CN108678718A - A kind of method of oil/gas well straight well orientation water-jet separate stratum fracfturing - Google Patents

A kind of method of oil/gas well straight well orientation water-jet separate stratum fracfturing Download PDF

Info

Publication number
CN108678718A
CN108678718A CN201810401323.XA CN201810401323A CN108678718A CN 108678718 A CN108678718 A CN 108678718A CN 201810401323 A CN201810401323 A CN 201810401323A CN 108678718 A CN108678718 A CN 108678718A
Authority
CN
China
Prior art keywords
well
jet
oil
perforation
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810401323.XA
Other languages
Chinese (zh)
Inventor
丁柯宇
周后俊
冯强
王治华
王玥
李娜
吴丰
陈保山
徐敏
李世恒
吕双
张华�
唐志博
姚卫东
刘欣
李梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Bohai Drilling Engineering Co Ltd
Original Assignee
CNPC Bohai Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Bohai Drilling Engineering Co Ltd filed Critical CNPC Bohai Drilling Engineering Co Ltd
Priority to CN201810401323.XA priority Critical patent/CN108678718A/en
Publication of CN108678718A publication Critical patent/CN108678718A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Abstract

The invention discloses a kind of methods that oil/gas well straight well orients water-jet separate stratum fracfturing, include the following steps:Pit shaft is pre-processed;Into pit shaft, tripping in orients water-jet staged fracturing operating tool string;Hydraulic ejector is positioned, is allowed to be accurately aimed at target zone;Judge whether the azimuth of positioning seat rocket body meets the requirements;Carry out pressing crack construction;The method of oil/gas well straight well orientation water-jet separate stratum fracfturing can adjust perforation angle before perforation, it is set to be directed at best perforation orientation, the formation fracture pressure and near-wellbore effect when well fracturing can be effectively reduced when pressure break, a wider smooth crack is formed in reservoir, to solve the problems, such as that conventional hydraulic abrasive perforating perforation efficiency is low and bending friction is big, formation fracture pressure is reduced, well fracturing effect is improved.

Description

A kind of method of oil/gas well straight well orientation water-jet separate stratum fracfturing
Technical field
The present invention relates to oil and gas gathering technical field, more particularly to a kind of oil/gas well straight well orients water-jet separate stratum fracfturing Method.
Background technology
The common hydraulic jet perforation mode of oil gas field is mainly spiral perforation, random due to its abrasive perforating direction Property, perforation may be misaligned with desirable orientation, and the complex fractures such as crack and multiple cracking are turned to generate, and is unfavorable for reservoir and changes It makes.
Invention content
The object of the present invention is to provide a kind of methods that oil/gas well straight well orients water-jet separate stratum fracfturing.
For this purpose, technical solution of the present invention is as follows:
A kind of method of oil/gas well straight well orientation water-jet separate stratum fracfturing, includes the following steps:
1) to the processing of pit shaft progress well-flushing, kill-job and dredging, scraping wall;
2) into pit shaft, tripping in orients water-jet staged fracturing operating tool string;
3) hydraulic ejector is positioned using banded cable magnetic locator, is allowed to be accurately aimed at target zone;
4) the tripping in gyro logging instrument from the oil pipe of staged fracturing operating tool string, it is fixed for measuring staged fracturing operating tool string The azimuth of rocket body is sat in position, and judges whether the azimuth measured meets the requirements, if judging result is "No", by well head Oil pipe is rotated to twist spraycan, the eyelet phase angular alignment of spraycan is made to spray target zone;If judging result is "Yes", Then enter in next step;
5) fracture well head is installed, pressing crack construction vehicle group is set, connects bottom surface pipeline, carrying out pressure break after pressure testing qualification applies Work;It opens hydrajet tool step by step using pitching and carries out staged fracturing injection.
Further, it carries out including the following steps in pressing crack construction process in the step 5):
A wellhead casing pipe gate) is opened, is replaced so that the discharge capacity progress of 0.5~1.0m3/min is low, one hole volume of replacement Liquid measure;
B) it is low replace after the completion of, by default sand ratio and design the perforating job that perforation discharge capacity carries out first segment, sand-laden fluid is logical It crosses base injcction device and forms high-speed jet, be shot through casing and stratum;
C after the completion of) first segment adds sand, the low-density ball of input and the matching of second segment sliding sleeve injector, release discharge capacity should be controlled System is in 1.0m3Within/min, ball is fallen on the ball seat of sliding sleeve injector, is opened sliding sleeve and is exposed nozzle, carries out the sandblasting of second segment Perforating and fracturing;
D step C) is repeated), realize multistage pressing crack construction.
Compared with prior art, the method for oil/gas well straight well orientation water-jet separate stratum fracfturing can be adjusted before perforation Perforation angle makes its be directed at best perforation orientation, and when pressure break can effectively reduce formation fracture pressure when well fracturing Power and near-wellbore effect form a wider smooth crack in reservoir, to solve conventional hydraulic abrasive perforating perforation effect Rate is low and the big problem of bending friction, reduction formation fracture pressure improve well fracturing effect.
Description of the drawings
Fig. 1 is the flow chart for the method that oil/gas well straight well provided by the invention orients water-jet separate stratum fracfturing.
Specific implementation mode
Below in conjunction with the accompanying drawings and specific embodiment the present invention is described further, but following embodiments are absolutely not to this hair It is bright to have any restrictions.
A kind of method of oil/gas well straight well orientation water-jet separate stratum fracfturing, as shown in Figure 1, including the following steps:
1) to the processing of pit shaft progress well-flushing, kill-job and dredging, scraping wall, the preparation before construction is completed,
2) into pit shaft, tripping in orients water-jet staged fracturing operating tool string;
3) hydraulic ejector is positioned using banded cable magnetic locator, is allowed to be accurately aimed at target zone;
4) the tripping in gyro logging instrument from the oil pipe of staged fracturing operating tool string, it is fixed for measuring staged fracturing operating tool string The azimuth of rocket body is sat in position, and judges whether the azimuth measured meets the requirements, if judging result is "No", by well head Oil pipe is rotated to twist spraycan, the eyelet phase angular alignment of spraycan is made to spray target zone;If judging result is "Yes", Then enter in next step;
5) fracture well head is installed, pressing crack construction vehicle group is set, connects bottom surface pipeline, carrying out pressure break after pressure testing qualification applies Work;Include the following steps in pressing crack construction process:
A wellhead casing pipe gate) is opened, is replaced so that the discharge capacity progress of 0.5~1.0m3/min is low, one hole volume of replacement Liquid measure;
B) it is low replace after the completion of, by default sand ratio and design the perforating job that perforation discharge capacity carries out first segment, sand-laden fluid is logical It crosses base injcction device and forms high-speed jet, be shot through casing and stratum;
C after the completion of) first segment adds sand, the low-density ball of input and the matching of second segment sliding sleeve injector, release discharge capacity should be controlled System is in 1.0m3Within/min, ball is fallen on the ball seat of sliding sleeve injector, is opened sliding sleeve and is exposed nozzle, carries out the sandblasting of second segment Perforating and fracturing;
D step C) is repeated), realize multistage pressing crack construction;Up to ten sections of pressing crack construction, pressing crack construction at most may be implemented After the completion, open flow drain, low-density is asked returned from shaft bottom from, and by be installed on well head tip-in device capture recycling, realize full well The without hindrance production of cylinder.

Claims (2)

1. a kind of method of oil/gas well straight well orientation water-jet separate stratum fracfturing, which is characterized in that include the following steps:
1) to the processing of pit shaft progress well-flushing, kill-job and dredging, scraping wall;
2) into pit shaft, tripping in orients water-jet staged fracturing operating tool string;
3) hydraulic ejector is positioned using banded cable magnetic locator, is allowed to be accurately aimed at target zone;
4) the tripping in gyro logging instrument from the oil pipe of staged fracturing operating tool string is sat for measuring the positioning of staged fracturing operating tool string The azimuth of rocket body, and judge whether the azimuth measured meets the requirements, if judging result is "No", by being rotated in well head Oil pipe twists spraycan, and the eyelet phase angular alignment of spraycan is made to spray target zone;If judging result is "Yes", into Enter in next step;
5) fracture well head is installed, pressing crack construction vehicle group is set, connects bottom surface pipeline, pressing crack construction is carried out after pressure testing qualification;Profit It opens hydrajet tool step by step with pitching and carries out staged fracturing injection.
2. the method for oil/gas well straight well orientation water-jet separate stratum fracfturing according to claim 1, which is characterized in that described Step 5) in carry out pressing crack construction process in include the following steps:
A wellhead casing pipe gate) is opened, is replaced so that the discharge capacity progress of 0.5~1.0m3/min is low, replaces the liquid measure of a hole volume;
B) it is low replace after the completion of, by default sand ratio and design the perforating job that perforation discharge capacity carries out first segment, sand-laden fluid passes through bottom Portion's injector forms high-speed jet, is shot through casing and stratum;
C after the completion of) first segment adds sand, the low-density ball of input and the matching of second segment sliding sleeve injector, release discharge capacity should control 1.0m3Within/min, ball is fallen on the ball seat of sliding sleeve injector, is opened sliding sleeve and is exposed nozzle, carries out the abrasive perforating of second segment Pressure break;
D step C) is repeated), realize multistage pressing crack construction.
CN201810401323.XA 2018-04-28 2018-04-28 A kind of method of oil/gas well straight well orientation water-jet separate stratum fracfturing Pending CN108678718A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810401323.XA CN108678718A (en) 2018-04-28 2018-04-28 A kind of method of oil/gas well straight well orientation water-jet separate stratum fracfturing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810401323.XA CN108678718A (en) 2018-04-28 2018-04-28 A kind of method of oil/gas well straight well orientation water-jet separate stratum fracfturing

Publications (1)

Publication Number Publication Date
CN108678718A true CN108678718A (en) 2018-10-19

Family

ID=63801777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810401323.XA Pending CN108678718A (en) 2018-04-28 2018-04-28 A kind of method of oil/gas well straight well orientation water-jet separate stratum fracfturing

Country Status (1)

Country Link
CN (1) CN108678718A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112112617A (en) * 2019-06-04 2020-12-22 中国石油化工股份有限公司 Method for developing thick-layer conglomerate oil reservoir by ectopic energy storage fracturing

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201106439Y (en) * 2007-12-19 2008-08-27 吉林石油集团有限责任公司 Orientation mechanism for high-precision perforating
CN201778771U (en) * 2010-07-28 2011-03-30 中国石油天然气股份有限公司 Fixed tubular column hydraulic jetting layer separating and fracturing integral tubular column
CN102278098A (en) * 2011-08-12 2011-12-14 中国石油天然气股份有限公司 Method for realizing accurate oriented perforating by cable transmission
CN105201461A (en) * 2015-09-02 2015-12-30 北京泰坦通源天然气资源技术有限公司 Multistage sand jet perforation and fracture combined operation method adopting coiled tubing and bottom packer

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201106439Y (en) * 2007-12-19 2008-08-27 吉林石油集团有限责任公司 Orientation mechanism for high-precision perforating
CN201778771U (en) * 2010-07-28 2011-03-30 中国石油天然气股份有限公司 Fixed tubular column hydraulic jetting layer separating and fracturing integral tubular column
CN102278098A (en) * 2011-08-12 2011-12-14 中国石油天然气股份有限公司 Method for realizing accurate oriented perforating by cable transmission
CN105201461A (en) * 2015-09-02 2015-12-30 北京泰坦通源天然气资源技术有限公司 Multistage sand jet perforation and fracture combined operation method adopting coiled tubing and bottom packer

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112112617A (en) * 2019-06-04 2020-12-22 中国石油化工股份有限公司 Method for developing thick-layer conglomerate oil reservoir by ectopic energy storage fracturing
CN112112617B (en) * 2019-06-04 2024-03-01 中国石油化工股份有限公司 Method for developing thick-layer sand conglomerate oil reservoir by ectopic energy storage fracturing

Similar Documents

Publication Publication Date Title
CN106593390B (en) A kind of method of dummy level well staged fracturing crack Extended workflow-net
US7409992B2 (en) Perforating gun
CN106223922A (en) Staged fracturing technique is blocked up in the seam inner shield of shale gas horizontal well proppant temporarily
CN106437662A (en) Hybrid temporary plugging volume fracturing method suitable for deep shale gas horizontal well
CN108086964A (en) Coal bed gas horizontal well orients hydrajet tool string and construction method
CN202645525U (en) Fracturing string
CN108952664A (en) A kind of oil/gas well straight well orientation water-jet multistage fracturing method
CN104790918B (en) Cluster well combines ground method for exploiting coal bed methane with horizontal well under MODEL OVER COMPLEX TOPOGRAPHY
WO2018120581A1 (en) Flexible tube-assisted delivery device for radial horizontal well
CN108425661A (en) Coiled tubing steel grit jet stream perforating system
CN111878051B (en) Shale reservoir seam control uniform expansion fracturing method
RU2311528C2 (en) Method for hydraulic reservoir fracturing
CN106930737A (en) The hydraulic jet perforation technique that ground-dipping uranium extraction drilling filter is built
CN107083944A (en) A kind of Oil/gas Well hydraulic fracturing underground low frequency hydraulic pulse generating means
CN102536186A (en) Method for fracturing composite pipe column through hydraulic jetting in segmented mode
CN105386746A (en) Horizontal well hydraulic fracturing perforation method
CN201802370U (en) Underground high-pressure water jet injection tool device
CN103075139A (en) Immovable string hydraulic jetting technology for fracture acidizing and string for immovable string hydraulic jetting technology for fracture acidizing
CN108678718A (en) A kind of method of oil/gas well straight well orientation water-jet separate stratum fracfturing
CN108661697A (en) Long drilled holes gas enhanced gas extraction method under the service well of ground
CN103089196B (en) Setting method and the device thereof joining work with abrasive perforating of bridging plug is carried out with oil pipe
CN110185035A (en) A kind of pile making method of the MJS engineering method suitable for hardpan
CN2779059Y (en) Energy gathered bullet composite blast perforation apparatus
CN104481488A (en) Partial pressure annular pressure control method of plumb shaft coiled tubing sand filling
CN110593803A (en) Integrated infinite-stage fracturing packer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181019