CN108708528A - A kind of high level civil construction building garbage deployment device - Google Patents

A kind of high level civil construction building garbage deployment device Download PDF

Info

Publication number
CN108708528A
CN108708528A CN201810522347.0A CN201810522347A CN108708528A CN 108708528 A CN108708528 A CN 108708528A CN 201810522347 A CN201810522347 A CN 201810522347A CN 108708528 A CN108708528 A CN 108708528A
Authority
CN
China
Prior art keywords
elevator
pipe
wall
flap
air bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810522347.0A
Other languages
Chinese (zh)
Other versions
CN108708528B (en
Inventor
吴东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hu Yang
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810522347.0A priority Critical patent/CN108708528B/en
Publication of CN108708528A publication Critical patent/CN108708528A/en
Application granted granted Critical
Publication of CN108708528B publication Critical patent/CN108708528B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/10Arrangements in buildings for the disposal of refuse

Abstract

The invention discloses a kind of high-rise civil construction building garbage deployment devices, belong to skyscraper garbage deployment device field.A kind of high level civil construction building garbage deployment device, including elevator and controller, the elevator are arranged on wall, and elevator is equipped in elevator.It may be implemented the high pressure gas in high pressure gas holder and enters damping air bag by air inlet pipe, the effective damping of damping air bag, reduce noise, shock-absorption air bag pushes the first flap lower end simultaneously, angle of inclination increases, effectively play speed governing effect, it is moved up and down in elevator using elevator, inflator pump is inflated by escape pipe to mixing appendix, to realize the inflation to high pressure gas holder, so that damping air bag effectively works, effectively reduce labor intensity, effectively prevent excessive velocities when garbage shaft weight-drop, effectively reduce noise, effectively prevent light matter matter from falling slowly simultaneously, ensure dispensing efficiency.

Description

A kind of high level civil construction building garbage deployment device
Technical field
The present invention relates to skyscraper garbage deployment device fields, more specifically to a kind of high-rise civil construction building Room garbage deployment device.
Background technology
With the development of society, the land resource in city gradually decreases, high-rise resident's building constructions gradually rise, Ju Minsheng The generation of house refuse is inevitably had in work.
It is by manually taking elevator, being then placed in dustbin downstairs, it is clear to be not easy to lower fortune that people, which handle house refuse mostly, Reason, labor intensity is big, and efficiency is low, also has at present through the downward garbage throwing of garbage shaft, but has weight and light object in rubbish, Excessive velocities will produce larger noise when existing garbage shaft weight-drop, rubbish can be caused to block slowly excessively, launch efficiency It is low.
Invention content
1. technical problems to be solved
For problems of the prior art, the purpose of the present invention is to provide a kind of high-rise civil construction buildings to be thrown with rubbish Device is put, artificial elevator conveying may be implemented in it, and labor intensity is big, and garbage shaft noise is big, and efficiency is low.
2. technical solution
To solve the above problems, the present invention adopts the following technical scheme that.
A kind of high level civil construction building garbage deployment device, including elevator and controller, the elevator setting On wall, and it is equipped with elevator in elevator, vertical lift channel is offered on the wall and bending-type rubbish launches channel, The vertical lift channel is located between elevator and bending-type rubbish dispensing channel, and the bending-type rubbish is launched to be opened on channel Equipped with hole is launched, the controller, which is located at, to be launched at hole, and bearing plate, the elevator are slidably connected in the vertical lift channel It is connected separately with the first directive wheel and the second directive wheel at the top of well and vertical lift channel, the bearing plate upper end is fixedly connected Have a steel wire rope, the one end of the steel wire rope far from bearing plate bypass successively the second directive wheel and the first directive wheel and with elevator upper end It is fixedly linked, bending-type rubbish is launched and is fixedly connected with guide plate in vias inner walls, is turned by first rotating shaft on the guide plate It is dynamic to be connected with the first flap, the first mounting groove is offered on the wall, and second is offered on the first mounting groove inner wall Mounting groove, second mounting groove are connected with damping air bag, and damping air bag and first in second mounting groove Flap lower end bottom side offsets, and high pressure gas holder is fixedly connected in first mounting groove, and the high pressure gas holder passes through air inlet pipe It is connected with damping air bag, and is connected with the first electromagnetic valve in air inlet pipe, the high pressure gas holder bottom end is connected by connecting tube Be connected to mixing appendix, be connected with multiple inflator pumps on the wall, the inflator pump outlet side by escape pipe with mix it is defeated Tracheae is connected, and check valve is connected on escape pipe, and promotion ball, the load-bearing are fixedly connected on the pressing lever of the inflator pump Plate upper and lower ends have been fixedly connected with smooth promotion body corresponding with ball is pushed, first electromagnetic valve and the electrical phase of controller Even.
Preferably, the sliding groove and sliding eye communicated, sliding eye upper end inner wall are offered on first flap It is rotatablely connected the second flap by the second rotation axis, the sliding eye is interior to slidably connect hollow promotion body by slip ring, Promotion pipe is slidably connected by draw runner in the sliding groove, is connected with sliding groove inner wall by spring on the promotion pipe, institute It states promotion pipe to offset with pipe is pushed by connecting tube, the promotion pipe upper end offsets with the second flap bottom side, first peace Folding and unfolding slot is offered on tankage inner wall, and folding and unfolding slot is located at high pressure gas holder lower right, and rotation is rotatably connected in the folding and unfolding slot Axis is socketed with resilience strength silver in the shaft, offers traction channel in first flap, in the traction channel Multiple traction fixed pulleys are connected with, traction rope are connected on the promotion pipe, the traction rope is around fixed pulley and through traction Channel is connected with resilience strength silver.
Preferably, the high pressure gas holder upper end is connected with gas outlet, and pressure valve is connected on the gas outlet, described to lose heart Pipe is connected by delivery hose with pipe is pushed, and the hollow promotion body lower right is connected with gas blow pipe, and is connected on gas blow pipe Blow head offers multiple ventholes on second flap.
Preferably, resetting spring is cased on the pressing lever, and the both ends of resetting spring are connected to and push ball and fill On inflator.
Preferably, it is connected with exhaust pipe on the damping air bag, and is connected with second solenoid valve door on exhaust pipe, institute Second solenoid valve door is stated to be electrical connected with controller.
3. advantageous effect
Compared with the prior art, the advantage of the invention is that:
This programme when needing garbage throwing, by launch hole to bending-type rubbish launch channel garbage throwing, high pressure gas holder In high pressure gas damping air bag is entered by air inlet pipe, the effective damping of damping air bag reduces noise, subtracts simultaneously Shake air bag push the first flap lower end, angle of inclination increase, effectively play speed governing effect, using elevator in elevator on Lower movement, inflator pump is inflated by escape pipe to mixing appendix, to realize the inflation to high pressure gas holder so that damping is inflated Air bag effectively works, and effectively reduces labor intensity, effectively prevents excessive velocities when garbage shaft weight-drop, has Effect reduces noise, while effectively preventing light matter matter from falling slowly, prevents rubbish from blocking, it is ensured that launches efficiency.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the first flap work expansion flowage structure schematic diagram of the present invention;
Fig. 3 is the structural schematic diagram at A in Fig. 1;
Fig. 4 is the structural schematic diagram at B in Fig. 3;
Fig. 5 is the structural schematic diagram at C in Fig. 3;
Fig. 6 is the structural schematic diagram at D in Fig. 4.
Figure label explanation:
Hole, 8 bending-type rubbish are launched in 1 first directive wheel, 2 steel wire ropes, 3 elevators, 4 elevators, 5 walls, 6 vertical lift channels, 7 Launch channel, 9 second directive wheels, 10 guide plates, 11 first rotating shafts, 12 first mounting grooves, 13 high pressure gas holders, 14 first decelerations Plate, 15 second mounting grooves, 16 connecting tubes, 17 mixing appendixs, 18 escape pipes, 19 check valves, 20 inflator pumps, 21 pressing levers, 22 Bearing plate, 23 resetting springs, 24 smooth promotion bodies, 25 push balls, 26 draw runners, 27 delivery hoses, 28 pressure valve, 29 gas bleeder valves, 30 sliding grooves, 31 sliding eyes, 32 connecting tubes, 33 hollow promotion bodies, 34 slip rings, 35 escape pipes, 36 blow heads, 37 ventholes, 38 second flaps, 39 second rotation axis, 40 push pipe, 41 springs, 42 first electromagnetic valves, 43 air inlet pipe, 44 dampings inflation Air bag, 45 folding and unfolding slots, 46 rotary shafts, 47 resilience strength silvers, 48 exhaust pipes, 49 second solenoid valve doors, 50 traction ropes, 51 tractions Channel, 52 controllers, 53 fixed pulleys.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention;Technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes;Obviously;Described embodiments are only a part of the embodiments of the present invention;Instead of all the embodiments.It is based on Embodiment in the present invention;It is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment;It shall fall within the protection scope of the present invention.
Embodiment 1:
Please refer to Fig.1-6, a kind of high level civil construction building garbage deployment device, including elevator 3 and controller 52, elevator Well 3 is arranged on wall 5, and elevator 4 is equipped in elevator 3, and vertical lift channel 6 and bending-type rubbish are offered on wall 5 Channel 8 is launched, vertical lift channel 6 is located between elevator 3 and bending-type rubbish dispensing channel 8, and bending-type rubbish is launched logical It is offered on road 8 and launches hole 7, controller 53, which is located at, to be launched at hole 7, is vertically moved up or down in channel 6 and is slidably connected bearing plate 22, electricity The top in stair shaft 3 and vertical lift channel 6 is connected separately with the first directive wheel 1 and the second directive wheel 9, and 22 upper end of bearing plate is fixed Be connected with steel wire rope 2, the one end of steel wire rope 2 far from bearing plate 22 bypass successively the second directive wheel 9 and the first directive wheel 1 and with electricity Terraced 4 upper ends are fixedly linked, and bending-type rubbish is launched and is fixedly connected with guide plate 10 on 8 inner wall of channel, by the on guide plate 10 One shaft 11 is rotatably connected to the first flap 14, and the first mounting groove 12 is offered on wall 5, is opened on 12 inner wall of the first mounting groove Equipped with the second mounting groove 15, the second mounting groove 15 is connected with damping air bag 44, and damping inflating air in second mounting groove 15 Capsule 44 offsets with 14 lower end bottom side of the first flap, and high pressure gas holder 13, high pressure gas holder 13 are fixedly connected in the first mounting groove 12 It is connected with damping air bag 44 by air inlet pipe 43, and is connected with the first electromagnetic valve 42, high pressure gas holder 13 in air inlet pipe 43 Bottom end is connected with mixing appendix 17 by connecting tube 16, and multiple inflator pumps 20 are connected on wall 5, and 20 outlet side of inflator pump is logical It crosses escape pipe 18 with mixing appendix 17 to be connected, and is connected with check valve 19 on escape pipe 18, on the pressing lever 21 of inflator pump 20 It being fixedly connected with and pushes ball 25,22 upper and lower ends of bearing plate have been fixedly connected with smooth promotion body 24 corresponding with ball 25 is pushed, First electromagnetic valve 42 is electrical connected with controller 52.
The sliding groove 30 communicated and sliding eye 31 are offered on first flap 14,31 upper end inner wall of sliding eye passes through second Rotation axis 39 is rotatablely connected the second flap 38, and sliding eye 31 is interior to slidably connect hollow promotion body 33 by slip ring 34, sliding It is slidably connected by draw runner 26 in dynamic slot 30 and pushes pipe 40, pushed and be connected with 30 inner wall of sliding groove by spring 41 on pipe 40, It pushes pipe 40 to be offseted by connecting tube 32 with pipe 40 is pushed, 40 upper end of pipe is pushed to offset with 38 bottom side of the second flap, the first peace Folding and unfolding slot 45 is offered on 12 inner wall of tankage, and folding and unfolding slot 45 is located at 13 lower right of high pressure gas holder, is rotatablely connected in folding and unfolding slot 45 There is rotary shaft 46, resilience strength silver 47 is socketed in shaft 46, traction channel 51 is offered in the first flap 14, traction is logical It is connected with multiple traction fixed pulleys 54 in road 51, pushes and is connected with traction rope 50 on pipe 40, traction rope 50 bypasses fixed pulley 53 simultaneously It is connected with resilience strength silver 47 through traction channel 51, when the first flap 14 rotates speed governing around first rotating shaft 11, first Flap 14 is gradually distance from the first mounting groove 12, and traction rope 50 pulls resilience strength piece 47, and resilience strength piece 47 is around rotary shaft 46 Rotation, convenient for pulling the first flap 14 to reset, while traction rope 50 pulls under the action of drawing channel 51 and fixed pulley 53 Pipe 40 is pushed to be slided on draw runner 26, to push pipe 40 to push hollow promotion body 33 by connecting tube 32, to hollow promotion Body 33 pushes the second flap 38 to be rotated around the second shaft 39, adjusts angle of inclination, further effective to carry out speed governing, it is ensured that throw Put efficiency.
13 upper end of high pressure gas holder is connected with gas outlet 29, pressure valve 28 is connected on gas outlet 29, gas outlet 29 is by defeated Hose 27 is sent to be connected with pipe 40 is pushed, hollow 33 lower right of promotion body is connected with gas blow pipe 35, and is connected with and blows on gas blow pipe 35 Gas head 36 offers multiple ventholes 37 on second flap 38, as moving up and down for elevator 4 is used for multiple times, high pressure gas holder When hypertonia in 13, the pressure valve 28 on gas outlet 29 is opened, and gas passes through delivery hose 27, pushes pipe 40, connecting tube 32 enter hollow promotion body 33, are launched in channel 8 to which gas blows to bending-type rubbish by gas blow pipe 35 and blow head 36, energy The light matter matter rested on flap is enough blown away, further effectively prevents from blocking, it is ensured that launches efficiency.
Resetting spring 23 is cased on pressing lever 21, and the both ends of resetting spring 23 are connected to and push ball 25 and inflator pump On 20, it is convenient for the reset of pressing lever 21.
It is connected with exhaust pipe 48 on damping air bag 44, and is connected with second solenoid valve door 49 on exhaust pipe 48, second Electromagnetic valve 49 is electrical connected with controller 52, convenient for the gas in discharge damping air bag 44.
Operation principle:This programme when needing garbage throwing, by launch hole 7 to bending-type rubbish launch channel 8 throw Rubbish is put, user opens the first electromagnetic valve 42, high pressure according to the weight operation and control device 52 of rubbish to which controller 52 controls High pressure gas in gas tank 13 enters damping air bag 44, the 44 effective damping of damping air bag, drop by air inlet pipe 43 Low noise, while shock-absorption air bag 44 pushes 14 lower end of the first flap, the first flap 14 is rotated around first rotating shaft 11, to incline Rake angle increases, and effectively plays speed governing effect, and high pressure gas holder 13 is filled with gas by connecting tube 16 and mixing appendix 17, profit It is moved up and down in elevator 3 with elevator 4, to which elevator 4 pulls bearing plate 22 in being vertically moved up or down channel 6 by steel wire rope 2 It moves up and down, bearing plate 22 pushes pressing lever 21 by the smooth promotion body 24 and promotion ball 25 at both ends, to which pressing lever 21 pushes away Dynamic inflator pump 20 works, to which inflator pump 20 is inflated by escape pipe 18 to mixing appendix 17, to realize to high pressure gas holder 13 inflation so that damping air bag 44 effectively works, and effectively reduces labor intensity, effectively prevents garbage shaft Excessive velocities when weight-drop effectively reduce noise, while effectively preventing light matter matter from falling slowly, prevent rubbish It blocks, it is ensured that launch efficiency.
It is described above;It is merely preferred embodiments of the present invention;But scope of protection of the present invention is not limited thereto; Any one skilled in the art is in the technical scope disclosed by the present invention;According to the technique and scheme of the present invention and its It improves design and is subject to equivalent substitution or change;Should all it cover within the scope of the present invention.

Claims (5)

1. a kind of high level civil construction building garbage deployment device, including elevator(3)And controller(52), the elevator (3)It is arranged in wall(5)On, and elevator(3)It is interior to be equipped with elevator(4), it is characterised in that:The wall(5)On offer it is vertical Straight liftway(6)Channel is launched with bending-type rubbish(8), the vertical lift channel(6)Positioned at elevator(3)And bending-type Rubbish launches channel(8)Between, the bending-type rubbish launches channel(8)On offer launch hole(7), the controller(53) Positioned at dispensing hole(7)Place, the vertical lift channel(6)Inside slidably connect bearing plate(22), the elevator(3)With it is vertical Liftway(6)Top be connected separately with the first directive wheel(1)With the second directive wheel(9), the bearing plate(22)Upper end is solid Surely it is connected with steel wire rope(2), the steel wire rope(2)Far from bearing plate(22)One end successively bypass the second directive wheel(9)With One directive wheel(1)And and elevator(4)Upper end is fixedly linked, and bending-type rubbish launches channel(8)Guiding is fixedly connected on inner wall Plate(10), the guide plate(10)On pass through first rotating shaft(11)It is rotatably connected to the first flap(14), the wall(5)On Offer the first mounting groove(12), first mounting groove(12)The second mounting groove is offered on inner wall(15), second peace Tankage(15), second mounting groove(15)Inside it is connected with damping air bag(44), and damping air bag(44)With first Flap(14)Lower end bottom side offsets, first mounting groove(12)Inside it is fixedly connected with high pressure gas holder(13), the high pressure gas Tank(13)Pass through air inlet pipe(43)With damping air bag(44)It is connected, and air inlet pipe(43)On be connected with the first electromagnetic valve (42), the high pressure gas holder(13)Bottom end passes through connecting tube(16)It is connected with mixing appendix(17), the wall(5)Upper connection There are multiple inflator pumps(20), the inflator pump(20)Outlet side passes through escape pipe(18)With mix appendix(17)It is connected, and goes out Tracheae(18)On be connected with check valve(19), the inflator pump(20)Pressing lever(21)On be fixedly connected with promotion ball(25), The bearing plate(22)Upper and lower ends have been fixedly connected with and have pushed ball(25)Corresponding smooth promotion body(24), first electricity Magnet valve door(42)With controller(52)It is electrical connected.
2. a kind of high-rise civil construction building garbage deployment device according to claim 1, it is characterised in that:Described One flap(14)On offer the sliding groove communicated(30)And sliding eye(31), the sliding eye(31)Upper end inner wall passes through Two rotation axis(39)It is rotatablely connected the second flap(38), the sliding eye(31)Inside pass through slip ring(34)It is slidably connected free The heart pushes body(33), the sliding groove(30)Inside pass through draw runner(26)Slidably connect promotion pipe(40), the promotion pipe(40) On pass through spring(41)With sliding groove(30)Inner wall is connected, the promotion pipe(40)Pass through connecting tube(32)It is managed with pushing(40)Phase It supports, the promotion pipe(40)Upper end and the second flap(38)Bottom side offsets, first mounting groove(12)It is offered on inner wall Folding and unfolding slot(45), and folding and unfolding slot(45)Positioned at high pressure gas holder(13)Lower right, the folding and unfolding slot(45)Inside it is rotatably connected to rotation Axis(46), the shaft(46)On be socketed with resilience strength silver(47), first flap(14)It is logical inside to offer traction Road(51), the traction channel(51)Inside it is connected with multiple traction fixed pulleys(54), the promotion pipe(40)On be connected with traction Rope(50), the traction rope(50)Around fixed pulley(53)And through traction channel(51)With resilience strength silver(47)It is connected.
3. a kind of high-rise civil construction building garbage deployment device according to claim 2, it is characterised in that:The height It calms the anger tank(13)Upper end is connected with gas outlet(29), the gas outlet(29)On be connected with pressure valve(28), the gas outlet (29)Pass through delivery hose(27)It is managed with pushing(40)It is connected, the hollow promotion body(33)Lower right is connected with gas blow pipe (35), and gas blow pipe(35)On be connected with blow head(36), second flap(38)On offer multiple ventholes(37).
4. a kind of high-rise civil construction building garbage deployment device according to claim 1, it is characterised in that:It is described to press Compression bar(21)On be cased with resetting spring(23), and resetting spring(23)Both ends be connected to promotion ball(25)And inflator pump (20)On.
5. a kind of high-rise civil construction building garbage deployment device according to claim 1, it is characterised in that:It is described to subtract Shake air bag(44)On be connected with exhaust pipe(48), and exhaust pipe(48)On be connected with second solenoid valve door(49), described Two electromagnetic valves(49)With controller(52)It is electrical connected.
CN201810522347.0A 2018-05-28 2018-05-28 A kind of high-rise resident, which builds a building, uses garbage deployment device Active CN108708528B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810522347.0A CN108708528B (en) 2018-05-28 2018-05-28 A kind of high-rise resident, which builds a building, uses garbage deployment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810522347.0A CN108708528B (en) 2018-05-28 2018-05-28 A kind of high-rise resident, which builds a building, uses garbage deployment device

Publications (2)

Publication Number Publication Date
CN108708528A true CN108708528A (en) 2018-10-26
CN108708528B CN108708528B (en) 2019-10-15

Family

ID=63869714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810522347.0A Active CN108708528B (en) 2018-05-28 2018-05-28 A kind of high-rise resident, which builds a building, uses garbage deployment device

Country Status (1)

Country Link
CN (1) CN108708528B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113638573A (en) * 2021-08-17 2021-11-12 中建八局发展建设有限公司 Super high-rise building garbage treatment device and working method thereof
CN113802714A (en) * 2021-09-30 2021-12-17 航天建筑设计研究院有限公司 Shock attenuation formula foundation structure and shock attenuation formula building structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2896523A1 (en) * 2006-01-25 2007-07-27 Joseph Alberici Refuse chute system access door for residential building, has panel articulated to frame, where panel has rear side, that is opposite to that turned towards frame and covered with plate which is made of viscoelastic material
KR20130016902A (en) * 2011-08-09 2013-02-19 주식회사 지케이에코놀로지 Natural circulation type collect and disposal apparatus of food waste materials
CN204826553U (en) * 2015-06-30 2015-12-02 中建三局第二建设工程有限责任公司 High -rise building waste classification handles passageway from buffering formula
CN206319543U (en) * 2016-10-18 2017-07-11 中国建筑第五工程局有限公司 System is transported under skyscraper vertical garbage
CN107472845A (en) * 2017-09-30 2017-12-15 钟国强 A kind of skyscraper garbage-cleaning passage

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2896523A1 (en) * 2006-01-25 2007-07-27 Joseph Alberici Refuse chute system access door for residential building, has panel articulated to frame, where panel has rear side, that is opposite to that turned towards frame and covered with plate which is made of viscoelastic material
KR20130016902A (en) * 2011-08-09 2013-02-19 주식회사 지케이에코놀로지 Natural circulation type collect and disposal apparatus of food waste materials
CN204826553U (en) * 2015-06-30 2015-12-02 中建三局第二建设工程有限责任公司 High -rise building waste classification handles passageway from buffering formula
CN206319543U (en) * 2016-10-18 2017-07-11 中国建筑第五工程局有限公司 System is transported under skyscraper vertical garbage
CN107472845A (en) * 2017-09-30 2017-12-15 钟国强 A kind of skyscraper garbage-cleaning passage

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113638573A (en) * 2021-08-17 2021-11-12 中建八局发展建设有限公司 Super high-rise building garbage treatment device and working method thereof
CN113802714A (en) * 2021-09-30 2021-12-17 航天建筑设计研究院有限公司 Shock attenuation formula foundation structure and shock attenuation formula building structure
CN113802714B (en) * 2021-09-30 2023-03-14 航天建筑设计研究院有限公司 Shock attenuation formula foundation structure and shock attenuation formula building structure

Also Published As

Publication number Publication date
CN108708528B (en) 2019-10-15

Similar Documents

Publication Publication Date Title
CN108708528A (en) A kind of high level civil construction building garbage deployment device
US5704841A (en) Device for accelerating and decelerating objects
CN106965194A (en) A kind of Elevator rescue flight device robot system
CN109809198A (en) Feeding device is built in a kind of room
CN108286324A (en) A kind of skyscraper intelligent garbage separate transport pipeline
CN206158267U (en) Double -deck folding jiffy stand
CN109867148A (en) The feeding device that field uses is built in a kind of room
CN105970870B (en) A kind of municipal works handle car with road ponding
CN105220911B (en) A kind of power station flood discharge runner inspection platform and its erection method
CN101049881A (en) Elevating amusement apparatus of tall building
CN110064492B (en) One-storey house construction waste transportation and treatment device
CN207032786U (en) A kind of atomized dust settling energy dissipating garbage chute
CN106192842B (en) A kind of quick water absorption device based on 3-freedom parallel mechanism
CN105003399B (en) A kind of electricity generation system to be generated electricity using wheel road pavement grinding pressure
CN206567099U (en) A kind of drying centrifuge of intermediate material
GB2224807A (en) Electricity generating system
CN201815027U (en) Portable handheld/hand-push type electrical smoke exhaust device for fire fighting
CN205475226U (en) Double automatic pile driver equipment of 60o
CN208964352U (en) Intelligent liquid counterweight energy conservation and environmental protection elevator
CN205557516U (en) Double continuous pile driver equipment
CN207829434U (en) The operation footstool of portable adjustment height
CN106223843B (en) A kind of method for beating suppending hole using automatic punching chassis in subway tunnel
CN206857923U (en) A kind of outer waterproof system of elevator door
CN112628643B (en) Intelligent lighting system for constructional engineering
KR100997197B1 (en) Fountain apparatus using descent unit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190902

Address after: 233500 Room 103, North Building, 11 Xincheng East Road, Chengguan Town, Mengcheng County, Bozhou City, Anhui Province

Applicant after: Li Fanghua

Address before: 232000 Jingtang Village, Anfeng Town, Shouxian County, Huainan City, Anhui Province

Applicant before: Wu Dong

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190912

Address after: 233500 Lacquer Garden Street 129, Chengguan Town, Mengcheng County, Bozhou City, Anhui Province

Applicant after: Hu Yang

Address before: 233500 Room 103, North Building, 11 Xincheng East Road, Chengguan Town, Mengcheng County, Bozhou City, Anhui Province

Applicant before: Li Fang Hua

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant