CN108708538A - Concreting workbench is built in a kind of room - Google Patents
Concreting workbench is built in a kind of room Download PDFInfo
- Publication number
- CN108708538A CN108708538A CN201810710558.7A CN201810710558A CN108708538A CN 108708538 A CN108708538 A CN 108708538A CN 201810710558 A CN201810710558 A CN 201810710558A CN 108708538 A CN108708538 A CN 108708538A
- Authority
- CN
- China
- Prior art keywords
- platform
- support leg
- workbench
- built
- lower section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000001681 protective effect Effects 0.000 claims abstract description 35
- 241000282326 Felis catus Species 0.000 claims abstract description 9
- 238000009434 installation Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G2001/156—Stackable platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G2001/157—Extensible platforms, e.g. telescopic platforms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Ladders (AREA)
Abstract
The invention discloses a kind of rooms to build concreting workbench, including pouring workbench main body, first support leg, cat ladder, second support leg and supporting rod, described pour is provided with the first platform in workbench main body, and first is welded with protective fence on platform and the second platform, first support leg is welded on the lower section of the first platform, and first is welded with bracing piece between platform and the first support leg, and the right side of the first platform is connected by hinge with protective door, the cat ladder is arranged in the lower section of the first platform, the lower section on the outside of the second platform is arranged by rotation axis for second support leg, the left and right ends of the supporting rod are connected with the first support leg and the second support leg by fixing bolt and bolt hole respectively.Concreting workbench is built in the room, can be reduced when without using the second platform and pour the occupied space of workbench main body, the centre position of the first platform is provided with port, convenient for users to up and down.
Description
Technical field
The present invention relates to technical field of buildings, concreting workbench is built in specially a kind of room.
Background technology
Concreting workbench is built in room, is a kind of ancillary equipment for building one-piece casting in work for room, is facilitated building
Worker's pours work.
But concreting workbench is built in existing room, in construction worker in use, being not easy to use field according to different
Scape is built concreting workbench to room and is adjusted, and the extension of work top is unfavorable for.
Invention content
The purpose of the present invention is to provide a kind of rooms to build concreting workbench, to solve to propose in above-mentioned background technology
Existing room build concreting workbench, in construction worker in use, being not easy to build room according to different usage scenarios
Concreting workbench is adjusted, and is unfavorable for the problem of work top extends.
To achieve the above object, the present invention provides the following technical solutions:Concreting workbench is built in a kind of room, including is poured
Workbench main body, the first support leg, cat ladder, the second support leg and supporting rod are built, described pour is provided in workbench main body
One platform, and protective fence is welded on the first platform and the second platform, first support leg is welded under the first platform
Side, and bracing piece is welded between the first platform and the first support leg, and the right side of the first platform passes through hinge and protective door
It is connected, the cat ladder is arranged in the lower section of the first platform, and the intermediate position of the first platform is provided with port, and port is logical
It crosses hinge with protective plate to be connected, the lower section on the outside of the second platform, and second is arranged by rotation axis in second support leg
Bolt hole, and the top setting of the second platform dextral protective fence are both provided in support leg and the first support leg adjacent thereto
Have a hanging ring, the left and right ends of the supporting rod by fixing bolt and bolt hole respectively with the first support leg and the second support leg
It is connected.
Preferably, the mounting structure of second platform is rotational structure, and the second platform is using rotation axis as rotation center.
Preferably, the height of second support leg is identical as the height of the first support leg, and the second support leg and first
Parallel installation each other between support leg.
Preferably, the supporting rod is located at the front and rear sides below the second platform, and supporting rod is about in the second platform
The heart is axisymmetricly installed.
Preferably, the port is through the first platform, and port is located at the center of the first platform.
Preferably, the height of the protective door and the height of protective fence are identical, and the length of protective door is less than the first platform
Width.
Compared with prior art, the beneficial effects of the invention are as follows:Concreting workbench is built in the room, and the second platform is set
Be set to rotatable structure type, be conducive to the expansion and folding of the second platform, it is user-friendly, and can without using
When the second platform, the occupied space for pouring workbench main body is reduced, the centre position of the first platform is provided with port, and port
Lower section be provided with cat ladder, convenient for users to up and down, be conducive to user and enter on the first platform.
Description of the drawings
Fig. 1 is that the present invention pours workbench agent structure schematic diagram;
Fig. 2 is the second platform deployed configuration schematic diagram of the invention;
Fig. 3 is the first platform of the invention and the second platform overlooking structure diagram.
In figure:1, workbench main body is poured;2, the first platform;3, the second platform;4, the first support leg;5, bracing piece;6,
Cat ladder;7, bolt hole;8, the second support leg;9, hanging ring;10, rotation axis;11, supporting rod;12, fixing bolt;13, port;14,
Protective plate;15, protective door;16, protective fence.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the present invention provides a kind of technical solution:Concreting workbench is built in a kind of room, including is poured
Workbench main body 1, the first platform 2, the second platform 3, the first support leg 4, bracing piece 5, cat ladder 6, bolt hole 7, the second support leg
8, hanging ring 9, rotation axis 10, supporting rod 11, fixing bolt 12, port 13, protective plate 14, protective door 15 and protective fence 16, pour
It is provided with the first platform 2 in workbench main body 1, and is welded with protective fence 16 on the first platform 2 and the second platform 3, first
Support leg 4 is welded on the lower section of the first platform 2, and bracing piece 5, and first are welded between the first platform 2 and the first support leg 4
The right side of platform 2 is connected by hinge with protective door 15, and cat ladder 6 is arranged in the lower section of the first platform 2, and the first platform 2
Intermediate position is provided with port 13, and port 13 is connected by hinge with protective plate 14, and the second support leg 8 passes through rotation axis
10 are arranged in the lower section in 3 outside of the second platform, and are both provided with spiral shell in the second support leg 8 and the first support leg 4 adjacent thereto
Keyhole 7, and the top of 3 right side protective fence 16 of the second platform is provided with hanging ring 9, and the left and right ends of supporting rod 11 pass through fixation
Bolt 12 and bolt hole 7 are connected with the first support leg 4 and the second support leg 8 respectively.
The mounting structure of second platform 3 of this example is rotational structure, and the second platform 3 is rotation center with rotation axis 10,
It is provided with the opening conducive to the second platform 3 and folding in this way.
The height of second support leg 8 is identical as the height of the first support leg 4, and the second support leg 8 and the first support leg 4 it
Between parallel installation each other, be provided in this way conducive to the second support leg 8 to the second platform 3 stablize support.
Supporting rod 11 is located at the front and rear sides of 3 lower section of the second platform, and supporting rod 11 is in axis about the center of the second platform 3
It is symmetrically installed, is provided with second support leg 8 is carried out stablizing support conducive to supporting rod 11 in this way.
Port 13 is through the first platform 2, and port 13 is located at the center of the first platform 2, is provided with is conducive in this way
User is entered by port 13 on the first platform 2.
The height of protective door 15 is identical as the height of protective fence 16, and the length of protective door 15 is less than the width of the first platform 2
Degree, is provided with is entered on the second platform 3 by the protective door 15 after opening conducive to user in this way.
Operation principle:When building concreting workbench using the room, as shown in figures 1 and 3, user can be by climbing
Ladder 6 climbs upwards, and after person to be used climbs to the port 13 of 2 lower end of the first platform, the protective plate on port 13 is pushed up with hand
14, and then protective plate 14 is opened by hinge, at this point, can simultaneously be entered by port 13 on first platform 2.
As shown in Figs. 1-3, when the second platform 3 is unfolded user, the suspension hook on extraneous boom hoisting is hung over second
On hanging ring 9 on 3 right side protective fence 16 of platform, extraneous boom hoisting can be made to pass through hanging ring 9 right end of second platform 3 is upward
It slings, the left end of the second platform 3 is rotated by rotation axis 10, after the right end of the second platform 3 is identical as its left end height,
By two the second support legs 8 of the lower section of the second platform 3 by 10 Unscrew of rotation axis, and by the spiral shell of 11 left and right ends of supporting rod
Keyhole 7 is corresponding with the bolt hole 7 in the first support leg 4 and the second support leg 8 respectively, and fixing bolt 12 is used in combination to be fixed,
After waiting for that two the second support legs 8 are fixed, user can open the inserted link on protective door 15, and protective door 15 is passed through conjunction
Page is opened, and then is entered on the second platform 3, the above sequence of operations just completed the room and build concreting workbench, this
The content not being described in detail in specification belongs to the prior art well known to professional and technical personnel in the field.
The standardized element that the present invention uses can commercially, and shaped piece is according to specification and attached drawing note
Load can carry out customized, and the specific connection type of each part is all made of ripe in the prior art bolt, rivet, welding etc.
Conventional means, machinery, part are all made of in the prior art, and the connection of conventional model is using connection side conventional in the prior art
Formula, this will not be detailed here.
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art,
It still can be with technical scheme described in the above embodiments is modified, or is carried out to which part technical characteristic etc.
With replacing, all within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this
Within the protection domain of invention.
Claims (6)
1. concreting workbench is built in a kind of room, including pours workbench main body(1), the first support leg(4), cat ladder(6),
Two support legs(8)And supporting rod(11), it is characterised in that:It is described to pour workbench main body(1)On be provided with the first platform(2),
And first platform(2)With the second platform(3)On be welded with protective fence(16), first support leg(4)It is flat to be welded on first
Platform(2)Lower section, and the first platform(2)With the first support leg(4)Between be welded with bracing piece(5), and the first platform(2)'s
Right side passes through hinge and protective door(15)It is connected, the cat ladder(6)It is arranged in the first platform(2)Lower section, and the first platform
(2)Intermediate position be provided with port(13), and port(13)Pass through hinge and protective plate(14)It is connected, described second
Support leg(8)Pass through rotation axis(10)It is arranged in the second platform(3)The lower section in outside, and the second support leg(8)With it is adjacent thereto
First support leg(4)On be both provided with bolt hole(7), and the second platform(3)Right side protective fence(16)Top be provided with and hang
Ring(9), the supporting rod(11)Left and right ends pass through fixing bolt(12)And bolt hole(7)Respectively with the first support leg
(4)With the second support leg(8)It is connected.
2. concreting workbench is built in a kind of room according to claim 1, it is characterised in that:Second platform(3)
Mounting structure be rotational structure, and the second platform(3)With rotation axis(10)For rotation center.
3. concreting workbench is built in a kind of room according to claim 1, it is characterised in that:Second support leg
(8)Height and the first support leg(4)Height it is identical, and the second support leg(8)With the first support leg(4)Between it is parallel each other
Installation.
4. concreting workbench is built in a kind of room according to claim 1, it is characterised in that:The supporting rod(11)Position
In the second platform(3)The front and rear sides of lower section, and supporting rod(11)About the second platform(3)Center axisymmetricly install.
5. concreting workbench is built in a kind of room according to claim 1, it is characterised in that:The port(13)Run through
In the first platform(2), and port(13)Positioned at the first platform(2)Center.
6. concreting workbench is built in a kind of room according to claim 1, it is characterised in that:The protective door(15)'s
Height and protective fence(16)Height it is identical, and protective door(15)Length be less than the first platform(2)Width.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810710558.7A CN108708538A (en) | 2018-07-02 | 2018-07-02 | Concreting workbench is built in a kind of room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810710558.7A CN108708538A (en) | 2018-07-02 | 2018-07-02 | Concreting workbench is built in a kind of room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108708538A true CN108708538A (en) | 2018-10-26 |
Family
ID=63873250
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810710558.7A Pending CN108708538A (en) | 2018-07-02 | 2018-07-02 | Concreting workbench is built in a kind of room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108708538A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110198153A1 (en) * | 2010-02-17 | 2011-08-18 | G.E. Leblanc Inc. | Modular platform |
CN206360313U (en) * | 2016-12-30 | 2017-07-28 | 王兴民 | A kind of meter reading aids in scaffold |
CN206427229U (en) * | 2016-12-02 | 2017-08-22 | 中船黄埔文冲船舶有限公司 | Substitute the operation platform of scaffold in cabin |
CN207063470U (en) * | 2017-08-18 | 2018-03-02 | 深圳市晶艺装饰设计工程有限公司 | A kind of high-altitude construction operation platform |
CN207144428U (en) * | 2017-07-03 | 2018-03-27 | 中建七局第四建筑有限公司 | A kind of easy-to-dismount building scaffold |
-
2018
- 2018-07-02 CN CN201810710558.7A patent/CN108708538A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110198153A1 (en) * | 2010-02-17 | 2011-08-18 | G.E. Leblanc Inc. | Modular platform |
CN206427229U (en) * | 2016-12-02 | 2017-08-22 | 中船黄埔文冲船舶有限公司 | Substitute the operation platform of scaffold in cabin |
CN206360313U (en) * | 2016-12-30 | 2017-07-28 | 王兴民 | A kind of meter reading aids in scaffold |
CN207144428U (en) * | 2017-07-03 | 2018-03-27 | 中建七局第四建筑有限公司 | A kind of easy-to-dismount building scaffold |
CN207063470U (en) * | 2017-08-18 | 2018-03-02 | 深圳市晶艺装饰设计工程有限公司 | A kind of high-altitude construction operation platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102839812B (en) | Intelligent construction platform for construction of super high-rise building | |
CN213359620U (en) | Protective fence for bridge demolition construction | |
CN208456076U (en) | Concreting workbench is built in a kind of room | |
CN209038875U (en) | A kind of building construction reinforcing bar is perpendicular to hang auxiliary device | |
CN108708538A (en) | Concreting workbench is built in a kind of room | |
CN218467019U (en) | Scaffold for building | |
CN207739661U (en) | A kind of external wall of high-rise building cleaning hanging ring safe to use | |
CN201502170U (en) | Horizontal supporting device of building external frame | |
CN214780190U (en) | Steel reinforcement framework lifting appliance with adjustable length | |
CN210239087U (en) | Hanging basket assembly for construction operation of suspended T-beam diaphragm plate formwork | |
CN205259928U (en) | Perpendicular cat ladder of suspension type | |
CN211396541U (en) | Earthquake-resistant reinforcing structure for building support | |
CN211058358U (en) | Folding protective net | |
CN207620343U (en) | A kind of safe portable scaffold | |
CN210289043U (en) | Anti-toppling scaffold | |
CN209413250U (en) | A kind of telescopic foot hand cradle being applicable in narrow space operation | |
CN208294053U (en) | Attachment type raise scaffold protecting screen structure | |
CN208152927U (en) | A kind of multi-functional dual-purpose Emergency Ladder | |
CN209923789U (en) | A collapsible hanging flower basket for prefabricating construction of case roof beam diaphragm | |
CN217028013U (en) | Climbing frame protective net | |
CN211137613U (en) | Annular PC component with boss | |
CN218346774U (en) | Two-stage turnover plate splicing structure | |
CN217680379U (en) | Interior decoration is with fitment platform of convenient equipment | |
CN108609501A (en) | A kind of building structure construction tower crane that security performance is high | |
CN213328684U (en) | Bridge construction operation platform convenient to installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181026 |