A kind of high level civil construction building garbage deployment device
Technical field
The present invention relates to skyscraper garbage deployment device fields, more specifically to a kind of high-rise civil construction building
Room garbage deployment device.
Background technology
With the development of society, the land resource in city gradually decreases, high-rise resident's building constructions gradually rise, Ju Minsheng
The generation of house refuse is inevitably had in work.
It is by manually taking elevator, being then placed in dustbin downstairs, it is clear to be not easy to lower fortune that people, which handle house refuse mostly,
Reason, labor intensity is big, and efficiency is low, also has at present through the downward garbage throwing of garbage shaft, but has weight and light object in rubbish,
Excessive velocities will produce larger noise when existing garbage shaft weight-drop, rubbish can be caused to block slowly excessively, launch efficiency
It is low.
Invention content
1. technical problems to be solved
For problems of the prior art, the purpose of the present invention is to provide a kind of high-rise civil construction buildings to be thrown with rubbish
Device is put, artificial elevator conveying may be implemented in it, and labor intensity is big, and garbage shaft noise is big, and efficiency is low.
2. technical solution
To solve the above problems, the present invention adopts the following technical scheme that.
A kind of high level civil construction building garbage deployment device, including elevator and controller, the elevator setting
On wall, and it is equipped with elevator in elevator, vertical lift channel is offered on the wall and bending-type rubbish launches channel,
The vertical lift channel is located between elevator and bending-type rubbish dispensing channel, and the bending-type rubbish is launched to be opened on channel
Equipped with hole is launched, the controller, which is located at, to be launched at hole, and bearing plate, the elevator are slidably connected in the vertical lift channel
It is connected separately with the first directive wheel and the second directive wheel at the top of well and vertical lift channel, the bearing plate upper end is fixedly connected
Have a steel wire rope, the one end of the steel wire rope far from bearing plate bypass successively the second directive wheel and the first directive wheel and with elevator upper end
It is fixedly linked, bending-type rubbish is launched and is fixedly connected with guide plate in vias inner walls, is turned by first rotating shaft on the guide plate
It is dynamic to be connected with the first flap, the first mounting groove is offered on the wall, and second is offered on the first mounting groove inner wall
Mounting groove, second mounting groove are connected with damping air bag, and damping air bag and first in second mounting groove
Flap lower end bottom side offsets, and high pressure gas holder is fixedly connected in first mounting groove, and the high pressure gas holder passes through air inlet pipe
It is connected with damping air bag, and is connected with the first electromagnetic valve in air inlet pipe, the high pressure gas holder bottom end is connected by connecting tube
Be connected to mixing appendix, be connected with multiple inflator pumps on the wall, the inflator pump outlet side by escape pipe with mix it is defeated
Tracheae is connected, and check valve is connected on escape pipe, and promotion ball, the load-bearing are fixedly connected on the pressing lever of the inflator pump
Plate upper and lower ends have been fixedly connected with smooth promotion body corresponding with ball is pushed, first electromagnetic valve and the electrical phase of controller
Even.
Preferably, the sliding groove and sliding eye communicated, sliding eye upper end inner wall are offered on first flap
It is rotatablely connected the second flap by the second rotation axis, the sliding eye is interior to slidably connect hollow promotion body by slip ring,
Promotion pipe is slidably connected by draw runner in the sliding groove, is connected with sliding groove inner wall by spring on the promotion pipe, institute
It states promotion pipe to offset with pipe is pushed by connecting tube, the promotion pipe upper end offsets with the second flap bottom side, first peace
Folding and unfolding slot is offered on tankage inner wall, and folding and unfolding slot is located at high pressure gas holder lower right, and rotation is rotatably connected in the folding and unfolding slot
Axis is socketed with resilience strength silver in the shaft, offers traction channel in first flap, in the traction channel
Multiple traction fixed pulleys are connected with, traction rope are connected on the promotion pipe, the traction rope is around fixed pulley and through traction
Channel is connected with resilience strength silver.
Preferably, the high pressure gas holder upper end is connected with gas outlet, and pressure valve is connected on the gas outlet, described to lose heart
Pipe is connected by delivery hose with pipe is pushed, and the hollow promotion body lower right is connected with gas blow pipe, and is connected on gas blow pipe
Blow head offers multiple ventholes on second flap.
Preferably, resetting spring is cased on the pressing lever, and the both ends of resetting spring are connected to and push ball and fill
On inflator.
Preferably, it is connected with exhaust pipe on the damping air bag, and is connected with second solenoid valve door on exhaust pipe, institute
Second solenoid valve door is stated to be electrical connected with controller.
3. advantageous effect
Compared with the prior art, the advantage of the invention is that:
This programme when needing garbage throwing, by launch hole to bending-type rubbish launch channel garbage throwing, high pressure gas holder
In high pressure gas damping air bag is entered by air inlet pipe, the effective damping of damping air bag reduces noise, subtracts simultaneously
Shake air bag push the first flap lower end, angle of inclination increase, effectively play speed governing effect, using elevator in elevator on
Lower movement, inflator pump is inflated by escape pipe to mixing appendix, to realize the inflation to high pressure gas holder so that damping is inflated
Air bag effectively works, and effectively reduces labor intensity, effectively prevents excessive velocities when garbage shaft weight-drop, has
Effect reduces noise, while effectively preventing light matter matter from falling slowly, prevents rubbish from blocking, it is ensured that launches efficiency.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the first flap work expansion flowage structure schematic diagram of the present invention;
Fig. 3 is the structural schematic diagram at A in Fig. 1;
Fig. 4 is the structural schematic diagram at B in Fig. 3;
Fig. 5 is the structural schematic diagram at C in Fig. 3;
Fig. 6 is the structural schematic diagram at D in Fig. 4.
Figure label explanation:
Hole, 8 bending-type rubbish are launched in 1 first directive wheel, 2 steel wire ropes, 3 elevators, 4 elevators, 5 walls, 6 vertical lift channels, 7
Launch channel, 9 second directive wheels, 10 guide plates, 11 first rotating shafts, 12 first mounting grooves, 13 high pressure gas holders, 14 first decelerations
Plate, 15 second mounting grooves, 16 connecting tubes, 17 mixing appendixs, 18 escape pipes, 19 check valves, 20 inflator pumps, 21 pressing levers, 22
Bearing plate, 23 resetting springs, 24 smooth promotion bodies, 25 push balls, 26 draw runners, 27 delivery hoses, 28 pressure valve, 29 gas bleeder valves,
30 sliding grooves, 31 sliding eyes, 32 connecting tubes, 33 hollow promotion bodies, 34 slip rings, 35 escape pipes, 36 blow heads, 37 ventholes,
38 second flaps, 39 second rotation axis, 40 push pipe, 41 springs, 42 first electromagnetic valves, 43 air inlet pipe, 44 dampings inflation
Air bag, 45 folding and unfolding slots, 46 rotary shafts, 47 resilience strength silvers, 48 exhaust pipes, 49 second solenoid valve doors, 50 traction ropes, 51 tractions
Channel, 52 controllers, 53 fixed pulleys.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention;Technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes;Obviously;Described embodiments are only a part of the embodiments of the present invention;Instead of all the embodiments.It is based on
Embodiment in the present invention;It is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment;It shall fall within the protection scope of the present invention.
Embodiment 1:
Please refer to Fig.1-6, a kind of high level civil construction building garbage deployment device, including elevator 3 and controller 52, elevator
Well 3 is arranged on wall 5, and elevator 4 is equipped in elevator 3, and vertical lift channel 6 and bending-type rubbish are offered on wall 5
Channel 8 is launched, vertical lift channel 6 is located between elevator 3 and bending-type rubbish dispensing channel 8, and bending-type rubbish is launched logical
It is offered on road 8 and launches hole 7, controller 53, which is located at, to be launched at hole 7, is vertically moved up or down in channel 6 and is slidably connected bearing plate 22, electricity
The top in stair shaft 3 and vertical lift channel 6 is connected separately with the first directive wheel 1 and the second directive wheel 9, and 22 upper end of bearing plate is fixed
Be connected with steel wire rope 2, the one end of steel wire rope 2 far from bearing plate 22 bypass successively the second directive wheel 9 and the first directive wheel 1 and with electricity
Terraced 4 upper ends are fixedly linked, and bending-type rubbish is launched and is fixedly connected with guide plate 10 on 8 inner wall of channel, by the on guide plate 10
One shaft 11 is rotatably connected to the first flap 14, and the first mounting groove 12 is offered on wall 5, is opened on 12 inner wall of the first mounting groove
Equipped with the second mounting groove 15, the second mounting groove 15 is connected with damping air bag 44, and damping inflating air in second mounting groove 15
Capsule 44 offsets with 14 lower end bottom side of the first flap, and high pressure gas holder 13, high pressure gas holder 13 are fixedly connected in the first mounting groove 12
It is connected with damping air bag 44 by air inlet pipe 43, and is connected with the first electromagnetic valve 42, high pressure gas holder 13 in air inlet pipe 43
Bottom end is connected with mixing appendix 17 by connecting tube 16, and multiple inflator pumps 20 are connected on wall 5, and 20 outlet side of inflator pump is logical
It crosses escape pipe 18 with mixing appendix 17 to be connected, and is connected with check valve 19 on escape pipe 18, on the pressing lever 21 of inflator pump 20
It being fixedly connected with and pushes ball 25,22 upper and lower ends of bearing plate have been fixedly connected with smooth promotion body 24 corresponding with ball 25 is pushed,
First electromagnetic valve 42 is electrical connected with controller 52.
The sliding groove 30 communicated and sliding eye 31 are offered on first flap 14,31 upper end inner wall of sliding eye passes through second
Rotation axis 39 is rotatablely connected the second flap 38, and sliding eye 31 is interior to slidably connect hollow promotion body 33 by slip ring 34, sliding
It is slidably connected by draw runner 26 in dynamic slot 30 and pushes pipe 40, pushed and be connected with 30 inner wall of sliding groove by spring 41 on pipe 40,
It pushes pipe 40 to be offseted by connecting tube 32 with pipe 40 is pushed, 40 upper end of pipe is pushed to offset with 38 bottom side of the second flap, the first peace
Folding and unfolding slot 45 is offered on 12 inner wall of tankage, and folding and unfolding slot 45 is located at 13 lower right of high pressure gas holder, is rotatablely connected in folding and unfolding slot 45
There is rotary shaft 46, resilience strength silver 47 is socketed in shaft 46, traction channel 51 is offered in the first flap 14, traction is logical
It is connected with multiple traction fixed pulleys 54 in road 51, pushes and is connected with traction rope 50 on pipe 40, traction rope 50 bypasses fixed pulley 53 simultaneously
It is connected with resilience strength silver 47 through traction channel 51, when the first flap 14 rotates speed governing around first rotating shaft 11, first
Flap 14 is gradually distance from the first mounting groove 12, and traction rope 50 pulls resilience strength piece 47, and resilience strength piece 47 is around rotary shaft 46
Rotation, convenient for pulling the first flap 14 to reset, while traction rope 50 pulls under the action of drawing channel 51 and fixed pulley 53
Pipe 40 is pushed to be slided on draw runner 26, to push pipe 40 to push hollow promotion body 33 by connecting tube 32, to hollow promotion
Body 33 pushes the second flap 38 to be rotated around the second shaft 39, adjusts angle of inclination, further effective to carry out speed governing, it is ensured that throw
Put efficiency.
13 upper end of high pressure gas holder is connected with gas outlet 29, pressure valve 28 is connected on gas outlet 29, gas outlet 29 is by defeated
Hose 27 is sent to be connected with pipe 40 is pushed, hollow 33 lower right of promotion body is connected with gas blow pipe 35, and is connected with and blows on gas blow pipe 35
Gas head 36 offers multiple ventholes 37 on second flap 38, as moving up and down for elevator 4 is used for multiple times, high pressure gas holder
When hypertonia in 13, the pressure valve 28 on gas outlet 29 is opened, and gas passes through delivery hose 27, pushes pipe 40, connecting tube
32 enter hollow promotion body 33, are launched in channel 8 to which gas blows to bending-type rubbish by gas blow pipe 35 and blow head 36, energy
The light matter matter rested on flap is enough blown away, further effectively prevents from blocking, it is ensured that launches efficiency.
Resetting spring 23 is cased on pressing lever 21, and the both ends of resetting spring 23 are connected to and push ball 25 and inflator pump
On 20, it is convenient for the reset of pressing lever 21.
It is connected with exhaust pipe 48 on damping air bag 44, and is connected with second solenoid valve door 49 on exhaust pipe 48, second
Electromagnetic valve 49 is electrical connected with controller 52, convenient for the gas in discharge damping air bag 44.
Operation principle:This programme when needing garbage throwing, by launch hole 7 to bending-type rubbish launch channel 8 throw
Rubbish is put, user opens the first electromagnetic valve 42, high pressure according to the weight operation and control device 52 of rubbish to which controller 52 controls
High pressure gas in gas tank 13 enters damping air bag 44, the 44 effective damping of damping air bag, drop by air inlet pipe 43
Low noise, while shock-absorption air bag 44 pushes 14 lower end of the first flap, the first flap 14 is rotated around first rotating shaft 11, to incline
Rake angle increases, and effectively plays speed governing effect, and high pressure gas holder 13 is filled with gas by connecting tube 16 and mixing appendix 17, profit
It is moved up and down in elevator 3 with elevator 4, to which elevator 4 pulls bearing plate 22 in being vertically moved up or down channel 6 by steel wire rope 2
It moves up and down, bearing plate 22 pushes pressing lever 21 by the smooth promotion body 24 and promotion ball 25 at both ends, to which pressing lever 21 pushes away
Dynamic inflator pump 20 works, to which inflator pump 20 is inflated by escape pipe 18 to mixing appendix 17, to realize to high pressure gas holder
13 inflation so that damping air bag 44 effectively works, and effectively reduces labor intensity, effectively prevents garbage shaft
Excessive velocities when weight-drop effectively reduce noise, while effectively preventing light matter matter from falling slowly, prevent rubbish
It blocks, it is ensured that launch efficiency.
It is described above;It is merely preferred embodiments of the present invention;But scope of protection of the present invention is not limited thereto;
Any one skilled in the art is in the technical scope disclosed by the present invention;According to the technique and scheme of the present invention and its
It improves design and is subject to equivalent substitution or change;Should all it cover within the scope of the present invention.