CN108693865A - Monitoring system, device and engineering tools - Google Patents

Monitoring system, device and engineering tools Download PDF

Info

Publication number
CN108693865A
CN108693865A CN201810282491.1A CN201810282491A CN108693865A CN 108693865 A CN108693865 A CN 108693865A CN 201810282491 A CN201810282491 A CN 201810282491A CN 108693865 A CN108693865 A CN 108693865A
Authority
CN
China
Prior art keywords
write
processing
monitoring
engineering tools
execution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810282491.1A
Other languages
Chinese (zh)
Inventor
瑗胯搐
西贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Azbil Corp
Original Assignee
Azbil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Azbil Corp filed Critical Azbil Corp
Publication of CN108693865A publication Critical patent/CN108693865A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0208Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0208Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
    • G05B23/0213Modular or universal configuration of the monitoring system, e.g. monitoring system having modules that may be combined to build monitoring program; monitoring system that can be applied to legacy systems; adaptable monitoring system; using different communication protocols
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0259Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
    • G05B23/0267Fault communication, e.g. human machine interface [HMI]
    • G05B23/0272Presentation of monitored results, e.g. selection of status reports to be displayed; Filtering information to the user
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24065Real time diagnostics

Abstract

The present invention relates to a kind of monitoring system, device and engineering tools can stop write-in processing when needing to stop monitoring control because executing write-in processing.Monitoring arrangement (2) has:Storage part (21), storage indicate that the type of write-in processing and monitoring control execute the data whether to be stopped since the write-in is handled;Determination unit (22), when indicating write-in processing by instruction unit (31), with reference to storage part (21), whether judgement monitoring control will stop due to the execution that the write-in is handled;And notification unit (23), it gives the judgement result notice of determination unit (22) to engineering tools (3), engineering tools (3) have receiving portion (32), whether it receives the suspension of write-in processing of the notice based on notification unit (23), when receiving portion (32) receives suspension write-in processing, instruction unit (31) sends out monitoring arrangement (2) instruction for stopping write-in processing.

Description

Monitoring system, device and engineering tools
Technical field
The present invention relates to a kind of device including carrying out monitoring control and the engineering work to described device instruction write-in processing Monitoring system, device and the engineering tools of tool.
Background technology
Conventionally, there is known a kind of monitoring system, to more field devices set in the building such as building or factory into Row monitoring control (referring for example to patent document 1).The monitoring system has:Control device carries out the monitoring control of field device System;Monitoring arrangement carries out the monitoring control of control device;And engineering tools, build monitoring system.Also, control dress It sets, monitoring arrangement and engineering tools are configured to use standardized open communication agreement BACnet (BuildingAutomation and Control networking protocol:Building automation and coutrol Data Communication in Computer Networks Agreement) (registered trademark) etc. be in communication with each other.
Existing technical literature
Patent document
Patent document 1:Japanese Patent Laid-Open 2014-153827 bulletins
Invention content
Problems to be solved by the invention
On the other hand, make the setting reflection in engineering tools to when monitoring arrangement (hereinafter referred to as write-in processing), sometimes Monitoring arrangement can be caused to temporarily cease monitoring control.
Executing which kind of write-in processing can cause monitoring arrangement to stop monitoring control, each not phase according to version of monitoring arrangement etc. Together.Therefore, user is difficult to judge that monitoring controls whether to stop.In addition, the setting in engineering tools is made to reflect to control device When there is also same problems.
The present invention be for solve the problems, such as it is as described above complete, and it is an object of the present invention to provide a kind of monitoring system, due to The execution of processing is written and needs in the case of stopping monitoring control, said write processing can be stopped.
Technical means to solve problem
Monitoring system of the present invention is characterized in that having:Device carries out monitoring control;And engineering tools, There is the instruction unit for indicating described device write-in processing, device to have for it:Storage part, storage indicate the kind of write-in processing The execution data whether to be stopped that class and monitoring control are handled due to the write-in;Determination unit is indicated in instruction unit and is write In the case of entering processing, with reference to storage part, whether judgement monitoring control will stop due to the execution that the write-in is handled;And notice Portion, by the judgement result notice of determination unit to engineering tools, engineering tools have receiving portion, receive logical based on notification unit Whether the suspension for the write-in processing known, in the case where receiving suspension write-in processing by receiving portion, instruction unit indicates device The suspension of write-in processing.
The effect of invention
According to the present invention, due to constituting as described above, so needing to stop monitoring control in the execution due to write-in processing In the case that stop is stopped, write-in processing can be stopped.
Description of the drawings
Fig. 1 is the figure for the configuration example for indicating the monitoring system involved by embodiments of the present invention 1.
Fig. 2 is to indicate that the write-in of the monitoring arrangement involved by embodiments of the present invention 1 handles the figure of relevant configuration example.
Fig. 3 is to indicate that the write-in of the engineering tools involved by embodiments of the present invention 1 handles the figure of relevant configuration example.
Fig. 4 is the figure for the write-in processing for indicating that the monitoring system involved by embodiments of the present invention 1 is carried out.
Specific implementation mode
Hereinafter, detaileding description of embodiments of the present invention while with reference to attached drawing.
Embodiment 1
Fig. 1 is the figure for the configuration example for indicating the monitoring system involved by embodiments of the present invention 1.
Monitoring system includes multiple controllers (control device) 1, monitoring arrangement 2 and engineering tools 3.Controller 1, monitoring arrangement 2 And engineering tools 3 can be in communication with each other using BACnet etc..Also, it is connected with multiple field devices in controller 1 (not scheme Show).In addition, in monitoring system, by measured values such as the temperature obtained by field device and for the controlling value of field device Equal data processings are that the data management unit on software monitors point.
Controller 1 carries out monitoring control according to the control of monitoring arrangement 2 to the monitoring point of the more field devices connected System.
Monitoring arrangement 2 carries out monitoring control to many motors control device 1 connected.
Engineering tools 3 build monitoring system.Have in controller 1 and monitoring that is, engineering tools 3 make record Device 2 carries out the project data of the information (control device information, prison view information and object information etc.) of monitoring control.So Afterwards, engineering tools 3 indicate write-in processing based on made project data to controller 1 and monitoring arrangement 2.In addition, below Write-in processing for monitoring arrangement 2 illustrates.
Then, on one side with reference to Fig. 2, relevant configuration example is handled to the write-in of monitoring arrangement 2 on one side and is illustrated.
As shown in Fig. 2, monitoring arrangement 2 has storage part 21, determination unit 22, notification unit 23 and enforcement division 24.In addition, determination unit 22, notification unit 23 and enforcement division 24 are by system LSI (Large Scale Integration:Large-scale integrated) etc. place Reason circuit, CPU (the Central Processing Unit for executing the program for being stored in memory etc.:Central processing unit) etc. It realizes.
Storage part 21 stores the type for indicating write-in processing and monitoring control since whether the execution that the write-in is handled is wanted The data of stopping.Above-mentioned data are set when monitoring arrangement 2 is manufactured and dispatched from the factory or by by function addition when upgraded version etc. It is fixed.In addition, storage part 21 is by HDD (Hard Disk Drive:Hard disk drive), DVD (Digital Versatile Disc: Digital video disk) or the compositions such as memory.
In the case where indicating write-in processing by the aftermentioned instruction unit 31 of engineering tools 3, determination unit 22 is with reference to storage Whether portion 21, judgement monitoring control will stop due to the execution that the said write is handled.
Notification unit 23 notifies engineering tools 3 the judgement result of determination unit 22.
Enforcement division 24 executes write-in processing.At this point, enforcement division 24 is being indicated the execution of write-in processing by instruction unit 31 Stage starts the execution of write-in processing.
Then, the relevant configuration example of write-in processing that engineering tools 3 are directed at while with reference to Fig. 3 illustrates.
As shown in figure 3, engineering tools 3 have instruction unit 31 and receiving portion 32.In addition, instruction unit 31 and receiving portion 32 are to pass through to be The processing circuit of system LSI etc., execution are stored in CPU of program of memory etc. etc. to realize.
Instruction unit 31 indicates write-in processing according to the requirement of the user of engineering tools 3 to monitoring arrangement 2.That is, being wanted in user Ask carry out write-in processing when, instruction unit 31 be based on project data, make comprising indicate for carrying out write-in processing in monitoring arrangement 2 Writing position and be written content information file.Then, instruction unit 31 notifies monitoring arrangement 2 made file, And indicate that write-in is handled.
In addition, in the case of receiving suspension write-in processing by receiving portion 32 after indicating monitoring arrangement 2 write-in processing, Instruction unit 31 indicates the monitoring arrangement 2 suspension of write-in processing.In addition, after indicating write-in processing to monitoring arrangement 2, It is received by receiving portion 32 in the case of executing write-in processing, instruction unit 31 indicates write-in processing to the monitoring arrangement 2 Execution.
Receiving portion 32 receives the write-in processing of the notice of the notification unit 23 based on monitoring arrangement 2 from the user of engineering tools 3 Suspension whether.
Herein, in monitoring arrangement 2, execute side by side it is various monitoring (obtain monitoring point process and update show picture into Journey etc.).Moreover, setting value (attribute) etc. of each monitoring control with reference to title, the object ID (object ID) of monitoring point etc..Separately Outside, object ID refers to, by the identification code for the object that the type (object type) of object and the instance number of the object form.As Object type, for example, AI (Analog Input can be enumerated:Simulation input), AO (Analog Output:Simulation output), BI (Binary Input:Binary system), BO (Binary Output:Binary system exports) etc..In addition, instance number refers to, distribution To each device or the number of each object type.
For example, when the setting value that multiple monitoring control institute's reference is changed to " 20 " from " 10 ", all monitoring control is same When with setting value be that " 20 " are acted, but sometimes, it may occur that certain monitoring control can be " 10 " with setting value into It is inconsistent that work, the others of taking action monitor that control is acted with setting value for " 20 ".In order to which portion's generation is such inconsistent, The scheduling etc. of monitoring control is carried out in monitoring system, but avoid completely it is inconsistent very difficult, especially for multiple prisons Setting value depending on the reference of control institute is more difficult.Therefore, in this case, carry out temporarily ceasing monitoring arrangement 2 sometimes Monitoring controls and then updates the action of setting value.
Like this, it has because executing write-in processing in monitoring arrangement 2, and the monitoring of monitoring arrangement 2 control temporarily ceases The case where.Therefore, the monitoring system involved by embodiment 1 is constituted using following:Write-in processing is indicated from engineering tools 3 In the case of, in monitoring arrangement 2, judgement monitoring control controls meeting since whether the execution that the write-in is handled will stop, and in monitoring In the case of stopping, write-in processing can be stopped.
Then, on one side with reference to Fig. 4, a write-in processing example for facing monitoring system as constructed as above illustrates.In addition, figure To be indicated in case of carrying out the suspension of write-in processing in 4.
Also, in the storage part of monitoring arrangement 2 21, the type for indicating write-in processing and monitoring control are stored with due to this The execution data whether to be stopped of processing are written.In the data, for example, being the change for only monitoring title a little in write-in processing In the case of more, it is set as that the monitoring control of monitoring arrangement 2 need not be stopped.On the other hand, it is pair in write-in processing in BACnet As identification code change in the case of, be set as stop monitoring arrangement 2 monitoring control.
As shown in figure 4, in the write-in processing example of the monitoring system, first, the instruction unit 31 of engineering tools 3 is according to engineering The requirement of the user of tool 3 indicates that write-in handles (step ST401) to monitoring arrangement 2.That is, when user requires to carry out at write-in When reason, instruction unit 31 is primarily based on the project data produced so far, makes the text for being written in monitoring arrangement 2 Part.Then, instruction unit 31 notifies monitoring arrangement 2 made file, and indicates that write-in is handled.
Then, the determination unit 22 of monitoring arrangement 2 judges with reference to storage part 21 since the instruction unit 31 of engineering tools 3 is signified The execution monitoring for the write-in processing shown controls whether to stop (step ST402).Specifically, based on being notified from instruction unit 31 File, with reference to the position (such as title or object ID etc. of monitoring point) for being handled and being changed according to write-in, and according to coming The data stored from storage part 21 judge that the write-in processing monitoring due to this controls whether to stop.For example, being handled in write-in Be monitoring point title change in the case of, determination unit 22 be determined as monitoring control will not stop.On the other hand, at write-in In the case that reason is the change of object ID, determination unit 22 is determined as that monitoring control can stop.
Then, the notification unit 23 of monitoring arrangement 2 notifies engineering tools 3 the judgement result (step ST403) of determination unit 22.
Then, the receiving portion 32 of engineering tools 3 receives the notification unit 23 based on monitoring arrangement 2 from the user of engineering tools 3 Notice write-in processing suspension whether (step ST404).
In this step ST404, in the case where receiving portion 32 has received execution write-in processing, the finger of engineering tools 3 Show that portion 31 indicates monitoring arrangement 2 execution of write-in processing.For example, being night in the time-bands for carrying out the instruction of write-in processing In the case of Deng the time-bands that like that need not monitor control, even if monitoring control since the write-in is handled and stopping there will not be Problem.Therefore, in the case of such a, user requires to execute write-in processing.
Then, the enforcement division 24 of monitoring arrangement 2 starts to execute write-in processing.That is, enforcement division 24 is based on notifying from instruction unit 31 File, and execute write-in processing.Then, a succession of processing terminates.
On the other hand, in the case that receiving portion 32 has received suspension write-in processing in step ST404, engineering tools 3 Instruction unit 31 to monitoring arrangement 2 indicate the write-in processing suspension (step ST405).For example, carrying out the instruction of write-in processing Time-bands be daytime etc. like that need monitoring control time-bands in the case of, if due to the write-in handle and monitor control Stop, then can go wrong.Therefore, in the case of such a, user requires to stop write-in processing.In this case, monitoring arrangement 2 Enforcement division 24 do not execute said write processing.Then, a succession of processing terminates.
In addition, in this case, because being not carried out write-in processing, the user of engineering tools 3 can be at such as night In need not monitor that the time-bands etc. of control require write-in to handle again like that.
User can easily be determined that the monitoring of the execution monitoring arrangement 2 due to write-in processing controls whether to stop as a result, Only, and in the case where being not intended to monitoring control to stop, write-in processing can be stopped.
Furthermore above, to after the judgement result that monitoring arrangement 2 notifies determination unit 22, the user of engineering tools 3 exists Confirm that the case where write-in processing is required to stop or executed on the basis of the judgement result is described.
However be not limited to this, user also can in advance (it is required that in step ST401 instruction write-in processing before) to engineering tools 3 It is set, so as to automatic in the case where the judgement result indicates that the execution by write-in processing can cause monitoring control to stop Stop write-in processing.User notifies the judgement result without waiting as a result,.
As described above, according to the present embodiment 1, monitoring arrangement 2 has:Storage part 21, storage indicate write-in processing The execution data whether to be stopped that type and monitoring control are handled due to the write-in;Determination unit 22, by instruction unit 31 When indicating write-in processing, with reference to storage part 21, whether judgement monitoring control will stop due to the execution that the write-in is handled;And Notification unit 23, by the judgement result notice of determination unit 22 to engineering tools 3, engineering tools 3 have receiving portion 32, receive base Whether the suspension of the write-in processing of the notice of notification unit 23, when receiving portion 32 receives suspension write-in processing, instruction unit 31 The suspension of write-in processing is indicated monitoring arrangement 2.Since monitoring arrangement 2 is constituted in the above-described manner, so at due to write-in The execution of reason and need stop monitoring control in the case of can stop the write-in processing.
In addition, hereinbefore, to judging monitoring arrangement 2 due to write-in processing based on the data for being stored in storage part 21 The case where whether execution will stop is described.However be not limited to this, such as, it is also possible to engineering tools 3 are regular or indefinite The above-mentioned data that the storage part 21 of monitoring arrangement 2 is stored are extracted and be maintained to phase, is used in combination engineering tools 3 carry out above-mentioned whether want The judgement of stopping.
In addition, above, the write-in processing for monitoring arrangement 2 is illustrated.However it is not limited to this, engineering work The similarly instruction write-in processing of 3 pairs of controllers 1 of tool, controller 1 are temporarily ceased because write-in processing is executed to existing sometimes The monitoring of field device controls.Therefore, for controller 1, it may also set up write-in identical with monitoring arrangement 2 and handle relevant structure At, and same effect can be obtained.
In addition, the present application is within the scope of the invention, the change of the arbitrary inscape of embodiment can be carried out The omission of the arbitrary inscape of shape or embodiment.
Symbol description
1 controller (control device)
2 monitoring arrangements
3 engineering tools
21 storage parts
22 determination units
23 notification units
24 enforcement divisions
31 instruction units
32 receiving portions.

Claims (7)

1. a kind of monitoring system, which is characterized in that have:
Device carries out monitoring control;And
Engineering tools have the instruction unit for indicating described device write-in processing,
Described device has:
Storage part, storage indicate whether the type of write-in processing and monitoring control are wanted due to the execution that the write-in is handled The data of stopping;
Determination unit, in the case where indicating write-in processing by the instruction unit, with reference to the storage part, judgement monitoring control Whether to stop due to the execution of write-in processing;And
Notification unit gives the judgement result notice of the determination unit to the engineering tools,
The engineering tools have receiving portion, whether receiving the suspension of write-in processing of the notice based on the notification unit,
The instruction unit indicates in the write-in processing described device when receiving suspension write-in processing by the receiving portion Only.
2. monitoring system according to claim 1, which is characterized in that
The instruction unit indicates that the write-in processing is held when receiving execution write-in processing by the receiving portion to described device Row;
Described device has enforcement division, and the stage for executing write-in processing is being indicated by the instruction unit, is being started at the write-in The execution of reason.
3. monitoring system according to claim 1 or 2, which is characterized in that
Described device is that the monitoring arrangement of monitoring control is carried out to control device.
4. monitoring system according to claim 1 or 2, which is characterized in that
Described device is that the control device of monitoring control is carried out to field device.
5. the monitoring system according to claim 3, which is characterized in that
Described device is that the control device of monitoring control is carried out to field device.
6. a kind of device, which is characterized in that have:
Storage part, storage indicate whether the type of write-in processing and monitoring control are wanted due to the execution that the write-in is handled The data of stopping;
Determination unit, in the case where indicating write-in processing by engineering tools, with reference to the storage part, judgement monitoring control by Whether to stop in the execution of write-in processing;And
Notification unit gives the judgement result notice of the determination unit to the engineering tools.
7. a kind of engineering tools, which is characterized in that have:
Instruction unit, to device instruction write-in processing;And
Receiving portion, receive judge by described device, based on monitoring control due to indicated by the instruction unit write-in handle Execution and whether to be stopped, write-in processing suspension whether,
In the case where the receiving portion receives suspension write-in processing, the instruction unit indicates that the write-in is handled to described device Suspension.
CN201810282491.1A 2017-04-03 2018-04-02 Monitoring system, device and engineering tools Pending CN108693865A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017-073740 2017-04-03
JP2017073740A JP6870897B2 (en) 2017-04-03 2017-04-03 Surveillance systems, devices and engineering tools

Publications (1)

Publication Number Publication Date
CN108693865A true CN108693865A (en) 2018-10-23

Family

ID=63844752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810282491.1A Pending CN108693865A (en) 2017-04-03 2018-04-02 Monitoring system, device and engineering tools

Country Status (3)

Country Link
JP (1) JP6870897B2 (en)
KR (1) KR102042737B1 (en)
CN (1) CN108693865A (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09152910A (en) * 1995-11-30 1997-06-10 Toshiba Corp Monitor and control equipment for power system
JPH09230924A (en) * 1996-02-21 1997-09-05 Toshiba Corp Monitor and control equipment
JP2004235791A (en) * 2003-01-29 2004-08-19 Fujitsu Access Ltd Method for altering setting of transmitter
JP2008210055A (en) * 2007-02-23 2008-09-11 Matsushita Electric Works Ltd Monitor and control apparatus
CN101951391A (en) * 2010-04-13 2011-01-19 杭州海康威视系统技术有限公司 Method, device and system for remotely upgrading monitoring equipment
CN102098493A (en) * 2009-12-11 2011-06-15 鸿富锦精密工业(深圳)有限公司 System and method for adjusting monitor parameters
CN102523660A (en) * 2011-12-30 2012-06-27 四川长虹电器股份有限公司 Streetlamp controller remote upgrading method
CN102983999A (en) * 2012-11-22 2013-03-20 安科智慧城市技术(中国)有限公司 Method and system for parameter configuration of monitoring platform system and device group
JP2014153827A (en) * 2013-02-06 2014-08-25 Azbil Corp Engineering device and engineering method
CN104469278A (en) * 2013-09-25 2015-03-25 浙江大华技术股份有限公司 Method and device for upgrading monitoring system
CN104750061A (en) * 2013-12-27 2015-07-01 阿自倍尔株式会社 Facility controlling system and history recording method
CN105183503A (en) * 2015-08-12 2015-12-23 浪潮(北京)电子信息产业有限公司 Secure upgrading method and apparatus for security software
CN105959644A (en) * 2016-06-21 2016-09-21 浙江宇视科技有限公司 Method and device for configuration of video monitoring equipment
KR20160150591A (en) * 2015-06-22 2016-12-30 아즈빌주식회사 Monitoring system and engineering tool

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006099171A (en) * 2004-09-28 2006-04-13 Yokogawa Electric Corp Command issuing method
JP5992775B2 (en) * 2012-09-04 2016-09-14 株式会社キーエンス Pluggable logic controller

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09152910A (en) * 1995-11-30 1997-06-10 Toshiba Corp Monitor and control equipment for power system
JPH09230924A (en) * 1996-02-21 1997-09-05 Toshiba Corp Monitor and control equipment
JP2004235791A (en) * 2003-01-29 2004-08-19 Fujitsu Access Ltd Method for altering setting of transmitter
JP2008210055A (en) * 2007-02-23 2008-09-11 Matsushita Electric Works Ltd Monitor and control apparatus
CN102098493A (en) * 2009-12-11 2011-06-15 鸿富锦精密工业(深圳)有限公司 System and method for adjusting monitor parameters
CN101951391A (en) * 2010-04-13 2011-01-19 杭州海康威视系统技术有限公司 Method, device and system for remotely upgrading monitoring equipment
CN102523660A (en) * 2011-12-30 2012-06-27 四川长虹电器股份有限公司 Streetlamp controller remote upgrading method
CN102983999A (en) * 2012-11-22 2013-03-20 安科智慧城市技术(中国)有限公司 Method and system for parameter configuration of monitoring platform system and device group
JP2014153827A (en) * 2013-02-06 2014-08-25 Azbil Corp Engineering device and engineering method
CN104469278A (en) * 2013-09-25 2015-03-25 浙江大华技术股份有限公司 Method and device for upgrading monitoring system
CN104750061A (en) * 2013-12-27 2015-07-01 阿自倍尔株式会社 Facility controlling system and history recording method
KR20160150591A (en) * 2015-06-22 2016-12-30 아즈빌주식회사 Monitoring system and engineering tool
CN105183503A (en) * 2015-08-12 2015-12-23 浪潮(北京)电子信息产业有限公司 Secure upgrading method and apparatus for security software
CN105959644A (en) * 2016-06-21 2016-09-21 浙江宇视科技有限公司 Method and device for configuration of video monitoring equipment

Also Published As

Publication number Publication date
JP6870897B2 (en) 2021-05-12
JP2018180592A (en) 2018-11-15
KR20180112709A (en) 2018-10-12
KR102042737B1 (en) 2019-11-08

Similar Documents

Publication Publication Date Title
US10146599B2 (en) System and method for a generic actor system container application
US20190146830A1 (en) Template-driven multi-tenant workflow processing
EP3065010B1 (en) Field device commissioning system and method
EP3074826B1 (en) Offloading human-machine-interaction tasks
TW201909046A (en) a microprocessor containing a model of the enterprise
CN107272549A (en) Control device, control method and program
EP3489776B1 (en) Control device, control method, and program
CN105678522A (en) Workflow engine and project management system based on workflow
CN102983999A (en) Method and system for parameter configuration of monitoring platform system and device group
US20160306656A1 (en) Intelligent application back stack management
EP3413149A1 (en) Field device commissioning system and field device commissioning method
JP7063292B2 (en) Control system, configuration device, and configuration program
TW202006614A (en) Constraint programming using block-based workflows
US8818783B2 (en) Representing state transitions
EP3104236B1 (en) Control device, control system, support apparatus, and control-device maintenance management method
CN108693865A (en) Monitoring system, device and engineering tools
CN109670082B (en) System and method for design data analysis
CN113626163A (en) Lightweight distributed increment self-scheduling method, system, equipment and medium
US8560095B2 (en) Changeable BACnet interface
EP2975516B1 (en) Intelligent application back stack management
CN112262350A (en) Block-based prediction for manufacturing environments
CN103503494A (en) Systems and methods for modifying content of mobile communication devices
CN113762821B (en) Cargo information processing method, device, equipment and storage medium
EP3905028A1 (en) System for providing software development environment, method for providing software development environment, and non-transitory computer readable medium
CN108664393B (en) Multi-server resource pool compatibility testing and correcting method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181023