unique thyristor in circuit come cut and cut off crowbar protect circuit, and then protect pusher side unsteady flow Device.In the prior art, crowbar protects circuit that short trouble occurs in DFIG stators, starts when voltage seriously falls, and inhibits DFIG rotor overcurrent helps DFIG to complete low voltage crossing.Traditional crowbar is one kind in grid collapses, wind-powered electricity generation When field busbar voltage is fallen the device of low voltage crossing, this method and biography are realized by absorbing whole energy that wind power plant is sent out System mode is different, the characteristics of protecting circuit using crowbar, using this controlled amounts of wind power plant busbar voltage as wind power plant with it is soft Property DC transmission system carry out the medium of information exchange, the coupled relation between two systems during failure is established, by right The mode of wind power plant busbar voltage soft readjustment makes Wind turbines be actively engaged in the tune of active power during DC system fault Section inhibits the overcurrent of the non-faulting pole during soft straight failure.Simultaneously because wind power plant busbar voltage is by wind farm side transverter Control can maximize the biography of non-faulting pole active power during failure by the value of wind power plant busbar voltage during determining failure Defeated capacity.
Invention content
Protect circuit to inhibit the principle of rotor-side overvoltage using crowbar, by the crowbar of existing blower interior Circuit is protected to reduce the output of wind turbine, inhibits the overcurrent of the non-faulting pole during soft straight failure.After crowbar starts, Double-fed wind turbine is worked in the form of squirrel cage induction motor, at this time the output power P of wind turbineemMeet following functional relation:Pem= f(Z,ω)·us 2, wherein Z is generator impedance, and ω is generator speed, and f (Z, ω) is a generator impedance and turns The function of speed, usFor the set end voltage of wind turbine.I.e. the output power of DFIG is directly proportional to the quadratic power of set end voltage, therefore logical The active power of output of wind turbine can be changed by overregulating set end voltage.
The application utilizes the rotor-side crowbar of traditional Wind turbines by the improvement to existing system grade control method A kind of structure, it is proposed that coordinate fault traversing method of the wind power plant through flexible DC power transmission grid-connected system.The present invention is by soft direct line The decompression control of system wind farm side transverter is combined with the control control of the power flexible of Wind turbines crowbar, straight reaching The protection of Flow Line takes into account flexible direct current system ability to transmit electricity under the premise of requiring.When a wherein pole break down and when being latched, By reducing the wind power plant busbar voltage of wind farm side converter Control electricity is protected to trigger the crowbar of double-fed blower interior The control targe for preventing DC line overcurrent is realized on road.Make Wind turbines at this time by controlling wind power plant busbar voltage simultaneously The active power of output is controllable.
The present invention essentially consists in the situation of change according to line current, active power to the improvement of wind-powered electricity generation field control method, The set end voltage for controlling Wind turbines, to inhibit the output power and overcurrent of Wind turbines.The present invention is to existing system grade The improvement of control method, therefore need not can specially increase hardware realization, so that it may so that flexible direct current power transmission system control is same Coordinate fault when Shi Shixian normally determines alternating voltage control and failure passes through control.
The technical scheme is that:
Coordinate fault traversing method of the wind power plant through flexible DC power transmission grid-connected system of the present invention, includes the following steps:
S1, under normal circumstances, wind farm side transverter are exchanged using alternating voltage control mode, wind farm side transverter is determined Voltage-controlled reference voltage is set as the first setting value under normal circumstances, and wind power plant busbar voltage is stablized at this time;
S2, wind farm side transverter detect whether that monopole, which occurs, to break down, and S1 is returned if monopole failure does not occur, Step S3 is then carried out in case of monopole failure;
S3, the current sensing means of non-faulting pole measure non-faulting electrode current value, and by the non-faulting electrode current value with Scheduled limit value input comparator together:If the non-faulting electrode current value is more than limit value, startup separator is needed to pass through plan Slightly, step S4 is carried out;If the non-faulting electrode current value is less than or equal to limit value, startup separator does not pass through strategy, returns Step S1;
S4, the second setting value when the reference voltage is set as breaking down, makes wind power plant bus voltage value drop rapidly It is low, when the wind power plant busbar voltage of double-fed wind turbine is below the startup threshold value that rotor-side crowbar protects circuit, rotor-side Crowbar protects circuit start;
S5, after crowbar protects circuit start and is latched the control pulse of insulated gate bipolar transistor IGBT, double-fed Formula induction machine DFIG is worked in the form of wire-wound asynchronous motor, in not controlling state;When reference voltage is to break down Two setting values are controlled as initial value by Voltage Feedback, and the new value of reference voltage is calculated, and are changed by wind farm side The control of stream device is so that the value of wind power plant busbar voltage reaches the new value of the reference voltage;
S6, after wind farm side transverter detects straight-flow system monopole Failure elimination, the reference voltage is reset to normally In the case of the first setting value, the value of wind power plant busbar voltage rises, protected when the value of wind power plant busbar voltage rises to crowbar When more than the startup threshold value of protection circuit, crowbar protection circuits exit, while restoring insulated gate bipolar transistor IGBT control Pulse, and return to step S1.
Preferably, the first setting value of the reference voltage under normal circumstances necessarily is greater than double-feedback aerogenerator Crowbar protects the startup threshold value of circuit, second setting value of the reference voltage in failure to have to be lower than double-fed type wind-force The startup threshold value of the crowbar protection circuits of generator.
Preferably, second setting value of the reference voltage in failure and double-fed type induction machine DFIG parameters and failure Preceding output of wind electric field is related, before the second setting value and failure when determining the failure by system emulation between output of wind electric field Correspondence so that crowbar protect circuit start after, non-faulting electrode current value just reaches the rated value of electric current.
Preferably, the first setting value of the reference voltage under normal circumstances is 1.0p.u., and the reference voltage is in event The second range of set value when barrier is 0.65-0.9p.u..
Preferably, the second setting value when reference voltage is to break down in the S5 is anti-by voltage as initial value Feedback control, is calculated the new value of reference voltage, and make wind power plant busbar voltage by the control of wind farm side transverter Value reach the new value of the reference voltage, be as follows:
uset=ufault-Δu;
Wherein, usetFor the reference voltage of wind farm side transverter alternating voltage control, UfaultIt is handed over for wind farm side transverter Second setting value of the voltage-controlled reference voltage when breaking down is flowed, Δ u is voltage variety;
Voltage controller is controlled using PI, and voltage variety is obtained by following formula:
Δ u=Kp(Id-Idn)+Ki∫(Id-Idn) dt,
Wherein, IdFor non-faulting electrode current measured value;IdnFor the rated value of monopolar current, it is determined by device characteristics Predetermined value;KiFor the integral parameter of PI controllers;KpFor the proportionality coefficient of PI controllers;
By the u of acquisitionsetIt is worth the new value of the reference voltage controlled as wind farm side transverter alternating voltage, passes through wind-powered electricity generation The control of field side transverter is so that wind power plant busbar voltage reaches the new value of reference voltage.
The beneficial effects of the invention are as follows:
1, the present invention is compared with Traditional control, when a wherein pole for flexible direct current power transmission system is latched because of failure, leads to Decompression control and the side crowbar protection circuit collective effect reduction outputs of double-fed fan rotor for crossing wind farm side transverter are active Power inhibits the overcurrent of non-faulting pole, therefore fast response time, and voltage fluctuation is small, smaller to the impact of Wind turbines.
2, the application protects circuit using existing double-fed fan rotor side crowbar, therefore need not additionally install additional logical Believe equipment and other hardware circuits.
Description of the drawings
Fig. 1 is wind power plant through flexible DC power transmission grid-connected system circuit diagram;
Fig. 2 is step-down coordination control flow chart;
Fig. 3 is the control block diagram of wind farm side transverter.
Specific implementation mode
The application protects circuit using the crowbar inside double-feedback aerogenerator, as wind power plant busbar voltage VwfIt is low Start crowbar when below the startup threshold value of setting and protect circuit, and locking is double while crowbar protection circuit starts Present insulated gate bipolar transistor (IGBT, Insulated the Gate Bipolar of the rotor-side transverter of wind turbine Transistor this characteristic for) controlling pulse, the reference voltage of alternating voltage control is set by wind power station control system, is come Wind power plant busbar voltage is controlled, is realized when straight-flow system monopole breaks down and non-faulting electrode current sets limit value beyond electric current When, wind farm side transverter voltage is reduced, realizes that fault traversing controls using crowbar protection circuits.In the present embodiment, wind Electric field is divided into two states through flexible DC power transmission grid-connected system, and first state is wind power plant through flexible DC power transmission grid-connected system Under normal circumstances, the second state is failure shape when monopole failure occurs through flexible DC power transmission grid-connected system for wind power plant for work State is with reference to the accompanying drawings described in detail coordinate fault traversing method of the wind power plant through flexible DC power transmission grid-connected system, specifically Include the following steps:
S1, under normal circumstances, wind farm side transverter is using alternating voltage control mode is determined, by keeping wind power plant busbar Voltage VwfStabilization, maintain the normal work of double-fed wind turbine, at this time wind power plant busbar voltage VwfValue be equal to the wind farm side change of current The reference voltage u of device alternating voltage controlsetSetting value Unormal, and set end voltage is equal to the rated voltage of DFIG, monopole electricity Flow the rated value I of the measured value and monopolar current of IdnIt is equal.Reference voltage usetThere are two pre-defined values, respectively:Normally In the case of the first setting value UnormalWith the second setting value U when breaking downfault.By nominal case leeward in the present embodiment Electric field busbar voltage is set as wind farm side transverter reference voltage base value, then UnormalUsual value 1.0p.u., double-fed type wind The startup threshold value of power generator crowbar protection circuits has to be lower than the first setting value U under normal circumstancesnormal.It breaks down When the second setting value UfaultHave to be lower than the startup threshold value of double-feedback aerogenerator crowbar protection circuits.UfaultTool Body value is related with output of wind electric field before DFIG parameters and failure, specially:After crowbar protects circuit start, non-faulting Electrode current value just reaches the rated value of electric current, to maximize the transmission capacity of non-faulting pole, can pass through in Practical Project System emulation determines UfaultCorrespondence between output of wind electric field before failure, to establish stipulations between the two, Ufault It will not change after setting.
S2, wind farm side transverter detect whether generation monopole failure, S1 are returned to if monopole failure does not occur, such as Fruit occurs then to carry out step S3.When a wherein pole of the wind power plant through flexible DC power transmission grid-connected system is broken down, break down Failure pole transverter can be latched, wind farm side transverter can detect whether wind power plant is sent out through flexible DC power transmission grid-connected system Raw monopole failure, and testing result is sent to non-faulting pole.
The current sensing means of S3, non-faulting pole measure non-faulting electrode current size, and by non-faulting electrode current value and in advance Fixed limit value input comparator together:If non-faulting electrode current value is more than limit value, startup separator is needed to pass through strategy, therefore Carry out step S4;If non-faulting electrode current value is less than or equal to limit value, startup separator does not pass through strategy, i.e. wind farm side changes Alternating voltage control, therefore return to step S1 are determined in stream device maintenance.According to the measured value I of non-faulting electrode current IdWhether beyond setting Limit value IdthDecide whether change wind farm side transverter control mode, at this time non-faulting electrode current I be exactly in step S1 just Monopolar current I in the case of often:As the measured value I of non-faulting electrode current IdLess than limit value IdthWhen, return to step S1, and when non- The measured value I of failure electrode current IdMore than IdthWhen, enter step S4.
S4, by reference voltage usetSecond setting value U of value when being set as breaking downfault, i.e. uset=Ufault, make Obtain wind power plant busbar voltage VwfValue reduce rapidly, as the wind power plant busbar voltage V of double-fed wind turbinewfIt is protected in rotor-side crowbar When below the startup threshold value of protection circuit, the turn on thyristors signal of triggering rotor-side crowbar protection circuits, rotor-side The thyristor signal of crowbar protection circuits is switched to 1 from 0, and rotor-side crowbar protects circuit start.UfaultSpecific value It is related with output of wind electric field before DFIG parameters and failure, it can determine U by system emulation in Practical ProjectfaultWith wind before failure Correspondence between electric field output, to establish stipulations between the two, UfaultIt will not change after setting, usually take It is worth range in 0.65-0.9p.u..
S5, when crowbar protects circuit start and after be latched the control pulse of IGBT, double-fed type induction machine (DFIG) with Wire-wound asynchronous motor form works, in not controlling state.Since crowbar protects the effect of circuit, the output power of DFIG It is reduced rapidly, the electric current of non-faulting pole also reduces therewith realizes fault traversing.According to fig. 3, by changing wind farm side transverter Reference voltage usetValue, can be with regulating wind power field busbar voltage VwfValue, to play the work of regulating wind power field output power With.This method is controlled by Voltage Feedback and is realized, specially:The reference voltage that wind farm side transverter controls alternating voltage usetInitial value design be voltage setting value U when breaking downfault.Wind power station control system is changed in real time by calculating later Reference voltage usetValue, expression formula is such as shown in (1)
uset=ufault-Δu (1);
Wherein, usetFor the reference voltage of wind farm side transverter alternating voltage control, UfaultIt is handed over for wind farm side transverter Second setting value of the voltage-controlled reference voltage when breaking down is flowed, Δ u is voltage variety;
Voltage controller controls (proportion adjustment and integral adjustment) using PI, and voltage variety is obtained by following formula:
Δ u=Kp(Id-Idn)+Ki∫(Id-Idn) dt (2),
Wherein, IdFor non-faulting electrode current measured value;IdnFor the rated value of monopolar current, it is determined by device characteristics Predetermined value;KiFor the integral parameter of PI controllers;KpFor the proportionality coefficient of PI controllers.
By the u of acquisitionsetIt is worth the reference voltage level as new wind farm side transverter, passes through wind farm side transverter Control is so that wind power plant busbar voltage VwfValue reach wind farm side transverter alternating voltage control reference voltage usetIt is new Value.
S6, after wind farm side transverter detects straight-flow system monopole fault clearance, the reference electricity of alternating voltage control Ballast is set as u under normal circumstancessetSetting value Unormal, i.e. uset=Unormal, due to Unormal>Ufault, wind power plant busbar voltage VwfValue rise, as wind power plant busbar voltage VwfValue rise to crowbar protection circuit startup threshold value more than when, The thyristor signal of crowbar protection circuits is switched to 0 from 1.When crowbar protection circuital currents, which are reduced to, maintains electric current or less Thyristor turns off, and crowbar protection circuits exit, while restoring IGBT control pulses, and return to step S1.
Below by taking a specific wind power plant as an example:
In this wind power plant, due to needing busbar voltage to be equal to the rated voltage U of DFIGn, by alternating voltage control Reference voltage usetSetting value UnormalBe set as 1.0p.u., according to set end voltage with the stipulations of wind power output by failure when exchange Voltage-controlled reference voltage usetSetting value UfaultIt is set as 0.7p.u..And the startup threshold value of circuit is protected to set crowbar For 0.9p.u..Setting those skilled in the art of these concrete numerical values can be configured according to the actual conditions of wind park.
Under normal circumstances, wind power station control system setting wind farm side transverter, will using alternating voltage control mode is determined Wind power plant busbar voltage is set as wind farm side transverter reference voltage base value under nominal case, then wind power station control system is set Determine the reference voltage u of alternating voltage controlset=1.0p.u., wind power plant busbar voltage VwfValue stabilization in 1.0p.u., wind power plant Output before failure is 1.0p.u..Wind power plant busbar voltage V at this timewfValue be equal to alternating voltage control reference voltage uset's Setting value Unormal, i.e. Vwf=uset=1.0p.u., set end voltage are equal to the rated voltage of DFIG, and the measured value of monopolar current I With the rated value I of monopolar currentdnIt is equal.
When wind farm side transverter detects that straight-flow system monopole breaks down and non-faulting electrode current is more prescribed a time limit, wind power plant The reference voltage u that control system controls alternating voltagesetValue 0.7p.u. is revised as by original 1.0p.u., that is, u is setset =0.7p.u., wind power plant busbar voltage VwfIt is controlled by wind farm side transverter, also with usetVariation and reduce.When double Present the wind power plant busbar voltage V of wind turbinewfWhen rotor-side crowbar protects the startup threshold value 0.9p.u. or less of circuit, triggering turns The thyristor signal of the turn on thyristors signal of sub- side crowbar protections circuit, rotor-side crowbar protection circuits is switched to from 0 1, rotor-side crowbar protects circuit start.
Work as VwfDrop to preset ufaultWhen, the control mode of wind farm side transverter is changed to by determining alternating voltage control Voltage Feedback controls, and by expression formula (1) and (2), wind farm side transverter is calculated according to the fluctuation of non-faulting electrode current The new value of the reference voltage of wind farm side transverter under failure so that wind power plant busbar is electric by the control of wind farm side transverter Press VwfTrack usetVariation.
After wind farm side transverter detects straight-flow system monopole failure removal, wind power station control system, which is reset, to be handed over Flow voltage-controlled reference voltage uset=1.0p.u. so that wind power plant busbar voltage VwfRise, as wind power plant busbar voltage Vwf When rising to the startup threshold value of crowbar protection circuits or more, the thyristor signal of crowbar protection circuits is switched to 0 from 1.When Crowbar protection circuital currents are reduced to thyristor when maintaining electric current or less and turn off, and crowbar protection circuits exit, while extensive Multiple IGBT controls pulse.Alternating voltage control is determined in the recovery of wind farm side transverter, as wind power plant busbar voltage VwfValue stabilization exist After 1.0p.u., wind power plant has been then restored to normal condition, realizes wind power plant and occurs through flexible DC power transmission grid-connected system monopole Fault traversing when failure.
Specific embodiment described herein is only to be given an example to the present invention.The technical field of the invention Technical staff can make various modifications or additions to the described embodiments or substitute by a similar method, but Without departing from the spirit of the invention or going beyond the scope defined by the appended claims.

Claims (5)

1. a kind of coordinate fault traversing method of wind power plant through flexible DC power transmission grid-connected system, it is characterised in that:Including as follows Step:
S1, under normal circumstances, wind farm side transverter, which uses, determines alternating voltage control mode, wind farm side transverter alternating voltage The reference voltage of control is set as the first setting value under normal circumstances, and wind power plant busbar voltage is stablized at this time;
S2, wind farm side transverter detect whether that monopole, which occurs, to break down, and S1 is returned if monopole failure does not occur, if Monopole failure occurs and then carries out step S3;
The current sensing means of S3, non-faulting pole measure non-faulting electrode current value, and by the non-faulting electrode current value and make a reservation for Limit value input comparator together:If the non-faulting electrode current value is more than limit value, startup separator is needed to pass through strategy, into Row step S4;If the non-faulting electrode current value is less than or equal to limit value, startup separator does not pass through strategy, return to step S1;
S4, the second setting value when the reference voltage is set as breaking down, makes wind power plant bus voltage value reduce rapidly, when When the wind power plant busbar voltage of double-fed wind turbine is below the startup threshold value that rotor-side crowbar protects circuit, rotor-side crowbar Protect circuit start;
S5, after crowbar protects circuit start and is latched the control pulse of insulated gate bipolar transistor IGBT, double-fed type sense Motor DFIG is answered to work in the form of wire-wound asynchronous motor, in not controlling state;Second when reference voltage is to break down sets Definite value is controlled as initial value by Voltage Feedback, and the new value of reference voltage is calculated, and passes through wind farm side transverter Control so that the value of wind power plant busbar voltage reaches the new value of the reference voltage;
S6, after wind farm side transverter detects straight-flow system monopole fault clearance, the reference voltage is reset to normal condition Under the first setting value, the value of wind power plant busbar voltage rises, when the value of wind power plant busbar voltage rises to crowbar protection electricity When more than the startup threshold value on road, crowbar protection circuits exit, while restoring insulated gate bipolar transistor IGBT control arteries and veins Punching, and return to step S1.
2. coordinate fault traversing method of the wind power plant according to claim 1 through flexible DC power transmission grid-connected system, special Sign is:The first setting value of the reference voltage under normal circumstances necessarily is greater than the crowbar of double-feedback aerogenerator The startup threshold value of circuit, second setting value of the reference voltage in failure is protected to have to be lower than double-feedback aerogenerator Crowbar protects the startup threshold value of circuit.
3. coordinate fault traversing method of the wind power plant according to claim 2 through flexible DC power transmission grid-connected system, special Sign is:
Second setting value of the reference voltage in failure goes out with wind power plant before double-fed type induction machine DFIG parameters and failure Power is related, and the correspondence before the second setting value and failure when determining failure by system emulation between output of wind electric field makes After obtaining crowbar protection circuit starts, non-faulting electrode current value just reaches the rated value of electric current.
4. coordinate fault traversing method of the wind power plant according to claim 2 through flexible DC power transmission grid-connected system, special Sign is:
The first setting value of the reference voltage under normal circumstances be 1.0p.u., the reference voltage in failure second Range of set value is 0.65-0.9p.u..
5. coordinate fault traversing method of the wind power plant according to claim 1 through flexible DC power transmission grid-connected system, described The second setting value when reference voltage is to break down in S5 is controlled by Voltage Feedback as initial value, reference is calculated The new value of voltage, and by the control of wind farm side transverter so that the value of wind power plant busbar voltage reaches the reference voltage New value, which is characterized in that be as follows:
uset=ufault-Δu;
Wherein, usetFor the reference voltage of wind farm side transverter alternating voltage control, UfaultFor wind farm side transverter alternating current Second setting value of the reference voltage of voltage-controlled system when breaking down, Δ u are voltage variety;
Voltage controller is controlled using PI, and voltage variety is obtained by following formula:
Δ u=Kp(Id-Idn)+Ki∫(Id-Idn) dt,
Wherein, IdFor non-faulting electrode current measured value;IdnFor the rated value of monopolar current, it is made a reservation for by what device characteristics determined Value;KiFor the integral parameter of PI controllers;KpFor the proportionality coefficient of PI controllers;
By the u of acquisitionsetIt is worth the new value of the reference voltage controlled as wind farm side transverter alternating voltage, passes through wind farm side The control of transverter is so that wind power plant busbar voltage reaches the new value of reference voltage.
CN201810505866.6A 2018-05-24 2018-05-24 Coordinated fault ride-through method for wind power plant through flexible direct current power transmission grid-connected system Active CN108711883B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810505866.6A CN108711883B (en) 2018-05-24 2018-05-24 Coordinated fault ride-through method for wind power plant through flexible direct current power transmission grid-connected system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810505866.6A CN108711883B (en) 2018-05-24 2018-05-24 Coordinated fault ride-through method for wind power plant through flexible direct current power transmission grid-connected system

Publications (2)

Publication Number Publication Date
CN108711883A true CN108711883A (en) 2018-10-26
CN108711883B CN108711883B (en) 2020-07-03

Family

ID=63870516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810505866.6A Active CN108711883B (en) 2018-05-24 2018-05-24 Coordinated fault ride-through method for wind power plant through flexible direct current power transmission grid-connected system

Country Status (1)

Country Link
CN (1) CN108711883B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109755966A (en) * 2019-03-25 2019-05-14 哈尔滨工业大学 The collaboration fault ride-through method that extensive offshore wind farm is sent outside through flexible direct current
CN111953012A (en) * 2020-06-29 2020-11-17 中国电力科学研究院有限公司 Method and system for restraining AC/DC temporary overvoltage
CN114447984A (en) * 2022-02-10 2022-05-06 华北电力大学 Low-voltage ride-through control method suitable for offshore wind power collection line fault and application

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101950973A (en) * 2010-09-29 2011-01-19 上海电力学院 Double-fed wind generating set control system and stable control method
CN102299526A (en) * 2011-09-09 2011-12-28 南车株洲电力机车研究所有限公司 Low voltage ride through (LVRT) control method and system device for doubly-fed wind generating set
CN102412597A (en) * 2012-02-07 2012-04-11 徐州中矿大传动与自动化有限公司 Low voltage ride through control method and device for double-fed wind power generation system
CN102447263A (en) * 2010-10-08 2012-05-09 上海工程技术大学 Doubly fed wind power generation control system on grid network fault condition and method thereof
CN103178548A (en) * 2013-04-11 2013-06-26 华北电力大学 Symmetrical fault ride-through control method of double-fed wind generator set
CN104022529A (en) * 2014-06-16 2014-09-03 张建华 Doubly-fed wind generator low voltage ride through control method based on improved Crowbar
CN105024402A (en) * 2015-07-20 2015-11-04 国家电网公司 High voltage ride-through method of doubly-fed wind turbine generator set
WO2016000220A1 (en) * 2014-07-02 2016-01-07 Ge Energy Power Conversion Technology Ltd Overvoltage protection self-trigger circuit for double fed induction generator (dfig) wind power system
CN105356520A (en) * 2015-11-24 2016-02-24 上海电力学院 Control method for improving low voltage ride through capability of wind power plant
CN107196338A (en) * 2017-06-30 2017-09-22 天津大学 A kind of double-fed blower fan low-voltage ride-through method of dynamic adjustment rotor crow bar resistance

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101950973A (en) * 2010-09-29 2011-01-19 上海电力学院 Double-fed wind generating set control system and stable control method
CN102447263A (en) * 2010-10-08 2012-05-09 上海工程技术大学 Doubly fed wind power generation control system on grid network fault condition and method thereof
CN102299526A (en) * 2011-09-09 2011-12-28 南车株洲电力机车研究所有限公司 Low voltage ride through (LVRT) control method and system device for doubly-fed wind generating set
CN102412597A (en) * 2012-02-07 2012-04-11 徐州中矿大传动与自动化有限公司 Low voltage ride through control method and device for double-fed wind power generation system
CN103178548A (en) * 2013-04-11 2013-06-26 华北电力大学 Symmetrical fault ride-through control method of double-fed wind generator set
CN104022529A (en) * 2014-06-16 2014-09-03 张建华 Doubly-fed wind generator low voltage ride through control method based on improved Crowbar
WO2016000220A1 (en) * 2014-07-02 2016-01-07 Ge Energy Power Conversion Technology Ltd Overvoltage protection self-trigger circuit for double fed induction generator (dfig) wind power system
CN105024402A (en) * 2015-07-20 2015-11-04 国家电网公司 High voltage ride-through method of doubly-fed wind turbine generator set
CN105356520A (en) * 2015-11-24 2016-02-24 上海电力学院 Control method for improving low voltage ride through capability of wind power plant
CN107196338A (en) * 2017-06-30 2017-09-22 天津大学 A kind of double-fed blower fan low-voltage ride-through method of dynamic adjustment rotor crow bar resistance

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
BIN LIU,CHANGBAO XU,ET AL.: "Research on the value of crowbar resistance to low voltage ride through of DFIG", 《2015 INTERNATIONAL CONFERENCE ON COMPUTER AND COMPUTATIONAL SCIENCES》 *
GAO FEI,XUE AN-CHENG,ET AL.: "Research on the improvement of LVRT ability of an actual DFIG-type wind farm with Crowbar and SVG", 《INTERNATIONAL CONFERENCE ON RENEWABLE POWER GENERATION 》 *
ZHOU PENG,HE YIKANG,ET AL.: "Control strategy of an active crowbar for DFIG based wind turbine under grid voltage dips", 《2007 INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES AND SYSTEMS》 *
丁明,胡腾华等: "基于Crowbar的双馈风机LVRT特性研究", 《合肥工业大学学报》 *
姜传,肖湘宁: "应用撬棒电路的双馈型风力发电机低电压穿越分析", 《电网与清洁能源》 *
谭伦农,王肖等: "双馈风电机组不对称故障穿越性能优化", 《电网技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109755966A (en) * 2019-03-25 2019-05-14 哈尔滨工业大学 The collaboration fault ride-through method that extensive offshore wind farm is sent outside through flexible direct current
CN111953012A (en) * 2020-06-29 2020-11-17 中国电力科学研究院有限公司 Method and system for restraining AC/DC temporary overvoltage
CN111953012B (en) * 2020-06-29 2022-08-19 中国电力科学研究院有限公司 Method and system for restraining AC/DC temporary overvoltage
CN114447984A (en) * 2022-02-10 2022-05-06 华北电力大学 Low-voltage ride-through control method suitable for offshore wind power collection line fault and application
CN114447984B (en) * 2022-02-10 2024-08-30 华北电力大学 Low-voltage ride-through control method applicable to offshore wind power collection line faults and application

Also Published As

Publication number Publication date
CN108711883B (en) 2020-07-03

Similar Documents

Publication Publication Date Title
US7859125B2 (en) Method of controlling a wind turbine connected to an electric utility grid
CN109347144B (en) Low voltage ride through method of wind power flexible direct current output system
Yang et al. A series-dynamic-resistor-based converter protection scheme for doubly-fed induction generator during various fault conditions
EP2140534B1 (en) Method and system to influence the power generation of an adjustable speed generator
Erlich et al. Advanced grid requirements for the integration of wind turbines into the German transmission system
CN105356520A (en) Control method for improving low voltage ride through capability of wind power plant
EP3729589B1 (en) Adaptive active power control in renewable energy power plants
CN108711883A (en) Coordinate fault traversing method of the wind power plant through flexible DC power transmission grid-connected system
CA2901713C (en) System and method for improving reactive current response time in a wind turbine
CN110365024B (en) Emergency control method for restraining sending-end fan off-line caused by direct-current commutation failure
CN114928087A (en) Fault ride-through method for wind field flexible-straight system based on unit cooperation-distributed unloading
CN108599192B (en) Power out-of-limit rapid control method and system for connecting island converter station with passive power grid
CN207691447U (en) Dual feedback wind power generation system low voltage ride through device
CN105610175B (en) Wide-area reactive power coordination control method for FACTS equipment
CN104022529A (en) Doubly-fed wind generator low voltage ride through control method based on improved Crowbar
Hao et al. Mitigating the impacts of photovoltaics on the power system
CN102306926B (en) Fault protection method and device for power generating current transformer
Yang et al. A new converter protection scheme for doubly-fed induction generators during disturbances
Zolfi et al. Enhancement of LVRT capability of DFIG-based wind turbines by superconducting fault current limiter
CN111711349A (en) MMC active current limiting method based on bridge arm voltage control
He et al. Protection coordination between a HVDC offshore wind system and AC grid
CN209134052U (en) A kind of wind power generation set grid-connection power generation passive type self-protection circuit
CN116131368B (en) Control method suitable for maximum active power output during low voltage ride through of doubly-fed wind farm
Shen et al. A novel control strategy for enhancing the LVRT and voltage support capabilities of DFIG
Balaji et al. Analysis and Control Of Grid Connected Multi Terminal HVDC System

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant