CN108681837A - Flexible production management method, device, terminal device and readable storage medium storing program for executing - Google Patents

Flexible production management method, device, terminal device and readable storage medium storing program for executing Download PDF

Info

Publication number
CN108681837A
CN108681837A CN201810695729.3A CN201810695729A CN108681837A CN 108681837 A CN108681837 A CN 108681837A CN 201810695729 A CN201810695729 A CN 201810695729A CN 108681837 A CN108681837 A CN 108681837A
Authority
CN
China
Prior art keywords
production
storage node
information storage
production phase
phase information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810695729.3A
Other languages
Chinese (zh)
Other versions
CN108681837B (en
Inventor
艾勇
李蔚栋
覃俊
帖军
夏梦
莫海芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South Central Minzu University
Original Assignee
South Central University for Nationalities
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South Central University for Nationalities filed Critical South Central University for Nationalities
Priority to CN201810695729.3A priority Critical patent/CN108681837B/en
Publication of CN108681837A publication Critical patent/CN108681837A/en
Application granted granted Critical
Publication of CN108681837B publication Critical patent/CN108681837B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer And Data Communications (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of flexible production management method, device, terminal device and readable storage medium storing program for executing.The present invention passes through the correspondence between the corresponding information storage node of the production phase information for establishing the different production phases,And the correspondence is stored in mapping table,To when needing to add the relevant information of product to be added into product phase table,A first production phase information storage node is created directly in production phase table,And the first production phase information is inserted into the first production phase information storage node,Then the first production phase information storage node is established and according to the correspondence between mapping table the second production phase information storage node found and third production session information storage node,And mapping table is updated according to newly-established correspondence,The product information for being inserted into product to be added into production phase table at any time can be realized,It is convenient, flexible,Enterprise is enable to rapidly adapt to the market demand and environmental change.

Description

Flexible production management method, device, terminal device and readable storage medium storing program for executing
Technical field
The present invention relates to production management technical field more particularly to a kind of flexible production management method, device, terminal devices And readable storage medium storing program for executing.
Background technology
With the changes of the times, the scientific and technical continuous improvement being constantly progressive with people's living condition, the valence of consumer It is worth variation of ideas quickly, consumption demand also becomes continuous variation that is more and more diversified, thus causing product demand, to adapt to The variation of the market demand and environment, each large enterprises constantly adjust its production management method.
It is as unit of product, that is, pressing component parts for assembly of a machine, (metering constitutes a production however, due to current productive function The unit of the quantity of the wholes of product, part or certain part) it works out a production plan, and the production schedule is typically before manufacture It makes.Thus, after starting production according to the production schedule, then put into product, adjustment product can to entire project impact compared with Greatly, along with the information feedback generated in production process is slower, typically this is just reported in the fixed dates of setting, such as the end of month Month production statistics information, or just go to work report production statistics information last month at the beginning of the month, so cannot achieve dynamically adjustment at all, this Result in enterprise during preparing product, speed of production is slower, serious to lag, and can not rapidly adapt to the market demand and environment Variation.
Therefore it provides it is a kind of can enterprise process of manufacture Flexibility and variability and controllability, to Enterprise is set preferably to meet the market requirement and " flexibility " productive function of environmental change, it appears particularly important.
The above is only used to facilitate the understanding of the technical scheme, and is not represented and is recognized that the above is existing skill Art.
Invention content
The main purpose of the present invention is to provide a kind of flexible production management method, device, terminal device and readable storages Medium, it is intended to which when preparing product, process of manufacture flexibility is low, changeability is poor, adjustable for enterprise in the prior art for solution Property is poor, can not meet the market requirement and the technical issues of environmental change.
To achieve the above object, it the present invention provides a kind of flexible production management method, the described method comprises the following steps:
Flexible production management platform adds instruction in response to the product that user triggers, and adding instruction according to the product determines The product information of product to be added;
Extracted from the product information product to be added be presently in the production phase the first production phase information, The of the second production phase information of a production phase and a product to be added lower production phase on the product to be added Three production session informations;
According to the mapping table pre-established, storage second production is searched in the production phase table to prestore Second production phase information storage node of session information and the third production stage letter for storing the third production session information Storage node is ceased, the second production phase information storage node is that the forerunner of the third production session information storage node ties Point, the mapping table are the second production phase information for storing corresponding described the in the production phase table The two production phase information storage nodes third production session information storage knot corresponding with the third production session information Correspondence between point;
A first production phase information storage node is created in the production phase table, and described first is produced Session information is inserted into the first production phase information storage node;
Establish the first production phase information storage node, the second production phase information storage node and described Correspondence between three production session information storage nodes, and the mapping table is updated according to the correspondence.
Preferably, described to establish the first production phase information storage node, the second production phase information storage Correspondence between node and the third production session information storage node, specifically includes:
Using the first production phase information storage node as the direct of the third production session information storage node Forerunner's node, using the first production phase information storage node as the direct of the second production phase information storage node Successor node, with determination the first production phase information storage node and the second production phase information storage node and the The position relationship of two production phase information storage nodes;
According to the first production phase information storage node and the second production phase information storage node and second The position relationship of production phase information storage node establishes the first production phase information storage node, second production Correspondence between session information storage node and the third production session information storage node.
Preferably, described that a first production phase information storage node is created in the production phase table, it will The first production phase information is inserted into before the first production phase information storage node, and the method further includes:
Judge whether the second production phase information storage node is the third production session information storage node Direct precursor node;
Correspondingly, described that a first production phase information storage node is created in the production phase table, it will The first production phase information is inserted into the first production phase information storage node, specifically includes:
If the second production phase information storage node be the third production session information storage node it is direct before Node is driven, then creates a first production phase information storage node in the production phase table, described first is given birth to It produces session information and is inserted into the first production phase information storage node;
If the second production phase information storage node is not the direct of the third production session information storage node Forerunner's node then creates a first production phase information storage node, by described first in the production phase table Production phase information is inserted into the first production phase information storage node, and by the second production phase information storage node Information storage node deletion between the third production session information storage node, if alternatively, second production phase Information storage node is not the direct precursor node of the third production session information storage node, then produces rank by described first Segment information is inserted into the letter between the second production phase information storage node and the third production session information storage node Storage node is ceased, original production session information is replaced.
Preferably, described that a first production phase information storage node is created in the production phase table, it will The first production phase information is inserted into before the first production phase information storage node, and the method further includes:
Judge the second of storage the second production phase information whether has been found in the production phase table Production phase information storage node and the third production session information storage node for storing the third production session information;
Correspondingly, described that a first production phase information storage node is created in the production phase table, it will The first production phase information is inserted into the first production phase information storage node, specifically includes:
If having found the second production rank of storage the second production phase information in the production phase table Segment information storage node and the third production session information storage node for storing the third production session information, then in the production A first production phase information storage node is created in product production phase table, described in the first production phase information insertion First production phase information storage node.
Preferably, whether the judgement has found storage second production phase in the production phase table Second production phase information storage node of information and the third production session information for storing the third production session information are deposited After storing up node, the method further includes:
If not finding the second production rank of storage the second production phase information in the production phase table Segment information storage node and the third production session information storage node for storing the third production session information, then in the production A first production phase information storage node is created in product production phase table, by the first production phase information, described the Two production phase information and the third production session information are inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update Relation table is penetrated, is specifically included:
Indirect forerunner's node of the first production phase information storage node is searched in the production phase table With indirect successor node;
Establish the first production phase information storage node and indirect forerunner's node for finding and it is described indirectly Correspondence between successor node, and the mapping table is updated according to the correspondence.
Preferably, whether the judgement has found storage second production phase in the production phase table Second production phase information storage node of information and the third production session information for storing the third production session information are deposited After storing up node, the method further includes:
If not finding the second production rank of storage the second production phase information in the production phase table Segment information storage node then creates a first production phase information storage node, by institute in the production phase table It states the first production phase information and the second production phase information is inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update Relation table is penetrated, is specifically included:
It establishes between the first production phase information storage node and the third production session information storage node Correspondence, and the mapping table is updated according to the correspondence.
Preferably, whether the judgement has found storage second production phase in the production phase table Second production phase information storage node of information and the third production session information for storing the third production session information are deposited After storing up node, the method further includes:
If not finding the third production rank for storing the third production session information in the production phase table Segment information storage node then creates a first production phase information storage node, by institute in the production phase table It states the first production phase information and the third production session information is inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update Relation table is penetrated, is specifically included:
It establishes between the first production phase information storage node and the second production phase information storage node Correspondence, and the mapping table is updated according to the correspondence.
In addition, to achieve the above object, the present invention also provides a kind of flexible production managing device, described device includes:
Respond module, the product for being triggered in response to user add instruction;
Determining module, for adding the product information that instruction determines product to be added according to the product;
Extraction module is presently in the first of the production phase for extracting the product to be added from the product information In production phase information, the product to be added one under the second production phase information of a production phase and the product to be added The third production session information of production phase;
Searching module, for according to the mapping table pre-established, searching and depositing in the production phase table to prestore It stores up the second production phase information storage node of the second production phase information and stores the third production session information Third production session information storage node, the second production phase information storage node are that the third production session information is deposited The direct precursor node of node is stored up, the mapping table is the second production rank stored in the production phase table The corresponding second production phase information storage node of the segment information third corresponding with the third production session information Correspondence between production phase information storage node;
Add module, for creating a first production phase information storage node in the production phase table, The first production phase information is inserted into the first production phase information storage node;
Update module, for establishing the first production phase information storage node, the second production phase information is deposited The correspondence between node and the third production session information storage node is stored up, and according to described in correspondence update Mapping table.
In addition, to achieve the above object, the present invention also provides a kind of terminal device, the terminal device includes:Storage Device, processor and it is stored in the flexible production management program that can be run on the memory and on the processor, it is described Flexible production management program is arranged for carrying out the step of flexible production management method.
In addition, to achieve the above object, the present invention also provides a kind of readable storage medium storing program for executing, the readable storage medium storing program for executing is Computer readable storage medium is stored with flexible production management program on the computer readable storage medium, described flexible raw The step of production management program realizes the flexible production management method when being executed by processor.
The present invention passes through the correspondence between the corresponding information storage node of the production phase information for establishing the different production phases Relationship, and the correspondence is stored in mapping table, to which the phase of product to be added is added into product phase table in needs When closing information, according to the mapping table, carried in the product information of lookup storage product to be added in product phase table The third production rank of the second production phase information storage node and storage third production session information of second production phase information Then segment information storage node creates a first production phase information storage node directly in production phase table, and First production phase information is inserted into the first production phase information storage node, the first production phase information is finally re-established and deposits Store up the correspondence between node, the second production phase information storage node and third production session information storage node, and root Mapping table is updated according to newly-established correspondence, can be realized in process of manufacture at any time to the production stage It is inserted into the product information of product to be added in table, and only correspondence need to be changed after being inserted into, without rebuilding production The structure of phase table greatly improves Flexibility and variability and controllability in process of manufacture so that enterprise can be fast Speed meets the market requirement and environmental change.
Description of the drawings
Fig. 1 is the structural schematic diagram of the terminal device for the hardware running environment that the embodiment of the present invention is related to;
Fig. 2 is the flow diagram of flexible production management method first embodiment of the present invention;
Fig. 3 is the flow diagram of flexible production management method second embodiment of the present invention;
Fig. 4 is the high-level schematic functional block diagram of flexible production managing device of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific implementation mode
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
Referring to Fig.1, Fig. 1 is the structural representation of the terminal device for the hardware running environment that the embodiment of the present invention is related to Figure.
The terminal device specifically refers to the equipment for being deployed with flexible production management function, can be specifically to support that deployment is flexible The physical server of production management function or virtual Cloud Server, the i.e. terminal device are to constitute flexible production management platform Equipment.
In addition, in the concrete realization, above-mentioned terminal device can also be the portable equipment for being able to access that network, such as Smart mobile phone, tablet computer and personal computer of various systems etc., will not enumerate herein, also be not particularly limited.
For the ease of understanding the specific works of the terminal device, it is specifically described below in conjunction with Fig. 1.
As shown in Figure 1, the terminal device may include:Processor 1001, such as central processing unit (Central Processing Unit, CPU), communication bus 1002, user interface 1003, network interface 1004, memory 1005.Wherein, Communication bus 1002 is for realizing the connection communication between these components.User interface 1003 may include tangible display screen, Voice recognition unit etc., optionally, user interface 1003 can also include standard wireline interface and wireless interface.Network interface 1004 may include optionally standard wireline interface and wireless interface (such as Wireless Fidelity (WIreless-FIdelity, WI-FI) Interface, blue tooth interface etc.).Memory 1005 can be high-speed RAM memory, can also be stable memory (non- Volatile memory), such as magnetic disk storage.Memory 1005 optionally can also be independently of aforementioned processor 1001 Storage device.
It will be understood by those skilled in the art that structure shown in Fig. 1 does not constitute the restriction to terminal device, can wrap It includes than illustrating more or fewer components, either combines certain components or different components arrangement.
Therefore, as shown in Figure 1, as may include in a kind of memory 1005 of computer storage media operating system, Network communication module, Subscriber Interface Module SIM and flexible production management program.
In terminal device shown in Fig. 1, network interface 1004 is mainly with the communication for establishing terminal device and user terminal Connection;User interface 1003 is mainly used for receiving the input instruction of user;The terminal device is deposited by the calling of processor 1001 The flexible production management program stored in reservoir 1005, and execute following operation:
Flexible production management platform adds instruction in response to the product that user triggers, and adding instruction according to the product determines The product information of product to be added;
Extracted from the product information product to be added be presently in the production phase the first production phase information, The of the second production phase information of a production phase and a product to be added lower production phase on the product to be added Three production session informations;
According to the mapping table pre-established, storage second production is searched in the production phase table to prestore Second production phase information storage node of session information and the third production stage letter for storing the third production session information Storage node is ceased, the second production phase information storage node is that the forerunner of the third production session information storage node ties Point, the mapping table are the second production phase information for storing corresponding described the in the production phase table The two production phase information storage nodes third production session information storage knot corresponding with the third production session information Correspondence between point;
A first production phase information storage node is created in the production phase table, and described first is produced Session information is inserted into the first production phase information storage node;
Establish the first production phase information storage node, the second production phase information storage node and described Correspondence between three production session information storage nodes, and the mapping table is updated according to the correspondence.
Further, processor 1001 can call the flexible production management program stored in memory 1005, also execute It operates below:
Using the first production phase information storage node as the direct of the third production session information storage node Forerunner's node, using the first production phase information storage node as the direct of the second production phase information storage node Successor node, with determination the first production phase information storage node and the second production phase information storage node and the The position relationship of two production phase information storage nodes;
According to the first production phase information storage node and the second production phase information storage node and second The position relationship of production phase information storage node establishes the first production phase information storage node, second production Correspondence between session information storage node and the third production session information storage node.
Further, processor 1001 can call the flexible production management program stored in memory 1005, also execute It operates below:
Judge whether the second production phase information storage node is the third production session information storage node Direct precursor node;
Correspondingly, described that a first production phase information storage node is created in the production phase table, it will The first production phase information is inserted into the first production phase information storage node, specifically includes:
If the second production phase information storage node be the third production session information storage node it is direct before Node is driven, then creates a first production phase information storage node in the production phase table, described first is given birth to It produces session information and is inserted into the first production phase information storage node;
If the second production phase information storage node is not the direct of the third production session information storage node Forerunner's node then creates a first production phase information storage node, by described first in the production phase table Production phase information is inserted into the first production phase information storage node, and by the second production phase information storage node Information storage node deletion between the third production session information storage node, if alternatively, second production phase Information storage node is not the direct precursor node of the third production session information storage node, then produces rank by described first Segment information is inserted into the letter between the second production phase information storage node and the third production session information storage node Storage node is ceased, original production session information is replaced.
Further, processor 1001 can call the flexible production management program stored in memory 1005, also execute It operates below:
Judge the second of storage the second production phase information whether has been found in the production phase table Production phase information storage node and the third production session information storage node for storing the third production session information;
Correspondingly, described that a first production phase information storage node is created in the production phase table, it will The first production phase information is inserted into the first production phase information storage node, specifically includes:
If having found the second production rank of storage the second production phase information in the production phase table Segment information storage node and the third production session information storage node for storing the third production session information, then in the production A first production phase information storage node is created in product production phase table, described in the first production phase information insertion First production phase information storage node.
Further, processor 1001 can call the flexible production management program stored in memory 1005, also execute It operates below:
If not finding the second production rank of storage the second production phase information in the production phase table Segment information storage node and the third production session information storage node for storing the third production session information, then in the production A first production phase information storage node is created in product production phase table, by the first production phase information, described the Two production phase information and the third production session information are inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update Relation table is penetrated, is specifically included:
Indirect forerunner's node of the first production phase information storage node is searched in the production phase table With indirect successor node;
Establish the first production phase information storage node and indirect forerunner's node for finding and it is described indirectly Correspondence between successor node, and the mapping table is updated according to the correspondence.
Further, processor 1001 can call the flexible production management program stored in memory 1005, also execute It operates below:
If not finding the second production rank of storage the second production phase information in the production phase table Segment information storage node then creates a first production phase information storage node, by institute in the production phase table It states the first production phase information and the second production phase information is inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update Relation table is penetrated, is specifically included:
It establishes between the first production phase information storage node and the third production session information storage node Correspondence, and the mapping table is updated according to the correspondence.
Further, processor 1001 can call the flexible production management program stored in memory 1005, also execute It operates below:
If not finding the third production rank for storing the third production session information in the production phase table Segment information storage node then creates a first production phase information storage node, by institute in the production phase table It states the first production phase information and the third production session information is inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update Relation table is penetrated, is specifically included:
It establishes between the first production phase information storage node and the second production phase information storage node Correspondence, and the mapping table is updated according to the correspondence.
This implementation through the above scheme, the corresponding information storage knot of production phase information by establishing the different production phases Correspondence between point, and the correspondence is stored in mapping table, to need to add into product phase table to wait for When adding the relevant information of product, according to the mapping table, the product for storing product to be added is searched in product phase table The the second production phase information storage node and storage third production session information of the second production phase information carried in information Third production session information storage node, then directly in production phase table create a first production phase information Storage node, and the first production phase information is inserted into the first production phase information storage node, finally re-establish the first life Produce pair between session information storage node, the second production phase information storage node and third production session information storage node Should be related to, and mapping table is updated according to newly-established correspondence, can realize in process of manufacture at any time to It is inserted into the product information of product to be added in production phase table, and only correspondence need to be changed after being inserted into, without again The structure for building production phase table, greatly improves the Flexibility and variability and controllability in process of manufacture, makes The market demand and environmental change can be rapidly adapted to by obtaining enterprise.
Based on above-mentioned hardware configuration, flexible production management method embodiment of the present invention is proposed.
It is the flow diagram of flexible production management method first embodiment of the present invention with reference to Fig. 2, Fig. 2.
In the first embodiment, the flexible production management method includes the following steps:
S10:Flexible production management platform adds instruction in response to the product that user triggers, and is added and is instructed according to the product Determine the product information of product to be added.
Specifically, flexible production management platform described in the present embodiment can be deployed on physical server, also may be used To be deployed on virtual Cloud Server, specific set-up mode, those skilled in the art can be arranged as required to, herein not It is limited.
S20:The first production phase that the product to be added is presently in the production phase is extracted from the product information The second production phase information of a production phase and a product to be added lower production phase in information, the product to be added Third production session information.
It should be understood that extracting the first production phase information, the second production phase information from the said goods information It, can be according to the pre-set identification number for identifying different production phase information successively and when third production session information Extraction can also be believed by the vocabulary that may relate to according to preset each generation phase from product according to Keyword Extraction Technique It is extracted in breath.Specific extracting mode, those skilled in the art can be arranged as required to, not be limited herein.
However, it should be understood that in the concrete realization, in addition to believing comprising the first production phase in the said goods information Except breath, the second production phase information and third production session information, it can also be applied according to flexible production management platform Field, occasion rationally to be arranged and need the information that carries, will not enumerate, be not also limited herein.
S30:According to the mapping table pre-established, storage described second is searched in the production phase table to prestore Second production phase information storage node of production phase information and the third production rank for storing the third production session information Segment information storage node.
It should be noted that the second production phase information storage node described in the present embodiment is the third production rank That is, in process of production the direct precursor node of segment information storage node generates the second production phase information storage node The process of second production phase production information of middle storage, necessarily in generating the third production session information storage node It is carried out before the process of the third production stage production information of storage.
For example the third production session information stored in third production session information storage node is semi-finished product information, then The the second production phase information stored in two production phase information storage nodes can be then raw material information.
In addition, mapping table described in the present embodiment is second life stored in the production phase table It is corresponding with the third production session information described to produce the corresponding second production phase information storage node of session information Correspondence between third production session information storage node, i.e., it is the second production phase information to be stored in mapping table The position relationship of storage node and third production session information storage node in production phase table.
It should be noted that these are only for example, not constituting any restriction to technical scheme of the present invention, having In body application, those skilled in the art can be configured as needed, and the present invention is without limitation.
S40:A first production phase information storage node is created in the production phase table, by described first Production phase information is inserted into the first production phase information storage node.
Specifically, the first production phase information storage knot created in the production phase table in the present embodiment Point position, can be specifically at the table tail of the production phase table, can also be in the production phase table Any two information storage node between, i.e., the present embodiment to the position of the first newly-built production phase information storage node not It is limited.
It should be understood that the field of storage information needs and first in the first newly-built production phase information storage node The field carried in production phase information is identical, and the first production phase information is being inserted into the first production phase information in this way When storage node, stored according to corresponding field.
For example, carrying serial number, name of product, Product Status of this information etc. in the first production phase information, then It is also required for these fields in the first newly-built production phase information storage node.
It should be noted that these are only for example, not constituting any restriction to technical scheme of the present invention, having In body application, those skilled in the art can be configured as needed, and the present invention is without limitation.
S50:Establish the first production phase information storage node, the second production phase information storage node and institute The correspondence between third production session information storage node is stated, and the mapping relations are updated according to the correspondence Table.
Specifically, can be accomplished by the following way:
First, using the first production phase information storage node as the third production session information storage node Direct precursor node, using the first production phase information storage node as the second production phase information storage node Immediate successor node, with determination the first production phase information storage node and the second production phase information storage node With the position relationship of the second production phase information storage node.
It should be noted that above-mentioned described using the first production phase information storage node as the third production rank The direct precursor node of segment information storage node, using the first production phase information storage node as the second production rank The operation of the immediate successor node of segment information storage node in the concrete realization can be by pre- in each information storage node One is stayed for storing the pointer field for being directed toward its direct precursor node and immediate successor node, then by respective pointer field The middle unique identification information that its direct precursor node and immediate successor node are set, such as address, serial number.
Then, according to the first production phase information storage node and the second production phase information storage node and The position relationship of second production phase information storage node establishes the first production phase information storage node, described second Correspondence between production phase information storage node and the third production session information storage node.
It should be noted that these are only for example, not constituting any restriction to technical scheme of the present invention, having In body application, those skilled in the art can be configured as needed, and the present invention is without limitation.
By foregoing description it is not difficult to find that the flexible production management method provided in the present embodiment, by establishing different lifes Correspondence between the corresponding information storage node of production phase information in production stage, and the correspondence is stored in mapping and is closed It is table, to when needing to add the relevant information of product to be added into product phase table, according to the mapping table, produce The second production phase of the second production phase information carried in the product information for storing product to be added is searched in product phase table Then the third production session information storage node of information storage node and storage third production session information is directly given birth in product It produces and creates a first production phase information storage node in phase table, and the first production phase information is inserted into the first production rank Segment information storage node finally re-establishes the first production phase information storage node, the second production phase information storage node Correspondence between third production session information storage node, and mapping relations are updated according to newly-established correspondence Table can realize the product information for being inserted into product to be added into production phase table at any time in process of manufacture, And correspondence only need to be changed after being inserted into, without rebuilding the structure of production phase table, production is greatly improved and adds Flexibility and variability during work and controllability so that enterprise can rapidly adapt to the market demand and environmental change.
In addition, it is noted that the flexible production management method provided in the present embodiment, not only can be adapted for enterprise Production management field, to adapt to a variety of relations of production flows in enterprise production process, to be provided for the standardized management of enterprise It is convenient;It may also adapt to reach the standardization to agricultural production in agricultural production so that agricultural products are from farmland to dining table The flow of links can be recorded clearly, and user is facilitated to check, i.e., any pattern for being related to different procedure links is all The flexible production management method can be applied, concrete implementation process, those skilled in the art can be by retouching in this implementation The content stated combines the demand of each scene to realize that details are not described herein again, is not also limited.
Further, as shown in figure 3, propose flexible production management method of the present invention based on first embodiment second implements Example creates a first production phase information storage node in the production phase table in the present embodiment, will be described First production phase information is inserted into before the first production phase information storage node, needs first to judge the second production rank Segment information storage node whether be the third production session information storage node direct precursor node, then according to judge tie Fruit carries out subsequent operation, refers to the step S00 increased newly in Fig. 3.
In step S00:Judge whether the second production phase information storage node is the third production stage letter The direct precursor node for ceasing storage node, that is, judge the second production phase information storage node and the third production stage Whether there is no other any information storage nodes for information storage node as intermediary, and there is direct associations therebetween.
Correspondingly, former step S40 specifically refines two sub-steps of S401 and S402, specifically:
In step 401:The second production phase information storage node and the third production session information are stored Information storage node deletion between node.
In step 402:A first production phase information storage node is created in the production phase table, it will The first production phase information is inserted into the first production phase information storage node.
That is, judging whether the second production phase information storage node is the third life in step S00 After the direct precursor node for producing session information storage node, if the second production phase information storage node is the third The direct precursor node of production phase information storage node then directly executes the operation in step S402, i.e., is given birth in the product It produces and creates a first production phase information storage node in phase table, the first production phase information is inserted into described first Production phase information storage node;It is deposited if the second production phase information storage node is not the third production session information The direct precursor node for storing up node, then first carry out step S401, by the second production phase information storage node and described the Information storage node deletion between three production session information storage nodes, then executes step S402 again, is given birth in the product It produces and creates a first production phase information storage node in phase table, the first production phase information is inserted into described first Production phase information storage node.
In addition, it is noted that in the concrete realization, when judging that the second production phase information storage node is not When the direct precursor node of the third production session information storage node, it can be arranged and not delete the second production phase letter The information storage node between storage node and the third production session information storage node is ceased, but described first is produced Session information is inserted between the second production phase information storage node and the third production session information storage node Information storage node replaces original production session information.
It should be understood that if the second production phase information storage node and the third production session information are deposited The information storage node number stored up between node is more than 1, then the information stored in management product production phase table for convenience, can With by extra several information storage node deletions, or these information storage nodes are directly merged into an information storage rank Section, the first production phase information storage node as the first production phase information of storage.
It should be noted that these are only for example, not constituting any restriction to technical scheme of the present invention, having In body application, those skilled in the art can be configured as needed, and the present invention is without limitation.
Further, in order to cope with various situations in actual production process, one is created in the production phase table The first production phase information is inserted into the first production phase information storage by a first production phase information storage node Before node, it can also first judge storage the second production phase letter whether has been found in the production phase table Second production phase information storage node of breath and the third production session information storage for storing the third production session information Then node executes suitable operation according to judging result so that enterprise can be preferably involved in the entire production process of specification Each procedure links.
Specifically, in the actual production process, can substantially exist:Storage has been found in the production phase table Second production phase information storage node of the second production phase information and store the of the third production session information Three production session information storage nodes do not find storage the second production phase information in the production phase table The second production phase information storage node and store the third production session information storage knot of the third production session information Point does not find in the production phase table and stores the second production phase information of the second production phase information and deposit It stores up node and does not find the third production stage for storing the third production session information in the production phase table Four kinds of situations of information storage node, for these four situations, the reply that can be made approximately as:
If having found the second production rank of storage the second production phase information in the production phase table Segment information storage node and the third production session information storage node for storing the third production session information, then in the production A first production phase information storage node is created in product production phase table, described in the first production phase information insertion First production phase information storage node.
If not finding the second production rank of storage the second production phase information in the production phase table Segment information storage node and the third production session information storage node for storing the third production session information, then in the production A first production phase information storage node is created in product production phase table, by the first production phase information, described the Two production phase information and the third production session information are inserted into the first production phase information storage node.
Correspondingly, operational suitability in step S50 becomes:Described first is searched in the production phase table Then indirect forerunner's node of production phase information storage node and indirect successor node establish the first production phase information Correspondence between storage node and the indirect forerunner's node found and the indirect successor node, and according to described Correspondence updates the mapping table.
If not finding the second production rank of storage the second production phase information in the production phase table Segment information storage node then creates a first production phase information storage node, by institute in the production phase table It states the first production phase information and the second production phase information is inserted into the first production phase information storage node.
Correspondingly, operational suitability in step S50 becomes:Directly establish the first production phase information storage knot Correspondence between point and the third production session information storage node, and the mapping is updated according to the correspondence Relation table.
If not finding the third production rank for storing the third production session information in the production phase table Segment information storage node then creates a first production phase information storage node, by institute in the production phase table It states the first production phase information and the third production session information is inserted into the first production phase information storage node.
Correspondingly, operational suitability in step S50 becomes:Directly establish the first production phase information storage knot Correspondence between point and the second production phase information storage node, and the mapping is updated according to the correspondence Relation table.
By foregoing description it is not difficult to find that flexible production management method provided in this embodiment, can preferably adapt to reality Various situations involved in the process of manufacture of border, meet the different demands of different product, so that process of manufacture becomes It is more flexible, variable and adjustable, greatly improve enterprise and meet the market requirement and the demand of environmental change.
In addition, the embodiment of the present invention also proposes a kind of flexible production management system.As shown in figure 4, the flexible production management System includes:Respond module 4001, determining module 4002, extraction module 4003, searching module 4004, add module 4005 and more New module 4006.
Wherein, respond module 4001, the product for being triggered in response to user add instruction.Determining module 4002, is used for The product information that instruction determines product to be added is added according to the product.Extraction module 4003 is used for from the product information The middle extraction product to be added is presently in the first production phase information of production phase, a production on the product to be added The third production session information of the second production phase information and a product to be added lower production phase in stage.Searching module 4004, for according to the mapping table pre-established, searching storage second life in the production phase table to prestore It produces the second production phase information storage node of session information and stores the third production stage of the third production session information Information storage node.Add module 4005, for creating a first production phase information in the production phase table The first production phase information is inserted into the first production phase information storage node by storage node.Update module 4006, For establishing the first production phase information storage node, the second production phase information storage node and third life The correspondence between session information storage node is produced, and the mapping table is updated according to the correspondence.
It should be noted that the second production phase information storage node described in the present embodiment is the third production rank That is, in process of production the direct precursor node of segment information storage node generates the second production phase information storage node The process of second production phase production information of middle storage, necessarily in generating the third production session information storage node It is carried out before the process of the third production stage production information of storage.
For example the third production session information stored in third production session information storage node is semi-finished product information, then The the second production phase information stored in two production phase information storage nodes can be then raw material information.
In addition, mapping table described in the present embodiment is second life stored in the production phase table It is corresponding with the third production session information described to produce the corresponding second production phase information storage node of session information Correspondence between third production session information storage node, i.e., it is the second production phase information to be stored in mapping table The position relationship of storage node and third production session information storage node in production phase table.
It should be noted that these are only for example, not constituting any restriction to technical scheme of the present invention, having In body application, those skilled in the art can be configured as needed, and the present invention is without limitation.
By foregoing description it is not difficult to find that the flexible production provided in the present embodiment manages system, by establishing different lifes Correspondence between the corresponding information storage node of production phase information in production stage, and the correspondence is stored in mapping and is closed It is table, to when needing to add the relevant information of product to be added into product phase table, according to the mapping table, produce The second production phase of the second production phase information carried in the product information for storing product to be added is searched in product phase table Then the third production session information storage node of information storage node and storage third production session information is directly given birth in product It produces and creates a first production phase information storage node in phase table, and the first production phase information is inserted into the first production rank Segment information storage node finally re-establishes the first production phase information storage node, the second production phase information storage node Correspondence between third production session information storage node, and mapping relations are updated according to newly-established correspondence Table can realize the product information for being inserted into product to be added into production phase table at any time in process of manufacture, And correspondence only need to be changed after being inserted into, without rebuilding the structure of production phase table, production is greatly improved and adds Flexibility and variability during work and controllability so that enterprise can rapidly adapt to the market demand and environmental change.
It should be noted that workflow described above is only schematical, not to the protection model of the present invention Enclose composition limit, in practical applications, those skilled in the art can select according to the actual needs part therein or It all achieves the purpose of the solution of this embodiment, is not herein limited.
In addition, the not technical detail of detailed description in the present embodiment, reference can be made to what any embodiment of the present invention was provided Flexible production management method, details are not described herein again.
In addition, the embodiment of the present invention also proposes that a kind of readable storage medium storing program for executing, the readable storage medium storing program for executing are computer-readable Storage medium is stored with flexible production management program, the flexible production management program on the computer readable storage medium Following operation is realized when being executed by processor:
Flexible production management platform adds instruction in response to the product that user triggers, and adding instruction according to the product determines The product information of product to be added;
Extracted from the product information product to be added be presently in the production phase the first production phase information, The of the second production phase information of a production phase and a product to be added lower production phase on the product to be added Three production session informations;
According to the mapping table pre-established, storage second production is searched in the production phase table to prestore Second production phase information storage node of session information and the third production stage letter for storing the third production session information Storage node is ceased, the second production phase information storage node is that the forerunner of the third production session information storage node ties Point, the mapping table are the second production phase information for storing corresponding described the in the production phase table The two production phase information storage nodes third production session information storage knot corresponding with the third production session information Correspondence between point;
A first production phase information storage node is created in the production phase table, and described first is produced Session information is inserted into the first production phase information storage node;
Establish the first production phase information storage node, the second production phase information storage node and described Correspondence between three production session information storage nodes, and the mapping table is updated according to the correspondence.
Further, following operation is also realized when the flexible production management program is executed by processor:
Using the first production phase information storage node as the direct of the third production session information storage node Forerunner's node, using the first production phase information storage node as the direct of the second production phase information storage node Successor node, with determination the first production phase information storage node and the second production phase information storage node and the The position relationship of two production phase information storage nodes;
According to the first production phase information storage node and the second production phase information storage node and second The position relationship of production phase information storage node establishes the first production phase information storage node, second production Correspondence between session information storage node and the third production session information storage node.
Further, following operation is also realized when the flexible production management program is executed by processor:
Judge whether the second production phase information storage node is the third production session information storage node Direct precursor node;
Correspondingly, described that a first production phase information storage node is created in the production phase table, it will The first production phase information is inserted into the first production phase information storage node, specifically includes:
If the second production phase information storage node be the third production session information storage node it is direct before Node is driven, then creates a first production phase information storage node in the production phase table, described first is given birth to It produces session information and is inserted into the first production phase information storage node;
If the second production phase information storage node is not the direct of the third production session information storage node Forerunner's node then creates a first production phase information storage node, by described first in the production phase table Production phase information is inserted into the first production phase information storage node, and by the second production phase information storage node Information storage node deletion between the third production session information storage node, if alternatively, second production phase Information storage node is not the direct precursor node of the third production session information storage node, then produces rank by described first Segment information is inserted into the letter between the second production phase information storage node and the third production session information storage node Storage node is ceased, original production session information is replaced.
Further, following operation is also realized when the flexible production management program is executed by processor:
Judge the second of storage the second production phase information whether has been found in the production phase table Production phase information storage node and the third production session information storage node for storing the third production session information;
Correspondingly, described that a first production phase information storage node is created in the production phase table, it will The first production phase information is inserted into the first production phase information storage node, specifically includes:
If having found the second production rank of storage the second production phase information in the production phase table Segment information storage node and the third production session information storage node for storing the third production session information, then in the production A first production phase information storage node is created in product production phase table, described in the first production phase information insertion First production phase information storage node.
Further, following operation is also realized when the flexible production management program is executed by processor:
If not finding the second production rank of storage the second production phase information in the production phase table Segment information storage node and the third production session information storage node for storing the third production session information, then in the production A first production phase information storage node is created in product production phase table, by the first production phase information, described the Two production phase information and the third production session information are inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update Relation table is penetrated, is specifically included:
Indirect forerunner's node of the first production phase information storage node is searched in the production phase table With indirect successor node;
Establish the first production phase information storage node and indirect forerunner's node for finding and it is described indirectly Correspondence between successor node, and the mapping table is updated according to the correspondence.
Further, following operation is also realized when the flexible production management program is executed by processor:
If not finding the second production rank of storage the second production phase information in the production phase table Segment information storage node then creates a first production phase information storage node, by institute in the production phase table It states the first production phase information and the second production phase information is inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update Relation table is penetrated, is specifically included:
It establishes between the first production phase information storage node and the third production session information storage node Correspondence, and the mapping table is updated according to the correspondence.
Further, following operation is also realized when the flexible production management program is executed by processor:
If not finding the third production rank for storing the third production session information in the production phase table Segment information storage node then creates a first production phase information storage node, by institute in the production phase table It states the first production phase information and the third production session information is inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update Relation table is penetrated, is specifically included:
It establishes between the first production phase information storage node and the second production phase information storage node Correspondence, and the mapping table is updated according to the correspondence.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that process, method, article or system including a series of elements include not only those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or system institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including this There is also other identical elements in the process of element, method, article or system.
The embodiments of the present invention are for illustration only, can not represent the quality of embodiment.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side Method can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but in many cases The former is more preferably embodiment.Based on this understanding, technical scheme of the present invention substantially in other words does the prior art Going out the part of contribution can be expressed in the form of software products, which is stored in one as described above In storage medium (such as ROM/RAM, magnetic disc, CD), including some instructions use so that a station terminal equipment (can be mobile phone, Computer, server or network equipment etc.) execute method described in each embodiment of the present invention.
It these are only the preferred embodiment of the present invention, be not intended to limit the scope of the invention, it is every to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (10)

1. a kind of flexible production management method, which is characterized in that the described method comprises the following steps:
Flexible production management platform adds instruction in response to the product that user triggers, and adds instruction determination according to the product and waits adding Add the product information of product;
The first production phase information, described that the product to be added is presently in the production phase is extracted from the product information The second production phase information of a production phase and the life of the third of a product to be added lower production phase on product to be added Produce session information;
According to the mapping table pre-established, is searched in the production phase table to prestore and store second production phase Second production phase information storage node of information and the third production session information for storing the third production session information are deposited Node is stored up, the second production phase information storage node is forerunner's node of the third production session information storage node, The mapping table is the second production phase information corresponding described second stored in the production phase table The production phase information storage node third production session information storage node corresponding with the third production session information Between correspondence;
A first production phase information storage node is created in the production phase table, by first production phase Information is inserted into the first production phase information storage node;
Establish the first production phase information storage node, the second production phase information storage node and third life The correspondence between session information storage node is produced, and the mapping table is updated according to the correspondence.
2. flexible production management method as described in claim 1, which is characterized in that described to establish the first production phase letter Cease pair between storage node, the second production phase information storage node and the third production session information storage node It should be related to, specifically include:
Using the first production phase information storage node as the direct precursor of the third production session information storage node Node, using the first production phase information storage node as the immediate successor of the second production phase information storage node Node, with determination the first production phase information storage node and the second production phase information storage node and the second life Produce the position relationship of session information storage node;
According to the first production phase information storage node and the second production phase information storage node and the second production The position relationship of session information storage node establishes the first production phase information storage node, second production phase Correspondence between information storage node and the third production session information storage node.
3. flexible production management method as claimed in claim 1 or 2, which is characterized in that described in the production stage A first production phase information storage node is created in table, and the first production phase information is inserted into the first production rank Before segment information storage node, the method further includes:
Judge whether the second production phase information storage node is the direct of the third production session information storage node Forerunner's node;
Correspondingly, described that a first production phase information storage node is created in the production phase table, it will be described First production phase information is inserted into the first production phase information storage node, specifically includes:
If the second production phase information storage node is the direct precursor knot of the third production session information storage node Point then creates a first production phase information storage node in the production phase table, and rank is produced by described first Segment information is inserted into the first production phase information storage node;
If the second production phase information storage node is not the direct precursor of the third production session information storage node Node then creates a first production phase information storage node in the production phase table, described first is produced Session information is inserted into the first production phase information storage node, if alternatively, the second production phase information storage node It is not the direct precursor node of the third production session information storage node, then the first production phase information is inserted into institute The information storage node between the second production phase information storage node and the third production session information storage node is stated, is replaced Change original production session information.
4. flexible production management method as claimed in claim 1 or 2, which is characterized in that described in the production stage A first production phase information storage node is created in table, and the first production phase information is inserted into the first production rank Before segment information storage node, the method further includes:
Judge that storage the second production phase information whether has been found in the production phase table second produces Session information storage node and the third production session information storage node for storing the third production session information;
Correspondingly, described that a first production phase information storage node is created in the production phase table, it will be described First production phase information is inserted into the first production phase information storage node, specifically includes:
If having found the second production phase letter of storage the second production phase information in the production phase table It ceases storage node and stores the third production session information storage node of the third production session information, then given birth in the product It produces and creates a first production phase information storage node in phase table, the first production phase information is inserted into described first Production phase information storage node.
5. flexible production management method as claimed in claim 4, which is characterized in that the judgement is in the production stage Whether found in table described in the second production phase information storage node and the storage of storage the second production phase information After the third production session information storage node of third production session information, the method further includes:
If not finding the second production phase letter for storing the second production phase information in the production phase table It ceases storage node and stores the third production session information storage node of the third production session information, then given birth in the product It produces and creates a first production phase information storage node in phase table, by the first production phase information, second life It produces session information and the third production session information is inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage node Correspondence between the third production session information storage node, and the mapping is updated according to the correspondence and is closed It is table, specifically includes:
Searched in the production phase table the first production phase information storage node indirect forerunner's node and Connect successor node;
Establish the first production phase information storage node and indirect forerunner's node for finding and described indirectly subsequent Correspondence between node, and the mapping table is updated according to the correspondence.
6. flexible production management method as claimed in claim 4, which is characterized in that the judgement is in the production stage Whether found in table described in the second production phase information storage node and the storage of storage the second production phase information After the third production session information storage node of third production session information, the method further includes:
If not finding the second production phase letter for storing the second production phase information in the production phase table Storage node is ceased, then creates a first production phase information storage node in the production phase table, by described the One production session information and the second production phase information are inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage node Correspondence between the third production session information storage node, and the mapping is updated according to the correspondence and is closed It is table, specifically includes:
Establish the correspondence between the first production phase information storage node and the third production session information storage node Relationship, and the mapping table is updated according to the correspondence.
7. flexible production management method as claimed in claim 4, which is characterized in that the judgement is in the production stage Whether found in table described in the second production phase information storage node and the storage of storage the second production phase information After the third production session information storage node of third production session information, the method further includes:
If not finding the third production stage letter for storing the third production session information in the production phase table Storage node is ceased, then creates a first production phase information storage node in the production phase table, by described the One production session information and the third production session information are inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage node Correspondence between the third production session information storage node, and the mapping is updated according to the correspondence and is closed It is table, specifically includes:
Establish the correspondence between the first production phase information storage node and the second production phase information storage node Relationship, and the mapping table is updated according to the correspondence.
8. a kind of flexible production managing device, which is characterized in that described device includes:
Respond module, the product for being triggered in response to user add instruction;
Determining module, for adding the product information that instruction determines product to be added according to the product;
Extraction module is presently in the first production of production phase for extracting the product to be added from the product information A production under the second production phase information of a production phase and the product to be added in session information, the product to be added The third production session information in stage;
Searching module, for according to the mapping table pre-established, storage institute to be searched in the production phase table to prestore It states the second production phase information storage node of the second production phase information and stores the third of the third production session information Production phase information storage node, the second production phase information storage node are third production session information storage knot The direct precursor node of point, the mapping table are second production phase letter stored in the production phase table Cease the corresponding second production phase information storage node third production corresponding with the third production session information Correspondence between session information storage node;
Add module, for creating a first production phase information storage node in the production phase table, by institute It states the first production phase information and is inserted into the first production phase information storage node;
Update module, for establishing the first production phase information storage node, the second production phase information storage knot Correspondence between point and the third production session information storage node, and the mapping is updated according to the correspondence Relation table.
9. a kind of terminal device, which is characterized in that the terminal device includes:Memory, processor and it is stored in described deposit On reservoir and the flexible production management program that can run on the processor, the flexible production management program are arranged for carrying out The step of flexible production management method as described in any one of claim 1 to 7.
10. a kind of readable storage medium storing program for executing, which is characterized in that the readable storage medium storing program for executing is computer readable storage medium, described Flexible production management program is stored on computer readable storage medium, when the flexible production management program is executed by processor The step of realizing flexible production management method as described in any one of claim 1 to 7.
CN201810695729.3A 2018-06-27 2018-06-27 Flexible production management method and device, terminal equipment and readable storage medium Active CN108681837B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810695729.3A CN108681837B (en) 2018-06-27 2018-06-27 Flexible production management method and device, terminal equipment and readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810695729.3A CN108681837B (en) 2018-06-27 2018-06-27 Flexible production management method and device, terminal equipment and readable storage medium

Publications (2)

Publication Number Publication Date
CN108681837A true CN108681837A (en) 2018-10-19
CN108681837B CN108681837B (en) 2020-08-04

Family

ID=63812435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810695729.3A Active CN108681837B (en) 2018-06-27 2018-06-27 Flexible production management method and device, terminal equipment and readable storage medium

Country Status (1)

Country Link
CN (1) CN108681837B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111695763A (en) * 2020-04-29 2020-09-22 同济大学 Scheduling system and method based on voice question and answer

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1963705A (en) * 2005-11-09 2007-05-16 株式会社东芝 Production plan apparatus and its method and production plan processing program
EP1803088A1 (en) * 2004-09-21 2007-07-04 Sap Ag Transfer of information associated to requirement orders in production planning
CN102509185A (en) * 2011-10-26 2012-06-20 贵州讯腾物联网有限公司 Product information traceability system and method
US20120271739A1 (en) * 2011-04-22 2012-10-25 MJFreeway, LLC Methods, Devices, and Computer Program Products for Tracking Product Inventory
CN104077645A (en) * 2013-03-29 2014-10-01 株式会社日立制作所 Production management system and management method
CN106408178A (en) * 2016-09-05 2017-02-15 南京简睿捷软件开发有限公司 Multi-dimensional data snapshot-based product BOM management method and device
CN106844933A (en) * 2017-03-13 2017-06-13 中国电子科技集团公司第二十九研究所 The full production procedure three-dimensional operation instruction generation method of micro-system product and system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1803088A1 (en) * 2004-09-21 2007-07-04 Sap Ag Transfer of information associated to requirement orders in production planning
CN1963705A (en) * 2005-11-09 2007-05-16 株式会社东芝 Production plan apparatus and its method and production plan processing program
US20120271739A1 (en) * 2011-04-22 2012-10-25 MJFreeway, LLC Methods, Devices, and Computer Program Products for Tracking Product Inventory
CN102509185A (en) * 2011-10-26 2012-06-20 贵州讯腾物联网有限公司 Product information traceability system and method
CN104077645A (en) * 2013-03-29 2014-10-01 株式会社日立制作所 Production management system and management method
CN106408178A (en) * 2016-09-05 2017-02-15 南京简睿捷软件开发有限公司 Multi-dimensional data snapshot-based product BOM management method and device
CN106844933A (en) * 2017-03-13 2017-06-13 中国电子科技集团公司第二十九研究所 The full production procedure three-dimensional operation instruction generation method of micro-system product and system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111695763A (en) * 2020-04-29 2020-09-22 同济大学 Scheduling system and method based on voice question and answer
CN111695763B (en) * 2020-04-29 2023-11-24 同济大学 Scheduling system and method based on voice question and answer

Also Published As

Publication number Publication date
CN108681837B (en) 2020-08-04

Similar Documents

Publication Publication Date Title
CN108733713B (en) Data query method and device in data warehouse
Amsden et al. Beyond late development: Taiwan's upgrading policies
CN107391134B (en) Method and device for automatically generating and dynamically transforming universal mobile application interactive interface
CN110213369A (en) A kind of service function chain autopatch system and its method of combination
BR102015007166A2 (en) mechanism for job assignment in a graph-based contact center
CN105955888A (en) Page debugging and previewing method and system
CN107483521A (en) A kind of information displaying method, apparatus and system
CN109670767A (en) Processing method, device, terminal device and the storage medium of workflow
CN109636301A (en) Workflow configuration method, system, terminal and the readable storage medium storing program for executing of financial business
CN105719049B (en) Method and system for realizing intelligent log
CN106843871B (en) A kind of design system and design method of domain model frame
CN110019337A (en) Determine methods, devices and systems efficient zoned in database
CN101465752A (en) Method and system for ordering linkman
CN110535679A (en) Management method, framework, network slice sales platform and the management system of slice
CN109544665A (en) Generation method, device and the storage medium of animation poster
CN109299448A (en) Resume intelligence filling method, system, server and storage medium
CN107678844A (en) Breakpoint intelligence shunt method, electronic installation and computer-readable storage medium
CN109522919A (en) A kind of data assessment method and device
CN115239173A (en) Scheduling plan generation method and device, electronic equipment and storage medium
CN108681837A (en) Flexible production management method, device, terminal device and readable storage medium storing program for executing
CN107908454A (en) A kind of interlock method and device of the multiwindow packet based on more bookmarks
CN110443382A (en) A kind of user interaction approach based on intelligent customer service platform
Zhang et al. An open innovation model for business innovation of Chinese telecom operators
CN109636127A (en) A kind of network based on positioning puts mutual assistance platform and its application method on someone's head
CN107220044A (en) Method and apparatus based on meta-model driven business object

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant