CN108711003A - The method of operating of big data under a kind of engineering management - Google Patents

The method of operating of big data under a kind of engineering management Download PDF

Info

Publication number
CN108711003A
CN108711003A CN201810442121.XA CN201810442121A CN108711003A CN 108711003 A CN108711003 A CN 108711003A CN 201810442121 A CN201810442121 A CN 201810442121A CN 108711003 A CN108711003 A CN 108711003A
Authority
CN
China
Prior art keywords
humidity
temperature
laboratory
information
message
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810442121.XA
Other languages
Chinese (zh)
Inventor
平步青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Sidagai Mdt Infotech Ltd
Original Assignee
Nanjing Sidagai Mdt Infotech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Sidagai Mdt Infotech Ltd filed Critical Nanjing Sidagai Mdt Infotech Ltd
Priority to CN201810442121.XA priority Critical patent/CN108711003A/en
Publication of CN108711003A publication Critical patent/CN108711003A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The method of operating of big data under a kind of engineering management, including:By the temperature sensor and humidity sensor in laboratory after the completion of lab construction, the data of the temperature and humidity in collected laboratory are then sent to host computer by controller;The temperature and humidity in the laboratory sensed is sent to controller by temperature sensor and humidity sensor, and the controller receives the information of the temperature and humidity in the laboratory just sensed immediately when the information of the temperature and humidity in the laboratory;The capacity that effectively prevents the data of the temperature and humidity in the laboratory that controller transmits host computer in the prior art in conjunction with its method is small, so that cost is low, the increased defect of difficulty to reducing cost.

Description

The method of operating of big data under a kind of engineering management
Technical field
The present invention relates to big data technical fields, and in particular to the method for operating of big data under a kind of engineering management.
Background technology
It it is O&M stage to laboratory for what is entered after the completion of lab construction, this respect needs to set laboratory Standby, if power supply, the humidity in laboratory, temperature are detected, but there is presently no special detection devices, are transporting in this way The dimension stage just lacks enough data collections, is insufficient in this way for big data structure.
The big data server system for laboratory engineering management is thus had developed, it includes monitor terminal and big Data server, the monitor terminal are connected by network with big data server, and the monitor terminal is the same as big data service Device transmits interaction data to realize laboratory engineering management each other;
Be additionally provided with temperature sensor and humidity sensor after the completion of lab construction in the lab, the temperature sensor and Humidity sensor is connected with controller, and the controller is connected with host computer, and the host computer passes through the same big data of network Server is connected.
The big data server includes engineering cost management, Quality Assistance Representative, Project Schedule Supervision and engineering peace Full management content;
The engineering cost management:When in budget, the cost of similar item and crucial cost structure in sector database Network quotation the tracking changed in real time;Second is that during engineering carries out, the section according to similar projects in sector database The real-time control of node cost is realized in point cost, the cost budgeting of this item nodes and the comparison of actual node cost;
The Quality Assistance Representative:When to project contracting unit and provided by sector database and the network information, Vertical analysis is carried out including material, equipment, the management state over the years of technology, the record data of prestige situation, and by itself and other Similar unit related data is compared, and selects optimal supply contractor, ensures construction quality;Second is that carrying out process in project In, the hidden danger of quality point of similar item in sector database is reminded in time, and combination progress data etc. carries out early warning;
The Project Schedule Supervision:On the one hand it is right on the basis of similar item compares and analyzes in sector database to emphasize The performance of project progress carries out follow-up investigations and analysis, while progress shape as the department that will construct, material supply department Construction speed is supervised or adjusted at any time to condition data, into ranks ratio, with this project construction plan data;In addition, in plan supervision fully In view of the real-time factor of weather, project progress is adjusted;
The engineering safety management:On the one hand the Safety Supervision data for combining sector database similar item, occupational health is pacified Entirely among environmental supervision regularization, to the regional Various Seasonal special weather situation record of construction, geological state, protect over the years Scheme implements data, underground utilities distribution and construction equipment, construction machinery safe mass standard and dining hall catering situation each side Face different data carries out analysis and engineering adjustment;The real-time progress data of integration project, real-time cost data, real-time quality data are comprehensive Close the real time status of analysis project safety;
By the temperature sensor and humidity sensor in laboratory after the completion of lab construction, then collected laboratory The data of temperature and humidity host computer is sent to by controller, using host computer the number of the temperature and humidity in laboratory It is sent in big data server and stores according to, local zone time.
Lab construction project supervision mechanism based on big data, due to carry out engineering cost management, Quality Assistance Representative, Project Schedule Supervision and engineering safety management are collected network and specialized database by the top layer database of establishment, are obtained related The mass data of similar projects, then by second layer database, taken out from project cost, quality, progress and security control index Access evidence, collects historical data by this project implementation time sequencing and is formed;Then data analysis comparison, top layer database are carried out Whether complied with standard for across comparison this project cost, quality, progress and security control degree, second layer database is used for indulging Implement standard to comparison programed cost, quality, progress and safe various aspects;It is finally that early warning and countermeasure are implemented, once The content not being inconsistent with plan is found in data analysis, just takes control measure.With scientific and reasonable, data system comprehensively, it is true Reliably, practical value is high, can carry out comprehensive monitoring analysis and diagnosis to laboratory engineering construction engineering project effectively in real time, To avoid because cost, quality, progress, security control is improper due to the loss that occurs.Pass through laboratory after the completion of lab construction In temperature sensor and humidity sensor, then the data of the temperature and humidity in collected laboratory are sent out by controller It is sent to host computer, the data of the temperature and humidity in laboratory, local zone time are sent to big data server using host computer Middle storage can thus supplement the insufficient defect of big data in real time.
In addition, the data of the temperature and humidity in collected laboratory are sent to host computer by controller, control in this way The capacity of the data of the temperature and humidity in the laboratory that device processed transmits host computer is not small so that cost is not low, to reducing cost Difficulty increase.
Invention content
To solve the above problems, the present invention provides a kind of method of operating of big data under engineering management, effectively prevent The capacity of the data of the temperature and humidity in the laboratory that controller transmits host computer in the prior art is small, so that cost is not The increased defect of difficulty low, to reducing cost.
The method of operating of big data under a kind of engineering management in order to overcome the deficiencies in the prior art, the present invention provides Solution, it is specific as follows:
The method of operating of big data under a kind of engineering management, including:It is passed by the temperature in laboratory after the completion of lab construction Then sensor and humidity sensor are sent to the data of the temperature and humidity in collected laboratory by controller upper Machine is sent to the data of the temperature and humidity in laboratory, local zone time in big data server using host computer and stores;
The data of the temperature and humidity in collected laboratory in such a way that controller is sent to host computer, control is operated in On device, the mode includes following measure:
A1:The temperature and humidity in the laboratory sensed is sent to controller, the control by temperature sensor and humidity sensor Device processed receives the letter of the temperature and humidity in the laboratory just sensed immediately when the information of the temperature and humidity in the laboratory Breath;
The temperature and humidity in the laboratory sensed is sent to controller, the controller by temperature sensor and humidity sensor The information of the temperature and humidity in the laboratory just sensed immediately when the information for receiving the temperature and humidity in the laboratory;
A2:Period periodically by setting traverses the information of the temperature and humidity in the laboratory sensed in the period, recognizes The follow-up identical message segment for continuing to occur is made, the follow-up identical message segment deflate for continuing to occur that identification is gone out Algorithm process reduces the size of the information of the temperature and humidity in laboratory, organizes the temperature and humidity in the laboratory again Information constitutes initial information;
The period of the setting is less than 8s;
In A2, it is described reduce laboratory temperature and humidity information size, organize again the laboratory temperature and The information of humidity constitutes initial information, including:
It builds with the follow-up corresponding message slot one of the identical message segment for continuing to occur and message slot two, described information piece one For the capacity of the follow-up identical message segment for continuing to occur, described information piece is second is that described subsequently continue the identical of appearance The byte number being spaced between the first character section of message segment and the first character section of the identical previous message segment of the message segment Add one;
In the information of the temperature and humidity in the laboratory, replaced with described information piece one and described information piece two described follow-up Continue occur identical message segment, with this obtain it is reduced-size after laboratory temperature and humidity information;
It establishes with the follow-up corresponding message slot three of identical message segment for continuing to occur, described information piece three is used for indicating institute State it is reduced-size after laboratory temperature and humidity information in header message piece whereabouts, the header message piece For one in message slot one and described information piece two the two message slots, another message slot be in the header message piece it Afterwards;
It is described it is reduced-size after laboratory temperature and humidity information and described information piece three be packaged, be organized into institute State initial information.
The periodic period by setting traverses the letter of the temperature and humidity in the laboratory sensed in the period Breath includes:
“15、16、17、18、19、20、21、16、17、18、19、20, 22,24,15,17,16,18 ... ", assert and italics mark " 16,17,18,19,20 " shown are the identical message segments for subsequently continuing to occur, and must subsequently continue to occur to this identical Message segment executes processing:It can build with the follow-up corresponding message slot one of identical message segment for continuing to occur and information Piece two, described information piece one are the capacity of the follow-up identical message segment for continuing to occur, and described information piece is second is that after described The first character section of the first character section previous message segment identical with the message segment of the continuous identical message segment for continuing to occur Between the byte number that is spaced add one, that is, the numerical value of message slot one is five, represent it is described it is follow-up continue to occur it is identical The numerical value of the byte number of message segment, described information piece two is six, represents the follow-up identical message segment for continuing to occur As soon as the byte number being spaced between first character section and the first character section of the identical previous message segment of the message segment adds, Be " 16,17,18,19,20,21,16" in two 16 between byte number be five, then plus once being six or described The numerical value of message slot two is two, represents the first character section and the message segment phase of the follow-up identical message segment for continuing to occur The byte number being spaced between the last byte of same previous message segment adds one;This is replaced with numerical value five and numerical value six The follow-up identical message segment for continuing to occur, just achieve it is reduced-size after laboratory temperature and humidity information:"15, 16,17,18,19,20,21,5,6,22,24,15,17,16,18,…";The whereabouts of message slot one and message slot two can It replaces each other;In addition, message slot three must also be built, described information piece three be used for indicating it is described it is reduced-size after laboratory temperature The whereabouts of header message piece in the information of degree and humidity, the header message piece are message slot one and described information piece two One in the two message slots, another message slot is in after the header message piece, and described information piece three is used for indicating It is described it is reduced-size after laboratory temperature and humidity information in header message piece whereabouts can be stem letter Breath piece the first byte be in it is described it is reduced-size after laboratory temperature and humidity information in which byte on, by This just obtain described information piece three numerical value be eight, then it is described it is reduced-size after laboratory temperature and humidity letter Breath, that is, " 15,16,17,18,19,20,21,5,6,22,24,15,17,16,18 ... " with numerical value be eight described information Piece three is packaged, and is organized into the initial information;
A3:Controller sends initial message to host computer.
Beneficial effects of the present invention are:
Such method allows sensor that the temperature and humidity in the laboratory sensed is sent to controller, and the controller receives The information of the temperature and humidity in the laboratory just sensed immediately when the information of the temperature and humidity in the laboratory, it is then all Phase property by setting period traverse the laboratory sensed in the period temperature and humidity information, assert subsequently after The continuous identical message segment occurred performs process to the follow-up identical message segment for continuing to occur that identification goes out to reduce laboratory Temperature and humidity information size, organize the information of the temperature and humidity in the laboratory again, constitute initial information, this The information capacity size of sample is the same as the temperature and humidity for not executing reduction laboratory to the identical message segment for subsequently continuing to occur For the information of the temperature and humidity in the laboratory of the size of information, information capacity size is greatly reduced, allows transmission Capacity to host computer becomes smaller so that and it is at low cost, it reduces cost and is more not difficult.
Also it is exactly that the capacity of the information of the temperature and humidity in laboratory is not small, the initial reality of current mode diameter straight grip The information for the temperature and humidity for testing room is transmitted to host computer, and the information occlusion of communication network is first commonly formed, and second host computer obtains The information of the temperature and humidity in the no small laboratory of capacity, wasting of resources itself is not also small, is often unfavorable for the realization of other function, This method can greatly reduce the information content for being transmitted to host computer in this way, can also reduce obstruction, can also reduce reduction host computer The wasting of resources enhances host computer function with this.
Specific implementation mode
The present invention is described further below in conjunction with embodiment.
The method of operating of big data under engineering management, including monitor terminal and big data server, the monitor terminal are logical It crosses network with big data server to be connected, the monitor terminal transmits interaction data to realize each other with big data server Laboratory engineering management;
Be additionally provided with temperature sensor and humidity sensor after the completion of lab construction in the lab, the temperature sensor and Humidity sensor is connected with controller, and the controller is connected with host computer, and the host computer passes through the same big data of network Server is connected;
The big data server includes engineering cost management, Quality Assistance Representative, Project Schedule Supervision and engineering safety prison Manage content;
The engineering cost management:When in budget, the cost of similar item and crucial cost structure in sector database Network quotation the tracking changed in real time;Second is that during engineering carries out, the section according to similar projects in sector database The real-time control of node cost is realized in point cost, the cost budgeting of this item nodes and the comparison of actual node cost;
The Quality Assistance Representative:When to project contracting unit and provided by sector database and the network information, Vertical analysis is carried out including material, equipment, the management state over the years of technology, the record data of prestige situation, and by itself and other Similar unit related data is compared, and selects optimal supply contractor, ensures construction quality;Second is that carrying out process in project In, the hidden danger of quality point of similar item in sector database is reminded in time, and combination progress data etc. carries out early warning;
The Project Schedule Supervision:On the one hand it is right on the basis of similar item compares and analyzes in sector database to emphasize The performance of project progress carries out follow-up investigations and analysis, while progress shape as the department that will construct, material supply department Construction speed is supervised or adjusted at any time to condition data, into ranks ratio, with this project construction plan data;In addition, in plan supervision fully In view of the real-time factor of weather, project progress is adjusted;
The engineering safety management:On the one hand the Safety Supervision data for combining sector database similar item, occupational health is pacified Entirely among environmental supervision regularization, to the regional Various Seasonal special weather situation record of construction, geological state, protect over the years Scheme implements data, underground utilities distribution and construction equipment, construction machinery safe mass standard and dining hall catering situation each side Face different data carries out analysis and engineering adjustment;The real-time progress data of integration project, real-time cost data, real-time quality data are comprehensive Close the real time status of analysis project safety;
By the temperature sensor and humidity sensor in laboratory after the completion of lab construction, then collected laboratory The data of temperature and humidity host computer is sent to by controller, using host computer the number of the temperature and humidity in laboratory It is sent in big data server and stores according to, local zone time.
Lab construction project supervision mechanism based on big data, due to carry out engineering cost management, Quality Assistance Representative, Project Schedule Supervision and engineering safety management are collected network and specialized database by the top layer database of establishment, are obtained related The mass data of similar projects, then by second layer database, taken out from project cost, quality, progress and security control index Access evidence, collects historical data by this project implementation time sequencing and is formed;Then data analysis comparison, top layer database are carried out Whether complied with standard for across comparison this project cost, quality, progress and security control degree, second layer database is used for indulging Implement standard to comparison programed cost, quality, progress and safe various aspects;It is finally that early warning and countermeasure are implemented, once The content not being inconsistent with plan is found in data analysis, just takes control measure.With scientific and reasonable, data system comprehensively, it is true Reliably, practical value is high, can carry out comprehensive monitoring analysis and diagnosis to laboratory engineering construction engineering project effectively in real time, To avoid because cost, quality, progress, security control is improper due to the loss that occurs.Pass through laboratory after the completion of lab construction In temperature sensor and humidity sensor, then the data of the temperature and humidity in collected laboratory are sent out by controller It is sent to host computer, the data of the temperature and humidity in laboratory, local zone time are sent to big data server using host computer Middle storage can thus supplement the insufficient defect of big data in real time.
The method of operating of big data under engineering management, including:It is passed by the temperature in laboratory after the completion of lab construction Then sensor and humidity sensor are sent to the data of the temperature and humidity in collected laboratory by controller upper Machine is sent to the data of the temperature and humidity in laboratory, local zone time in big data server using host computer and stores;
The data of the temperature and humidity in collected laboratory in such a way that controller is sent to host computer, control is operated in On device, the mode includes following measure:
A1:The temperature and humidity in the laboratory sensed is sent to controller, the control by temperature sensor and humidity sensor Device receives the information of the temperature and humidity in the laboratory just sensed immediately when the information of the temperature and humidity in the laboratory;
The temperature and humidity in the laboratory sensed is sent to controller, the controller by temperature sensor and humidity sensor The information of the temperature and humidity in the laboratory just sensed immediately when the information for receiving the temperature and humidity in the laboratory;
A2:Period periodically by setting traverses the information of the temperature and humidity in the laboratory sensed in the period, recognizes The follow-up identical message segment for continuing to occur is made, the follow-up identical message segment deflate for continuing to occur that identification is gone out Algorithm process reduces the size of the information of the temperature and humidity in laboratory, organizes the temperature and humidity in the laboratory again Information constitutes initial information;
The period of the setting is less than 8s;
In A2, it is described reduce laboratory temperature and humidity information size, organize again the laboratory temperature and The information of humidity constitutes initial information, including:
It builds with the follow-up corresponding message slot one of the identical message segment for continuing to occur and message slot two, described information piece one For the capacity of the follow-up identical message segment for continuing to occur, described information piece is second is that described subsequently continue the identical of appearance The byte number being spaced between the first character section of message segment and the first character section of the identical previous message segment of the message segment Add one;
In the information of the temperature and humidity in the laboratory, replaced with described information piece one and described information piece two described follow-up Continue occur identical message segment, with this obtain it is reduced-size after laboratory temperature and humidity information;
It establishes with the follow-up corresponding message slot three of identical message segment for continuing to occur, described information piece three is used for indicating institute State it is reduced-size after laboratory temperature and humidity information in header message piece whereabouts, the header message piece For one in message slot one and described information piece two the two message slots, another message slot be in the header message piece it Afterwards;
It is described it is reduced-size after laboratory temperature and humidity information and described information piece three be packaged, be organized into institute State initial information.
It is as follows just to lift specific practical examples for scheme more than talking clearly:
The periodic period by setting traverses the packet of the temperature and humidity in the laboratory sensed in the period It includes:
“15、16、17、18、19、20、21、16、17、18、19、20, 22,24,15,17,16,18 ... ", wherein table before pause mark The numerical value for showing a byte can assert by checking, assert " 16,17,18,19,20 " that italics mark be subsequently after The continuous identical message segment occurred, the identical message segment that subsequently must continue to occur to this execute processing:Same institute can be built State the corresponding message slot one of the follow-up identical message segment for continuing to occur and message slot two, described information piece one be it is described subsequently after The capacity of the continuous identical message segment occurred, described information piece second is that the follow-up identical message segment for continuing to occur first The byte number being spaced between a byte and the first character section of the identical previous message segment of the message segment adds one, that is, believes The numerical value for ceasing piece one is five, represents the byte number of the follow-up identical message segment for continuing to occur, described information piece two Numerical value is six, and the first character section for representing the follow-up identical message segment for continuing to occur is identical with the message segment previous The byte number being spaced between the first character section of message segment adds one, that is, " 16,17,18,19,20,21,16" in two Byte number between 16 is five, then plus once being two for the numerical value of six or described information piece two, represent it is described subsequently after The last byte of the first character section previous message segment identical with the message segment of the continuous identical message segment occurred it Between the byte number that is spaced add one, see in this way, it is only necessary to have a message slot that can correctly represent out and described follow-up continue to occur The first character section of identical message segment just potentially acts as message slot two in the opposite whereabouts of same message segment, more It must illustrate and be, only give the pattern of two different qualified information pieces two here, after the guiding of such pattern, for Containing several follow-up identical message segments for continuing to occur, individually subsequently continue less letter as message segment several times occur When the information of the temperature and humidity in single laboratory, the follow-up phase for continuing to occur can be also assert with other pattern The pattern of the whereabouts of same message segment, such pattern obtained after enlightenment should not be related to model beyond the technical solution Farmland.Replace the follow-up identical message segment for continuing to occur with numerical value five and numerical value six, just achieve it is reduced-size after reality Test the information of the temperature and humidity of room:"15,16,17,18,19,20,21,5,6,22,24,15,17,16,18,…";In this way may be used Know, message slot one and the whereabouts of message slot two can be replaced each other, not interfere subsequent execution in this way;Host computer must rely on letter Breath piece one is associated with the whereabouts of message slot two, gives the side of the information of the temperature and humidity of corresponding reduction experiment room Method, this method are not subordinate to the range of the technical solution, just not illustrate.In addition, message slot three must also be built, described information piece three For indicate it is described it is reduced-size after laboratory temperature and humidity information in header message piece whereabouts, it is described Header message piece is message slot one and one in described information piece two the two message slots, another message slot is in the head After portion's message slot, it is detailed in fact, described information piece three be used for indicating it is described it is reduced-size after the temperature in laboratory and wet The whereabouts of header message piece in the information of degree can be the first byte of header message piece be in it is described it is reduced-size after Laboratory temperature and humidity information in which byte on, thus just obtain described information piece three numerical value be eight, It must state, because the concrete instance for giving message slot three is few, also just give single qualified information piece three here Pattern, after the guiding of such pattern, for containing several follow-up identical message segments for continuing to occur, single follow-up continue When there is the information of the temperature and humidity in less simple laboratory as message segment several times, can also it use in addition Pattern assert the pattern of described information piece three, and such pattern obtained after enlightenment should not exceed being related to for the technical solution Scope.
Then it is described it is reduced-size after laboratory temperature and humidity information, that is, " 15,16,17,18,19, 20,21,5,6,22,24,15,17,16,18 ... " the described information piece three for being eight with numerical value is packaged, be organized into it is described just Beginning information;In addition after host computer three obtains the initial information, when the information for executing the temperature and humidity of reduction experiment room, via When message slot three determines the whereabouts of header message piece, it just can be appreciated that the message slot after the immediately header message piece is Another message slot, rather than the information of the temperature and humidity in laboratory.
A3:Controller sends initial message to host computer.
Such method allows temperature sensor and humidity sensor that the temperature and humidity in the laboratory sensed is sent to control Device processed, the controller receive the temperature in the laboratory just sensed immediately when the information of the temperature and humidity in the laboratory With the information of humidity, the temperature and humidity in the laboratory sensed in the period is then periodically traversed by the period set Information, assert and the follow-up identical message segment for continuing to occur, the follow-up identical message segment for continuing to occur that identification is gone out The size for performing process to reduce the information of the temperature and humidity in laboratory, organizes the temperature and humidity in the laboratory again Information constitutes initial information, and such information capacity size is same not to execute reduction to the identical message segment for subsequently continuing to occur It is to greatly reduce information for the information of the temperature and humidity in the laboratory of the size of the information of the temperature and humidity in laboratory Amount of capacity, allow the capacity for being transmitted to host computer to become smaller so that it is at low cost, it reduces cost and is more not difficult.
Also it is exactly that the capacity of the information of the temperature and humidity in laboratory is not small, the initial reality of current mode diameter straight grip The information for the temperature and humidity for testing room is transmitted to host computer, and the information occlusion of communication network is first commonly formed, and second host computer obtains The information of the temperature and humidity in the no small laboratory of capacity, wasting of resources itself is not also small, is often unfavorable for the realization of other function, This method can greatly reduce the information content for being transmitted to host computer in this way, can also reduce obstruction, can also reduce reduction host computer The wasting of resources enhances host computer function with this.
The present invention is described in a manner of being illustrated with embodiment above, it will be understood by those of skill in the art that this It is open to be not limited to embodiments described above, in the case of without departing from the scope of the present invention, it can make a variety of changes, change And replacement.

Claims (2)

1. the method for operating of big data under a kind of engineering management, which is characterized in that including:Pass through experiment after the completion of lab construction Then the data of the temperature and humidity in collected laboratory are passed through controller by the temperature sensor in room and humidity sensor It is sent to host computer;
The data of the temperature and humidity in collected laboratory in such a way that controller is sent to host computer, control is operated in On device, the mode includes following measure:
A1:The temperature and humidity in the laboratory sensed is sent to controller, the control by temperature sensor and humidity sensor Device processed receives the letter of the temperature and humidity in the laboratory just sensed immediately when the information of the temperature and humidity in the laboratory Breath;
The temperature and humidity in the laboratory sensed is sent to controller, the controller by temperature sensor and humidity sensor The information of the temperature and humidity in the laboratory just sensed immediately when the information for receiving the temperature and humidity in the laboratory;
A2:Period periodically by setting traverses the information of the temperature and humidity in the laboratory sensed in the period, recognizes The follow-up identical message segment for continuing to occur is made, the follow-up identical message segment for continuing to occur that identification goes out is handled The size for reducing the information of the temperature and humidity in laboratory, organizes the information of the temperature and humidity in the laboratory again, constitutes Initial information;
The period of the setting is less than 8s;
In A2, it is described reduce laboratory temperature and humidity information size, organize again the laboratory temperature and The information of humidity constitutes initial information, including:
It builds with the follow-up corresponding message slot one of the identical message segment for continuing to occur and message slot two, described information piece one For the capacity of the follow-up identical message segment for continuing to occur, described information piece is second is that described subsequently continue the identical of appearance The byte number being spaced between the first character section of message segment and the first character section of the identical previous message segment of the message segment Add one;
In the information of the temperature and humidity in the laboratory, replaced with described information piece one and described information piece two described follow-up Continue occur identical message segment, with this obtain it is reduced-size after laboratory temperature and humidity information;
It establishes with the follow-up corresponding message slot three of identical message segment for continuing to occur, described information piece three is used for indicating institute State it is reduced-size after laboratory temperature and humidity information in header message piece whereabouts, the header message piece For one in message slot one and described information piece two the two message slots, another message slot be in the header message piece it Afterwards;
It is described it is reduced-size after laboratory temperature and humidity information and described information piece three be packaged, be organized into institute State initial information;
The periodic period by setting traverses the packet of the temperature and humidity in the laboratory sensed in the period It includes:
“15、16、17、18、19、20、21、16、17、18、19、20, 22,24,15,17,16,18 ... ", assert and italics mark " 16,17,18,19,20 " shown are the identical message segments for subsequently continuing to occur, and must subsequently continue to occur to this identical Message segment executes processing:It can build with the follow-up corresponding message slot one of identical message segment for continuing to occur and information Piece two, described information piece one are the capacity of the follow-up identical message segment for continuing to occur, and described information piece is second is that after described The first character section of the first character section previous message segment identical with the message segment of the continuous identical message segment for continuing to occur Between the byte number that is spaced add one, that is, the numerical value of message slot one is five, represent it is described it is follow-up continue to occur it is identical The numerical value of the byte number of message segment, described information piece two is six, represents the follow-up identical message segment for continuing to occur As soon as the byte number being spaced between first character section and the first character section of the identical previous message segment of the message segment adds, Be " 16,17,18,19,20,21,16" in two 16 between byte number be five, then plus once being six or described The numerical value of message slot two is two, represents the first character section and the message segment phase of the follow-up identical message segment for continuing to occur The byte number being spaced between the last byte of same previous message segment adds one;This is replaced with numerical value five and numerical value six The follow-up identical message segment for continuing to occur, just achieve it is reduced-size after laboratory temperature and humidity information:"15, 16,17,18,19,20,21,5,6,22,24,15,17,16,18,…";The whereabouts of message slot one and message slot two can It replaces each other;In addition, message slot three must also be built, described information piece three be used for indicating it is described it is reduced-size after laboratory temperature The whereabouts of header message piece in the information of degree and humidity, the header message piece are message slot one and described information piece two One in the two message slots, another message slot is in after the header message piece, and described information piece three is used for indicating It is described it is reduced-size after laboratory temperature and humidity information in header message piece whereabouts can be stem letter Breath piece the first byte be in it is described it is reduced-size after laboratory temperature and humidity information in which byte on, by This just obtain described information piece three numerical value be eight, then it is described it is reduced-size after laboratory temperature and humidity letter Breath, that is, " 15,16,17,18,19,20,21,5,6,22,24,15,17,16,18 ... " with numerical value be eight described information Piece three is packaged, and is organized into the initial information;
A3:Controller sends initial message to host computer.
2. the method for operating of big data under engineering management according to claim 1, which is characterized in that described that identification is gone out The follow-up identical message segment for continuing to occur is handled the mode of the size of the information of the temperature and humidity to reduce laboratory It is handled with deflate algorithms to reduce the temperature in laboratory for the follow-up identical message segment for continuing to occur that identification is gone out With the size of the information of humidity.
CN201810442121.XA 2018-05-10 2018-05-10 The method of operating of big data under a kind of engineering management Withdrawn CN108711003A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810442121.XA CN108711003A (en) 2018-05-10 2018-05-10 The method of operating of big data under a kind of engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810442121.XA CN108711003A (en) 2018-05-10 2018-05-10 The method of operating of big data under a kind of engineering management

Publications (1)

Publication Number Publication Date
CN108711003A true CN108711003A (en) 2018-10-26

Family

ID=63868314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810442121.XA Withdrawn CN108711003A (en) 2018-05-10 2018-05-10 The method of operating of big data under a kind of engineering management

Country Status (1)

Country Link
CN (1) CN108711003A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105258303A (en) * 2015-11-20 2016-01-20 珠海格力电器股份有限公司 Remote transmission control method and device for air conditioner unit operation data and air conditioner
CN106296132A (en) * 2016-08-19 2017-01-04 北京戴纳实验科技有限公司 Big data server system for laboratory engineering management

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105258303A (en) * 2015-11-20 2016-01-20 珠海格力电器股份有限公司 Remote transmission control method and device for air conditioner unit operation data and air conditioner
CN106296132A (en) * 2016-08-19 2017-01-04 北京戴纳实验科技有限公司 Big data server system for laboratory engineering management

Similar Documents

Publication Publication Date Title
CN104914807B (en) The incidence relation and alignment of determination process element and measured value in the process
WO2019233047A1 (en) Power grid dispatching-based operation and maintenance method
CN106681183B (en) Monitor the method, apparatus, system and computer-readable storage medium of manufacturing device
CN104765322B (en) Production line monitoring system
CN105357061B (en) A kind of O&M monitoring analysis system based on high amount of traffic processing technique
CN107070692A (en) A kind of cloud platform monitoring service system analyzed based on big data and method
CN106685703A (en) Intelligent data collection and visual monitoring system
CN101477374B (en) Continuous casting bleed-out time sequence spacing combined diagnosis prediction method based on fuzzy neural network
CN103576632A (en) Live pig growth environment monitoring and control system based on internet of things technology
CN107272608A (en) Industrial equipment and system in cloud platform are proved
CN107291830A (en) A kind of creation method of equipment knowledge base
CN109450094A (en) A kind of substation relay protection method for inspecting and system
CN109245310A (en) A kind of electric power monitoring system based on real-time data base
CN106940678A (en) A kind of system real time health degree analysis and assessment method and device
CN116189407B (en) Intelligent early warning system based on data monitoring
CN113112169A (en) Sewage treatment plant's wisdom cloud service system
CN106155026A (en) A kind of cement plant coal consumption and carbon emission monitoring method
CN109995599A (en) A kind of intelligent alarm method of network performance exception
CN109660407A (en) Distributed system monitoring system and method
Alves et al. A hybrid approach for big data outlier detection from electric power SCADA system
CN110247474A (en) A kind of statistics method of summary and system based on D5000 system operation of power networks state
CN108073160A (en) Thermoelectricity factory owner, the method for early warning of reheat steam temperature rapid decrease
CN109191049A (en) A kind of logistics transportation supervisory systems and monitoring and managing method based on cloud computing
CN108711003A (en) The method of operating of big data under a kind of engineering management
CN109884469A (en) The determination method of distribution network failure section and fault moment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20181026