CN108708650A - A kind of jamb - Google Patents

A kind of jamb Download PDF

Info

Publication number
CN108708650A
CN108708650A CN201810517467.1A CN201810517467A CN108708650A CN 108708650 A CN108708650 A CN 108708650A CN 201810517467 A CN201810517467 A CN 201810517467A CN 108708650 A CN108708650 A CN 108708650A
Authority
CN
China
Prior art keywords
hook
horizontal segment
frame
frame ontology
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810517467.1A
Other languages
Chinese (zh)
Other versions
CN108708650B (en
Inventor
徐�明
郑智杰
朱良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Huaxia Building Door And Window Curtain Wall Decoration Co Ltd
Original Assignee
Sichuan Huaxia Building Door And Window Curtain Wall Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Huaxia Building Door And Window Curtain Wall Decoration Co Ltd filed Critical Sichuan Huaxia Building Door And Window Curtain Wall Decoration Co Ltd
Priority to CN201810517467.1A priority Critical patent/CN108708650B/en
Publication of CN108708650A publication Critical patent/CN108708650A/en
Application granted granted Critical
Publication of CN108708650B publication Critical patent/CN108708650B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/02Base frames, i.e. template frames for openings in walls or the like, provided with means for securing a further rigidly-mounted frame; Special adaptations of frames to be fixed therein
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/04Frames for doors, windows, or the like to be fixed in openings
    • E06B1/32Frames composed of parts made of different materials
    • E06B1/325Frames composed of parts made of different materials comprising insulation between two metal section members
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/04Frames for doors, windows, or the like to be fixed in openings
    • E06B1/36Frames uniquely adapted for windows
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/04Frames for doors, windows, or the like to be fixed in openings
    • E06B1/52Frames specially adapted for doors
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/56Fastening frames to the border of openings or to similar contiguous frames
    • E06B1/58Fastening frames to the border of openings or to similar contiguous frames by filling up the joints, e.g. by cementing
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/56Fastening frames to the border of openings or to similar contiguous frames
    • E06B1/60Fastening frames to the border of openings or to similar contiguous frames by mechanical means, e.g. anchoring means
    • E06B1/6015Anchoring means
    • E06B1/6038Anchoring means specially adapted for being embedded in the wall

Abstract

The present invention relates to a kind of jambs, including frame ontology and the fixed metal plate being detachably arranged on frame ontology, the fixed metal plate includes first horizontal segment, second horizontal segment and the tilting section being connected between first horizontal segment and the second horizontal segment, second horizontal segment is fixed by swell fixture and is embedded on building, the filling gap for fill concrete is formed between the first horizontal segment and building, the first horizontal segment is provided with the buckling parts for being fastened with frame ontology away from building end, when use need not in building constructure directly pre-buried frame ontology, frame ontology can be mounted directly after building is built, frame ontology is not easy to be damaged after installation, frame ontology is not easily to fall off after mounting simultaneously, structural strength is high.

Description

A kind of jamb
Technical field
The present invention relates to door and window, more particularly to a kind of jamb.
Background technology
With the improvement of living standards, people are higher and higher with the requirement of working environment to living, in some skyscrapers On often use larger door and window so that bright and clear in building.
As shown in figure 5, building is reserved with fixing groove 12 made of concrete at fixed door and window, in use, first by door The frame ontology 1 of window 13 is fixed in fixing groove 12, then carries out joint filling etc. by cement so that frame ontology 1, which is fixed on, to be built It builds on object, glass door and window 13 is installed on frame ontology 1 later still when building house, needs direct while building Enter frame ontology 1 is pre-buried in building, and since construction site is more mixed and disorderly, some weights are easy after falling so that pre-buried Good frame ontology 1 is impaired, while concrete is easily accessible in frame ontology 1 and solidifies in construction, the final door and window 13 that influences Normal mounting.
Invention content
The purpose of the present invention is to provide a kind of jamb, have frame ontology mounted on building build after the completion of and Frame ontology is not easy to be hit impaired advantage by weight after installation.
The present invention above-mentioned technical purpose technical scheme is that:A kind of jamb, including side Frame ontology and the fixed metal plate being detachably arranged on frame ontology, the fixed metal plate includes first horizontal segment, second Horizontal segment and the tilting section being connected between first horizontal segment and the second horizontal segment, second horizontal segment are solid by swell fixture Determine and be embedded on building, forms the filling gap for fill concrete, institute between the first horizontal segment and building It states first horizontal segment and building end is provided with buckling parts for being fastened with frame ontology.
Through the above technical solutions, construction when, first by fixed metal plate it is pre-buried enter building on, when building has been built It can be not miscellaneous because to build place after finishing more clean and tidy for building by fixed metal plate installation frame ontology after finishing Random holder and tool etc., therefore frame ontology does not tend to have weight etc. and falls after mounting, therefore frame ontology is not easily damaged, together Sample is built due to building and is finished, and concrete all solidifies completion, so not having not solidified concrete falls into frame sheet In body, therefore door and window can be easily installed after installing frame ontology, when needing installation frame ontology, by frame ontology and button Conjunction portion is clamped, and when installation is simple and convenient, simultaneously because with concrete in fill gap, therefore fixed metal plate with build The contact area built between object is big, adhesive strength higher between the two, when in use fixed metal plate be not easy with building it Between be detached from.
Preferably, the buckling parts includes that setting deviates from inclination at tilting section in first horizontal segment with first horizontal segment Hook at section, the hook is evenly equipped with multiple along the length direction of first horizontal segment.
Through the above technical solutions, being installed between fixed metal plate and frame ontology for convenience, in first horizontal segment It is provided with hook, fast and easy when hook is fastened with frame ontology, and since hook is uniformly distributed, frame ontology is in fixation Uniform force afterwards, it is not easily to fall off.
Preferably, punching hole, the first horizontal segment direction filling are provided in the first horizontal segment between the hook Clearance side is provided with the cramp of several T-types.
Through the above technical solutions, in order to enable connected between fixed metal plate and building it is even closer, in the first water It is provided with punching hole and cramp in flat section, in use, first following closely fixed metal plate on building by swell fixture, Zhi Hou Fill concrete in gap is filled, part concrete will be by punching hole at this time, while cramp will be embedded in mixing in filling gap In solidifying soil, after filling the concrete setting in gap, cramp will firmly engage with the concrete in filling gap, lead to simultaneously Fixed metal plate will be securely fixed by crossing the concrete of punching hole so that and fixed metal plate is not likely to produce shaking, when in use, Gu It is high to determine metallic plate fixing intensity, is less prone to the case where falling off.
Preferably, that first horizontal segment length direction is provided with two away from filling clearance side in the first horizontal segment is flat Capable fixed strip, the punching hole are detachably provided between two fixed strips between two fixed strips for preventing to fill out The isolation item that the steam filled in gap is leaked to first horizontal segment away from filling clearance side by punching hole.
Through the above technical solutions, due in use, concrete is easy water suction, causes to fill the part steam in gap It readily penetrates through punching hole and enters fixed metal plate away from clearance side is filled, to which these steam enter in frame ontology, work as door and window After being fixed on frame ontology, these steam will be contacted directly with door and window, and the hollow glass on door and window is caused to work long hours Wet environment is easy occur steam in hollow glass, influences the translucency of door and window, is completely cut off by being arranged in first horizontal segment Item can prevent steam from being directly entered in frame ontology, effectively reduce the moisture content of hollow glass surrounding, while also effective lattice Gear heat is scattered and disappeared by punching hole, and the heat-insulating capability of door and window is strong.
Preferably, be provided on the fixed strip for install isolation item mounting groove, the mounting groove with isolation item it Between be provided with fluid sealant.
Through the above technical solutions, completely cutting off item in order to facilitate the installation of, mounting groove is provided on fixed strip, while by close Sealing can make mounting groove and completely cut off the better tightness between item.
Preferably, the hook is formed by bending by sheet metal, and the hook includes the first bending section and the second bending section, institute It is acute angle to state the angle a between the first bending section and the second bending section.
Through the above technical solutions, in order to effectively prevent frame ontology to fall off from fixed metal plate when by more energetically, It sets hook to the first bending section and the second bending section, and so that the angle between the first bending section and the second bending section is sharp Angle will be not easy to be straightened, it is ensured that frame ontology is firmly hooked together by hook when hook stress at this time.
Preferably, the frame ontology is used to be provided with the hook tabs for hooking together with hook with fixed metal plate connecting pin.
Through the above technical solutions, in order to enable frame ontology is securely fixed with fixed metal plate, set on frame ontology It is equipped with the hook tabs hooked together with hook.
Preferably, the hook tabs hooks together section and second including first and hooks together section, and described first, which hooks together section and second, hooks together section Between angle b be acute angle.
Through the above technical solutions, by hook tabs be set as first hook together section with second hook together section after, hook tabs can be facilitated Hooked together with hook, at the same by first hook together section and second hook together between section angle be set as to make hook tabs and card after acute angle Mutually limitation in use is hooked, reduces the case where hook is straightened with hook tabs when stress is excessive to a certain extent.
Preferably, the hook tabs is distributed on along the length direction of frame ontology on frame ontology, the hook tabs and hook Quantity is consistent and corresponds, and the distance between two adjacent described hooks are not less than the width of hook tabs, the two adjacent hook tabs it Between distance be not less than hook width.
It can will through the above technical solutions, hook tabs can be made to be hooked together with corresponding hook when using, when normal mounting Frame ontology is inserted into from one end of fixed metal plate, then hook is allowed to be hooked together with hook tabs, but the region smaller in some spaces, Then not extra space makes frame ontology be inserted into from one end of fixed metal plate, at this time can be by frame ontology and fixed gold Belong to plate to be staggered in the longitudinal direction so that hook tabs is between two adjacent hooks, and hook is between two adjacent hook tabs, most Afterwards so that hook moves frame ontology after being aligned on the length direction of fixed metal plate with hook tabs so that hook is mutual with hook tabs It hooks together, may make frame ontology to be hooked together together with fixed metal plate at this time, it is simple and convenient when fixed, compared to traditional company Method is connect, this mode that hooks together can carry out in smaller space, facilitate installation of the later stage to frame ontology.
Preferably, the frame ontology includes the first isolation frame, the second isolation frame and is detachably arranged at the first isolation frame It is isolated between frame for the connection strap that frame is fixed together, the first isolation frame to be isolated with second in the first isolation frame with second Between frame is isolated with second, and connection strap both sides are provided with nylon heat-insulating strip.
Through the above technical solutions, frame, which is isolated, with second by setting frame ontology to the first isolation frame can facilitate side The manufacture of frame ontology can be facilitated by connection strap and the first isolation frame is isolated frame with second and is linked together, by nylon every Hot item can play good heat-insulated and soundproof effect.
In conclusion the present invention having the beneficial effect that in contrast to the prior art:
(1)By the way that fixed metal plate is arranged, it may be convenient to frame ontology be fixed after building has been built, therefore Frame ontology is not easy to be damaged and fall into concrete etc.;
(2)Simultaneously after fixation since fixed metal plate is pre-buried between floors, in stress, fixed metal plate is not easy to take off It falls, therefore the frame ontology being fixed on fixed metal plate is not susceptible to fall.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Obtain other attached drawings according to these attached drawings.
Fig. 1 is the structural schematic diagram of embodiment, the structure of main prominent building and door and window;
Fig. 2 is the sectional view at A-A in Fig. 1;
Fig. 3 is the enlarged view at B in Fig. 2, the connection structure of main prominent frame ontology and fixed metal plate;
Fig. 4 is the enlarged view at C in Fig. 3, the structure of main prominent hook and hook tabs;
Fig. 5 is the structural schematic diagram of the prior art.
Reference numeral:1, frame ontology;111, the first isolation frame;112, the second isolation frame;113, connection strap;2, fixed gold Belong to plate;211, first horizontal segment;212, the second horizontal segment;213, tilting section;3, gap is filled;4, hook;411, the first bending Section;412, the second bending section;5, punching hole;6, cramp;7, fixed strip;8, completely cut off item;9, mounting groove;10, hook tabs;101, first Hook together section;102, second section is hooked together;11, nylon heat-insulating strip;12, fixing groove;13, door and window.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as at this It is all protected by Patent Law in the right of invention.
As shown in Figure 1,3, a kind of jamb, including frame ontology 1 and the fixation that is detachably arranged on frame ontology 1 Metallic plate 2, fixed metal plate 2 is pre-buried between floors, and fixed metal plate 2 includes first horizontal segment 211, the second horizontal segment 212 and the tilting section 213 that is connected between first horizontal segment 211 and the second horizontal segment 212, in first horizontal segment 211 away from building It builds object end and is provided with buckling parts for being fastened with frame ontology 1.
As shown in Figure 3,4, buckling parts include setting in first horizontal segment 211 at tilting section 213 and first horizontal segment 211 hook 4 at the tilting section 213, hook 4 be evenly equipped with along the length direction of first horizontal segment 211 it is multiple, hook 4 by Sheet metal is formed by bending, and hook 4 includes the first bending section 411 and the second bending section 412, the bending of the first bending section 411 and second Angle a between section 412 is acute angle.
Frame ontology 1 include the first isolation frame 111, second frame 112 is isolated and be detachably arranged at the first isolation frame 111 with Connection strap 113 between second isolation frame 112, the first isolation frame 111 with second frame 112 be isolated between, and positioned at connection strap 113 Both sides are provided with nylon heat-insulating strip 11, wherein the first isolation frame 111 be isolated on frame 112 with second be separately provided for and The hook tabs 10 that hook 4 hooks together, and hook tabs 10 is distributed on along the length direction of frame ontology 1 on frame ontology 1, hook tabs 10 and card It is consistent and correspond to hook 4 quantity, the distance between two adjacent hooks 4 are not less than the width of hook tabs 10, two adjacent hook tabs 10 it Between distance be not less than hook 4 width, hooked together in order to facilitate hook tabs 10 and hook 4 so that hook tabs 10 hooks together section including first 101 and second hook together section 102, and first to hook together section 101 and the second angle b for hooking together between section 102 be acute angle.
Hook tabs 10 can be made to be hooked together with corresponding hook 4 when using, it can be by frame ontology 1 from fixation when normal mounting One end of metallic plate 2 is inserted into, and hook 4 is then allowed to be hooked together with hook tabs 10, but the region smaller in some spaces, then not extra Space frame ontology 1 is inserted into from one end of fixed metal plate 2, frame ontology 1 and fixed metal plate 2 can be existed at this time It is staggered on length direction so that hook tabs 10 is between two adjacent hooks 4, and hook 4 is between two adjacent hook tabs 10, most Afterwards so that hook 4 moves frame ontology 1 after being aligned on the length direction of fixed metal plate 2 with hook tabs 10 so that hook 4 and hook Piece 10 mutually hooks together, and may make frame ontology 1 to be hooked together together with fixed metal plate 2 at this time, simple and convenient when fixed, compares In traditional connection method, this mode that hooks together can carry out in smaller space, facilitate installation of the later stage to frame ontology 1.
Angle a between first bending section 411 and the second bending section 412 is set as acute angle, and section 101 is hooked together by first The angle b hooked together with second between section 102 is set as acute angle, can make hook tabs 10 and the mutually limitation in use of hook 4, when It will be not easy to be straightened when hook 4 and larger 10 stress of hook tabs, it is ensured that frame ontology 1 is firmly hooked together by hook 4, will to a certain extent Reduce the case where hook 4 is straightened with hook tabs 10 when stress is excessive.
When construction, first by the pre-buried entrance building of fixed metal plate 2, fixation can be passed through after building is built Hook tabs 10 and hook 4 clamping on frame ontology 1 when needing installation frame ontology 1, is by 2 installation frame ontology 1 of metallic plate Can, when installation, is simple and convenient, and since hook 4 and hook tabs 10 are uniformly distributed, the uniform force after fixation of frame ontology 1, Simultaneously because there is concrete in filling gap 3, therefore the contact area between fixed metal plate 2 and building is big, the two Between adhesive strength higher, when in use fixed metal plate 2 be not easy to be detached between building.
As shown in Figure 2,3, wherein the second horizontal segment 212 is fixed by swell fixture and is embedded on building, the first water The filling gap 3 for fill concrete is formed between flat section 211 and building, in the first horizontal segment 211 between hook 4 It is provided with punching hole 5, first horizontal segment 211 is provided with the cramp 6 of several T-types towards filling 3 side of gap.
In use, first following closely fixed metal plate 2 on building by swell fixture, filled in filling gap 3 later Concrete, part concrete will be by punching hole 5 at this time, while cramp 6 will be embedded in the concrete in filling gap 3, when filling out It fills after the concrete setting in gap 3, cramp 6 will firmly engage with the concrete in filling gap 3, while pass through punching hole 5 concrete will securely fix fixed metal plate 2 so that and fixed metal plate 2 is not likely to produce shaking, when in use, fixed gold It is high to belong to 2 fixing intensity of plate, is less prone to the case where falling off.
As shown in figure 3, due in use, concrete is easy water suction, leads to fill the part steam in gap 3 and is easy thoroughly It crosses punching hole 5 and enters fixed metal plate 2 away from filling 3 side of gap, to which these steam enter in frame ontology 1, when door and window is solid After being scheduled on frame ontology 1, these steam will be contacted directly with door and window, and the hollow glass on door and window is caused to work long hours in tide Wet environment is easy occur steam in hollow glass, influences the translucency of door and window, therefore, deviates from first horizontal segment 211 and fills out It fills 3 side of gap and 211 length direction of first horizontal segment is provided with two parallel fixed strips 7, and it is solid so that punching hole 5 is located at two Between determining item 7, while it being provided with mounting groove 9 on fixed strip 7, is plugged in mounting groove 9 for preventing to fill in gap 3 Steam completely cuts off item 8 to first horizontal segment 211 by punching hole 5 in the isolation item 8 for filling the leakage of 3 side of gap, the present embodiment For rubber strip, in order to enable better tightness between mounting groove 9 and isolation item 8, is provided between mounting groove 9 and isolation item 8 Fluid sealant can prevent steam from being directly entered in frame ontology 1, effectively reduce the steam of hollow glass surrounding by completely cutting off item 8 Content, while also effective lattice gear heat is scattered and disappeared by punching hole 5, the heat-insulating capability of door and window is strong.
The above is only the exemplary embodiment of the present invention, protection domain and is not intended to limit the present invention, this hair Bright protection domain is determined by the attached claims.

Claims (10)

1. a kind of jamb, including frame ontology (1) and the fixed metal plate (2) that is detachably arranged on frame ontology (1), It is characterized in that:The fixed metal plate (2) includes first horizontal segment (211), the second horizontal segment (212) and is connected to the first water Tilting section (213) between flat section (211) and the second horizontal segment (212), second horizontal segment (212) are solid by swell fixture Determine and be embedded on building, the first horizontal segment (211) is formed between building between the filling for fill concrete Gap (3), the first horizontal segment (211) are provided with the buckling parts for being fastened with frame ontology (1) away from building end.
2. a kind of jamb according to claim 1, it is characterised in that:The buckling parts includes being arranged in first level Hook (4) of the section (211) at tilting section (213) with first horizontal segment (211) at tilting section (213), the hook (4) it is evenly equipped with along the length direction of first horizontal segment (211) multiple.
3. a kind of jamb according to claim 2, it is characterised in that:First horizontal segment between the hook (4) (211) punching hole (5) is provided on, the first horizontal segment (211) is provided with the button of several T-types towards filling gap (3) side Piece (6).
4. a kind of jamb according to claim 3, it is characterised in that:Deviate from the first horizontal segment (211) and fills out It fills gap (3) side and first horizontal segment (211) length direction is provided with two parallel fixed strips (7), punching hole (5) position Between two fixed strips (7), detachably it is provided between two fixed strips (7) for preventing the steam in filling gap (3) The isolation item (8) leaked to first horizontal segment (211) away from filling gap (3) side by punching hole (5).
5. a kind of jamb stated according to claim 4, it is characterised in that:It is provided on the fixed strip (7) for installing Completely cut off the mounting groove (9) of item (8), fluid sealant is provided between the mounting groove (9) and isolation item (8).
6. a kind of jamb according to claim 2, it is characterised in that:The hook (4) is formed by bending by sheet metal, The hook (4) includes the first bending section (411) and the second bending section (412), and first bending section (411) is bent with second Angle a between section (412) is acute angle.
7. a kind of jamb according to claim 2, it is characterised in that:The frame ontology (1) is used for and fixed gold Belong to plate (2) connecting pin and is provided with the hook tabs (10) for being hooked together with hook (4).
8. a kind of jamb according to claim 7, it is characterised in that:The hook tabs (10) hooks together section including first (101) section (102) is hooked together with second, described first, which hooks together section (101) and second, hooks together the angle b between section (102) as acute angle.
9. a kind of jamb according to claim 7, it is characterised in that:The hook tabs (10) is along frame ontology (1) Length direction be distributed on frame ontology (1), the hook tabs (10) it is consistent with hook (4) quantity and correspond, two is adjacent The distance between described hook (4) is not less than the width of hook tabs (10), and the distance between two adjacent described hook tabs (10) are not less than The width of hook (4).
10. a kind of jamb according to claim 1, it is characterised in that:The frame ontology (1) includes the first isolation It frame (111), the second isolation frame (112) and is detachably arranged at the first isolation frame (111) and is isolated between frame (112) with second and be used for The connection strap (113) that frame (112) is fixed together, the first isolation frame (111) is isolated with second in first isolation frame (111) Between frame (112) is isolated with second, and connection strap (113) both sides are provided with nylon heat-insulating strip (11).
CN201810517467.1A 2018-05-25 2018-05-25 Jamb Active CN108708650B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810517467.1A CN108708650B (en) 2018-05-25 2018-05-25 Jamb

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810517467.1A CN108708650B (en) 2018-05-25 2018-05-25 Jamb

Publications (2)

Publication Number Publication Date
CN108708650A true CN108708650A (en) 2018-10-26
CN108708650B CN108708650B (en) 2020-04-10

Family

ID=63870661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810517467.1A Active CN108708650B (en) 2018-05-25 2018-05-25 Jamb

Country Status (1)

Country Link
CN (1) CN108708650B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110671004A (en) * 2019-09-25 2020-01-10 西安市紫旭幕墙有限责任公司 Wet installation structure and method for aluminum alloy door and window

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1913949B2 (en) * 1969-03-19 1975-05-15 Hobeka, Fenster- U. Tuerenfabrik, 8000 Muenchen Window or door frame fixture in frame - with polygonal-necked shafts on eccentric discs held in frame holes
CN103899183A (en) * 2014-03-25 2014-07-02 安徽同济建设集团有限责任公司 Rainwater seepage prevention device of plastic steel window
CN203879216U (en) * 2014-05-21 2014-10-15 浙江亚厦幕墙有限公司 Window frame of aluminum alloy fixed window
CN205206608U (en) * 2015-12-07 2016-05-04 苏州市利德装饰装潢有限公司 Door and window aluminium alloy with multiple thermal -insulated structure
CN205663348U (en) * 2016-06-01 2016-10-26 江苏智维门窗科技有限公司 Window frame attaches frame connecting piece
CN205936159U (en) * 2016-08-08 2017-02-08 深圳市广田方特幕墙科技有限公司 Can dismantle door and window

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1913949B2 (en) * 1969-03-19 1975-05-15 Hobeka, Fenster- U. Tuerenfabrik, 8000 Muenchen Window or door frame fixture in frame - with polygonal-necked shafts on eccentric discs held in frame holes
CN103899183A (en) * 2014-03-25 2014-07-02 安徽同济建设集团有限责任公司 Rainwater seepage prevention device of plastic steel window
CN203879216U (en) * 2014-05-21 2014-10-15 浙江亚厦幕墙有限公司 Window frame of aluminum alloy fixed window
CN205206608U (en) * 2015-12-07 2016-05-04 苏州市利德装饰装潢有限公司 Door and window aluminium alloy with multiple thermal -insulated structure
CN205663348U (en) * 2016-06-01 2016-10-26 江苏智维门窗科技有限公司 Window frame attaches frame connecting piece
CN205936159U (en) * 2016-08-08 2017-02-08 深圳市广田方特幕墙科技有限公司 Can dismantle door and window

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110671004A (en) * 2019-09-25 2020-01-10 西安市紫旭幕墙有限责任公司 Wet installation structure and method for aluminum alloy door and window

Also Published As

Publication number Publication date
CN108708650B (en) 2020-04-10

Similar Documents

Publication Publication Date Title
US6470638B1 (en) Moisture management system
KR101026106B1 (en) Junction structure of installation frame for seismic control damper and it's junction method
US7367164B2 (en) Low-profile flash pan
KR20130075240A (en) Weld-free roll-formed steel curtain wall system
CN108708650A (en) A kind of jamb
KR101248575B1 (en) Outside panel assembly for construction
US8650810B1 (en) Water diverter and related methods
KR20130051327A (en) Water tighten panel for window frame
KR100722237B1 (en) Waterproof hummock of waterproof layer in outer wall of structure and manufacturing method and constructing method thereof
KR101207212B1 (en) Constructing method for exterior panel in building
CN109898953A (en) A kind of replacing options for the building doors and windows retaining old frame
CN110499843A (en) A kind of combination connecting elements and the exterior wall heat-preserving system with it
KR200421885Y1 (en) A Fastening Fastener of Building Outer Wall Ornamental
KR200421886Y1 (en) A Connecting Device for Fastening Fastener of Building Outer Wall Ornamental
CN110847757A (en) Sliding type windowsill flashing structure and installation method thereof
JP4450744B2 (en) Exterior finishing material mounting structure
CN205577157U (en) Window flower structure for building wall
CN215054123U (en) Anchoring part for building insulation board bonding anchor
RU41318U1 (en) KIT OF PROFILES FOR WALL FACING PANELS AND SEALING GASKET included in the KIT (OPTIONS)
RU131769U1 (en) FACING MOUNTING UNIT
KR20000006640A (en) window flashing on a outer wall insulating building and method for constructing them
CN210713905U (en) Building safety device
CN213510306U (en) Fireproof window frame structure for glass window
KR200479335Y1 (en) Connecting structure of external finish materials using the joining members for connecting external finish materials improved heat-blocking ability
CN218437897U (en) Glass railing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant