CN108711773A - A kind of design method of buildings integrative wire laying equipment room - Google Patents
A kind of design method of buildings integrative wire laying equipment room Download PDFInfo
- Publication number
- CN108711773A CN108711773A CN201810579805.4A CN201810579805A CN108711773A CN 108711773 A CN108711773 A CN 108711773A CN 201810579805 A CN201810579805 A CN 201810579805A CN 108711773 A CN108711773 A CN 108711773A
- Authority
- CN
- China
- Prior art keywords
- equipment room
- comprehensive wiring
- installation
- design method
- cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/06—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
- H02G1/08—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to comprehensive wiring technology field, especially a kind of design method of buildings integrative wire laying equipment room includes the following steps:S1, analogue simulation;A1, measurement is examined on the spot;A2, selected location, simulator locating installation;A3, it is assessed;S2, pipeline it is pre-buried;The installation of S3, crane span structure;S4, the laying of cable, test;The installation of S5, distribution plant.The present invention, in the method connected up, can effectively reduce the risk that design error causes construction to fail, the value with good practicability and popularization using first analog simulation assessment.
Description
Technical field
The present invention relates to comprehensive wiring technology field more particularly to a kind of design sides of buildings integrative wire laying equipment room
Method.
Background technology
Comprehensive wiring system is that one extremely flexible, modular, the information transmission in building or between groups of building
Channel is intelligent building-information superhighway.It can make data, voice, vision facilities and switching equipment be connected with each other
It connects, also can manage system with other information is connected with each other, and these equipment can be made to be connected with external communication network, such as city electricity
The private local area network of phone network, Urban Data net or each system.Comprehensive wiring is made of the component of different series and specification, wherein
Including:Transmission medium, relevant connection hardware (such as distributing frame, connector, socket, plug, adapter) and electric protective equipment
Deng.These components can be used to build each subsystem, they have respective particular use, to meet different user, non-homology
The demand of system, and can be converted with the variation of demand.
Comprehensive wiring equipment room is inlet-outlet line distributing frame and voice, data, image, building control of placed comprehensive wiring etc.
The place of equipment is the place that wiring and its application system to building or groups of building are managed and safeguard, is comprehensive cloth
Most important region in linear system system, for this purpose, scientifically and rationally designing and with to get comprehensive wiring equipment room ready critically important.
Invention content
The purpose of the present invention is to solve disadvantages existing in the prior art, and a kind of buildings integrative wire laying proposed
The design method of equipment room.
To achieve the goals above, present invention employs following technical solutions:
A kind of design method of buildings integrative wire laying equipment room is designed, is included the following steps:
S1, analogue simulation:
A1, measurement is examined on the spot, draws architectural plan, the three-dimensional equal proportion that building is then established by computer is three-dimensional
Model;
A2, based on the equal proportion threedimensional model that previous step is established, select the position of comprehensive wiring equipment room, it is right later
Digital SPC exchange, main frame and the computer network facility of comprehensive wiring equipment room, wiring system equipment carry out mould
Quasi- location and installation is connected up based on equal proportion threedimensional model;
A3, simulation result is assessed, is improved later, and re-start assessment;
S2, pipeline it is pre-buried:The construction of pipeline is carried out according to simulation result;
The installation of S3, crane span structure;
The section utilization rate 20-45% of B1, cable testing bridge, wire casing;
Grounding connection is carried out between B2, every section of crane span structure;
S4, the laying of cable, test;
The installation of S5, distribution plant:
The various marks of connecting terminal are clear, complete in C1, distributing cabinet body;
C2, all devices set ground terminal, and good connection access building ground terminal row;
Label is carried out after C3, distributing frame installation and corresponds to work, it is ensured that clear and definite.
Preferably, the position selection of comprehensive wiring equipment room follows following principle:Comprehensive wiring equipment room should be close proximity to
Common communicating line pass incoming interface, common communicating line road leading-in end and comprehensive wiring equipment and the spacing of network interface do not surpass generally
Cross 10m, comprehensive wiring equipment room should be set to the middle part of building and as far as possible close proximity to light current well and far from strong-electromagnetic field,
Comprehensive wiring equipment room should select in Environmental security, dry and ventilated, bright and convenient for maintenance management the place of cleaning.
Preferably, when cable laying, paired cable length in reserve is 4~5m;Optical cable equipment end length in reserve be 6~
8m;For have particular/special requirement by design requirement length in reserve.
Preferably, the assessment of simulation result is carried out in A3 by the way of constructing in advance, establishes comprehensive wiring equipment room
Then show house is constructed in show house, then evaluate the result constructed in advance, evaluates underproof redesign
Cabling scenario, until assessing qualified.
Preferably, show house uses wooden or plastics matter equal proportion model, show house wall, bottom plate to be set using hollow
It sets, wallboard and bottom plate are disposed as movable plate, and convenient for dismounting is repeated, construction is in such a way that first scribing line positioning is installed again.
A kind of design method of buildings integrative wire laying equipment room proposed by the present invention, advantageous effect are:The present invention adopts
With the assessment of first analog simulation in the method connected up, the risk that design error causes construction to fail, tool can be effectively reduced
There is the value of good practicability and popularization.
Specific implementation mode
The following is a clear and complete description of the technical scheme in the embodiments of the invention, it is clear that described embodiment
Only a part of the embodiment of the present invention, instead of all the embodiments.
Embodiment 1
A kind of design method of buildings integrative wire laying equipment room, includes the following steps:
S1, analogue simulation:
A1, measurement is examined on the spot, draws architectural plan, the three-dimensional equal proportion that building is then established by computer is three-dimensional
Model;
A2, based on the equal proportion threedimensional model that previous step is established, select the position of comprehensive wiring equipment room, it is right later
Digital SPC exchange, main frame and the computer network facility of comprehensive wiring equipment room, wiring system equipment carry out mould
Quasi- location and installation is connected up based on equal proportion threedimensional model;
A3, simulation result is assessed, is improved later, and re-start assessment;
S2, pipeline it is pre-buried:The construction of pipeline is carried out according to simulation result;
The installation of S3, crane span structure;
The section utilization rate 20% of B1, cable testing bridge, wire casing;
Grounding connection is carried out between B2, every section of crane span structure;
S4, the laying of cable, test;
The installation of S5, distribution plant:
The various marks of connecting terminal are clear, complete in C1, distributing cabinet body;
C2, all devices set ground terminal, and good connection access building ground terminal row;
Label is carried out after C3, distributing frame installation and corresponds to work, it is ensured that clear and definite.
The position selection of comprehensive wiring equipment room follows following principle:Comprehensive wiring equipment room should be close proximity to common communication
Circuit introduces interface, and common communicating line road leading-in end and comprehensive wiring equipment and the spacing of network interface are usually no more than 10m, comprehensive
The middle part of building should be set between conjunction wiring unit as far as possible and close proximity to light current well and far from strong-electromagnetic field, comprehensive wiring
Equipment room should select in Environmental security, dry and ventilated, bright and convenient for maintenance management the place of cleaning.
When cable laying, paired cable length in reserve is 4m;Optical cable is 6m in equipment end length in reserve;For there is special want
Ask by design requirement length in reserve.
The assessment of simulation result is carried out by the way of constructing in advance in A3, establishes the show house of comprehensive wiring equipment room,
Then it constructs in show house, then the result constructed in advance is evaluated, evaluate underproof redesign wiring side
Case, until assessing qualified.
Show house use wooden or plastics matter equal proportion model, show house wall, bottom plate use hollow setting, wallboard and
Bottom plate is disposed as movable plate, and convenient for dismounting is repeated, construction is in such a way that first scribing line positioning is installed again.
Embodiment 2
A kind of design method of buildings integrative wire laying equipment room, includes the following steps:
S1, analogue simulation:
A1, measurement is examined on the spot, draws architectural plan, the three-dimensional equal proportion that building is then established by computer is three-dimensional
Model;
A2, based on the equal proportion threedimensional model that previous step is established, select the position of comprehensive wiring equipment room, it is right later
Digital SPC exchange, main frame and the computer network facility of comprehensive wiring equipment room, wiring system equipment carry out mould
Quasi- location and installation is connected up based on equal proportion threedimensional model;
A3, simulation result is assessed, is improved later, and re-start assessment;
S2, pipeline it is pre-buried:The construction of pipeline is carried out according to simulation result;
The installation of S3, crane span structure;
The section utilization rate 25% of B1, cable testing bridge, wire casing;
Grounding connection is carried out between B2, every section of crane span structure;
S4, the laying of cable, test;
The installation of S5, distribution plant:
The various marks of connecting terminal are clear, complete in C1, distributing cabinet body;
C2, all devices set ground terminal, and good connection access building ground terminal row;
Label is carried out after C3, distributing frame installation and corresponds to work, it is ensured that clear and definite.
The position selection of comprehensive wiring equipment room follows following principle:Comprehensive wiring equipment room should be close proximity to common communication
Circuit introduces interface, and common communicating line road leading-in end and comprehensive wiring equipment and the spacing of network interface are usually no more than 10m, comprehensive
The middle part of building should be set between conjunction wiring unit as far as possible and close proximity to light current well and far from strong-electromagnetic field, comprehensive wiring
Equipment room should select in Environmental security, dry and ventilated, bright and convenient for maintenance management the place of cleaning.
When cable laying, paired cable length in reserve is 4m;Optical cable is 7m in equipment end length in reserve;For there is special want
Ask by design requirement length in reserve.
The assessment of simulation result is carried out by the way of constructing in advance in A3, establishes the show house of comprehensive wiring equipment room,
Then it constructs in show house, then the result constructed in advance is evaluated, evaluate underproof redesign wiring side
Case, until assessing qualified.
Show house use wooden or plastics matter equal proportion model, show house wall, bottom plate use hollow setting, wallboard and
Bottom plate is disposed as movable plate, and convenient for dismounting is repeated, construction is in such a way that first scribing line positioning is installed again.
Embodiment 3
A kind of design method of buildings integrative wire laying equipment room, includes the following steps:
S1, analogue simulation:
A1, measurement is examined on the spot, draws architectural plan, the three-dimensional equal proportion that building is then established by computer is three-dimensional
Model;
A2, based on the equal proportion threedimensional model that previous step is established, select the position of comprehensive wiring equipment room, it is right later
Digital SPC exchange, main frame and the computer network facility of comprehensive wiring equipment room, wiring system equipment carry out mould
Quasi- location and installation is connected up based on equal proportion threedimensional model;
A3, simulation result is assessed, is improved later, and re-start assessment;
S2, pipeline it is pre-buried:The construction of pipeline is carried out according to simulation result;
The installation of S3, crane span structure;
The section utilization rate 30% of B1, cable testing bridge, wire casing;
Grounding connection is carried out between B2, every section of crane span structure;
S4, the laying of cable, test;
The installation of S5, distribution plant:
The various marks of connecting terminal are clear, complete in C1, distributing cabinet body;
C2, all devices set ground terminal, and good connection access building ground terminal row;
Label is carried out after C3, distributing frame installation and corresponds to work, it is ensured that clear and definite.
The position selection of comprehensive wiring equipment room follows following principle:Comprehensive wiring equipment room should be close proximity to common communication
Circuit introduces interface, and common communicating line road leading-in end and comprehensive wiring equipment and the spacing of network interface are usually no more than 10m, comprehensive
The middle part of building should be set between conjunction wiring unit as far as possible and close proximity to light current well and far from strong-electromagnetic field, comprehensive wiring
Equipment room should select in Environmental security, dry and ventilated, bright and convenient for maintenance management the place of cleaning.
When cable laying, paired cable length in reserve is 5m;Optical cable is 7m in equipment end length in reserve;For there is special want
Ask by design requirement length in reserve.
The assessment of simulation result is carried out by the way of constructing in advance in A3, establishes the show house of comprehensive wiring equipment room,
Then it constructs in show house, then the result constructed in advance is evaluated, evaluate underproof redesign wiring side
Case, until assessing qualified.
Show house use wooden or plastics matter equal proportion model, show house wall, bottom plate use hollow setting, wallboard and
Bottom plate is disposed as movable plate, and convenient for dismounting is repeated, construction is in such a way that first scribing line positioning is installed again.
Embodiment 4
A kind of design method of buildings integrative wire laying equipment room, includes the following steps:
S1, analogue simulation:
A1, measurement is examined on the spot, draws architectural plan, the three-dimensional equal proportion that building is then established by computer is three-dimensional
Model;
A2, based on the equal proportion threedimensional model that previous step is established, select the position of comprehensive wiring equipment room, it is right later
Digital SPC exchange, main frame and the computer network facility of comprehensive wiring equipment room, wiring system equipment carry out mould
Quasi- location and installation is connected up based on equal proportion threedimensional model;
A3, simulation result is assessed, is improved later, and re-start assessment;
S2, pipeline it is pre-buried:The construction of pipeline is carried out according to simulation result;
The installation of S3, crane span structure;
The section utilization rate 45% of B1, cable testing bridge, wire casing;
Grounding connection is carried out between B2, every section of crane span structure;
S4, the laying of cable, test;
The installation of S5, distribution plant:
The various marks of connecting terminal are clear, complete in C1, distributing cabinet body;
C2, all devices set ground terminal, and good connection access building ground terminal row;
Label is carried out after C3, distributing frame installation and corresponds to work, it is ensured that clear and definite.
The position selection of comprehensive wiring equipment room follows following principle:Comprehensive wiring equipment room should be close proximity to common communication
Circuit introduces interface, and common communicating line road leading-in end and comprehensive wiring equipment and the spacing of network interface are usually no more than 10m, comprehensive
The middle part of building should be set between conjunction wiring unit as far as possible and close proximity to light current well and far from strong-electromagnetic field, comprehensive wiring
Equipment room should select in Environmental security, dry and ventilated, bright and convenient for maintenance management the place of cleaning.
When cable laying, paired cable length in reserve is 5m;Optical cable is 8m in equipment end length in reserve;For there is special want
Ask by design requirement length in reserve.
The assessment of simulation result is carried out by the way of constructing in advance in A3, establishes the show house of comprehensive wiring equipment room,
Then it constructs in show house, then the result constructed in advance is evaluated, evaluate underproof redesign wiring side
Case, until assessing qualified.
Show house use wooden or plastics matter equal proportion model, show house wall, bottom plate use hollow setting, wallboard and
Bottom plate is disposed as movable plate, and convenient for dismounting is repeated, construction is in such a way that first scribing line positioning is installed again.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (5)
1. a kind of design method of buildings integrative wire laying equipment room, which is characterized in that include the following steps:
S1, analogue simulation:
A1, measurement is examined on the spot, draws architectural plan, the three-dimensional equal proportion three-dimensional mould of building is then established by computer
Type;
A2, based on the equal proportion threedimensional model that previous step is established, the position of comprehensive wiring equipment room is selected, later to synthesis
It is fixed that digital SPC exchange, main frame and computer network facility between wiring unit, wiring system equipment simulate
Position installation, based on equal proportion threedimensional model, is connected up;
A3, simulation result is assessed, is improved later, and re-start assessment;
S2, pipeline it is pre-buried:The construction of pipeline is carried out according to simulation result;
The installation of S3, crane span structure;
The section utilization rate 20-45% of B1, cable testing bridge, wire casing;
Grounding connection is carried out between B2, every section of crane span structure;
S4, the laying of cable, test;
The installation of S5, distribution plant:
The various marks of connecting terminal are clear, complete in C1, distributing cabinet body;
C2, all devices set ground terminal, and good connection access building ground terminal row;
Label is carried out after C3, distributing frame installation and corresponds to work, it is ensured that clear and definite.
2. a kind of design method of buildings integrative wire laying equipment room according to claim 1, which is characterized in that comprehensive cloth
The position selection of line equipment room follows following principle:Comprehensive wiring equipment room should close proximity to common communicating line pass incoming interface,
Common communicating line road leading-in end and comprehensive wiring equipment and the spacing of network interface are usually no more than 10m, comprehensive wiring equipment room
It should be set to the middle part of building as far as possible and close proximity to light current well and far from strong-electromagnetic field, comprehensive wiring equipment room should select
In Environmental security, dry and ventilated, bright and convenient for maintenance management the place of cleaning.
3. a kind of design method of buildings integrative wire laying equipment room according to claim 1, it is characterised in that:Cable cloth
When putting, paired cable length in reserve is 4~5m;Optical cable is 6~8m in equipment end length in reserve;For have particular/special requirement by setting
Meter requires length in reserve.
4. a kind of design method of buildings integrative wire laying equipment room according to claim 1, it is characterised in that:It is right in A3
The assessment of simulation result is carried out by the way of constructing in advance, the show house of comprehensive wiring equipment room is established, then in show house
It constructs, then the result constructed in advance is evaluated, evaluate underproof redesign cabling scenario, until assessment is qualified
Until.
5. a kind of design method of buildings integrative wire laying equipment room according to claim 1, it is characterised in that:Show house
Using wooden or plastics matter equal proportion model, show house wall, bottom plate use hollow setting, and wallboard and bottom plate are disposed as living
Movable plate, convenient for dismounting is repeated, construction is in such a way that first scribing line positioning is installed again.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810579805.4A CN108711773A (en) | 2018-06-07 | 2018-06-07 | A kind of design method of buildings integrative wire laying equipment room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810579805.4A CN108711773A (en) | 2018-06-07 | 2018-06-07 | A kind of design method of buildings integrative wire laying equipment room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108711773A true CN108711773A (en) | 2018-10-26 |
Family
ID=63871372
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810579805.4A Pending CN108711773A (en) | 2018-06-07 | 2018-06-07 | A kind of design method of buildings integrative wire laying equipment room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108711773A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111293632A (en) * | 2018-12-07 | 2020-06-16 | 中车唐山机车车辆有限公司 | Modularized pre-wiring method for railway vehicle and simulation wire slot |
CN116305382A (en) * | 2021-12-07 | 2023-06-23 | 中国电信国际有限公司 | Wiring method and device based on three-dimensional scene, storage medium and electronic equipment |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105204793A (en) * | 2015-09-23 | 2015-12-30 | 中国十七冶集团有限公司 | Method for applying BIM and 3D printing technology to construction |
CN105677978A (en) * | 2016-01-08 | 2016-06-15 | 中建三局第一建设工程有限责任公司 | Horizontal multi-pipe support and prefabricating construction method thereof based on BIM |
CN106202831A (en) * | 2016-08-10 | 2016-12-07 | 中国建筑第八工程局有限公司 | A kind of pipeline layout optimization method based on BIM |
CN106844867A (en) * | 2016-12-26 | 2017-06-13 | 蓝禹智慧建筑科技(北京)有限公司 | Assembled architecture method for designing and device |
CN107067174A (en) * | 2017-04-13 | 2017-08-18 | 上海航天能源股份有限公司 | A kind of distributed energy resource system three dimensional design appraisal procedure based on BIM |
CN107066750A (en) * | 2017-04-26 | 2017-08-18 | 中天建设集团有限公司天津分公司 | A kind of method for solving the arrangement of electrical and mechanical comprehensive pipeline |
CN107169214A (en) * | 2017-05-24 | 2017-09-15 | 辽宁工程技术大学 | A kind of BUILDINGS MODELS design method |
CN107546676A (en) * | 2016-06-29 | 2018-01-05 | 黑龙江省康格尔科技有限公司 | A kind of building and groups of building comprehensive wiring system wiring method |
CN107681570A (en) * | 2017-11-13 | 2018-02-09 | 河南宏骏通信工程有限公司 | A kind of design method of buildings integrative wire laying equipment room |
CN107780585A (en) * | 2016-08-27 | 2018-03-09 | 上海宝冶集团有限公司 | The prefabricated construction method of installation of concrete panel based on BIM systems |
CN107784137A (en) * | 2016-08-26 | 2018-03-09 | 上海宝冶集团有限公司 | Electrical and mechanical comprehensive Hanger Design method based on BIM technology |
CN107862105A (en) * | 2017-09-30 | 2018-03-30 | 山东聊建集团有限公司 | The method confided a technological secret based on BIM to component working procedure |
-
2018
- 2018-06-07 CN CN201810579805.4A patent/CN108711773A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105204793A (en) * | 2015-09-23 | 2015-12-30 | 中国十七冶集团有限公司 | Method for applying BIM and 3D printing technology to construction |
CN105677978A (en) * | 2016-01-08 | 2016-06-15 | 中建三局第一建设工程有限责任公司 | Horizontal multi-pipe support and prefabricating construction method thereof based on BIM |
CN107546676A (en) * | 2016-06-29 | 2018-01-05 | 黑龙江省康格尔科技有限公司 | A kind of building and groups of building comprehensive wiring system wiring method |
CN106202831A (en) * | 2016-08-10 | 2016-12-07 | 中国建筑第八工程局有限公司 | A kind of pipeline layout optimization method based on BIM |
CN107784137A (en) * | 2016-08-26 | 2018-03-09 | 上海宝冶集团有限公司 | Electrical and mechanical comprehensive Hanger Design method based on BIM technology |
CN107780585A (en) * | 2016-08-27 | 2018-03-09 | 上海宝冶集团有限公司 | The prefabricated construction method of installation of concrete panel based on BIM systems |
CN106844867A (en) * | 2016-12-26 | 2017-06-13 | 蓝禹智慧建筑科技(北京)有限公司 | Assembled architecture method for designing and device |
CN107067174A (en) * | 2017-04-13 | 2017-08-18 | 上海航天能源股份有限公司 | A kind of distributed energy resource system three dimensional design appraisal procedure based on BIM |
CN107066750A (en) * | 2017-04-26 | 2017-08-18 | 中天建设集团有限公司天津分公司 | A kind of method for solving the arrangement of electrical and mechanical comprehensive pipeline |
CN107169214A (en) * | 2017-05-24 | 2017-09-15 | 辽宁工程技术大学 | A kind of BUILDINGS MODELS design method |
CN107862105A (en) * | 2017-09-30 | 2018-03-30 | 山东聊建集团有限公司 | The method confided a technological secret based on BIM to component working procedure |
CN107681570A (en) * | 2017-11-13 | 2018-02-09 | 河南宏骏通信工程有限公司 | A kind of design method of buildings integrative wire laying equipment room |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111293632A (en) * | 2018-12-07 | 2020-06-16 | 中车唐山机车车辆有限公司 | Modularized pre-wiring method for railway vehicle and simulation wire slot |
CN116305382A (en) * | 2021-12-07 | 2023-06-23 | 中国电信国际有限公司 | Wiring method and device based on three-dimensional scene, storage medium and electronic equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101894488B (en) | Distributed three-dimensional simulation training system for regional power system transformer station | |
CN102103650B (en) | Three-dimensional simulation arrangement-along construction method for power transmission line | |
CN101354852B (en) | Emulation experiment platform of buildings integrative wire laying system and emulation method thereof | |
CN108711773A (en) | A kind of design method of buildings integrative wire laying equipment room | |
CN110705878A (en) | Method for approximately estimating reliability of medium-voltage distribution network | |
CN202886983U (en) | Intelligent comprehensive building wiring system | |
JPS63174512A (en) | Network wiring system | |
CN109755892A (en) | A kind of IDC cable comprehensive wiring method | |
CN108683959A (en) | A kind of building intellectualization comprehensive wiring system | |
CN113990132A (en) | Power transformation and distribution operation and maintenance integrated practical training system and practical training method | |
CN107528253A (en) | The design method of computer network comprehensive wiring | |
CN207765959U (en) | A kind of intelligent grid scheduling controlling comprehensive training system | |
CN106485386A (en) | A kind of library's comprehensive wiring delivery receiving acceptance engineering | |
CN202650332U (en) | Virtual simulation training system of distributed transformer substation based on province, prefecture and county level networks | |
CN111652389B (en) | Distribution network primary equipment grounding overhaul layout method, device, equipment and medium | |
CN210377961U (en) | Intelligent substation relay protection training room | |
CN201251877Y (en) | Simulation experiment platform of building comprehensive wiring system and simulation method thereof. | |
CN107040757A (en) | A kind of university's Campus Network monitoring system | |
CN204947494U (en) | Comprehensive wiring system in a kind of intelligent building | |
CN208460227U (en) | Building conversational system Practical teaching device | |
CN213400084U (en) | Data center network training device | |
Huang | Application of MCU in Engineering of Intelligent Building Network | |
CN201465331U (en) | Intelligent building equipment fault assessment device | |
CN101493997A (en) | Intelligent synthesis check device and method for building by setting bug in different position | |
No | AARON ANDERSON |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181026 |