CN108678759A - The replacing options of TBM development machine components in a kind of tunnel - Google Patents

The replacing options of TBM development machine components in a kind of tunnel Download PDF

Info

Publication number
CN108678759A
CN108678759A CN201810202833.4A CN201810202833A CN108678759A CN 108678759 A CN108678759 A CN 108678759A CN 201810202833 A CN201810202833 A CN 201810202833A CN 108678759 A CN108678759 A CN 108678759A
Authority
CN
China
Prior art keywords
cutterhead
host
tunnel
tbm development
replacing options
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810202833.4A
Other languages
Chinese (zh)
Inventor
阳争荣
金永就
王松茂
丁仕辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong No 2 Hydropower Engineering Co Ltd
Original Assignee
Guangdong No 2 Hydropower Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong No 2 Hydropower Engineering Co Ltd filed Critical Guangdong No 2 Hydropower Engineering Co Ltd
Priority to CN201810202833.4A priority Critical patent/CN108678759A/en
Publication of CN108678759A publication Critical patent/CN108678759A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/08Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield

Abstract

The invention discloses a kind of replacing options of TBM development machine components in tunnel, the cutterhead is dismantled after fixation cutter head from host, the host retreats, enable the storage acupuncture point for storing the new component needed to change between the cutterhead and the host, by in new part replacement to the host, cutterhead described in the host Forward abutting joint.The present invention by the side wall in tunnel opens up storage cave to store new component, and by the cutterhead of TBM development machines fix and host after move, make storage cave between cutterhead and host, to carry out the replacement of broken parts, to repair.The invention avoids in addition opening up branch hole by tunnel and using large lifting equipment, can component be replaced on the spot time saving, laborsaving, economically, and step is simple in narrow tunnel space, it is easily operated.

Description

The replacing options of TBM development machine components in a kind of tunnel
Technical field
The present invention relates to a kind of construction method in constructing tunnel field, TBM development machine components in especially a kind of tunnel Replacing options.
Background technology
The construction works such as TBM development machines are a kind of advanced constructing tunnel large-scale special equipments, it collects driving, supporting, slags tap Sequence is integrated, and can be worked continuously;It is also the batch production assembly line constructing tunnel equipment of the system integrations such as mechanical, electrical, liquid, gas. Have many advantages, such as driving speed it is fast, conducive to environmental protection, comprehensive benefit it is high, it can be achieved that the complexity that is difficult to realize of traditional drilling and blasting method geographically The construction of looks deep and long tunnels, using increasingly wider in the tunnel engineerings such as railway, water power, traffic, mine, municipal administration at home.
TBM development machines are made of each section system, and connection is compact, bulky.Wherein host point be in base bearing, Big transmission gear, etc. be all TBM development machines large-scale important component, and since TBM development machines are in long distance tunnel construction When have some failures appearance.
It is difficult larger when the large component damaged TBM development machines in work progress is replaced, it is primarily due to tunnel The weight and volume of the large component of narrow space in road, cutterhead and host machine part is all larger, it usually needs uses lifting equipment It is dismounted.
Because of narrow space in tunnel, large lifting equipment is impassable, and conventional method is opened by the tunnel tunneled If a branch hole is connected at head and host, to use large lifting equipment to dismantle and replace the relevant new component of items, The above method is time-consuming, laborious, expensive.
Invention content
The purpose of the present invention is to provide a kind of replacing options of TBM development machine components in tunnel, makes TBM development machines The more transducing of component carries out in tunnel and convenient for the installation of follow-up cutterhead, and whole process is time saving, laborsaving, economical.
The solution that the present invention solves its technical problem is:The replacing options of TBM development machine components in a kind of tunnel, Gu Dismantle the cutterhead after stationary knife disk from host, the host retreats, enable the storage acupuncture point of the new component that storage needed to change in Between the cutterhead and the host, by new part replacement to the host, cutterhead described in the host Forward abutting joint.
As a further improvement of the above technical scheme, include the following steps:
Step 1, the side wall in tunnel open up the storage cave, and the storage acupuncture point is in the rear side of the host, by new portion Part is transported in the storage cave;
Step 2, the fixed cutterhead, dismantles the connection of the cutterhead and the host;
Step 3, the host are fallen back along tunnel to the rear in the storage cave;
Step 4 dismantles the worn part needed to change on the host, and worn part is transported in the storage cave;
Step 5, on the host by the new component installation in the storage cave;
Step 6, move forward cutterhead described in the host abutting joint, releases the fixation of the cutterhead, completes repairs.
As a further improvement of the above technical scheme, tearing open for new component and worn part is completed using light and small heavy-duty hoisting equipment Dress and transport, the light and small heavy-duty hoisting equipment include the track girder of suspension centre anchor pole, hoist and the installation hoist.
As a further improvement of the above technical scheme, after step 3, the light and small heavy-duty hoisting equipment is mounted on institute State between cutterhead and the host, the both ends of the track girder can temporary weld on the shield shell of the cutterhead and the host.
As a further improvement of the above technical scheme, before step 3, barrier when implementing to fall back in tunnel is removed.
As a further improvement of the above technical scheme, the cutterhead is fixed on face by anchor cable.
As a further improvement of the above technical scheme, the step packet being fixed on the cutterhead by anchor cable on face It includes:
A. the anchor cable recyclable in the area surface construction in tunnel;
B. the cutter on the cutterhead is dismantled, makes to reserve channel of reeving on the cutterhead;
The Forward of c.TBM development machines is simultaneously the cutterhead top pressure on face;
D. the anchor cable is passed through into the channel of reeving, and prestress anchoraging is implemented to the cutterhead.
As a further improvement of the above technical scheme, the cutterhead is equipped with multiple channels of reeving, multiple described to reeve Channel is evenly distributed on the cutterhead.
The beneficial effects of the invention are as follows:The present invention opens up storage cave to store new component by the side wall in tunnel, and will The cutterhead of TBM development machines fix and host after move, make storage cave between cutterhead and host, to carry out broken parts more It changes, repair.The invention avoids in addition opened up by tunnel branch hole and use large lifting equipment, in narrow tunnel space Can component be replaced on the spot time saving, laborsaving, economically, and step is simple, it is easily operated.
Description of the drawings
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described.Obviously, described attached drawing is a part of the embodiment of the present invention, rather than is all implemented Example, those skilled in the art without creative efforts, can also be obtained according to these attached drawings other designs Scheme and attached drawing.
Fig. 1 is the schematic diagram of step a in the present invention;
Fig. 2 be the present invention Fig. 1 in A-A sectional views;
Fig. 3 is the schematic diagram of step 3 in the present invention;
Fig. 4 be the present invention Fig. 3 in B-B sectional views.
Specific implementation mode
The technique effect of the design of the present invention, concrete structure and generation is carried out below with reference to embodiment and attached drawing clear Chu is fully described by, to be completely understood by the purpose of the present invention, feature and effect.Obviously, described embodiment is this hair Bright a part of the embodiment, rather than whole embodiments, based on the embodiment of the present invention, those skilled in the art are not being paid The other embodiment obtained under the premise of creative work, belongs to the scope of protection of the invention.In addition, be previously mentioned in text All connection/connection relations not singly refer to component and directly connect, and refer to that can be added deduct according to specific implementation situation by adding Few couple auxiliary, to form more preferably coupling structure.
Referring to Fig.1~Fig. 4, the replacing options of TBM development machine components in a kind of tunnel are torn open from host 3 after fixation cutter head 2 Unload the cutterhead 2, the host 3 retreats, and the storage cave 1 for the new component that storage needed to change is enabled to be located at the cutterhead 2 and described Between host 3, by new part replacement to the host 3, the host 3 moves forward cutterhead 2 described in abutting joint.The class of new component Type includes various large-scale, the medium-sized and small parts applied in TBM development machines.The technical program is widely used in TBM drivings The replacement of various parts in machine, and it is particularly suitable for the replacement of large component, which obviate take in existing traditional replacing options When laborious step, keep the replacement of large component more simple and efficient.
It is further used as preferred embodiment, is included the following steps:
Step 1, the side wall in tunnel open up the storage cave 1, and the storage cave 1 is located at the rear side of the host 3, will New component is transported in the storage cave 1.The suitable position of the rear side of host 3 described in tunnel-side opens up needed for storage means The storage cave 1, to store the new component needed to change and the worn part damaged.The storage cave 1 is by using brill The mode of the non-explosion such as spy machine or hand excavation opens up.
Step 2, the fixed cutterhead 2, dismantles the connection of the cutterhead 2 and the host 3.
Step 3, the host 3 are fallen back along tunnel to the rear in the storage cave 1.Make the cutterhead 2 and the host 3 It separates, the cutterhead 2 is fixed, and the host 3 is fallen back pulls open a distance with the cutterhead 2, and the storage cave 1 is at this time described Between cutterhead 2 and the host 3.The length range of the distance is 2~20 meters.
Step 4 dismantles the worn part needed to change on the host 3, and worn part is transported in the storage cave 1.
New component in the storage cave 1 is mounted on the host 3 by step 5.
Step 6, move forward cutterhead 2 described in 3 abutting joint of the host, releases the fixation of the cutterhead 2, completes repairs.
Be further used as preferred embodiment, using light and small heavy-duty hoisting equipment complete new component and worn part dismounting and It transports, the light and small heavy-duty hoisting equipment includes suspension centre anchor pole 7, hoist 6 and the track girder 8 for installing the hoist 6.Work as replacement When large component, the transport and lifting of the large component in tunnel can be efficiently realized using the light and small heavy-duty hoisting equipment. After step 3, the light and small heavy-duty hoisting equipment is mounted between the cutterhead 2 and the host 3, the two of the track girder 8 End can temporary weld on the shield shell of the cutterhead 2 and the host 3.The upper surface of the suspension centre anchor pole 7 and the host 3 The outer surface of shield shell flushes, and the upper surface of the track girder 8 is connect with the lower surface of the suspension centre anchor pole 7, and the hoist 6 is pacified On the track girder 8.The suspension centre anchor pole 7, the track girder 8 are installed temporarily between the cutterhead 2 and the host 3 With the hoist 6, convenient for it is time saving, effortlessly move the component.
It is further used as preferred embodiment, before step 3, removes barrier when implementing to fall back in tunnel, to protect The front and back of development machine moves position when card does not influence maintenance.
It is further used as preferred embodiment, the cutterhead 2 is fixed on face by anchor cable 4.TBM is tunneled The cutterhead 2 of machine is fixed on face, is turned on one's side after avoiding the cutterhead 2 from being detached from from the dismounting of the host 3, is convenient for follow-up institute State the repairing of the component of host 3, and the abutting joint of the cutterhead 2 and the host 3 later.
It is further used as preferred embodiment, the step packet cutterhead 2 being fixed on by anchor cable 4 on face It includes:
A. the anchor cable 4 recyclable in the area surface construction in tunnel;
B. the cutter on the cutterhead 2 is dismantled, makes to reserve channel 5 of reeving on the cutterhead 2.Dismantle phase in the cutterhead 2 Cutter is answered, the channel 5 of reeving anchored needed for the cutterhead 2 is vacateed, is used in case the anchor cable 4 is reeved and anchored.
For the Forward of c.TBM development machines simultaneously 2 top pressure of the cutterhead on face, the cutterhead 2 is close to face with after an action of the bowels Continuous anchoring.
D. the anchor cable 4 is passed through into the channel 5 of reeving, and prestress anchoraging is implemented to the cutterhead 2.It will be recyclable The anchor cable 4 pass through the cutterhead 2, the cutterhead 2 is anchored on face by the anchor cable 4, avoid the cutterhead 2 from The dismounting of the host 3 is turned on one's side after being detached from.
Wherein, the implementation sequence of step a and step b can be interchanged, and can be also carried out at the same time by different engineer operation personnel The two steps.
Be further used as preferred embodiment, the cutterhead 2 is equipped with multiple channels 5 of reeving, it is multiple it is described reeve it is logical Road 5 is evenly distributed on the cutterhead 2.The cutterhead 2, which is equipped with, multiple described reeves channel 5 to coordinate the anchor cable 4, institute It states after anchor cable 4 passes through the channel 5 of reeving and forms anchor point on the cutterhead 2, to the fixed cutterhead 2.The anchoring Point is evenly distributed on the cutterhead 2, and the prestressing force suffered by the cutterhead 2 is made to be evenly distributed, then the cutterhead 2 can be more steady Surely it is fixed on face.
It is to be illustrated to the better embodiment of the present invention, but the invention is not limited to the reality above Example is applied, those skilled in the art can also make various equivalent modifications or be replaced under the premise of without prejudice to spirit of that invention It changes, these equivalent modifications or replacement are all contained in the application claim limited range.

Claims (8)

1. the replacing options of TBM development machines component in a kind of tunnel, it is characterised in that:It is torn open from host (3) after fixation cutter head (2) The cutterhead (2) is unloaded, the host (3) retreats, and the storage cave (1) for storing the new component needed to change is enabled to be located at the cutterhead (2) between the host (3), by new part replacement to the host (3), the host (3) moves forward described in abutting joint Cutterhead (2).
2. the replacing options of TBM development machine components in a kind of tunnel according to claim 1, it is characterised in that:Including with Lower step:
Step 1, the side wall in tunnel open up the storage cave (1), and storage cave (1) is located at the rear side of the host (3), New component is transported in the storage cave (1);
Step 2, the fixed cutterhead (2), dismantles the connection of the cutterhead (2) and the host (3);
Step 3, the host (3) are fallen back along tunnel to the rear of storage cave (1);
Step 4 dismantles the worn part needed to change on the host (3), and worn part is transported in the storage cave (1);
New component in storage cave (1) is mounted on the host (3) by step 5;
Step 6, move forward cutterhead (2) described in the host (3) abutting joint, releases the fixation of the cutterhead (2), completes repairs.
3. the replacing options of TBM development machine components in a kind of tunnel according to claim 2, it is characterised in that:Using light Small lifting equipment completes the dismounting and transport of new component and worn part, the light and small heavy-duty hoisting equipment include suspension centre anchor pole (7), The track girder (8) of hoist (6) and the installation hoist (6).
4. the replacing options of TBM development machine components in a kind of tunnel according to claim 3, it is characterised in that:In step After three, the light and small heavy-duty hoisting equipment is mounted between the cutterhead (2) and the host (3), the two of the track girder (8) End can temporary weld on the shield shell of the cutterhead (2) and the host (3).
5. the replacing options of TBM development machine components in a kind of tunnel according to claim 2, it is characterised in that:In step Before three, barrier when implementing to fall back in tunnel is removed.
6. the replacing options of TBM development machine components, feature exist in a kind of tunnel according to any one of claims 1-5 In:The cutterhead (2) is fixed on face by anchor cable (4).
7. the replacing options of TBM development machine components in a kind of tunnel according to claim 6, it is characterised in that:Pass through anchor The cutterhead (2) is fixed on the step on face by rope (4):
A. in the recyclable anchor cable of the area surface construction in tunnel (4);
B. the cutter on the cutterhead (2) is dismantled, makes to reserve channel of reeving (5) on the cutterhead (2);
The Forward of c.TBM development machines is simultaneously the cutterhead (2) top pressure on face;
D. the anchor cable (4) is passed through into the channel (5) of reeving, and prestress anchoraging is implemented to the cutterhead (2).
8. the replacing options of TBM development machine components in a kind of tunnel according to claim 7, it is characterised in that:The knife Disk (2) is equipped with multiple channels of reeving (5), and multiple channels (5) of reeving are evenly distributed on the cutterhead (2).
CN201810202833.4A 2018-03-13 2018-03-13 The replacing options of TBM development machine components in a kind of tunnel Pending CN108678759A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810202833.4A CN108678759A (en) 2018-03-13 2018-03-13 The replacing options of TBM development machine components in a kind of tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810202833.4A CN108678759A (en) 2018-03-13 2018-03-13 The replacing options of TBM development machine components in a kind of tunnel

Publications (1)

Publication Number Publication Date
CN108678759A true CN108678759A (en) 2018-10-19

Family

ID=63800075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810202833.4A Pending CN108678759A (en) 2018-03-13 2018-03-13 The replacing options of TBM development machine components in a kind of tunnel

Country Status (1)

Country Link
CN (1) CN108678759A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111075456A (en) * 2019-12-30 2020-04-28 中铁一局集团有限公司 Full-section construction structure and construction method for large-section weak stratum tunnel
CN111720134A (en) * 2020-07-06 2020-09-29 中铁十八局集团有限公司 Method for replacing TBM cutter head in hole without enlarging hole
CN114109416A (en) * 2021-12-03 2022-03-01 中铁隧道局集团有限公司 Method for replacing TBM main bearing in tunnel

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102305085A (en) * 2011-09-23 2012-01-04 上海城建(集团)公司 Special section cutting device of full-section development machine
CN102787847A (en) * 2012-08-24 2012-11-21 中铁隧道装备制造有限公司 Roadway tunneling machine
CN203362170U (en) * 2013-06-06 2013-12-25 日立造船株式会社 Shield heading machine for specially-shaped-section tunnel
CN203362167U (en) * 2013-06-06 2013-12-25 日立造船株式会社 Shield tunneling machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102305085A (en) * 2011-09-23 2012-01-04 上海城建(集团)公司 Special section cutting device of full-section development machine
CN102787847A (en) * 2012-08-24 2012-11-21 中铁隧道装备制造有限公司 Roadway tunneling machine
CN102787847B (en) * 2012-08-24 2014-12-31 中铁工程装备集团有限公司 Roadway tunneling machine
CN203362170U (en) * 2013-06-06 2013-12-25 日立造船株式会社 Shield heading machine for specially-shaped-section tunnel
CN203362167U (en) * 2013-06-06 2013-12-25 日立造船株式会社 Shield tunneling machine

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
翟金川: "长距离隧道掘进中TBM设备主轴承更换的研究与应用", 《石家庄铁道大学学报(自然科学版)》 *
许杰: "TB880E型掘进机刀盘洞内固定和拆装技术研究与应用", 《铁道建筑技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111075456A (en) * 2019-12-30 2020-04-28 中铁一局集团有限公司 Full-section construction structure and construction method for large-section weak stratum tunnel
CN111720134A (en) * 2020-07-06 2020-09-29 中铁十八局集团有限公司 Method for replacing TBM cutter head in hole without enlarging hole
CN114109416A (en) * 2021-12-03 2022-03-01 中铁隧道局集团有限公司 Method for replacing TBM main bearing in tunnel

Similar Documents

Publication Publication Date Title
CN105127707B (en) Method for disassembling earth pressure balance shield machine in tunnel
CN108678759A (en) The replacing options of TBM development machine components in a kind of tunnel
CN107035381B (en) A kind of underground mine TBM dismantles construction method
CN101220746A (en) TBM pilot tunnel expansion digging method for 20km double-line double-cavity ultra-long tunnel construction
CN109611151B (en) Method for hanging shield machine out in narrow space near business line
CN106437741B (en) A kind of New Austrian Tunneling Method rock tunnel(ling) machine
CN103382844A (en) Temporary support and permanent support parallel operation excavating technology and equipment for tracked hydraulic combined support
CN104775754A (en) Pole disc type multi-boom drill jumbo
CN105240022A (en) In-tunnel demounting method of TBM (tunnel boring machine) without expanding tunnel chamber
CN107083959A (en) A kind of gob-side entry retaining method
CN112343617A (en) Automatic mine roadway tunneling system
CN208669306U (en) One kind being adapted to existing tunnel enlarged diameter type shield machine
CN208885296U (en) Cantilevered digging and anchoring integrated machine
CN109505619A (en) A kind of plain type hard rock TBM
CN206129284U (en) Xin aofa tunnel boring machine
CN110065167B (en) Tunnel secondary lining concrete and rock cutting mechanism, cutting equipment and cutting method
CN110053172B (en) Cantilever type universal cutting mechanism, equipment and cutting method for tunnel
CN209354152U (en) Plain type hard rock TBM
CN209324359U (en) A kind of economical rock tunnel(ling) machine being adapted to great burying
CN110985018A (en) Three-circle shield main machine and shield machine for underground excavation of subway station and construction method
CN114151090A (en) Disassembling and transporting method of TBM for two opposite constructions
CN113202491B (en) TBM dismounting construction method
CN213775387U (en) Automatic change mining tunnelling machine
CN110410088B (en) Retractable tunneling machine and retraction method thereof
CN115288714A (en) Small-turning compact open-type full-face rock tunneling machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181019

RJ01 Rejection of invention patent application after publication