CN108677706A - It can be used for the shaft of bridge movement job platform - Google Patents
It can be used for the shaft of bridge movement job platform Download PDFInfo
- Publication number
- CN108677706A CN108677706A CN201810418630.9A CN201810418630A CN108677706A CN 108677706 A CN108677706 A CN 108677706A CN 201810418630 A CN201810418630 A CN 201810418630A CN 108677706 A CN108677706 A CN 108677706A
- Authority
- CN
- China
- Prior art keywords
- sunpender
- bridge
- shaft
- workbench
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/10—Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
- E01D19/106—Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges
Abstract
The present invention relates to construction project field, the shaft that can be used for bridge movement job platform, including plane bearing (121), connector (122) and circular orbit (123) are disclosed;Plane bearing (121) includes inner axes (1211), upper bearing (metal) circle (1212), there is gap between inner axes (1211) and lower bearing circle (1213), symmetrical at least two trundle (1231) is equipped in circular orbit (123), lower bearing circle (1213) and the first sunpender (111) are connected by connector (122), and inner axes (1211) connect the second sunpender (112).The plane bearing that the present invention has selected diameter smaller, while circular orbit having been used to strengthen the stability and rigidity of shaft, and the structure shaft lighter in weight, reduce the heavy burden of workbench.The trundle that (diameter is smaller) lower bearing circle is equipped with by connector, connection circular orbit, strengthens the stability of plane bearing, and the structure shaft lighter in weight, reduces the weight of workbench.
Description
Technical field
The present invention relates to construction project field, more particularly to can be used for the shaft of bridge movement job platform.
Background technology
Along with the development that the fast development of national economy and construction project are with rapid changepl. never-ending changes and improvements.Bridge is construction project neck
The important component in domain needs to complete by heavy instrument during existing highway bridge construction, detection, repair, cost compared with
Construction site high and that needs are larger.
Invention content
The present invention in view of the shortcomings of the prior art, provides the shaft that can be used for bridge movement job platform.
In order to solve the above-mentioned technical problem, the present invention is addressed by following technical proposals:
It can be used for the shaft of bridge movement job platform, including plane bearing, connector and circular orbit;Plane axis is contracted
Inner axes, upper bearing (metal) circle are included, is linked into an integrated entity between inner axes and upper bearing (metal) circle, lower bearing circle, inner axes and lower axle are additionally provided with
Holding has gap between enclosing, be equipped at least three trundles in circular orbit, be additionally provided with the first sunpender and the second sunpender, lower bearing circle
It is connected by connector with the first sunpender.
When sunpender radius of turn is bigger, dead weight of platform generates bias, reduces the stability of workbench.Shaft
When diameter is smaller, stability and rigidity are poor, shorten the service life of equipment.The present invention has selected diameter smaller
Plane bearing, while circular orbit having been used to strengthen the stability and rigidity of shaft, and the structure shaft lighter in weight, it reduces
The heavy burden of workbench.The lower bearing circle that (diameter is smaller) plane bearing is equipped with connects (ruggedized construction by connector
) trundle that circular orbit is equipped with, the stability of plane bearing, and the structure shaft lighter in weight are strengthened, work is reduced
Make the weight of platform.
Preferably, being set in circular orbit, there are two trundles.
Preferably, the first sunpender, shaft and the second sunpender are set gradually from top to bottom.
Preferably, further including the moving trolley device being located on bridge floor, moving trolley device is additionally provided with sunpender, sunpender packet
Include the first sunpender, shaft and the second sunpender.When passing through bridge pier, being rotated by shaft, workbench is rotated by 90 ° in horizontal plane,
Will pass through bridge pier.The present invention is suitable for the processes such as construction, detection, the maintenance and reinforcement of bridge, and workbench is by being rotated by 90 °
By bridge pier, solution connects the technical issues of workbench movement in the prior art receives the bridge pier interference of adjacent bridge.Movement is small
Vehicle device is to install two trolleies simultaneously on bridge when being located at bridge general work, and workbench links together, and is mounted on bridge
On do not need additional bridge inspection car, solve existing highway bridge maintenance process Bridge tool car and need to occupy asking for track
Topic.Moving trolley device is simple assembling moving trolley device.
Preferably, moving trolley device is connected with the Work platform system being located at below bridge floor, moving trolley device and
Work platform system is connected by sunpender, and the second sunpender is fixedly connected with Work platform system.Invention bridge construction, detection,
In maintenance process, assembling Work platform system links together, and present invention invention is applied on bridge, and additional bridge is not needed
Beam tool car solves the problems, such as that existing highway bridge construction, detection, maintenance process Bridge tool car need to occupy track, this hair
It is bright not influence traffic, track need not be closed.
Preferably, Work platform system is equipped with automatic elevating platform, being equipped with movement on the downside of automatic elevating platform sets
It is standby.Automatic elevating platform is movable automatic lifting workbench, movable automatic lifting movable workbench to operation site
Lower section, then in work site by the high and low position of lift adjustment operation console, on the one hand facilitate the dimension in each site below bridge
It repaiies, facilitates operation;On the other hand a workbench only installs a movable automatic lifting workbench and inspection can be completed
Work is repaiied, device structure is simplified, saves equipment cost.Automatic elevating platform side wall top is equipped with position sensor and alarm
Device, position sensor are in safe distance for detecting automatic elevating platform with surrounding objects, and lifting working platform lifted
In journey or in moving process, when less than safe distance, alarm starts to alarm, and has ensured that hoistable platform is not collided,
The personal safety of bridge maintenance personnel is ensured.Preferably, automatic elevating platform surrounding side wall top is equipped with position sense
Answer device.
Preferably, Work platform system includes the first workbench, the second workbench and connector, the first work is flat
Platform and the second workbench are connected by connector.Added using assembling Work platform system progress bridge construction, detection, repair
Gu when, the first workbench and second workbench one end link together, and strengthen the stability of workbench.Passing through bridge
When pier, the connection between the workbench being connected is released, by shaft, each comfortable horizontal plane of two workbenches rotates 90
Degree, will pass through bridge pier.
Preferably, being equipped with gap between the first workbench and the second workbench.
The present invention has significant technique effect as a result of above technical scheme:
When sunpender radius of turn is bigger, dead weight of platform generates bias, reduces the stability of workbench.Shaft
When diameter is smaller, stability and rigidity are poor, shorten the service life of equipment.The present invention has selected diameter smaller
Plane bearing, while circular orbit having been used to strengthen the stability and rigidity of shaft, and the structure shaft lighter in weight, it reduces
The heavy burden of workbench.The lower bearing circle that (diameter is smaller) plane bearing is equipped with connects (ruggedized construction by connector
) trundle that circular orbit is equipped with, the stability of plane bearing, and the structure shaft lighter in weight are strengthened, work is reduced
Make the weight of platform.
In addition, the features such as present invention is safe efficient, economic, environmentally friendly, small, light-weight, operation is convenient, it can be continuous
Operation.High construction efficiency of the present invention needs next operating point again after the completion of solving one operating point construction of bridge inspection car
The problem of fixing, being unable to continuous work.Economic benefits of the present invention are high, and cost is far below bridge inspection car.The present invention has environmental protection
Effect solves the problems, such as that the bridge inspection car used in existing operation needs to discharge vehicle exhaust.
Description of the drawings
The structural schematic diagram that Fig. 1 is.
Fig. 2 is the structural schematic diagram of shaft working condition invention.
Specific implementation mode
Present invention is further described in detail with embodiment below in conjunction with the accompanying drawings.
Embodiment 1
It can be used for the shaft of bridge movement job platform, as shown in Figs. 1-2, including plane bearing 121,122 and of connector
Circular orbit 123;Plane bearing 121 includes inner axes 1211, upper bearing (metal) circle 1212, inner axes 1211 and upper bearing (metal) circle 1212 it
Between link into an integrated entity, be additionally provided with lower bearing circle 1213, there is gap, circular orbit between inner axes 1211 and lower bearing circle 1213
It is equipped at least three trundles 1231 in 123, is additionally provided with the first sunpender 111 and the second sunpender 112, lower bearing circle 1213 and first
Sunpender 111 is connected by connector 122.
When passing through bridge pier, by opening connector 7, unlock between the first workbench 21 and the second workbench 22
Connection.It is rotated by shaft 12, Work platform system 2 is rotated by 90 ° in horizontal plane, will pass through bridge pier, and then completes bridge
Construction, detection, maintenance and reinforcement.
Embodiment 2
It can be used for the shaft of bridge movement job platform, as shown in Figs. 1-2, including plane bearing 121,122 and of connector
Circular orbit 123;Plane bearing 121 includes inner axes 1211, upper bearing (metal) circle 1212, inner axes 1211 and upper bearing (metal) circle 1212 it
Between link into an integrated entity, be additionally provided with lower bearing circle 1213, there is gap, circular orbit between inner axes 1211 and lower bearing circle 1213
Trundle 1231 there are three being set in 123, is additionally provided with the first sunpender 111 and the second sunpender 112, lower bearing circle 1213 and the first sunpender
111 are connected by connector 122.
Embodiment 3
It can be used for the shaft of bridge movement job platform, as shown in Figs. 1-2, including plane bearing 121,122 and of connector
Circular orbit 123;Plane bearing 121 includes inner axes 1211, upper bearing (metal) circle 1212, inner axes 1211 and upper bearing (metal) circle 1212 it
Between link into an integrated entity, be additionally provided with lower bearing circle 1213, there is gap, circular orbit between inner axes 1211 and lower bearing circle 1213
Trundle 1231 there are three being set in 123, is additionally provided with the first sunpender 111 and the second sunpender 112, lower bearing circle 1213 and the first sunpender
111 are connected by connector 122, and inner axes 1211 connect the second sunpender 112.First sunpender 111, shaft 12 and the second sunpender
112 set gradually from top to bottom.
Further include the moving trolley device 1 being located on bridge floor, moving trolley device 1 is additionally provided with sunpender 11, and sunpender 11 includes
First sunpender 111, shaft 12 and the second sunpender 112.
Moving trolley device 1 is connected with the Work platform system 2 being located at below bridge floor, and moving trolley device 1 and work are flat
Platform system 2 is connected by sunpender 11, and the second sunpender 112 is fixedly connected with Work platform system 2.Work platform system 2 is equipped with certainly
Dynamic self-powered platform 3,3 downside of automatic elevating platform are equipped with mobile device.Work platform system 2 includes the first workbench
21, the second workbench 22 and connector 7, the first workbench 21 and the second workbench 22 are connected by connector 7.First
Gap is equipped between workbench 21 and the second workbench 22.
When passing through bridge pier, by opening connector 7, unlock between the first workbench 21 and the second workbench 22
Connection.It is rotated by shaft 12, Work platform system 2 is rotated by 90 ° in horizontal plane, will pass through bridge pier, and then completes bridge
Construction, detection, maintenance and reinforcement.
Automatic elevating platform 3 is moved to the downside that bridge floor overhauls site, automatic lifting work by mobile device first
The maintenance site of bridge floor is accurately positioned in platform 3 by lifting gear again.
In short, the foregoing is merely presently preferred embodiments of the present invention, it is all according to impartial made by scope of the present invention patent
Variation and modification, should all belong to the covering scope of patent of the present invention.
Claims (8)
1. can be used for the shaft of bridge movement job platform, it is characterised in that:Including plane bearing (121), connector (122) and
Circular orbit (123);Plane bearing (121) includes inner axes (1211), upper bearing (metal) circle (1212), inner axes (1211) and upper axis
Hold and link into an integrated entity between circle (1212), be additionally provided with lower bearing circle (1213), inner axes (1211) and lower bearing circle (1213) it
Between have a gap, at least three trundles (1231) are equipped in circular orbit (123), the first sunpender (111) and second is additionally provided with and hangs
Bar (112), lower bearing circle (1213) and the first sunpender (111) are connected by connector (122).
2. the shaft according to claim 1 that can be used for bridge movement job platform, it is characterised in that:Circular orbit
(123) trundle (1231) there are three being set in.
3. the shaft according to claim 1 that can be used for bridge movement job platform, it is characterised in that:First sunpender
(111), shaft (12) and the second sunpender (112) are set gradually from top to bottom.
4. the shaft according to claim 1 that can be used for bridge movement job platform, it is characterised in that:Further include being located at bridge
Moving trolley device (1) on face, moving trolley device (1) are additionally provided with sunpender (11), and sunpender (11) includes the first sunpender
(111), shaft (12) and the second sunpender (112).
5. the shaft according to claim 4 that can be used for bridge movement job platform, it is characterised in that:Moving trolley device
(1) it is connected with the Work platform system (2) being located at below bridge floor, moving trolley device (1) and Work platform system (2) are by hanging
Bar (11) connects, and the second sunpender (112) is fixedly connected with Work platform system (2).
6. the shaft according to claim 5 that can be used for bridge movement job platform, it is characterised in that:Work platform system
(2) it is equipped with automatic elevating platform (3), mobile device is equipped on the downside of automatic elevating platform (3).
7. the shaft according to claim 5 that can be used for bridge movement job platform, it is characterised in that:Work platform system
(2) include the first workbench (21), the second workbench (22) and connector (7), the first workbench (21) and the second work
Make platform (22) to connect by connector (7).
8. the shaft according to claim 7 that can be used for bridge movement job platform, it is characterised in that:First workbench
(21) gap (6) are equipped between the second workbench (22).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810418630.9A CN108677706A (en) | 2018-05-04 | 2018-05-04 | It can be used for the shaft of bridge movement job platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810418630.9A CN108677706A (en) | 2018-05-04 | 2018-05-04 | It can be used for the shaft of bridge movement job platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108677706A true CN108677706A (en) | 2018-10-19 |
Family
ID=63801391
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810418630.9A Pending CN108677706A (en) | 2018-05-04 | 2018-05-04 | It can be used for the shaft of bridge movement job platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108677706A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20000049885A (en) * | 2000-05-04 | 2000-08-05 | 이석원 | Working automobile for check and maintenance of bridges |
CN202202256U (en) * | 2011-08-02 | 2012-04-25 | 山东高速青岛公路有限公司 | Suspension frame for bridge maintenance |
CN204430913U (en) * | 2015-02-13 | 2015-07-01 | 苏州江源精密机械有限公司 | The rotary accessory head automatic replacement head storehouse device of gantry machining center |
CN205501818U (en) * | 2016-03-30 | 2016-08-24 | 中铁十五局集团有限公司 | Steel trussed arch bridge bridge tool car |
CN106351120A (en) * | 2016-08-30 | 2017-01-25 | 湖北华舟重工应急装备股份有限公司 | Door connected bridge maintenance car |
CN106368122A (en) * | 2016-10-18 | 2017-02-01 | 湖北华舟重工应急装备股份有限公司 | Self-propelled dual-beam bridge maintenance platform |
CN206052542U (en) * | 2016-08-17 | 2017-03-29 | 中国建筑第六工程局有限公司 | For the Transportable type workbench of Bridge repair and reinforcement |
CN107642037A (en) * | 2017-10-23 | 2018-01-30 | 广西大学 | A kind of intelligence system for bridge machinery |
-
2018
- 2018-05-04 CN CN201810418630.9A patent/CN108677706A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20000049885A (en) * | 2000-05-04 | 2000-08-05 | 이석원 | Working automobile for check and maintenance of bridges |
CN202202256U (en) * | 2011-08-02 | 2012-04-25 | 山东高速青岛公路有限公司 | Suspension frame for bridge maintenance |
CN204430913U (en) * | 2015-02-13 | 2015-07-01 | 苏州江源精密机械有限公司 | The rotary accessory head automatic replacement head storehouse device of gantry machining center |
CN205501818U (en) * | 2016-03-30 | 2016-08-24 | 中铁十五局集团有限公司 | Steel trussed arch bridge bridge tool car |
CN206052542U (en) * | 2016-08-17 | 2017-03-29 | 中国建筑第六工程局有限公司 | For the Transportable type workbench of Bridge repair and reinforcement |
CN106351120A (en) * | 2016-08-30 | 2017-01-25 | 湖北华舟重工应急装备股份有限公司 | Door connected bridge maintenance car |
CN106368122A (en) * | 2016-10-18 | 2017-02-01 | 湖北华舟重工应急装备股份有限公司 | Self-propelled dual-beam bridge maintenance platform |
CN107642037A (en) * | 2017-10-23 | 2018-01-30 | 广西大学 | A kind of intelligence system for bridge machinery |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108677708A (en) | A kind of suspension bridge movement job platform system | |
CN101712439A (en) | Crane transition auxiliary device, transport trailer and method for dismantling crane | |
CN102633194B (en) | Railway crane for high-speed railway rescue and construction | |
CN201825671U (en) | Hoisting trolley for track plate | |
CN201635019U (en) | Detection mechanism for steel box girder bridge | |
CN201580913U (en) | Crane transition auxiliary device, transportation trailer | |
CN108677707A (en) | A kind of planer-type bridge movement job platform system | |
CN109132875A (en) | Rubber-tyred tunnel tracklaying crane and construction method | |
CN103669218A (en) | Novel steel and concrete combined section steel box girder block and assembling and splicing method thereof | |
CN204754249U (en) | A transporting device that is used for indoor big flue to install | |
CN203475323U (en) | Half-range open type movable working trolley | |
CN108677706A (en) | It can be used for the shaft of bridge movement job platform | |
CN205766074U (en) | A kind of moveable step ladder in the workshop that is welded for passenger vehicle | |
CN110758421B (en) | Vehicle maintenance vehicle suitable for air rail transit system | |
CN107881907A (en) | A kind of inspection car for bridge main arch | |
CN209144649U (en) | The mobile job platform system of rotatable bridge | |
CN111847274A (en) | Switch rail changing operation vehicle and rail changing method | |
CN206501764U (en) | A kind of concrete vehicle-mounted coring machine holder device | |
CN212159677U (en) | Movable flaw detection mechanism for train wheel axle | |
CN207347856U (en) | Railway track construction is hung with just beam is traversing | |
CN210132415U (en) | Installation device of desulfurizing tower | |
CN108677709A (en) | A kind of vehicular bridge movement job platform system | |
CN209143537U (en) | Rubber-tyred tunnel tracklaying crane | |
CN209259547U (en) | A kind of rotatable hoisting apparatus | |
CN207293955U (en) | The railway track construction for possessing new derricking gear is hung with just beam is traversing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181019 |