CN108681837A - Flexible production management method, device, terminal device and readable storage medium storing program for executing - Google Patents
Flexible production management method, device, terminal device and readable storage medium storing program for executing Download PDFInfo
- Publication number
- CN108681837A CN108681837A CN201810695729.3A CN201810695729A CN108681837A CN 108681837 A CN108681837 A CN 108681837A CN 201810695729 A CN201810695729 A CN 201810695729A CN 108681837 A CN108681837 A CN 108681837A
- Authority
- CN
- China
- Prior art keywords
- production
- storage node
- information storage
- production phase
- phase information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer And Data Communications (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of flexible production management method, device, terminal device and readable storage medium storing program for executing.The present invention passes through the correspondence between the corresponding information storage node of the production phase information for establishing the different production phases,And the correspondence is stored in mapping table,To when needing to add the relevant information of product to be added into product phase table,A first production phase information storage node is created directly in production phase table,And the first production phase information is inserted into the first production phase information storage node,Then the first production phase information storage node is established and according to the correspondence between mapping table the second production phase information storage node found and third production session information storage node,And mapping table is updated according to newly-established correspondence,The product information for being inserted into product to be added into production phase table at any time can be realized,It is convenient, flexible,Enterprise is enable to rapidly adapt to the market demand and environmental change.
Description
Technical field
The present invention relates to production management technical field more particularly to a kind of flexible production management method, device, terminal devices
And readable storage medium storing program for executing.
Background technology
With the changes of the times, the scientific and technical continuous improvement being constantly progressive with people's living condition, the valence of consumer
It is worth variation of ideas quickly, consumption demand also becomes continuous variation that is more and more diversified, thus causing product demand, to adapt to
The variation of the market demand and environment, each large enterprises constantly adjust its production management method.
It is as unit of product, that is, pressing component parts for assembly of a machine, (metering constitutes a production however, due to current productive function
The unit of the quantity of the wholes of product, part or certain part) it works out a production plan, and the production schedule is typically before manufacture
It makes.Thus, after starting production according to the production schedule, then put into product, adjustment product can to entire project impact compared with
Greatly, along with the information feedback generated in production process is slower, typically this is just reported in the fixed dates of setting, such as the end of month
Month production statistics information, or just go to work report production statistics information last month at the beginning of the month, so cannot achieve dynamically adjustment at all, this
Result in enterprise during preparing product, speed of production is slower, serious to lag, and can not rapidly adapt to the market demand and environment
Variation.
Therefore it provides it is a kind of can enterprise process of manufacture Flexibility and variability and controllability, to
Enterprise is set preferably to meet the market requirement and " flexibility " productive function of environmental change, it appears particularly important.
The above is only used to facilitate the understanding of the technical scheme, and is not represented and is recognized that the above is existing skill
Art.
Invention content
The main purpose of the present invention is to provide a kind of flexible production management method, device, terminal device and readable storages
Medium, it is intended to which when preparing product, process of manufacture flexibility is low, changeability is poor, adjustable for enterprise in the prior art for solution
Property is poor, can not meet the market requirement and the technical issues of environmental change.
To achieve the above object, it the present invention provides a kind of flexible production management method, the described method comprises the following steps:
Flexible production management platform adds instruction in response to the product that user triggers, and adding instruction according to the product determines
The product information of product to be added;
Extracted from the product information product to be added be presently in the production phase the first production phase information,
The of the second production phase information of a production phase and a product to be added lower production phase on the product to be added
Three production session informations;
According to the mapping table pre-established, storage second production is searched in the production phase table to prestore
Second production phase information storage node of session information and the third production stage letter for storing the third production session information
Storage node is ceased, the second production phase information storage node is that the forerunner of the third production session information storage node ties
Point, the mapping table are the second production phase information for storing corresponding described the in the production phase table
The two production phase information storage nodes third production session information storage knot corresponding with the third production session information
Correspondence between point;
A first production phase information storage node is created in the production phase table, and described first is produced
Session information is inserted into the first production phase information storage node;
Establish the first production phase information storage node, the second production phase information storage node and described
Correspondence between three production session information storage nodes, and the mapping table is updated according to the correspondence.
Preferably, described to establish the first production phase information storage node, the second production phase information storage
Correspondence between node and the third production session information storage node, specifically includes:
Using the first production phase information storage node as the direct of the third production session information storage node
Forerunner's node, using the first production phase information storage node as the direct of the second production phase information storage node
Successor node, with determination the first production phase information storage node and the second production phase information storage node and the
The position relationship of two production phase information storage nodes;
According to the first production phase information storage node and the second production phase information storage node and second
The position relationship of production phase information storage node establishes the first production phase information storage node, second production
Correspondence between session information storage node and the third production session information storage node.
Preferably, described that a first production phase information storage node is created in the production phase table, it will
The first production phase information is inserted into before the first production phase information storage node, and the method further includes:
Judge whether the second production phase information storage node is the third production session information storage node
Direct precursor node;
Correspondingly, described that a first production phase information storage node is created in the production phase table, it will
The first production phase information is inserted into the first production phase information storage node, specifically includes:
If the second production phase information storage node be the third production session information storage node it is direct before
Node is driven, then creates a first production phase information storage node in the production phase table, described first is given birth to
It produces session information and is inserted into the first production phase information storage node;
If the second production phase information storage node is not the direct of the third production session information storage node
Forerunner's node then creates a first production phase information storage node, by described first in the production phase table
Production phase information is inserted into the first production phase information storage node, and by the second production phase information storage node
Information storage node deletion between the third production session information storage node, if alternatively, second production phase
Information storage node is not the direct precursor node of the third production session information storage node, then produces rank by described first
Segment information is inserted into the letter between the second production phase information storage node and the third production session information storage node
Storage node is ceased, original production session information is replaced.
Preferably, described that a first production phase information storage node is created in the production phase table, it will
The first production phase information is inserted into before the first production phase information storage node, and the method further includes:
Judge the second of storage the second production phase information whether has been found in the production phase table
Production phase information storage node and the third production session information storage node for storing the third production session information;
Correspondingly, described that a first production phase information storage node is created in the production phase table, it will
The first production phase information is inserted into the first production phase information storage node, specifically includes:
If having found the second production rank of storage the second production phase information in the production phase table
Segment information storage node and the third production session information storage node for storing the third production session information, then in the production
A first production phase information storage node is created in product production phase table, described in the first production phase information insertion
First production phase information storage node.
Preferably, whether the judgement has found storage second production phase in the production phase table
Second production phase information storage node of information and the third production session information for storing the third production session information are deposited
After storing up node, the method further includes:
If not finding the second production rank of storage the second production phase information in the production phase table
Segment information storage node and the third production session information storage node for storing the third production session information, then in the production
A first production phase information storage node is created in product production phase table, by the first production phase information, described the
Two production phase information and the third production session information are inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage
Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update
Relation table is penetrated, is specifically included:
Indirect forerunner's node of the first production phase information storage node is searched in the production phase table
With indirect successor node;
Establish the first production phase information storage node and indirect forerunner's node for finding and it is described indirectly
Correspondence between successor node, and the mapping table is updated according to the correspondence.
Preferably, whether the judgement has found storage second production phase in the production phase table
Second production phase information storage node of information and the third production session information for storing the third production session information are deposited
After storing up node, the method further includes:
If not finding the second production rank of storage the second production phase information in the production phase table
Segment information storage node then creates a first production phase information storage node, by institute in the production phase table
It states the first production phase information and the second production phase information is inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage
Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update
Relation table is penetrated, is specifically included:
It establishes between the first production phase information storage node and the third production session information storage node
Correspondence, and the mapping table is updated according to the correspondence.
Preferably, whether the judgement has found storage second production phase in the production phase table
Second production phase information storage node of information and the third production session information for storing the third production session information are deposited
After storing up node, the method further includes:
If not finding the third production rank for storing the third production session information in the production phase table
Segment information storage node then creates a first production phase information storage node, by institute in the production phase table
It states the first production phase information and the third production session information is inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage
Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update
Relation table is penetrated, is specifically included:
It establishes between the first production phase information storage node and the second production phase information storage node
Correspondence, and the mapping table is updated according to the correspondence.
In addition, to achieve the above object, the present invention also provides a kind of flexible production managing device, described device includes:
Respond module, the product for being triggered in response to user add instruction;
Determining module, for adding the product information that instruction determines product to be added according to the product;
Extraction module is presently in the first of the production phase for extracting the product to be added from the product information
In production phase information, the product to be added one under the second production phase information of a production phase and the product to be added
The third production session information of production phase;
Searching module, for according to the mapping table pre-established, searching and depositing in the production phase table to prestore
It stores up the second production phase information storage node of the second production phase information and stores the third production session information
Third production session information storage node, the second production phase information storage node are that the third production session information is deposited
The direct precursor node of node is stored up, the mapping table is the second production rank stored in the production phase table
The corresponding second production phase information storage node of the segment information third corresponding with the third production session information
Correspondence between production phase information storage node;
Add module, for creating a first production phase information storage node in the production phase table,
The first production phase information is inserted into the first production phase information storage node;
Update module, for establishing the first production phase information storage node, the second production phase information is deposited
The correspondence between node and the third production session information storage node is stored up, and according to described in correspondence update
Mapping table.
In addition, to achieve the above object, the present invention also provides a kind of terminal device, the terminal device includes:Storage
Device, processor and it is stored in the flexible production management program that can be run on the memory and on the processor, it is described
Flexible production management program is arranged for carrying out the step of flexible production management method.
In addition, to achieve the above object, the present invention also provides a kind of readable storage medium storing program for executing, the readable storage medium storing program for executing is
Computer readable storage medium is stored with flexible production management program on the computer readable storage medium, described flexible raw
The step of production management program realizes the flexible production management method when being executed by processor.
The present invention passes through the correspondence between the corresponding information storage node of the production phase information for establishing the different production phases
Relationship, and the correspondence is stored in mapping table, to which the phase of product to be added is added into product phase table in needs
When closing information, according to the mapping table, carried in the product information of lookup storage product to be added in product phase table
The third production rank of the second production phase information storage node and storage third production session information of second production phase information
Then segment information storage node creates a first production phase information storage node directly in production phase table, and
First production phase information is inserted into the first production phase information storage node, the first production phase information is finally re-established and deposits
Store up the correspondence between node, the second production phase information storage node and third production session information storage node, and root
Mapping table is updated according to newly-established correspondence, can be realized in process of manufacture at any time to the production stage
It is inserted into the product information of product to be added in table, and only correspondence need to be changed after being inserted into, without rebuilding production
The structure of phase table greatly improves Flexibility and variability and controllability in process of manufacture so that enterprise can be fast
Speed meets the market requirement and environmental change.
Description of the drawings
Fig. 1 is the structural schematic diagram of the terminal device for the hardware running environment that the embodiment of the present invention is related to;
Fig. 2 is the flow diagram of flexible production management method first embodiment of the present invention;
Fig. 3 is the flow diagram of flexible production management method second embodiment of the present invention;
Fig. 4 is the high-level schematic functional block diagram of flexible production managing device of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific implementation mode
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
Referring to Fig.1, Fig. 1 is the structural representation of the terminal device for the hardware running environment that the embodiment of the present invention is related to
Figure.
The terminal device specifically refers to the equipment for being deployed with flexible production management function, can be specifically to support that deployment is flexible
The physical server of production management function or virtual Cloud Server, the i.e. terminal device are to constitute flexible production management platform
Equipment.
In addition, in the concrete realization, above-mentioned terminal device can also be the portable equipment for being able to access that network, such as
Smart mobile phone, tablet computer and personal computer of various systems etc., will not enumerate herein, also be not particularly limited.
For the ease of understanding the specific works of the terminal device, it is specifically described below in conjunction with Fig. 1.
As shown in Figure 1, the terminal device may include:Processor 1001, such as central processing unit (Central
Processing Unit, CPU), communication bus 1002, user interface 1003, network interface 1004, memory 1005.Wherein,
Communication bus 1002 is for realizing the connection communication between these components.User interface 1003 may include tangible display screen,
Voice recognition unit etc., optionally, user interface 1003 can also include standard wireline interface and wireless interface.Network interface
1004 may include optionally standard wireline interface and wireless interface (such as Wireless Fidelity (WIreless-FIdelity, WI-FI)
Interface, blue tooth interface etc.).Memory 1005 can be high-speed RAM memory, can also be stable memory (non-
Volatile memory), such as magnetic disk storage.Memory 1005 optionally can also be independently of aforementioned processor 1001
Storage device.
It will be understood by those skilled in the art that structure shown in Fig. 1 does not constitute the restriction to terminal device, can wrap
It includes than illustrating more or fewer components, either combines certain components or different components arrangement.
Therefore, as shown in Figure 1, as may include in a kind of memory 1005 of computer storage media operating system,
Network communication module, Subscriber Interface Module SIM and flexible production management program.
In terminal device shown in Fig. 1, network interface 1004 is mainly with the communication for establishing terminal device and user terminal
Connection;User interface 1003 is mainly used for receiving the input instruction of user;The terminal device is deposited by the calling of processor 1001
The flexible production management program stored in reservoir 1005, and execute following operation:
Flexible production management platform adds instruction in response to the product that user triggers, and adding instruction according to the product determines
The product information of product to be added;
Extracted from the product information product to be added be presently in the production phase the first production phase information,
The of the second production phase information of a production phase and a product to be added lower production phase on the product to be added
Three production session informations;
According to the mapping table pre-established, storage second production is searched in the production phase table to prestore
Second production phase information storage node of session information and the third production stage letter for storing the third production session information
Storage node is ceased, the second production phase information storage node is that the forerunner of the third production session information storage node ties
Point, the mapping table are the second production phase information for storing corresponding described the in the production phase table
The two production phase information storage nodes third production session information storage knot corresponding with the third production session information
Correspondence between point;
A first production phase information storage node is created in the production phase table, and described first is produced
Session information is inserted into the first production phase information storage node;
Establish the first production phase information storage node, the second production phase information storage node and described
Correspondence between three production session information storage nodes, and the mapping table is updated according to the correspondence.
Further, processor 1001 can call the flexible production management program stored in memory 1005, also execute
It operates below:
Using the first production phase information storage node as the direct of the third production session information storage node
Forerunner's node, using the first production phase information storage node as the direct of the second production phase information storage node
Successor node, with determination the first production phase information storage node and the second production phase information storage node and the
The position relationship of two production phase information storage nodes;
According to the first production phase information storage node and the second production phase information storage node and second
The position relationship of production phase information storage node establishes the first production phase information storage node, second production
Correspondence between session information storage node and the third production session information storage node.
Further, processor 1001 can call the flexible production management program stored in memory 1005, also execute
It operates below:
Judge whether the second production phase information storage node is the third production session information storage node
Direct precursor node;
Correspondingly, described that a first production phase information storage node is created in the production phase table, it will
The first production phase information is inserted into the first production phase information storage node, specifically includes:
If the second production phase information storage node be the third production session information storage node it is direct before
Node is driven, then creates a first production phase information storage node in the production phase table, described first is given birth to
It produces session information and is inserted into the first production phase information storage node;
If the second production phase information storage node is not the direct of the third production session information storage node
Forerunner's node then creates a first production phase information storage node, by described first in the production phase table
Production phase information is inserted into the first production phase information storage node, and by the second production phase information storage node
Information storage node deletion between the third production session information storage node, if alternatively, second production phase
Information storage node is not the direct precursor node of the third production session information storage node, then produces rank by described first
Segment information is inserted into the letter between the second production phase information storage node and the third production session information storage node
Storage node is ceased, original production session information is replaced.
Further, processor 1001 can call the flexible production management program stored in memory 1005, also execute
It operates below:
Judge the second of storage the second production phase information whether has been found in the production phase table
Production phase information storage node and the third production session information storage node for storing the third production session information;
Correspondingly, described that a first production phase information storage node is created in the production phase table, it will
The first production phase information is inserted into the first production phase information storage node, specifically includes:
If having found the second production rank of storage the second production phase information in the production phase table
Segment information storage node and the third production session information storage node for storing the third production session information, then in the production
A first production phase information storage node is created in product production phase table, described in the first production phase information insertion
First production phase information storage node.
Further, processor 1001 can call the flexible production management program stored in memory 1005, also execute
It operates below:
If not finding the second production rank of storage the second production phase information in the production phase table
Segment information storage node and the third production session information storage node for storing the third production session information, then in the production
A first production phase information storage node is created in product production phase table, by the first production phase information, described the
Two production phase information and the third production session information are inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage
Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update
Relation table is penetrated, is specifically included:
Indirect forerunner's node of the first production phase information storage node is searched in the production phase table
With indirect successor node;
Establish the first production phase information storage node and indirect forerunner's node for finding and it is described indirectly
Correspondence between successor node, and the mapping table is updated according to the correspondence.
Further, processor 1001 can call the flexible production management program stored in memory 1005, also execute
It operates below:
If not finding the second production rank of storage the second production phase information in the production phase table
Segment information storage node then creates a first production phase information storage node, by institute in the production phase table
It states the first production phase information and the second production phase information is inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage
Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update
Relation table is penetrated, is specifically included:
It establishes between the first production phase information storage node and the third production session information storage node
Correspondence, and the mapping table is updated according to the correspondence.
Further, processor 1001 can call the flexible production management program stored in memory 1005, also execute
It operates below:
If not finding the third production rank for storing the third production session information in the production phase table
Segment information storage node then creates a first production phase information storage node, by institute in the production phase table
It states the first production phase information and the third production session information is inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage
Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update
Relation table is penetrated, is specifically included:
It establishes between the first production phase information storage node and the second production phase information storage node
Correspondence, and the mapping table is updated according to the correspondence.
This implementation through the above scheme, the corresponding information storage knot of production phase information by establishing the different production phases
Correspondence between point, and the correspondence is stored in mapping table, to need to add into product phase table to wait for
When adding the relevant information of product, according to the mapping table, the product for storing product to be added is searched in product phase table
The the second production phase information storage node and storage third production session information of the second production phase information carried in information
Third production session information storage node, then directly in production phase table create a first production phase information
Storage node, and the first production phase information is inserted into the first production phase information storage node, finally re-establish the first life
Produce pair between session information storage node, the second production phase information storage node and third production session information storage node
Should be related to, and mapping table is updated according to newly-established correspondence, can realize in process of manufacture at any time to
It is inserted into the product information of product to be added in production phase table, and only correspondence need to be changed after being inserted into, without again
The structure for building production phase table, greatly improves the Flexibility and variability and controllability in process of manufacture, makes
The market demand and environmental change can be rapidly adapted to by obtaining enterprise.
Based on above-mentioned hardware configuration, flexible production management method embodiment of the present invention is proposed.
It is the flow diagram of flexible production management method first embodiment of the present invention with reference to Fig. 2, Fig. 2.
In the first embodiment, the flexible production management method includes the following steps:
S10:Flexible production management platform adds instruction in response to the product that user triggers, and is added and is instructed according to the product
Determine the product information of product to be added.
Specifically, flexible production management platform described in the present embodiment can be deployed on physical server, also may be used
To be deployed on virtual Cloud Server, specific set-up mode, those skilled in the art can be arranged as required to, herein not
It is limited.
S20:The first production phase that the product to be added is presently in the production phase is extracted from the product information
The second production phase information of a production phase and a product to be added lower production phase in information, the product to be added
Third production session information.
It should be understood that extracting the first production phase information, the second production phase information from the said goods information
It, can be according to the pre-set identification number for identifying different production phase information successively and when third production session information
Extraction can also be believed by the vocabulary that may relate to according to preset each generation phase from product according to Keyword Extraction Technique
It is extracted in breath.Specific extracting mode, those skilled in the art can be arranged as required to, not be limited herein.
However, it should be understood that in the concrete realization, in addition to believing comprising the first production phase in the said goods information
Except breath, the second production phase information and third production session information, it can also be applied according to flexible production management platform
Field, occasion rationally to be arranged and need the information that carries, will not enumerate, be not also limited herein.
S30:According to the mapping table pre-established, storage described second is searched in the production phase table to prestore
Second production phase information storage node of production phase information and the third production rank for storing the third production session information
Segment information storage node.
It should be noted that the second production phase information storage node described in the present embodiment is the third production rank
That is, in process of production the direct precursor node of segment information storage node generates the second production phase information storage node
The process of second production phase production information of middle storage, necessarily in generating the third production session information storage node
It is carried out before the process of the third production stage production information of storage.
For example the third production session information stored in third production session information storage node is semi-finished product information, then
The the second production phase information stored in two production phase information storage nodes can be then raw material information.
In addition, mapping table described in the present embodiment is second life stored in the production phase table
It is corresponding with the third production session information described to produce the corresponding second production phase information storage node of session information
Correspondence between third production session information storage node, i.e., it is the second production phase information to be stored in mapping table
The position relationship of storage node and third production session information storage node in production phase table.
It should be noted that these are only for example, not constituting any restriction to technical scheme of the present invention, having
In body application, those skilled in the art can be configured as needed, and the present invention is without limitation.
S40:A first production phase information storage node is created in the production phase table, by described first
Production phase information is inserted into the first production phase information storage node.
Specifically, the first production phase information storage knot created in the production phase table in the present embodiment
Point position, can be specifically at the table tail of the production phase table, can also be in the production phase table
Any two information storage node between, i.e., the present embodiment to the position of the first newly-built production phase information storage node not
It is limited.
It should be understood that the field of storage information needs and first in the first newly-built production phase information storage node
The field carried in production phase information is identical, and the first production phase information is being inserted into the first production phase information in this way
When storage node, stored according to corresponding field.
For example, carrying serial number, name of product, Product Status of this information etc. in the first production phase information, then
It is also required for these fields in the first newly-built production phase information storage node.
It should be noted that these are only for example, not constituting any restriction to technical scheme of the present invention, having
In body application, those skilled in the art can be configured as needed, and the present invention is without limitation.
S50:Establish the first production phase information storage node, the second production phase information storage node and institute
The correspondence between third production session information storage node is stated, and the mapping relations are updated according to the correspondence
Table.
Specifically, can be accomplished by the following way:
First, using the first production phase information storage node as the third production session information storage node
Direct precursor node, using the first production phase information storage node as the second production phase information storage node
Immediate successor node, with determination the first production phase information storage node and the second production phase information storage node
With the position relationship of the second production phase information storage node.
It should be noted that above-mentioned described using the first production phase information storage node as the third production rank
The direct precursor node of segment information storage node, using the first production phase information storage node as the second production rank
The operation of the immediate successor node of segment information storage node in the concrete realization can be by pre- in each information storage node
One is stayed for storing the pointer field for being directed toward its direct precursor node and immediate successor node, then by respective pointer field
The middle unique identification information that its direct precursor node and immediate successor node are set, such as address, serial number.
Then, according to the first production phase information storage node and the second production phase information storage node and
The position relationship of second production phase information storage node establishes the first production phase information storage node, described second
Correspondence between production phase information storage node and the third production session information storage node.
It should be noted that these are only for example, not constituting any restriction to technical scheme of the present invention, having
In body application, those skilled in the art can be configured as needed, and the present invention is without limitation.
By foregoing description it is not difficult to find that the flexible production management method provided in the present embodiment, by establishing different lifes
Correspondence between the corresponding information storage node of production phase information in production stage, and the correspondence is stored in mapping and is closed
It is table, to when needing to add the relevant information of product to be added into product phase table, according to the mapping table, produce
The second production phase of the second production phase information carried in the product information for storing product to be added is searched in product phase table
Then the third production session information storage node of information storage node and storage third production session information is directly given birth in product
It produces and creates a first production phase information storage node in phase table, and the first production phase information is inserted into the first production rank
Segment information storage node finally re-establishes the first production phase information storage node, the second production phase information storage node
Correspondence between third production session information storage node, and mapping relations are updated according to newly-established correspondence
Table can realize the product information for being inserted into product to be added into production phase table at any time in process of manufacture,
And correspondence only need to be changed after being inserted into, without rebuilding the structure of production phase table, production is greatly improved and adds
Flexibility and variability during work and controllability so that enterprise can rapidly adapt to the market demand and environmental change.
In addition, it is noted that the flexible production management method provided in the present embodiment, not only can be adapted for enterprise
Production management field, to adapt to a variety of relations of production flows in enterprise production process, to be provided for the standardized management of enterprise
It is convenient;It may also adapt to reach the standardization to agricultural production in agricultural production so that agricultural products are from farmland to dining table
The flow of links can be recorded clearly, and user is facilitated to check, i.e., any pattern for being related to different procedure links is all
The flexible production management method can be applied, concrete implementation process, those skilled in the art can be by retouching in this implementation
The content stated combines the demand of each scene to realize that details are not described herein again, is not also limited.
Further, as shown in figure 3, propose flexible production management method of the present invention based on first embodiment second implements
Example creates a first production phase information storage node in the production phase table in the present embodiment, will be described
First production phase information is inserted into before the first production phase information storage node, needs first to judge the second production rank
Segment information storage node whether be the third production session information storage node direct precursor node, then according to judge tie
Fruit carries out subsequent operation, refers to the step S00 increased newly in Fig. 3.
In step S00:Judge whether the second production phase information storage node is the third production stage letter
The direct precursor node for ceasing storage node, that is, judge the second production phase information storage node and the third production stage
Whether there is no other any information storage nodes for information storage node as intermediary, and there is direct associations therebetween.
Correspondingly, former step S40 specifically refines two sub-steps of S401 and S402, specifically:
In step 401:The second production phase information storage node and the third production session information are stored
Information storage node deletion between node.
In step 402:A first production phase information storage node is created in the production phase table, it will
The first production phase information is inserted into the first production phase information storage node.
That is, judging whether the second production phase information storage node is the third life in step S00
After the direct precursor node for producing session information storage node, if the second production phase information storage node is the third
The direct precursor node of production phase information storage node then directly executes the operation in step S402, i.e., is given birth in the product
It produces and creates a first production phase information storage node in phase table, the first production phase information is inserted into described first
Production phase information storage node;It is deposited if the second production phase information storage node is not the third production session information
The direct precursor node for storing up node, then first carry out step S401, by the second production phase information storage node and described the
Information storage node deletion between three production session information storage nodes, then executes step S402 again, is given birth in the product
It produces and creates a first production phase information storage node in phase table, the first production phase information is inserted into described first
Production phase information storage node.
In addition, it is noted that in the concrete realization, when judging that the second production phase information storage node is not
When the direct precursor node of the third production session information storage node, it can be arranged and not delete the second production phase letter
The information storage node between storage node and the third production session information storage node is ceased, but described first is produced
Session information is inserted between the second production phase information storage node and the third production session information storage node
Information storage node replaces original production session information.
It should be understood that if the second production phase information storage node and the third production session information are deposited
The information storage node number stored up between node is more than 1, then the information stored in management product production phase table for convenience, can
With by extra several information storage node deletions, or these information storage nodes are directly merged into an information storage rank
Section, the first production phase information storage node as the first production phase information of storage.
It should be noted that these are only for example, not constituting any restriction to technical scheme of the present invention, having
In body application, those skilled in the art can be configured as needed, and the present invention is without limitation.
Further, in order to cope with various situations in actual production process, one is created in the production phase table
The first production phase information is inserted into the first production phase information storage by a first production phase information storage node
Before node, it can also first judge storage the second production phase letter whether has been found in the production phase table
Second production phase information storage node of breath and the third production session information storage for storing the third production session information
Then node executes suitable operation according to judging result so that enterprise can be preferably involved in the entire production process of specification
Each procedure links.
Specifically, in the actual production process, can substantially exist:Storage has been found in the production phase table
Second production phase information storage node of the second production phase information and store the of the third production session information
Three production session information storage nodes do not find storage the second production phase information in the production phase table
The second production phase information storage node and store the third production session information storage knot of the third production session information
Point does not find in the production phase table and stores the second production phase information of the second production phase information and deposit
It stores up node and does not find the third production stage for storing the third production session information in the production phase table
Four kinds of situations of information storage node, for these four situations, the reply that can be made approximately as:
If having found the second production rank of storage the second production phase information in the production phase table
Segment information storage node and the third production session information storage node for storing the third production session information, then in the production
A first production phase information storage node is created in product production phase table, described in the first production phase information insertion
First production phase information storage node.
If not finding the second production rank of storage the second production phase information in the production phase table
Segment information storage node and the third production session information storage node for storing the third production session information, then in the production
A first production phase information storage node is created in product production phase table, by the first production phase information, described the
Two production phase information and the third production session information are inserted into the first production phase information storage node.
Correspondingly, operational suitability in step S50 becomes:Described first is searched in the production phase table
Then indirect forerunner's node of production phase information storage node and indirect successor node establish the first production phase information
Correspondence between storage node and the indirect forerunner's node found and the indirect successor node, and according to described
Correspondence updates the mapping table.
If not finding the second production rank of storage the second production phase information in the production phase table
Segment information storage node then creates a first production phase information storage node, by institute in the production phase table
It states the first production phase information and the second production phase information is inserted into the first production phase information storage node.
Correspondingly, operational suitability in step S50 becomes:Directly establish the first production phase information storage knot
Correspondence between point and the third production session information storage node, and the mapping is updated according to the correspondence
Relation table.
If not finding the third production rank for storing the third production session information in the production phase table
Segment information storage node then creates a first production phase information storage node, by institute in the production phase table
It states the first production phase information and the third production session information is inserted into the first production phase information storage node.
Correspondingly, operational suitability in step S50 becomes:Directly establish the first production phase information storage knot
Correspondence between point and the second production phase information storage node, and the mapping is updated according to the correspondence
Relation table.
By foregoing description it is not difficult to find that flexible production management method provided in this embodiment, can preferably adapt to reality
Various situations involved in the process of manufacture of border, meet the different demands of different product, so that process of manufacture becomes
It is more flexible, variable and adjustable, greatly improve enterprise and meet the market requirement and the demand of environmental change.
In addition, the embodiment of the present invention also proposes a kind of flexible production management system.As shown in figure 4, the flexible production management
System includes:Respond module 4001, determining module 4002, extraction module 4003, searching module 4004, add module 4005 and more
New module 4006.
Wherein, respond module 4001, the product for being triggered in response to user add instruction.Determining module 4002, is used for
The product information that instruction determines product to be added is added according to the product.Extraction module 4003 is used for from the product information
The middle extraction product to be added is presently in the first production phase information of production phase, a production on the product to be added
The third production session information of the second production phase information and a product to be added lower production phase in stage.Searching module
4004, for according to the mapping table pre-established, searching storage second life in the production phase table to prestore
It produces the second production phase information storage node of session information and stores the third production stage of the third production session information
Information storage node.Add module 4005, for creating a first production phase information in the production phase table
The first production phase information is inserted into the first production phase information storage node by storage node.Update module 4006,
For establishing the first production phase information storage node, the second production phase information storage node and third life
The correspondence between session information storage node is produced, and the mapping table is updated according to the correspondence.
It should be noted that the second production phase information storage node described in the present embodiment is the third production rank
That is, in process of production the direct precursor node of segment information storage node generates the second production phase information storage node
The process of second production phase production information of middle storage, necessarily in generating the third production session information storage node
It is carried out before the process of the third production stage production information of storage.
For example the third production session information stored in third production session information storage node is semi-finished product information, then
The the second production phase information stored in two production phase information storage nodes can be then raw material information.
In addition, mapping table described in the present embodiment is second life stored in the production phase table
It is corresponding with the third production session information described to produce the corresponding second production phase information storage node of session information
Correspondence between third production session information storage node, i.e., it is the second production phase information to be stored in mapping table
The position relationship of storage node and third production session information storage node in production phase table.
It should be noted that these are only for example, not constituting any restriction to technical scheme of the present invention, having
In body application, those skilled in the art can be configured as needed, and the present invention is without limitation.
By foregoing description it is not difficult to find that the flexible production provided in the present embodiment manages system, by establishing different lifes
Correspondence between the corresponding information storage node of production phase information in production stage, and the correspondence is stored in mapping and is closed
It is table, to when needing to add the relevant information of product to be added into product phase table, according to the mapping table, produce
The second production phase of the second production phase information carried in the product information for storing product to be added is searched in product phase table
Then the third production session information storage node of information storage node and storage third production session information is directly given birth in product
It produces and creates a first production phase information storage node in phase table, and the first production phase information is inserted into the first production rank
Segment information storage node finally re-establishes the first production phase information storage node, the second production phase information storage node
Correspondence between third production session information storage node, and mapping relations are updated according to newly-established correspondence
Table can realize the product information for being inserted into product to be added into production phase table at any time in process of manufacture,
And correspondence only need to be changed after being inserted into, without rebuilding the structure of production phase table, production is greatly improved and adds
Flexibility and variability during work and controllability so that enterprise can rapidly adapt to the market demand and environmental change.
It should be noted that workflow described above is only schematical, not to the protection model of the present invention
Enclose composition limit, in practical applications, those skilled in the art can select according to the actual needs part therein or
It all achieves the purpose of the solution of this embodiment, is not herein limited.
In addition, the not technical detail of detailed description in the present embodiment, reference can be made to what any embodiment of the present invention was provided
Flexible production management method, details are not described herein again.
In addition, the embodiment of the present invention also proposes that a kind of readable storage medium storing program for executing, the readable storage medium storing program for executing are computer-readable
Storage medium is stored with flexible production management program, the flexible production management program on the computer readable storage medium
Following operation is realized when being executed by processor:
Flexible production management platform adds instruction in response to the product that user triggers, and adding instruction according to the product determines
The product information of product to be added;
Extracted from the product information product to be added be presently in the production phase the first production phase information,
The of the second production phase information of a production phase and a product to be added lower production phase on the product to be added
Three production session informations;
According to the mapping table pre-established, storage second production is searched in the production phase table to prestore
Second production phase information storage node of session information and the third production stage letter for storing the third production session information
Storage node is ceased, the second production phase information storage node is that the forerunner of the third production session information storage node ties
Point, the mapping table are the second production phase information for storing corresponding described the in the production phase table
The two production phase information storage nodes third production session information storage knot corresponding with the third production session information
Correspondence between point;
A first production phase information storage node is created in the production phase table, and described first is produced
Session information is inserted into the first production phase information storage node;
Establish the first production phase information storage node, the second production phase information storage node and described
Correspondence between three production session information storage nodes, and the mapping table is updated according to the correspondence.
Further, following operation is also realized when the flexible production management program is executed by processor:
Using the first production phase information storage node as the direct of the third production session information storage node
Forerunner's node, using the first production phase information storage node as the direct of the second production phase information storage node
Successor node, with determination the first production phase information storage node and the second production phase information storage node and the
The position relationship of two production phase information storage nodes;
According to the first production phase information storage node and the second production phase information storage node and second
The position relationship of production phase information storage node establishes the first production phase information storage node, second production
Correspondence between session information storage node and the third production session information storage node.
Further, following operation is also realized when the flexible production management program is executed by processor:
Judge whether the second production phase information storage node is the third production session information storage node
Direct precursor node;
Correspondingly, described that a first production phase information storage node is created in the production phase table, it will
The first production phase information is inserted into the first production phase information storage node, specifically includes:
If the second production phase information storage node be the third production session information storage node it is direct before
Node is driven, then creates a first production phase information storage node in the production phase table, described first is given birth to
It produces session information and is inserted into the first production phase information storage node;
If the second production phase information storage node is not the direct of the third production session information storage node
Forerunner's node then creates a first production phase information storage node, by described first in the production phase table
Production phase information is inserted into the first production phase information storage node, and by the second production phase information storage node
Information storage node deletion between the third production session information storage node, if alternatively, second production phase
Information storage node is not the direct precursor node of the third production session information storage node, then produces rank by described first
Segment information is inserted into the letter between the second production phase information storage node and the third production session information storage node
Storage node is ceased, original production session information is replaced.
Further, following operation is also realized when the flexible production management program is executed by processor:
Judge the second of storage the second production phase information whether has been found in the production phase table
Production phase information storage node and the third production session information storage node for storing the third production session information;
Correspondingly, described that a first production phase information storage node is created in the production phase table, it will
The first production phase information is inserted into the first production phase information storage node, specifically includes:
If having found the second production rank of storage the second production phase information in the production phase table
Segment information storage node and the third production session information storage node for storing the third production session information, then in the production
A first production phase information storage node is created in product production phase table, described in the first production phase information insertion
First production phase information storage node.
Further, following operation is also realized when the flexible production management program is executed by processor:
If not finding the second production rank of storage the second production phase information in the production phase table
Segment information storage node and the third production session information storage node for storing the third production session information, then in the production
A first production phase information storage node is created in product production phase table, by the first production phase information, described the
Two production phase information and the third production session information are inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage
Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update
Relation table is penetrated, is specifically included:
Indirect forerunner's node of the first production phase information storage node is searched in the production phase table
With indirect successor node;
Establish the first production phase information storage node and indirect forerunner's node for finding and it is described indirectly
Correspondence between successor node, and the mapping table is updated according to the correspondence.
Further, following operation is also realized when the flexible production management program is executed by processor:
If not finding the second production rank of storage the second production phase information in the production phase table
Segment information storage node then creates a first production phase information storage node, by institute in the production phase table
It states the first production phase information and the second production phase information is inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage
Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update
Relation table is penetrated, is specifically included:
It establishes between the first production phase information storage node and the third production session information storage node
Correspondence, and the mapping table is updated according to the correspondence.
Further, following operation is also realized when the flexible production management program is executed by processor:
If not finding the third production rank for storing the third production session information in the production phase table
Segment information storage node then creates a first production phase information storage node, by institute in the production phase table
It states the first production phase information and the third production session information is inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage
Correspondence between node and the third production session information storage node, and reflected according to described in correspondence update
Relation table is penetrated, is specifically included:
It establishes between the first production phase information storage node and the second production phase information storage node
Correspondence, and the mapping table is updated according to the correspondence.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that process, method, article or system including a series of elements include not only those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or system institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including this
There is also other identical elements in the process of element, method, article or system.
The embodiments of the present invention are for illustration only, can not represent the quality of embodiment.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side
Method can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but in many cases
The former is more preferably embodiment.Based on this understanding, technical scheme of the present invention substantially in other words does the prior art
Going out the part of contribution can be expressed in the form of software products, which is stored in one as described above
In storage medium (such as ROM/RAM, magnetic disc, CD), including some instructions use so that a station terminal equipment (can be mobile phone,
Computer, server or network equipment etc.) execute method described in each embodiment of the present invention.
It these are only the preferred embodiment of the present invention, be not intended to limit the scope of the invention, it is every to utilize this hair
Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills
Art field, is included within the scope of the present invention.
Claims (10)
1. a kind of flexible production management method, which is characterized in that the described method comprises the following steps:
Flexible production management platform adds instruction in response to the product that user triggers, and adds instruction determination according to the product and waits adding
Add the product information of product;
The first production phase information, described that the product to be added is presently in the production phase is extracted from the product information
The second production phase information of a production phase and the life of the third of a product to be added lower production phase on product to be added
Produce session information;
According to the mapping table pre-established, is searched in the production phase table to prestore and store second production phase
Second production phase information storage node of information and the third production session information for storing the third production session information are deposited
Node is stored up, the second production phase information storage node is forerunner's node of the third production session information storage node,
The mapping table is the second production phase information corresponding described second stored in the production phase table
The production phase information storage node third production session information storage node corresponding with the third production session information
Between correspondence;
A first production phase information storage node is created in the production phase table, by first production phase
Information is inserted into the first production phase information storage node;
Establish the first production phase information storage node, the second production phase information storage node and third life
The correspondence between session information storage node is produced, and the mapping table is updated according to the correspondence.
2. flexible production management method as described in claim 1, which is characterized in that described to establish the first production phase letter
Cease pair between storage node, the second production phase information storage node and the third production session information storage node
It should be related to, specifically include:
Using the first production phase information storage node as the direct precursor of the third production session information storage node
Node, using the first production phase information storage node as the immediate successor of the second production phase information storage node
Node, with determination the first production phase information storage node and the second production phase information storage node and the second life
Produce the position relationship of session information storage node;
According to the first production phase information storage node and the second production phase information storage node and the second production
The position relationship of session information storage node establishes the first production phase information storage node, second production phase
Correspondence between information storage node and the third production session information storage node.
3. flexible production management method as claimed in claim 1 or 2, which is characterized in that described in the production stage
A first production phase information storage node is created in table, and the first production phase information is inserted into the first production rank
Before segment information storage node, the method further includes:
Judge whether the second production phase information storage node is the direct of the third production session information storage node
Forerunner's node;
Correspondingly, described that a first production phase information storage node is created in the production phase table, it will be described
First production phase information is inserted into the first production phase information storage node, specifically includes:
If the second production phase information storage node is the direct precursor knot of the third production session information storage node
Point then creates a first production phase information storage node in the production phase table, and rank is produced by described first
Segment information is inserted into the first production phase information storage node;
If the second production phase information storage node is not the direct precursor of the third production session information storage node
Node then creates a first production phase information storage node in the production phase table, described first is produced
Session information is inserted into the first production phase information storage node, if alternatively, the second production phase information storage node
It is not the direct precursor node of the third production session information storage node, then the first production phase information is inserted into institute
The information storage node between the second production phase information storage node and the third production session information storage node is stated, is replaced
Change original production session information.
4. flexible production management method as claimed in claim 1 or 2, which is characterized in that described in the production stage
A first production phase information storage node is created in table, and the first production phase information is inserted into the first production rank
Before segment information storage node, the method further includes:
Judge that storage the second production phase information whether has been found in the production phase table second produces
Session information storage node and the third production session information storage node for storing the third production session information;
Correspondingly, described that a first production phase information storage node is created in the production phase table, it will be described
First production phase information is inserted into the first production phase information storage node, specifically includes:
If having found the second production phase letter of storage the second production phase information in the production phase table
It ceases storage node and stores the third production session information storage node of the third production session information, then given birth in the product
It produces and creates a first production phase information storage node in phase table, the first production phase information is inserted into described first
Production phase information storage node.
5. flexible production management method as claimed in claim 4, which is characterized in that the judgement is in the production stage
Whether found in table described in the second production phase information storage node and the storage of storage the second production phase information
After the third production session information storage node of third production session information, the method further includes:
If not finding the second production phase letter for storing the second production phase information in the production phase table
It ceases storage node and stores the third production session information storage node of the third production session information, then given birth in the product
It produces and creates a first production phase information storage node in phase table, by the first production phase information, second life
It produces session information and the third production session information is inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage node
Correspondence between the third production session information storage node, and the mapping is updated according to the correspondence and is closed
It is table, specifically includes:
Searched in the production phase table the first production phase information storage node indirect forerunner's node and
Connect successor node;
Establish the first production phase information storage node and indirect forerunner's node for finding and described indirectly subsequent
Correspondence between node, and the mapping table is updated according to the correspondence.
6. flexible production management method as claimed in claim 4, which is characterized in that the judgement is in the production stage
Whether found in table described in the second production phase information storage node and the storage of storage the second production phase information
After the third production session information storage node of third production session information, the method further includes:
If not finding the second production phase letter for storing the second production phase information in the production phase table
Storage node is ceased, then creates a first production phase information storage node in the production phase table, by described the
One production session information and the second production phase information are inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage node
Correspondence between the third production session information storage node, and the mapping is updated according to the correspondence and is closed
It is table, specifically includes:
Establish the correspondence between the first production phase information storage node and the third production session information storage node
Relationship, and the mapping table is updated according to the correspondence.
7. flexible production management method as claimed in claim 4, which is characterized in that the judgement is in the production stage
Whether found in table described in the second production phase information storage node and the storage of storage the second production phase information
After the third production session information storage node of third production session information, the method further includes:
If not finding the third production stage letter for storing the third production session information in the production phase table
Storage node is ceased, then creates a first production phase information storage node in the production phase table, by described the
One production session information and the third production session information are inserted into the first production phase information storage node;
Correspondingly, described to establish the first production phase information storage node, the second production phase information storage node
Correspondence between the third production session information storage node, and the mapping is updated according to the correspondence and is closed
It is table, specifically includes:
Establish the correspondence between the first production phase information storage node and the second production phase information storage node
Relationship, and the mapping table is updated according to the correspondence.
8. a kind of flexible production managing device, which is characterized in that described device includes:
Respond module, the product for being triggered in response to user add instruction;
Determining module, for adding the product information that instruction determines product to be added according to the product;
Extraction module is presently in the first production of production phase for extracting the product to be added from the product information
A production under the second production phase information of a production phase and the product to be added in session information, the product to be added
The third production session information in stage;
Searching module, for according to the mapping table pre-established, storage institute to be searched in the production phase table to prestore
It states the second production phase information storage node of the second production phase information and stores the third of the third production session information
Production phase information storage node, the second production phase information storage node are third production session information storage knot
The direct precursor node of point, the mapping table are second production phase letter stored in the production phase table
Cease the corresponding second production phase information storage node third production corresponding with the third production session information
Correspondence between session information storage node;
Add module, for creating a first production phase information storage node in the production phase table, by institute
It states the first production phase information and is inserted into the first production phase information storage node;
Update module, for establishing the first production phase information storage node, the second production phase information storage knot
Correspondence between point and the third production session information storage node, and the mapping is updated according to the correspondence
Relation table.
9. a kind of terminal device, which is characterized in that the terminal device includes:Memory, processor and it is stored in described deposit
On reservoir and the flexible production management program that can run on the processor, the flexible production management program are arranged for carrying out
The step of flexible production management method as described in any one of claim 1 to 7.
10. a kind of readable storage medium storing program for executing, which is characterized in that the readable storage medium storing program for executing is computer readable storage medium, described
Flexible production management program is stored on computer readable storage medium, when the flexible production management program is executed by processor
The step of realizing flexible production management method as described in any one of claim 1 to 7.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810695729.3A CN108681837B (en) | 2018-06-27 | 2018-06-27 | Flexible production management method and device, terminal equipment and readable storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810695729.3A CN108681837B (en) | 2018-06-27 | 2018-06-27 | Flexible production management method and device, terminal equipment and readable storage medium |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108681837A true CN108681837A (en) | 2018-10-19 |
CN108681837B CN108681837B (en) | 2020-08-04 |
Family
ID=63812435
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810695729.3A Active CN108681837B (en) | 2018-06-27 | 2018-06-27 | Flexible production management method and device, terminal equipment and readable storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108681837B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111695763A (en) * | 2020-04-29 | 2020-09-22 | 同济大学 | Scheduling system and method based on voice question and answer |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1963705A (en) * | 2005-11-09 | 2007-05-16 | 株式会社东芝 | Production plan apparatus and its method and production plan processing program |
EP1803088A1 (en) * | 2004-09-21 | 2007-07-04 | Sap Ag | Transfer of information associated to requirement orders in production planning |
CN102509185A (en) * | 2011-10-26 | 2012-06-20 | 贵州讯腾物联网有限公司 | Product information traceability system and method |
US20120271739A1 (en) * | 2011-04-22 | 2012-10-25 | MJFreeway, LLC | Methods, Devices, and Computer Program Products for Tracking Product Inventory |
CN104077645A (en) * | 2013-03-29 | 2014-10-01 | 株式会社日立制作所 | Production management system and management method |
CN106408178A (en) * | 2016-09-05 | 2017-02-15 | 南京简睿捷软件开发有限公司 | Multi-dimensional data snapshot-based product BOM management method and device |
CN106844933A (en) * | 2017-03-13 | 2017-06-13 | 中国电子科技集团公司第二十九研究所 | The full production procedure three-dimensional operation instruction generation method of micro-system product and system |
-
2018
- 2018-06-27 CN CN201810695729.3A patent/CN108681837B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1803088A1 (en) * | 2004-09-21 | 2007-07-04 | Sap Ag | Transfer of information associated to requirement orders in production planning |
CN1963705A (en) * | 2005-11-09 | 2007-05-16 | 株式会社东芝 | Production plan apparatus and its method and production plan processing program |
US20120271739A1 (en) * | 2011-04-22 | 2012-10-25 | MJFreeway, LLC | Methods, Devices, and Computer Program Products for Tracking Product Inventory |
CN102509185A (en) * | 2011-10-26 | 2012-06-20 | 贵州讯腾物联网有限公司 | Product information traceability system and method |
CN104077645A (en) * | 2013-03-29 | 2014-10-01 | 株式会社日立制作所 | Production management system and management method |
CN106408178A (en) * | 2016-09-05 | 2017-02-15 | 南京简睿捷软件开发有限公司 | Multi-dimensional data snapshot-based product BOM management method and device |
CN106844933A (en) * | 2017-03-13 | 2017-06-13 | 中国电子科技集团公司第二十九研究所 | The full production procedure three-dimensional operation instruction generation method of micro-system product and system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111695763A (en) * | 2020-04-29 | 2020-09-22 | 同济大学 | Scheduling system and method based on voice question and answer |
CN111695763B (en) * | 2020-04-29 | 2023-11-24 | 同济大学 | Scheduling system and method based on voice question and answer |
Also Published As
Publication number | Publication date |
---|---|
CN108681837B (en) | 2020-08-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108733713B (en) | Data query method and device in data warehouse | |
Amsden et al. | Beyond late development: Taiwan's upgrading policies | |
CN107391134B (en) | Method and device for automatically generating and dynamically transforming universal mobile application interactive interface | |
CN110213369A (en) | A kind of service function chain autopatch system and its method of combination | |
BR102015007166A2 (en) | mechanism for job assignment in a graph-based contact center | |
CN105955888A (en) | Page debugging and previewing method and system | |
CN107483521A (en) | A kind of information displaying method, apparatus and system | |
CN109670767A (en) | Processing method, device, terminal device and the storage medium of workflow | |
CN109636301A (en) | Workflow configuration method, system, terminal and the readable storage medium storing program for executing of financial business | |
CN105719049B (en) | Method and system for realizing intelligent log | |
CN106843871B (en) | A kind of design system and design method of domain model frame | |
CN110019337A (en) | Determine methods, devices and systems efficient zoned in database | |
CN101465752A (en) | Method and system for ordering linkman | |
CN110535679A (en) | Management method, framework, network slice sales platform and the management system of slice | |
CN109544665A (en) | Generation method, device and the storage medium of animation poster | |
CN109299448A (en) | Resume intelligence filling method, system, server and storage medium | |
CN107678844A (en) | Breakpoint intelligence shunt method, electronic installation and computer-readable storage medium | |
CN109522919A (en) | A kind of data assessment method and device | |
CN115239173A (en) | Scheduling plan generation method and device, electronic equipment and storage medium | |
CN108681837A (en) | Flexible production management method, device, terminal device and readable storage medium storing program for executing | |
CN107908454A (en) | A kind of interlock method and device of the multiwindow packet based on more bookmarks | |
CN110443382A (en) | A kind of user interaction approach based on intelligent customer service platform | |
Zhang et al. | An open innovation model for business innovation of Chinese telecom operators | |
CN109636127A (en) | A kind of network based on positioning puts mutual assistance platform and its application method on someone's head | |
CN107220044A (en) | Method and apparatus based on meta-model driven business object |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |