CN108711773A - A kind of design method of buildings integrative wire laying equipment room - Google Patents

A kind of design method of buildings integrative wire laying equipment room Download PDF

Info

Publication number
CN108711773A
CN108711773A CN201810579805.4A CN201810579805A CN108711773A CN 108711773 A CN108711773 A CN 108711773A CN 201810579805 A CN201810579805 A CN 201810579805A CN 108711773 A CN108711773 A CN 108711773A
Authority
CN
China
Prior art keywords
equipment room
comprehensive wiring
installation
design method
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810579805.4A
Other languages
Chinese (zh)
Inventor
吴军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Xinkexin Technology Co Ltd
Original Assignee
Wuhan Xinkexin Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Xinkexin Technology Co Ltd filed Critical Wuhan Xinkexin Technology Co Ltd
Priority to CN201810579805.4A priority Critical patent/CN108711773A/en
Publication of CN108711773A publication Critical patent/CN108711773A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • H02G1/08Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to comprehensive wiring technology field, especially a kind of design method of buildings integrative wire laying equipment room includes the following steps:S1, analogue simulation;A1, measurement is examined on the spot;A2, selected location, simulator locating installation;A3, it is assessed;S2, pipeline it is pre-buried;The installation of S3, crane span structure;S4, the laying of cable, test;The installation of S5, distribution plant.The present invention, in the method connected up, can effectively reduce the risk that design error causes construction to fail, the value with good practicability and popularization using first analog simulation assessment.

Description

A kind of design method of buildings integrative wire laying equipment room
Technical field
The present invention relates to comprehensive wiring technology field more particularly to a kind of design sides of buildings integrative wire laying equipment room Method.
Background technology
Comprehensive wiring system is that one extremely flexible, modular, the information transmission in building or between groups of building Channel is intelligent building-information superhighway.It can make data, voice, vision facilities and switching equipment be connected with each other It connects, also can manage system with other information is connected with each other, and these equipment can be made to be connected with external communication network, such as city electricity The private local area network of phone network, Urban Data net or each system.Comprehensive wiring is made of the component of different series and specification, wherein Including:Transmission medium, relevant connection hardware (such as distributing frame, connector, socket, plug, adapter) and electric protective equipment Deng.These components can be used to build each subsystem, they have respective particular use, to meet different user, non-homology The demand of system, and can be converted with the variation of demand.
Comprehensive wiring equipment room is inlet-outlet line distributing frame and voice, data, image, building control of placed comprehensive wiring etc. The place of equipment is the place that wiring and its application system to building or groups of building are managed and safeguard, is comprehensive cloth Most important region in linear system system, for this purpose, scientifically and rationally designing and with to get comprehensive wiring equipment room ready critically important.
Invention content
The purpose of the present invention is to solve disadvantages existing in the prior art, and a kind of buildings integrative wire laying proposed The design method of equipment room.
To achieve the goals above, present invention employs following technical solutions:
A kind of design method of buildings integrative wire laying equipment room is designed, is included the following steps:
S1, analogue simulation:
A1, measurement is examined on the spot, draws architectural plan, the three-dimensional equal proportion that building is then established by computer is three-dimensional Model;
A2, based on the equal proportion threedimensional model that previous step is established, select the position of comprehensive wiring equipment room, it is right later Digital SPC exchange, main frame and the computer network facility of comprehensive wiring equipment room, wiring system equipment carry out mould Quasi- location and installation is connected up based on equal proportion threedimensional model;
A3, simulation result is assessed, is improved later, and re-start assessment;
S2, pipeline it is pre-buried:The construction of pipeline is carried out according to simulation result;
The installation of S3, crane span structure;
The section utilization rate 20-45% of B1, cable testing bridge, wire casing;
Grounding connection is carried out between B2, every section of crane span structure;
S4, the laying of cable, test;
The installation of S5, distribution plant:
The various marks of connecting terminal are clear, complete in C1, distributing cabinet body;
C2, all devices set ground terminal, and good connection access building ground terminal row;
Label is carried out after C3, distributing frame installation and corresponds to work, it is ensured that clear and definite.
Preferably, the position selection of comprehensive wiring equipment room follows following principle:Comprehensive wiring equipment room should be close proximity to Common communicating line pass incoming interface, common communicating line road leading-in end and comprehensive wiring equipment and the spacing of network interface do not surpass generally Cross 10m, comprehensive wiring equipment room should be set to the middle part of building and as far as possible close proximity to light current well and far from strong-electromagnetic field, Comprehensive wiring equipment room should select in Environmental security, dry and ventilated, bright and convenient for maintenance management the place of cleaning.
Preferably, when cable laying, paired cable length in reserve is 4~5m;Optical cable equipment end length in reserve be 6~ 8m;For have particular/special requirement by design requirement length in reserve.
Preferably, the assessment of simulation result is carried out in A3 by the way of constructing in advance, establishes comprehensive wiring equipment room Then show house is constructed in show house, then evaluate the result constructed in advance, evaluates underproof redesign Cabling scenario, until assessing qualified.
Preferably, show house uses wooden or plastics matter equal proportion model, show house wall, bottom plate to be set using hollow It sets, wallboard and bottom plate are disposed as movable plate, and convenient for dismounting is repeated, construction is in such a way that first scribing line positioning is installed again.
A kind of design method of buildings integrative wire laying equipment room proposed by the present invention, advantageous effect are:The present invention adopts With the assessment of first analog simulation in the method connected up, the risk that design error causes construction to fail, tool can be effectively reduced There is the value of good practicability and popularization.
Specific implementation mode
The following is a clear and complete description of the technical scheme in the embodiments of the invention, it is clear that described embodiment Only a part of the embodiment of the present invention, instead of all the embodiments.
Embodiment 1
A kind of design method of buildings integrative wire laying equipment room, includes the following steps:
S1, analogue simulation:
A1, measurement is examined on the spot, draws architectural plan, the three-dimensional equal proportion that building is then established by computer is three-dimensional Model;
A2, based on the equal proportion threedimensional model that previous step is established, select the position of comprehensive wiring equipment room, it is right later Digital SPC exchange, main frame and the computer network facility of comprehensive wiring equipment room, wiring system equipment carry out mould Quasi- location and installation is connected up based on equal proportion threedimensional model;
A3, simulation result is assessed, is improved later, and re-start assessment;
S2, pipeline it is pre-buried:The construction of pipeline is carried out according to simulation result;
The installation of S3, crane span structure;
The section utilization rate 20% of B1, cable testing bridge, wire casing;
Grounding connection is carried out between B2, every section of crane span structure;
S4, the laying of cable, test;
The installation of S5, distribution plant:
The various marks of connecting terminal are clear, complete in C1, distributing cabinet body;
C2, all devices set ground terminal, and good connection access building ground terminal row;
Label is carried out after C3, distributing frame installation and corresponds to work, it is ensured that clear and definite.
The position selection of comprehensive wiring equipment room follows following principle:Comprehensive wiring equipment room should be close proximity to common communication Circuit introduces interface, and common communicating line road leading-in end and comprehensive wiring equipment and the spacing of network interface are usually no more than 10m, comprehensive The middle part of building should be set between conjunction wiring unit as far as possible and close proximity to light current well and far from strong-electromagnetic field, comprehensive wiring Equipment room should select in Environmental security, dry and ventilated, bright and convenient for maintenance management the place of cleaning.
When cable laying, paired cable length in reserve is 4m;Optical cable is 6m in equipment end length in reserve;For there is special want Ask by design requirement length in reserve.
The assessment of simulation result is carried out by the way of constructing in advance in A3, establishes the show house of comprehensive wiring equipment room, Then it constructs in show house, then the result constructed in advance is evaluated, evaluate underproof redesign wiring side Case, until assessing qualified.
Show house use wooden or plastics matter equal proportion model, show house wall, bottom plate use hollow setting, wallboard and Bottom plate is disposed as movable plate, and convenient for dismounting is repeated, construction is in such a way that first scribing line positioning is installed again.
Embodiment 2
A kind of design method of buildings integrative wire laying equipment room, includes the following steps:
S1, analogue simulation:
A1, measurement is examined on the spot, draws architectural plan, the three-dimensional equal proportion that building is then established by computer is three-dimensional Model;
A2, based on the equal proportion threedimensional model that previous step is established, select the position of comprehensive wiring equipment room, it is right later Digital SPC exchange, main frame and the computer network facility of comprehensive wiring equipment room, wiring system equipment carry out mould Quasi- location and installation is connected up based on equal proportion threedimensional model;
A3, simulation result is assessed, is improved later, and re-start assessment;
S2, pipeline it is pre-buried:The construction of pipeline is carried out according to simulation result;
The installation of S3, crane span structure;
The section utilization rate 25% of B1, cable testing bridge, wire casing;
Grounding connection is carried out between B2, every section of crane span structure;
S4, the laying of cable, test;
The installation of S5, distribution plant:
The various marks of connecting terminal are clear, complete in C1, distributing cabinet body;
C2, all devices set ground terminal, and good connection access building ground terminal row;
Label is carried out after C3, distributing frame installation and corresponds to work, it is ensured that clear and definite.
The position selection of comprehensive wiring equipment room follows following principle:Comprehensive wiring equipment room should be close proximity to common communication Circuit introduces interface, and common communicating line road leading-in end and comprehensive wiring equipment and the spacing of network interface are usually no more than 10m, comprehensive The middle part of building should be set between conjunction wiring unit as far as possible and close proximity to light current well and far from strong-electromagnetic field, comprehensive wiring Equipment room should select in Environmental security, dry and ventilated, bright and convenient for maintenance management the place of cleaning.
When cable laying, paired cable length in reserve is 4m;Optical cable is 7m in equipment end length in reserve;For there is special want Ask by design requirement length in reserve.
The assessment of simulation result is carried out by the way of constructing in advance in A3, establishes the show house of comprehensive wiring equipment room, Then it constructs in show house, then the result constructed in advance is evaluated, evaluate underproof redesign wiring side Case, until assessing qualified.
Show house use wooden or plastics matter equal proportion model, show house wall, bottom plate use hollow setting, wallboard and Bottom plate is disposed as movable plate, and convenient for dismounting is repeated, construction is in such a way that first scribing line positioning is installed again.
Embodiment 3
A kind of design method of buildings integrative wire laying equipment room, includes the following steps:
S1, analogue simulation:
A1, measurement is examined on the spot, draws architectural plan, the three-dimensional equal proportion that building is then established by computer is three-dimensional Model;
A2, based on the equal proportion threedimensional model that previous step is established, select the position of comprehensive wiring equipment room, it is right later Digital SPC exchange, main frame and the computer network facility of comprehensive wiring equipment room, wiring system equipment carry out mould Quasi- location and installation is connected up based on equal proportion threedimensional model;
A3, simulation result is assessed, is improved later, and re-start assessment;
S2, pipeline it is pre-buried:The construction of pipeline is carried out according to simulation result;
The installation of S3, crane span structure;
The section utilization rate 30% of B1, cable testing bridge, wire casing;
Grounding connection is carried out between B2, every section of crane span structure;
S4, the laying of cable, test;
The installation of S5, distribution plant:
The various marks of connecting terminal are clear, complete in C1, distributing cabinet body;
C2, all devices set ground terminal, and good connection access building ground terminal row;
Label is carried out after C3, distributing frame installation and corresponds to work, it is ensured that clear and definite.
The position selection of comprehensive wiring equipment room follows following principle:Comprehensive wiring equipment room should be close proximity to common communication Circuit introduces interface, and common communicating line road leading-in end and comprehensive wiring equipment and the spacing of network interface are usually no more than 10m, comprehensive The middle part of building should be set between conjunction wiring unit as far as possible and close proximity to light current well and far from strong-electromagnetic field, comprehensive wiring Equipment room should select in Environmental security, dry and ventilated, bright and convenient for maintenance management the place of cleaning.
When cable laying, paired cable length in reserve is 5m;Optical cable is 7m in equipment end length in reserve;For there is special want Ask by design requirement length in reserve.
The assessment of simulation result is carried out by the way of constructing in advance in A3, establishes the show house of comprehensive wiring equipment room, Then it constructs in show house, then the result constructed in advance is evaluated, evaluate underproof redesign wiring side Case, until assessing qualified.
Show house use wooden or plastics matter equal proportion model, show house wall, bottom plate use hollow setting, wallboard and Bottom plate is disposed as movable plate, and convenient for dismounting is repeated, construction is in such a way that first scribing line positioning is installed again.
Embodiment 4
A kind of design method of buildings integrative wire laying equipment room, includes the following steps:
S1, analogue simulation:
A1, measurement is examined on the spot, draws architectural plan, the three-dimensional equal proportion that building is then established by computer is three-dimensional Model;
A2, based on the equal proportion threedimensional model that previous step is established, select the position of comprehensive wiring equipment room, it is right later Digital SPC exchange, main frame and the computer network facility of comprehensive wiring equipment room, wiring system equipment carry out mould Quasi- location and installation is connected up based on equal proportion threedimensional model;
A3, simulation result is assessed, is improved later, and re-start assessment;
S2, pipeline it is pre-buried:The construction of pipeline is carried out according to simulation result;
The installation of S3, crane span structure;
The section utilization rate 45% of B1, cable testing bridge, wire casing;
Grounding connection is carried out between B2, every section of crane span structure;
S4, the laying of cable, test;
The installation of S5, distribution plant:
The various marks of connecting terminal are clear, complete in C1, distributing cabinet body;
C2, all devices set ground terminal, and good connection access building ground terminal row;
Label is carried out after C3, distributing frame installation and corresponds to work, it is ensured that clear and definite.
The position selection of comprehensive wiring equipment room follows following principle:Comprehensive wiring equipment room should be close proximity to common communication Circuit introduces interface, and common communicating line road leading-in end and comprehensive wiring equipment and the spacing of network interface are usually no more than 10m, comprehensive The middle part of building should be set between conjunction wiring unit as far as possible and close proximity to light current well and far from strong-electromagnetic field, comprehensive wiring Equipment room should select in Environmental security, dry and ventilated, bright and convenient for maintenance management the place of cleaning.
When cable laying, paired cable length in reserve is 5m;Optical cable is 8m in equipment end length in reserve;For there is special want Ask by design requirement length in reserve.
The assessment of simulation result is carried out by the way of constructing in advance in A3, establishes the show house of comprehensive wiring equipment room, Then it constructs in show house, then the result constructed in advance is evaluated, evaluate underproof redesign wiring side Case, until assessing qualified.
Show house use wooden or plastics matter equal proportion model, show house wall, bottom plate use hollow setting, wallboard and Bottom plate is disposed as movable plate, and convenient for dismounting is repeated, construction is in such a way that first scribing line positioning is installed again.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (5)

1. a kind of design method of buildings integrative wire laying equipment room, which is characterized in that include the following steps:
S1, analogue simulation:
A1, measurement is examined on the spot, draws architectural plan, the three-dimensional equal proportion three-dimensional mould of building is then established by computer Type;
A2, based on the equal proportion threedimensional model that previous step is established, the position of comprehensive wiring equipment room is selected, later to synthesis It is fixed that digital SPC exchange, main frame and computer network facility between wiring unit, wiring system equipment simulate Position installation, based on equal proportion threedimensional model, is connected up;
A3, simulation result is assessed, is improved later, and re-start assessment;
S2, pipeline it is pre-buried:The construction of pipeline is carried out according to simulation result;
The installation of S3, crane span structure;
The section utilization rate 20-45% of B1, cable testing bridge, wire casing;
Grounding connection is carried out between B2, every section of crane span structure;
S4, the laying of cable, test;
The installation of S5, distribution plant:
The various marks of connecting terminal are clear, complete in C1, distributing cabinet body;
C2, all devices set ground terminal, and good connection access building ground terminal row;
Label is carried out after C3, distributing frame installation and corresponds to work, it is ensured that clear and definite.
2. a kind of design method of buildings integrative wire laying equipment room according to claim 1, which is characterized in that comprehensive cloth The position selection of line equipment room follows following principle:Comprehensive wiring equipment room should close proximity to common communicating line pass incoming interface, Common communicating line road leading-in end and comprehensive wiring equipment and the spacing of network interface are usually no more than 10m, comprehensive wiring equipment room It should be set to the middle part of building as far as possible and close proximity to light current well and far from strong-electromagnetic field, comprehensive wiring equipment room should select In Environmental security, dry and ventilated, bright and convenient for maintenance management the place of cleaning.
3. a kind of design method of buildings integrative wire laying equipment room according to claim 1, it is characterised in that:Cable cloth When putting, paired cable length in reserve is 4~5m;Optical cable is 6~8m in equipment end length in reserve;For have particular/special requirement by setting Meter requires length in reserve.
4. a kind of design method of buildings integrative wire laying equipment room according to claim 1, it is characterised in that:It is right in A3 The assessment of simulation result is carried out by the way of constructing in advance, the show house of comprehensive wiring equipment room is established, then in show house It constructs, then the result constructed in advance is evaluated, evaluate underproof redesign cabling scenario, until assessment is qualified Until.
5. a kind of design method of buildings integrative wire laying equipment room according to claim 1, it is characterised in that:Show house Using wooden or plastics matter equal proportion model, show house wall, bottom plate use hollow setting, and wallboard and bottom plate are disposed as living Movable plate, convenient for dismounting is repeated, construction is in such a way that first scribing line positioning is installed again.
CN201810579805.4A 2018-06-07 2018-06-07 A kind of design method of buildings integrative wire laying equipment room Pending CN108711773A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810579805.4A CN108711773A (en) 2018-06-07 2018-06-07 A kind of design method of buildings integrative wire laying equipment room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810579805.4A CN108711773A (en) 2018-06-07 2018-06-07 A kind of design method of buildings integrative wire laying equipment room

Publications (1)

Publication Number Publication Date
CN108711773A true CN108711773A (en) 2018-10-26

Family

ID=63871372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810579805.4A Pending CN108711773A (en) 2018-06-07 2018-06-07 A kind of design method of buildings integrative wire laying equipment room

Country Status (1)

Country Link
CN (1) CN108711773A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111293632A (en) * 2018-12-07 2020-06-16 中车唐山机车车辆有限公司 Modularized pre-wiring method for railway vehicle and simulation wire slot
CN116305382A (en) * 2021-12-07 2023-06-23 中国电信国际有限公司 Wiring method and device based on three-dimensional scene, storage medium and electronic equipment

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105204793A (en) * 2015-09-23 2015-12-30 中国十七冶集团有限公司 Method for applying BIM and 3D printing technology to construction
CN105677978A (en) * 2016-01-08 2016-06-15 中建三局第一建设工程有限责任公司 Horizontal multi-pipe support and prefabricating construction method thereof based on BIM
CN106202831A (en) * 2016-08-10 2016-12-07 中国建筑第八工程局有限公司 A kind of pipeline layout optimization method based on BIM
CN106844867A (en) * 2016-12-26 2017-06-13 蓝禹智慧建筑科技(北京)有限公司 Assembled architecture method for designing and device
CN107067174A (en) * 2017-04-13 2017-08-18 上海航天能源股份有限公司 A kind of distributed energy resource system three dimensional design appraisal procedure based on BIM
CN107066750A (en) * 2017-04-26 2017-08-18 中天建设集团有限公司天津分公司 A kind of method for solving the arrangement of electrical and mechanical comprehensive pipeline
CN107169214A (en) * 2017-05-24 2017-09-15 辽宁工程技术大学 A kind of BUILDINGS MODELS design method
CN107546676A (en) * 2016-06-29 2018-01-05 黑龙江省康格尔科技有限公司 A kind of building and groups of building comprehensive wiring system wiring method
CN107681570A (en) * 2017-11-13 2018-02-09 河南宏骏通信工程有限公司 A kind of design method of buildings integrative wire laying equipment room
CN107780585A (en) * 2016-08-27 2018-03-09 上海宝冶集团有限公司 The prefabricated construction method of installation of concrete panel based on BIM systems
CN107784137A (en) * 2016-08-26 2018-03-09 上海宝冶集团有限公司 Electrical and mechanical comprehensive Hanger Design method based on BIM technology
CN107862105A (en) * 2017-09-30 2018-03-30 山东聊建集团有限公司 The method confided a technological secret based on BIM to component working procedure

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105204793A (en) * 2015-09-23 2015-12-30 中国十七冶集团有限公司 Method for applying BIM and 3D printing technology to construction
CN105677978A (en) * 2016-01-08 2016-06-15 中建三局第一建设工程有限责任公司 Horizontal multi-pipe support and prefabricating construction method thereof based on BIM
CN107546676A (en) * 2016-06-29 2018-01-05 黑龙江省康格尔科技有限公司 A kind of building and groups of building comprehensive wiring system wiring method
CN106202831A (en) * 2016-08-10 2016-12-07 中国建筑第八工程局有限公司 A kind of pipeline layout optimization method based on BIM
CN107784137A (en) * 2016-08-26 2018-03-09 上海宝冶集团有限公司 Electrical and mechanical comprehensive Hanger Design method based on BIM technology
CN107780585A (en) * 2016-08-27 2018-03-09 上海宝冶集团有限公司 The prefabricated construction method of installation of concrete panel based on BIM systems
CN106844867A (en) * 2016-12-26 2017-06-13 蓝禹智慧建筑科技(北京)有限公司 Assembled architecture method for designing and device
CN107067174A (en) * 2017-04-13 2017-08-18 上海航天能源股份有限公司 A kind of distributed energy resource system three dimensional design appraisal procedure based on BIM
CN107066750A (en) * 2017-04-26 2017-08-18 中天建设集团有限公司天津分公司 A kind of method for solving the arrangement of electrical and mechanical comprehensive pipeline
CN107169214A (en) * 2017-05-24 2017-09-15 辽宁工程技术大学 A kind of BUILDINGS MODELS design method
CN107862105A (en) * 2017-09-30 2018-03-30 山东聊建集团有限公司 The method confided a technological secret based on BIM to component working procedure
CN107681570A (en) * 2017-11-13 2018-02-09 河南宏骏通信工程有限公司 A kind of design method of buildings integrative wire laying equipment room

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111293632A (en) * 2018-12-07 2020-06-16 中车唐山机车车辆有限公司 Modularized pre-wiring method for railway vehicle and simulation wire slot
CN116305382A (en) * 2021-12-07 2023-06-23 中国电信国际有限公司 Wiring method and device based on three-dimensional scene, storage medium and electronic equipment

Similar Documents

Publication Publication Date Title
CN101894488B (en) Distributed three-dimensional simulation training system for regional power system transformer station
CN102103650B (en) Three-dimensional simulation arrangement-along construction method for power transmission line
CN101354852B (en) Emulation experiment platform of buildings integrative wire laying system and emulation method thereof
CN108711773A (en) A kind of design method of buildings integrative wire laying equipment room
CN110705878A (en) Method for approximately estimating reliability of medium-voltage distribution network
CN202886983U (en) Intelligent comprehensive building wiring system
JPS63174512A (en) Network wiring system
CN109755892A (en) A kind of IDC cable comprehensive wiring method
CN108683959A (en) A kind of building intellectualization comprehensive wiring system
CN113990132A (en) Power transformation and distribution operation and maintenance integrated practical training system and practical training method
CN107528253A (en) The design method of computer network comprehensive wiring
CN207765959U (en) A kind of intelligent grid scheduling controlling comprehensive training system
CN106485386A (en) A kind of library's comprehensive wiring delivery receiving acceptance engineering
CN202650332U (en) Virtual simulation training system of distributed transformer substation based on province, prefecture and county level networks
CN111652389B (en) Distribution network primary equipment grounding overhaul layout method, device, equipment and medium
CN210377961U (en) Intelligent substation relay protection training room
CN201251877Y (en) Simulation experiment platform of building comprehensive wiring system and simulation method thereof.
CN107040757A (en) A kind of university's Campus Network monitoring system
CN204947494U (en) Comprehensive wiring system in a kind of intelligent building
CN208460227U (en) Building conversational system Practical teaching device
CN213400084U (en) Data center network training device
Huang Application of MCU in Engineering of Intelligent Building Network
CN201465331U (en) Intelligent building equipment fault assessment device
CN101493997A (en) Intelligent synthesis check device and method for building by setting bug in different position
No AARON ANDERSON

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181026