CN108691038A - Combing machine frame constructs - Google Patents
Combing machine frame constructs Download PDFInfo
- Publication number
- CN108691038A CN108691038A CN201810251586.7A CN201810251586A CN108691038A CN 108691038 A CN108691038 A CN 108691038A CN 201810251586 A CN201810251586 A CN 201810251586A CN 108691038 A CN108691038 A CN 108691038A
- Authority
- CN
- China
- Prior art keywords
- frame
- cell
- combing
- combing machine
- pivotally supported
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01G—PRELIMINARY TREATMENT OF FIBRES, e.g. FOR SPINNING
- D01G19/00—Combing machines
- D01G19/06—Details
- D01G19/24—Framework; Casings; Coverings
Landscapes
- Engineering & Computer Science (AREA)
- Textile Engineering (AREA)
- Preliminary Treatment Of Fibers (AREA)
Abstract
The present invention provides a kind of combing machine frame construction that can easily transport combing machine.Combing machine frame is configured to be divided into:Left cell (U1) links with multiple long side direction one end and left side frame (24) and constitutes the left side beam structure member (27) of the part of beam (26);With right sided cell (U2), the right side beam structure member (28) of multiple parts for linking with right side frame (25) with long side direction one end and constituting beam (26).Right sided cell (U2) has central frame (39), the central frame (39) links with the long side direction other end of left side beam structure member (27) and the long side direction other end of right side beam structure member (28), in left cell (U1), has the beam support frame (F) supported to left side beam structure member (27).
Description
Technical field
The present invention relates to combing machine frame constructions.
Background technology
In general, combing machine has the homework department for being equipped with 8 combing heads.As such a combing machine frame structure
It makes, such as there is frame disclosed in Patent Document 1 to construct.Combing machine frame construction disclosed in Patent Document 1 has:Left frame
Frame and right side frame, left side frame and right side frame are configured to across whole combing heads;And track (beam), it is set up in left side
Frame and right side frame.Moreover, the tongs plate axis of combing head, cylinder axis and detaching roller are via the bracket for being fixed on upper siding track
It is supported in siding track.
Patent document 1:Japanese Unexamined Patent Publication 2012-1844 bulletins
However, in recent years, as combing machine, proposing the combing machine for having the homework department for being equipped with 12,16 combing heads.
In the frame construction supported to 12,16 combing heads, the track that is linked between left side frame and right side frame
It is extended, compared with the combing machine for having the homework department for being equipped with 8 combing heads, it is difficult to transport.
Invention content
The purpose of the present invention is to provide the combing machine frame constructions that can easily transport combing machine.
Combing machine frame construction for solving the above problems a little is characterized by, and is had:Left side frame and right side frame,
The left side frame and right side frame are configured to across whole combing heads;And more beams, they are set up in the left side frame
It with the right side frame, and is set up in parallel in parallel to each other, wherein combing machine can be divided into:Left cell, with institute
State the more girder construction components that left side frame and length direction one end link and constitute a part for the beam with the left side frame;
And right sided cell, link with the right side frame with the right side frame and length direction one end and constitutes one of the beam
Point more girder construction components, any one unit in the left cell and the right sided cell has central frame, described
The beam of central frame and the long side direction other end and the right sided cell of the girder construction component of the left cell
The long side direction other end of structure member links, another unit in the left cell and right sided cell has to the beam
The beam support frame that structure member is supported.
Using the structure, it is set as combing machine frame construction that can be divided into left cell and right sided cell, thus, it is possible to
Segmentation combing machine is transported, and compared with the case where transporting combing machine under ameristic state, is easy transport combing machine.And
And left cell and right sided cell can be maintained girder construction component in parallel to each other by central frame or beam support frame
The state being set up in parallel.Even if combing head to be supported on to the girder construction component of left cell or the beam knot of right sided cell as a result,
Structure component, girder construction component will not be bent, and can combing head be separately equipped with to the state in left cell and right sided cell
It is lower to be transported respectively.
In addition, related combing machine frame construction, Ke Yishi, the combing machine have the work for being equipped with 12 combing heads
Industry portion is arranged 8 combing heads in the left cell, also, 4 combing heads is arranged in the right sided cell.
Using the structure, common combing machine frame construction has the homework department for being equipped with 8 combing heads.By in left side
8 combing heads are arranged in unit, and thus, it is possible to left cell is set as frame identical with common combing machine to construct.Therefore, lead to
It crosses and adds right sided cell in the left cell constructed as common combing machine frame, thus, it is possible to build to have to be equipped with 12
The combing machine of the homework department of combing head.
In addition, related combing machine frame construction, Ke Yishi, the combing machine have the work for being equipped with 12 combing heads
Industry portion has been separately equipped with 6 combing heads in the left cell and the right sided cell.
Using the structure, common combing machine frame construction has the homework department for being equipped with 8 combing heads.By in left side
Unit and right sided cell are separately equipped with 6 combing heads, thus enable that size in the long side direction and the right side of left cell
The common combing machine frame construction of size ratio in the long side direction of unit is small.
In addition, related combing machine frame construction, Ke Yishi will be to described in the left cell and the right sided cell
What the axis (axis, cylinder axis, detaching roller and the tongs plate axis of lap roller) that combing head has was supported is pivotally supported frame
Link with the girder construction component, and the central frame has and is pivotally supported portion to what the axis was supported.
Using the structure, left cell and right sided cell are linked up and while build combing machine frame construction,
It can be arranged between left cell and right sided cell and be pivotally supported portion.Moreover, left cell and right sided cell can be utilized to be had
The standby frame that is pivotally supported supports the axis of combing head with the portion that is pivotally supported that central frame has.
In accordance with the invention it is possible to easily transport combing machine.
Description of the drawings
In Fig. 1, (a) is the schematic front view for the combing machine frame construction for showing embodiment, is (b) to show and middle boxes
The partial front elevation view of the connection construction of frame.
Fig. 2 is the diagrammatic side view of combing head.
Fig. 3 is the 3-3 line sectional views for the Fig. 1 for showing combing machine frame construction.
Fig. 4 is the schematic front view for showing to be divided into left cell and the state of right sided cell.
Fig. 5 is the 5-5 line sectional views for the Fig. 1 for showing combing machine frame construction.
Fig. 6 is the 6-6 line sectional views for the Fig. 1 for showing combing machine frame construction.
Fig. 7 is the 7-7 line sectional views for the Fig. 1 for showing combing machine frame construction.
Fig. 8 is the schematic front view for showing to be divided into left cell and the state of right sided cell in other examples.
Specific implementation mode
Hereinafter, according to Fig. 1~Fig. 7, the embodiment that combing machine frame construction is embodied is illustrated.Such as
Shown in (a) in Fig. 1, combing machine has the homework department for being equipped with 12 combing heads 11.
As shown in Fig. 2, each combing head 11 has:A pair of of lap roller 12;Nipper device 14 has feed roll motor 13;
Combing cylinder 15 is rotated integrally with cylinder axis 15a;And front and back two pairs of detaching rollers 16,17, front and back two pairs of detaching rollers
16,17 have top detaching roller 16a, 17a and bottom detaching roller 16b, 17b (detaching roller 16,17 be respectively up and down in a pair,
Pairs of detaching roller has two pairs front and back).Nipper device 14 has nipper frame 18, which is disposed of can be in essence
Front and back advance in top for combing cylinder 15 swings, and nipper frame 18 has nipper plate 19 in its bottom.On nipper frame 18, by fulcrum
Nipper arm 20 is arranged and configured to rotate by 18a, and nippers 20a is fixed on the top of nipper arm 20.Nippers 20a and nipper frame
18 front and back traveling pendulum motion synchronizes, and in the folding of regulation moment, cooperates with nipper plate 19 and holds cotton roll L.On nipper frame 18,
Top comb 21 is installed as implementation regulation movement synchronous with nipper frame 18 in the front of nipper plate 19.
At the rear of combing cylinder 15 and in the lower section of nipper frame 18, tongs plate axis 22 be equipped being capable of reciprocating rotation.
The first end of nipper frame actuating arm 23 by can with 22 unitary rotation of tongs plate axis in a manner of be fixed on tongs plate axis 22, in nipper frame
The rear end of the second end of actuating arm 23, nipper frame 18 is supported to rotate via fulcrum 23a.Nipper frame 18 is constituted
For by the reciprocating rotation (pendulum motion) of tongs plate axis 22, the top end part of nipper plate 19 relative to detaching roller 16,17 to connect
Closely, the mode swing detached.
Next, being illustrated to combing machine frame construction.
As shown in (a) in Fig. 1, combing machine frame construction has the left side frame 24 being configured to across whole combing heads 11
The beam 26 of left side frame 24 and right side frame 25 is set up in right side frame 25 and 4 (referring to Fig. 3).In addition, combing machine frame
Framework is made to be formed by linking up left cell U1 with right sided cell U2.In addition, left cell U1 is seen from front
It is located at the unit in left side in the case of examining combing machine, right sided cell U2 is to be located at right side in the case of the combing machine from front
Unit.
First, left cell U1 and right sided cell U2 are illustrated.
Left cell U1 has 24,4 left side beams as girder construction component linked with left side frame 24 of left side frame
Structure member 27 and the auxiliary frame 36 linked with left side beam structure member 27.As shown in figure 3, left side frame 24 is in approximate square
Shape plate.Each left side beam structure member 27 has left flange 27a in long side direction one end, by screw 40 from left flange 27a with
24 screw-thread fit of left side frame, and each left side beam structure member 27 is implemented to link.
As shown in (b) in (a) or Fig. 1 in Fig. 1, each left side beam structure member 27 has in the long side direction other end
Link and uses flange 27b, connection flange 27b that can be connect with the central frame 39 of right sided cell U2.4 left side beam structure members
27 are set up in parallel in parallel to each other.If the face with left flange 27a connections in left side frame 24 is set as side surface 24b, left side
The long side direction of girder construction component 27 is orthogonal with the side surface 24b of left side frame 24.
As shown in figure 3, left cell U1 has is pivotally supported frame 37 by 27 bearing of left side beam structure member of upside 2.
It is pivotally supported frame 37 and is anchored on the 2 left side beam structure members 27 in upside by fastening unit (not shown).Frame 37 is pivotally supported to exist
8 have been equally spaced on the long side direction of left side beam structure member 27.On the long side direction of left side beam structure member 27
Adjacent be pivotally supported between frame 37 is equipped with combing head 11, and left cell U1, which is in, has the work for being equipped with 8 combing heads 11
The state in industry portion.
In the front side for being pivotally supported frame 37, be supported with bottom detaching roller 16b in the detaching roller 16,17 as axis,
17b is being supported with cylinder axis 15a than the position of bottom detaching roller 16b, 17b on the lower.In the rear side bearing for being pivotally supported frame 37
There is tongs plate axis 22, the top of the tongs plate axis 22 in being pivotally supported frame 37 is supported with the axis 12a of lap roller 12.Lap roller 12
Axis 12a, cylinder axis 15a, tongs plate axis 22 is can support the length of each component for 8 combing heads 11 that left cell U1 has
Degree.
Each axis 12a, 15a, 22 length in the axial direction and left cell U1 the almost phase of length in the long side direction
Together, but each axis 12a, 15a, 22 can be in the axial direction centre position be split.It forms as a result, each in the state of dividing
Axis 12a, 15a, 22 be each component that can support 4 combing heads 11 length.Middle position in the axial direction forms point
Each axis 12a, 15a, the 22 not shown shaft couplings cut link.
As shown in (a) or Fig. 5 in Fig. 1, left cell U1 is in the left side beam structure member 27 of upside 2 and in downside 2
Have the first auxiliary frame 36a and the second auxiliary frame 36b between root left side beam structure member 27.First auxiliary frame 36a with
The 8th is pivotally supported the connection of frame 37 from 24 side number of left side frame.First auxiliary frame 36a is linked to left side beam structure member 27
In the position farthest from left side frame 24, i.e., with the long side direction other end of same left side beam structure member 27 is immediate is pivotally supported
Frame 37 links.
Second auxiliary frame 36b with from 24 side number of left side frame the 5th be pivotally supported frame 37 connection.Second auxiliary frame
Close to the centre of 24 the two of the first auxiliary frame 36a and left side frame on the long side direction of 36b and left side beam structure member 27
Position at be pivotally supported frame 37 connection.
Each auxiliary frame 36a, 36b are formed as two tooth fork-shapeds.The upper end of each auxiliary frame 36a, 36b are being pivotally supported frame 37
Lower surface at link with being pivotally supported frame 37 and formed, each lower ends of two tooth forks respectively with the left side beam structural portion of downside 2
The upper surface of part 27 links.
Left cell U1 in the left side beam structure member 27 of downside 2 with each auxiliary frame 36a, 36b link in place of have
Standby leg 38.The lower face 38a of each leg 38 and the lower face 24a of left side frame 24 are in the same plane.By these
The lower face 24a of the left side frame 24 and lower face 38a of each leg 38, state left cell U1 being placed on horizontal plane
Under, each left side beam structure member 27 is in horizontal-extending state.4 left side beam structure members 27 are respectively by being pivotally supported frame
37, each auxiliary frame 36a, 36b and leg 38 are by maintain the state support being mutually parallel.That is, by by being pivotally supported frame
37, the beam support frame F that the first auxiliary frame 36a, the second auxiliary frame 36b and leg 38 are constituted, each left side beam structural portion
Part 27 is supported in the state of the dislocation on inhibiting short transverse.
Next, illustrating right sided cell U2.
As shown in (a) or Fig. 6 in Fig. 1, there is right sided cell U2 right side frame 25,4 to link with right side frame 25
Right side beam structure member 28 and with right side beam structure member 28 link central frame 39.
Right side frame 25 is in approximate rectangular plate.Each right side beam structure member 28 has right flange in long side direction one end
28a makes screw 40 from right flange 28a and 25 screw-thread fit of right side frame, and implements to link to each right side beam structure member 28.
As shown in (b) or Fig. 7 in Fig. 1, each right side beam structure member 28 has connection in the long side direction other end and uses
Flange 28b, connection flange 28b by make screw 40 and central frame 39 screw-thread fit by link with central frame 39.It is intermediate
Frame 39 is in approximate rectangular plate.The lower face 39a of central frame 39 is generally aligned in the same plane with the lower face 25a of right side frame 25
On.Each right side beam structure member 28 is set up in right side frame 25 and central frame 39, and right side beam structure member 28 builds beam construction.
4 right side beam structure members 28 maintain the state being set up in parallel in parallel to each other.If by connecting with right flange 28a in right side frame 25
The face of knot is set as side surface 25b, then the long side direction of right side beam structure member 28 is orthogonal with the side surface 25b of right side frame 25.
In the state that right sided cell U2 is placed on horizontal plane, each 28 horizontal extension of right side beam structure member.
Right sided cell U2 has is pivotally supported frame 37 by 28 bearing of right side beam structure member of upside 2.It is pivotally supported frame
37 are anchored on the 2 right side beam structure members 28 in upside by fastening unit (not shown).Frame 37 is pivotally supported in right side girder construction
4 have been equally spaced on the long side direction of component 28.The adjacent axis branch on the long side direction of right side beam structure member 28
Combing head 11 is equipped between support frame frame 37.Right sided cell U2 is in the state for having the homework department for being equipped with 4 combing heads 11.
Central frame 39 has on top is pivotally supported portion 39b.Right sided cell U2 has at 4 positions is pivotally supported frame 37,
And have and be pivotally supported portion 39b, this be pivotally supported portion 39b be in from 25 side number of right side frame the 4th be pivotally supported 37 phase of frame
Adjacent state.In right sided cell U2, for the 4th combing head 11 from 25 side number of right side frame, it is provided on the right side of it
It is pivotally supported frame 37, portion 39b is pivotally supported what left side was provided with central frame 39.Each axis 12a that right sided cell U2 has,
15a, 22 length in the axial direction be each component that can support 4 combing heads 11 length.
Moreover, make screw 40 run through left cell U1 each left side beam structure member 27 connection flange 27b, make this
Screw 40 and 39 screw-thread fit of central frame build combing machine frame to link up left cell U1 and right sided cell U2
Framework is made.
As shown in (a) in Fig. 1, the lower face 24a of left side frame 24, the lower face 38a of leg 38, central frame 39
Lower face 39a and the lower face 25a of right side frame 25 are in the same plane.In addition, left side beam structure member 27 by by
The beam support frame F of frame 37, the first auxiliary frame 36a, the second auxiliary frame 36b and the composition of leg 38 is pivotally supported by with dimension
The state support being mutually parallel is held, right side beam structure member 28 is by being set up in right side frame 25 and central frame 39 and by tie up
Hold the state support being mutually parallel.Therefore, left side beam structure member 27 and right side beam opposed on the long side direction of combing machine
Structure member 28 is located at position opposed in identical height.
Moreover, left side beam structure member 27 and right side beam structure member 28 opposed on the long side direction of combing machine via
Central frame 39 links, and builds a beam 26.Beam 26 is set up in left side frame 24 and right side frame 25, builds beam construction.By beam
26 beam constructions realized, are utilized central frame 39 and by being pivotally supported frame 37, the first auxiliary frame 36a, the second auxiliary frame
The beam support frame F that 36b and leg 38 are constituted is maintained.In combing machine frame construction, state of 4 beams 26 to be mutually parallel
It is set up in parallel, in the state that combing machine is placed on horizontal plane, 26 horizontal extension of each beam.
On the beam 26 of upside 2, it is set side by side with 8 that left side frame 24 has and is pivotally supported frame 37, right side frame
25 4 had are pivotally supported frame 37 and what right sided cell U2 had is pivotally supported portion 39b, and forming 13 being capable of support shaft
The position of (axis 12a, cylinder axis 15a, detaching roller 16,17 and the tongs plate axis 22 of lap roller 12).Moreover, in combing machine
It is adjacent on long side direction to be pivotally supported frame 37 each other and be pivotally supported frame 37 and be pivotally supported between portion 39b and be equipped with essence
Comb one's hair 11.In addition, each axis 12a, 15a of each axis 12a, 15a, 22 and right sided cell U2 of the sides left cell U1,22 respectively by
Shaft coupling connection (not shown), supports each component of combing head 11.
Next, being illustrated to the effect of the combing machine frame construction constituted as previously described.For example, being removed by combing machine
In the case of entering factory, manufacture is equipped with the left cell U1 of 8 combing heads 11 and is equipped with the right sided cell of 4 combing heads 11
U2.Then, as shown in figure 4, in the state of being divided into left cell U1 and right sided cell U2, it is single separately to carry left side
They are moved in factory by first U1 and right sided cell U2 respectively.In the factory moved in, by each left side beam knot of left cell U1
The connection of structure component 27 is linked with the central frame 39 of flange 27b and right sided cell U2, to which left cell U1 and right side is single
First U2 is linked up.Then, left side beam structure member 27 and right side beam structure member 28 is produced via central frame 39 to link
And it builds beam 26 and has the combing machine for the homework department for being equipped with 12 combing heads 11.
In addition, for example, in the case where moving out combing machine from factory to repair combing machine, make screw 40 from left side
The connection of girder construction component 27 is backed out with flange 27b, and left side beam structure member 27 is made to be detached with central frame 39, by combing machine point
Solution is left cell U1 and right sided cell U2.At this point, in combing head is respectively arranged in left cell U1 and right sided cell U2
11 state.In turn, left cell U1 and right sided cell U2 is separately conveyed, they are moved in and repairs destination.
Using the above embodiment, following effect can be obtained.
(1) combing machine that can will be provided with being equipped with the homework department of 12 combing heads 11 is divided into left cell U1 and right side
Unit U2.Implement the transport to combing machine therefore, it is possible to which combing machine is divided into left cell U1 and right sided cell U2, to
Compared with the case where transporting entire combing machine, it is easy transport.
(2) right sided cell U2 is maintained right side beam structure member 28 and right side frame 25, the connection of central frame 39 and right side
The state that girder construction component 28 is parallelly set up in parallel.Left cell U1 is maintained left side beam structure member 27 and by being pivotally supported frame
The beam support frame F that frame 37, the first auxiliary frame 36a, the second auxiliary frame 36b and leg 38 are constituted links and left side beam knot
The state that structure component 27 is parallelly set up in parallel.It therefore, can when left cell U1 and right sided cell U2 are formd connection
Inhibit left side beam structure member 27 and dislocation of the right side beam structure member 28 on height and position, 12 combing heads 11 can be inhibited
It misplaces in the up-down direction.In particular, detaching roller 16,17, cylinder axis 15a, tongs plate axis 22, lap roller 12 can be inhibited to exist
It misplaces in upper and lower directions.
(3) right sided cell U2 is maintained right side beam structure member 28 and right side frame 25, the connection of central frame 39 and right side
The state that girder construction component 28 is parallelly set up in parallel.Left cell U1 is maintained left side beam structure member 27 and by being pivotally supported frame
The beam support frame F that frame 37, the first auxiliary frame 36a, the second auxiliary frame 36b and leg 38 are constituted links and left side beam knot
The state that structure component 27 is parallelly set up in parallel.Even if detaching roller 16,17, cylinder axis 15a, tongs plate axis 22, cotton are arranged as a result,
Multiple components such as roller 12 are rolled up, flexure, the height and position of left side beam structure member 27 and right side beam structure member 28 can be also inhibited
On dislocation, can be in the state of being provided with multiple components.Left cell U1 and right sided cell U2 is transported respectively.Therefore, with
In being compared the case where moving in destination assembling parts for left cell U1 and right sided cell U2, combing machine is manufactured moving in destination
It becomes easy.
(4) 8 combing heads 11 are equipped in left cell U1, left cell U1 is identical as common combing machine structure.By
This, by using the structure for constructing identical left cell U1 connection right sided cells U2 with common combing machine frame relative to construction
It makes, can easily build the combing machine for the quantity for increasing combing head 11.
(5) right sided cell U2 can by by right side beam structure member 28 be set up in central frame 39 and right side frame 25 come
Maintain the beam construction of right side beam structure member 28, right sided cell U2 that can be not necessarily to have by being pivotally supported frame 37, the first auxiliary frame
The beam support frame F that frame 36a, the second auxiliary frame 36b and leg 38 are constituted.
(6) central frame 39 of right sided cell U2, which is integrally provided with, is pivotally supported portion 39b.Therefore, it is possible to using in order to will be right
Side unit U2 and left cell U1 is linked up and the central frame 39 that uses, combing head 11 is arranged.With relative to middle boxes
Frame 39 is provided independently from the case where being pivotally supported frame 37 and compares, and construction becomes simple.
In addition it is also possible to change the above embodiment as shown below.
Zero as shown in figure 8, can also be, and left cell U1 is the construction for having the homework department for being equipped with 6 combing heads 11,
Right sided cell U2 is the construction for having the homework department for being equipped with 6 combing heads 11.In this case, left cell U1 has 6
It is pivotally supported frame 37.Auxiliary frame 36 and axis branch farthest at the position from left side frame 24 in left side beam structure member 27
Support frame frame 37 (from left side frame 24 is several the 6th) links, and furthest away is pivotally supported frame 37 and left frame with this
The frame 37 (from left side frame 24 is several the 4th) that is pivotally supported that the centre of both framves 24 is close links.
Right sided cell U2 has to be pivotally supported portion 39b and links with right side beam structure member 28 with central frame 39 one
It is pivotally supported frame 37, has 7 to axis (axis 12a, cylinder axis 15a, detaching roller 16,17 and the tongs plate axis of lap roller 12
22) part supported.In addition, right sided cell U2 has auxiliary frame 36, the auxiliary frame 36 and axis is supported
The frame 37 that is pivotally supported of the middle being located at long side direction in part links.
In this case of composition, left cell U1 and having is equipped with 8 combing heads 11 as embodiment
The case where homework department, is compared, and the size on long side direction shortens.Even if can not be moved in the left cell U1 of embodiment as a result,
Place can also move in.
Zero can be, central frame 39, which is additionally provided with, is pivotally supported frame 37, and portion 39b is pivotally supported without having.
Zero can be, combing machine has the homework department for being equipped with 16 combing heads 11.
In such a situation it is preferred that being that the combing head 11 that will be separately equipped in left cell U1 and right sided cell U2 is set
It is 8.
Zero can be, when transporting left cell U1 and right sided cell U2, so that combing head 11 is in the state removed, removing
Enter destination and combing head 11 is arranged again.
Zero in embodiments, Ke Yishi, in right sided cell U2 setting auxiliary frames 36 and leg 38.That is, right sided cell
The beam support frame F constituted by being pivotally supported frame 37, auxiliary frame 36 and leg 38 can also be arranged in U2.
Zero can be, the quantity for the combing head 11 for being disposed in left cell U1 is set as 4, in left cell U1 settings
Between frame 39.In this case, the quantity for the combing head 11 for being disposed in right sided cell U2 is set as 8, is set in right sided cell U2
Set auxiliary frame 36 and leg 38.
Zero can be, by the quantity for the combing head 11 for being disposed in left cell U1 and right sided cell U2 be set as odd number (3 and
9,5 and 7).
Zero can be, the quantity for the combing head 11 for being disposed in left cell U1 and right sided cell U2 is set to 4,
The other unit of 4 combing heads 11 can be arranged in setting between left cell U1 and right sided cell U2.Unit that should be other
For, axial one end of the girder construction component for the part for constituting beam 26 is linked in framework, also, in girder construction component
The axial other end locally connection flange.In the separate unit, girder construction component can be supported by beam support frame F, also may be used
To be not provided with beam support frame F.
In turn, the connection of left cell U1 is linked with flange 27b and other unit, and by the beam of other unit
The connection flange of structure member links with the central frame 39 of right sided cell U2.In this way, structure, which has, is equipped with 12 combing heads
The combing machine frame of 11 homework department constructs.
The quantity for the component that zero combing head 11 has can change as appropriate, and in this case, be pivotally supported frame 37
It can also be changed with the quantity for the axis for being pivotally supported portion 39b bearings.
Next, the technological thought that addition can be grasped according to the above embodiment and other examples below.
(1) a kind of combing machine frame construction, wherein
In the case where being split to the left cell and the right sided cell, the central frame and the left side
The long side direction of the beam component parts of the small unit of size in the long side direction in unit and the right sided cell is another
One end links.
(2) a kind of combing machine frame construction, wherein
The reinforced frame with it is big with the size in the long side direction in the left cell and the right sided cell
The long side direction other end of the beam component parts of unit is immediate to be pivotally supported frame connection.
Claims (7)
1. a kind of combing machine frame construction, has:Left side frame and right side frame, the left side frame and right side frame are configured to
Across whole combing heads;And
More beams, they are set up in the left side frame and the right side frame, and are set up in parallel in parallel to each other, wherein
It can be divided into:
Left cell links and constitutes the one of the beam with the left side frame and length direction one end with the left side frame
More partial girder construction components;With
Right sided cell links and constitutes the one of the beam with the right side frame and length direction one end with the right side frame
More partial girder construction components,
Any one unit in the left cell and the right sided cell has central frame, the central frame and the left side
The long side side of the long side direction other end of the girder construction component of side unit and the girder construction component of the right sided cell
Link to the other end,
Another unit in the left cell and right sided cell has the beam support supported to the girder construction component
Frame.
2. combing machine frame construction according to claim 1, wherein
The combing machine has the homework department for being equipped with 12 combing heads, and 8 combing are arranged in the left cell
Head, also, 4 combing heads are arranged in the right sided cell.
3. combing machine frame construction according to claim 1, wherein
The combing machine has the homework department for being equipped with 12 combing heads, in the left cell and the right sided cell point
It is not equipped 6 combing heads.
4. combing machine frame construction according to claim 1 or 2, wherein
In the left cell and the right sided cell, frame is pivotally supported by what the axis having to the combing head supported
Link with the girder construction component, and the central frame has and is pivotally supported portion to what the axis was supported.
5. combing machine frame construction according to claim 3, wherein
In the left cell and the right sided cell, frame is pivotally supported by what the axis having to the combing head supported
Link with the girder construction component, and the central frame has and is pivotally supported portion to what the axis was supported.
6. combing machine frame construction according to claim 4, wherein
In the case where being split to the left cell and the right sided cell, the central frame and the left cell
With the long side direction other end of the girder construction component of the small unit of size in the long side direction in the right sided cell
Connection.
7. the combing machine frame construction according to claim 4 or 6, wherein
Reinforced frame and the institute with the big unit of the size in the long side direction in the left cell and the right sided cell
The immediate frame that is pivotally supported of the long side direction other end for stating girder construction component links.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017-065587 | 2017-03-29 | ||
JP2017065587A JP6787221B2 (en) | 2017-03-29 | 2017-03-29 | Combed frame structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108691038A true CN108691038A (en) | 2018-10-23 |
CN108691038B CN108691038B (en) | 2021-03-16 |
Family
ID=61827592
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810251586.7A Active CN108691038B (en) | 2017-03-29 | 2018-03-26 | Frame structure of combing machine |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP3382071B1 (en) |
JP (1) | JP6787221B2 (en) |
CN (1) | CN108691038B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19504134A1 (en) * | 1995-02-09 | 1996-08-14 | Chemnitzer Spinnereimaschinen | Comber |
CN1590614A (en) * | 2003-08-28 | 2005-03-09 | 里特机械公司 | Vibration damper for comber |
CN1904163A (en) * | 2005-07-26 | 2007-01-31 | 里特机械公司 | Drive device for combing machine |
CN102286808A (en) * | 2010-06-16 | 2011-12-21 | 株式会社丰田自动织机 | Frame structure for comber |
CN203668571U (en) * | 2013-12-13 | 2014-06-25 | 江苏派利帝纺织科技有限公司 | Combing machine with semi-automatic coil conveyor |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2793109Y (en) * | 2005-05-14 | 2006-07-05 | 东台纺织机械有限责任公司 | Wall board structure of comber |
-
2017
- 2017-03-29 JP JP2017065587A patent/JP6787221B2/en active Active
-
2018
- 2018-03-26 CN CN201810251586.7A patent/CN108691038B/en active Active
- 2018-03-27 EP EP18164224.0A patent/EP3382071B1/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19504134A1 (en) * | 1995-02-09 | 1996-08-14 | Chemnitzer Spinnereimaschinen | Comber |
CN1590614A (en) * | 2003-08-28 | 2005-03-09 | 里特机械公司 | Vibration damper for comber |
CN1904163A (en) * | 2005-07-26 | 2007-01-31 | 里特机械公司 | Drive device for combing machine |
CN102286808A (en) * | 2010-06-16 | 2011-12-21 | 株式会社丰田自动织机 | Frame structure for comber |
CN203668571U (en) * | 2013-12-13 | 2014-06-25 | 江苏派利帝纺织科技有限公司 | Combing machine with semi-automatic coil conveyor |
Also Published As
Publication number | Publication date |
---|---|
CN108691038B (en) | 2021-03-16 |
JP6787221B2 (en) | 2020-11-18 |
EP3382071B1 (en) | 2020-01-29 |
JP2018168491A (en) | 2018-11-01 |
EP3382071A1 (en) | 2018-10-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2008519730A5 (en) | ||
KR20100124668A (en) | A shed-former device and a jacquard type loom fitted with such a device | |
CN108691038A (en) | Combing machine frame constructs | |
TW453909B (en) | Roller leveler | |
CN101328638B (en) | Drawing device for controlling heald frame of weaving machine and shed-forming component and weaving machine | |
CN111139722A (en) | Novel steel box girder and steel-concrete composite girder structure | |
CN108792763A (en) | A kind of clothes processing material collecting device | |
CN105350646A (en) | Two-dimensional tensegrity structure unit based on hexagon geometry | |
CN207582690U (en) | connecting node | |
JP5648333B2 (en) | Comb frame structure | |
CN108060720A (en) | A kind of heart tension integral structure | |
CN207904766U (en) | A kind of prestressing force triangle hanging basket of light weight high bearing capacity | |
CN208732399U (en) | The bottom support frame of lift car | |
CN2302063Y (en) | Suspension type bilateral driving flip-flow screen | |
CN104514375A (en) | Foldable bar frame, especially concret distribution bar frame | |
CN207619626U (en) | A kind of push-pin mechanism | |
CN206487043U (en) | A kind of compost fermentation factory's canopy and its steel-structure roof | |
CN206370239U (en) | A kind of bridge structural model device | |
CN217231044U (en) | Driving mechanism | |
CN100503919C (en) | Heddle, heald frame and loom with the heald frame | |
CN111689408A (en) | Transition arm section, double-arm connecting assembly, double-arm support and light arm support | |
CN205859101U (en) | Overrunning belt pulley and spring leaf thereof | |
CN114592261B (en) | Jacquard with low machine body, low weight and high stability | |
CN217602449U (en) | Wear-resisting sliding construction who hardly drops | |
CN205423654U (en) | Elastic bending motion |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |