CN108673058A - Automobile buffer beam straight seam welding Rollforming Shaped Tube technique and die-changing apparatus - Google Patents

Automobile buffer beam straight seam welding Rollforming Shaped Tube technique and die-changing apparatus Download PDF

Info

Publication number
CN108673058A
CN108673058A CN201810342933.7A CN201810342933A CN108673058A CN 108673058 A CN108673058 A CN 108673058A CN 201810342933 A CN201810342933 A CN 201810342933A CN 108673058 A CN108673058 A CN 108673058A
Authority
CN
China
Prior art keywords
steel band
steel
welding
block
rollforming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810342933.7A
Other languages
Chinese (zh)
Other versions
CN108673058B (en
Inventor
邵长亮
宫绍庆
许维忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Huashun Heavy Industry Group Co.,Ltd.
Original Assignee
SHANDONG SHUNSHI HIGH-TECH Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG SHUNSHI HIGH-TECH Co Ltd filed Critical SHANDONG SHUNSHI HIGH-TECH Co Ltd
Priority to CN201810342933.7A priority Critical patent/CN108673058B/en
Publication of CN108673058A publication Critical patent/CN108673058A/en
Application granted granted Critical
Publication of CN108673058B publication Critical patent/CN108673058B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Abstract

The present invention relates to a kind of automobile buffer beam straight seam welding Rollforming Shaped Tube techniques:(1)Steel coil strip is unfolded for uncoiling;(2)Leveling carries out leveling to the steel band after expansion, and steel band is conveyed toward next station;(3)The head of steel band after leveling and tail portion are carried out shearing tack, and the steel band material tail after shearing tack are welded together with the material head after next steel band shearing tack by tack and butt welding respectively;(4)It prestores, kink storage bin will be sent into welding steel band;(5)Molding, the steel band in kink storage bin is sent to molding machine, bends to pipe to be welded gradually according to certain order;(6)The both ends that pipe is connected to each other are squeezed and carry out high-frequency welding after forming certain angular aperture by high-frequency welding;(7)Water cooling is cooled to room temperature the steel pipe of high-frequency welding by spray mode;(8)Steel pipe after water cooling is carried out sizing by special-shaped gradual change sizing by sizing unit;(9)Steel pipe cutting after sizing is specific length by copying.

Description

Automobile buffer beam straight seam welding Rollforming Shaped Tube technique and die-changing apparatus
Technical field
The present invention relates to steel pipe forming technical field more particularly to a kind of automobile buffer beam straight seam welding steel tubes Moulding process and die-changing apparatus.
Background technology
Steel pipes with straight is mainly used in public waterworks, petrochemical industry, chemical industry, power industry, agricultural irrigation, city Build etc., liquid can be used as to convey and used, such as water supply, draining, gas conveying is can also be used as and use, such as coal gas, steaming air-liquid Liquefied oil gas is also used as structure use, makees pile driving pipe, makees bridge, can also be used as harbour, road, building structure pipe.Closely Several years straight seam welded pipe are also widely used in automotive field and furniture house ornamentation field, straight seam welding steel tubes therein It is widely used in automotive frame, automobile decoration, pendent lamp penetration pipe, tea table supporting leg etc., has reached different using effects. But the production technology of current straight seam welding steel tubes is complex, causes it higher at production cost, not meeting market needs It seeks development trend;And current production technology is cumbersome when carrying out die change, especially in the replacement of left and right mold, Holding time is long, bad to positivity.
Invention content
In view of the deficiencies of the prior art, the present invention provides a kind of automobile buffer beam straight seam welding Rollforming Shaped Tube techniques And die-changing apparatus, production cost is reduced, and improve production efficiency, and keep die change more quick.
The present invention is achieved through the following technical solutions, provide a kind of automobile buffer beam straight seam welding steel tubes at Type technique, it is specific as follows:
(1)Uncoiling installs steel coil strip to uncoiler, and uncoiling expansion is carried out by uncoiler;
(2)Leveling carries out leveling to the steel band after expansion, and steel band is conveyed toward next station, to ensure the flatness of steel band;
(3)The head of steel band after leveling and tail portion are carried out shearing tack by tack and butt welding respectively, and will shear the steel after tack Strip tail welds together with the material head after next steel band shearing tack, and the steel band being welded is conveyed toward next station, leads to That crosses steel band is spliced to form longer steel band, with ensure unit can continuous production, improve production efficiency;
(4)It prestores, kink storage bin will be sent into welding steel band, this step is for storing steel band, to ensure that unit is continuously given birth to It is not influenced by material volume replacement when production, avoids wasting time because of shutdown;
(5)Molding, the steel band in kink storage bin is sent to molding machine, bends to pipe to be welded gradually according to certain order Base, bending radius are determined according to the pipe to be obtained;
(6)The both ends that pipe is connected to each other are squeezed and carry out high-frequency welding after forming certain angular aperture by high-frequency welding, and welding is completed The burr flattening-out of commissure is ensured by tumbling rack by the quality of steel pipe finished product afterwards;
(7)Water cooling is cooled to room temperature the steel pipe of high-frequency welding by spray mode, it is hard can to improve steel pipe to a certain extent Degree is convenient for the elimination of welding stress;
(8)Special-shaped gradual change sizing carries out the steel pipe after water cooling by being equipped with the sizing unit of upper/lower die and left and right mold Sizing, upper/lower die fastens the cavity cross section shape to be formed and left and right mold fasten the cavity cross section shape to be formed with it is different The section of type pipe is identical, and when sizing, left and right mold and upper/lower die alternately squeeze steel pipe, until steel pipe wall with it is left Right mould has or upper/lower die fastens the cavity to be formed and is bonded completely, and in Sizing Process, Minimal Tension is carried between the rack of sizing unit There is cut to avoid steel tube surface in system;
(9)Steel pipe cutting after sizing is specific length by copying;
(10)Runout table, by the steel pipe market of specific length after cutting to product collecting region;
(11)Product is collected, by the steel pipe collecting of specific length, pile.
As an optimization, in the step(4)In, when steel band enters kink storage bin, by import arrangement for deflecting by steel Band-offset goes to vertical state, and the outlet arrangement for deflecting that steel band is deflected to horizontality is arranged in the outlet of kink storage bin.This Prioritization scheme increases the storing ability of kink storage bin, and is conveniently transported toward subsequent processing.
As an optimization, in the step(5)In a graded refer to first going out the two sides of steel band to homonymy symmetrical molding Segmental arc is gradually lengthened the segmental arc of both sides by being molded several times, until the segmental arc of both sides formed to semicircle.This prioritization scheme The rounding off that can ensure steel pipe radian avoids the occurrence of oval phenomenon.
As an optimization, in the step(9)In by contact and be equipped with steel pipe the measuring roller of incremental encoder into Row surveys length, and cut-off is determined after the signal of cutting equipment acquisition incremental encoder.Such long mode of survey can make cutting position Positioning is more accurate, and the velocity variations of steel pipe will not have an impact the control accuracy of cut-off in cutting process.
A kind of automobile buffer beam straight seam welding Rollforming Shaped Tube die-changing apparatus, including small car body and it is installed in institute The track box on small car body is stated, and the two-way hydraulic cylinder being installed on the track box, the both sides of the two-way hydraulic cylinder are lived Stopper rod end is installed with electromagnet respectively, and the slideway consistent with the piston rod direction of two-way hydraulic cylinder is offered in the track box Hole is installed with a baffle in the skidway hole, and being slipped respectively in the skidway hole of the baffle both sides has supporting beam, the supporting beam It is equipped with elastic barrier resetting apparatus, one end of supporting beam stretching skidway hole and the distance between elastic barrier resetting apparatus be not small In the width of mold, conllinear mold sliding slot is additionally provided in the supporting beam of both sides.
Electromagnet is closely attracted after being powered with mold in this programme, will by the action of two-way hydraulic cylinder both sides piston rod Left and right mold is moved along mold sliding slot to press bed simultaneously, be ensure that synchronous progress, and good to neutrality, is improved more Efficiency is changed, when dismantling mold, during piston rod stretches out, electromagnet encounters elastic barrier resetting apparatus, to drive supporting beam Protruding, when workbench is encountered in supporting beam outer end, piston rod continues to stretch out, and elastic barrier resetting apparatus compressive deformation makes Electromagnet by elastic barrier resetting apparatus, after electromagnet is attracted with mold, piston rod is retracted, and mold is completely into support When on beam, electromagnet power-off, piston rod continues to retract, and after electromagnet touches elastic barrier resetting apparatus, supporting beam is retracted therewith, When the inner end of supporting beam is touched to baffle, piston rod squeezes elastic barrier resetting apparatus, it is made to lose barrier effect, piston rod warp Later, elastic barrier resetting apparatus resets under elastic reaction, during piston rod extends and retracts, supporting beam is driven to stretch Go out and retract, reduce equipment occupation space, simplifies structure.
As an optimization, the electromagnet is equipped with the protrusion being adapted to mold side towards the side of mold.By being set to The protrusion of mold side adaptation, increases the contact area of electromagnet and mold, prevents from disengaging in drawing process.
Preferably, the elastic barrier resetting apparatus includes vertical with the piston rod of two-way hydraulic cylinder and solid with supporting beam The cross bar that connects is arranged torsional spring on the cross bar, and the block affixed with the spring body of the torsional spring, the spring silk of the torsional spring Both ends are affixed with supporting beam, and the block is T shapes, and the lower edge of block upper boss both sides is respectively provided with chamfering, and cross bar axis is extremely The distance of block lower boss front and back sides is less than to the distance of upper surface of support beam, and the front and rear edges of electromagnet lower end also is provided with Chamfering.
When electromagnet encounters block, since the force of sliding friction of supporting beam is smaller, torsional spring does not deform, supporting beam with It the stretching of piston rod and is stretched out to workbench, when supporting beam encounters workbench, piston rod continues to stretch out and make torsional spring Deformation, block rotate therewith, and lose the barrier effect to electromagnet, electromagnet is moved to after block at mold, electromagnet It is attracted with mold after energization, during piston rod is retracted, is equally first to drive supporting beam to retract under the blocking of block, is propping up Beam is supportted by after baffle, electromagnet pushes block rotation and passes through block, and final piston rod is fully retracted.
Preferably, the elastic barrier resetting apparatus includes vertical with the piston rod of two-way hydraulic cylinder and solid with supporting beam The cross bar connect, and it is arranged block on the cross bar, the both sides of the block are respectively equipped with the spring being connect with supporting beam, The block is T shapes, and the lower edges of block upper boss both sides is respectively provided with chamfering, side before and after cross bar axis to block lower boss The distance in face is less than to the distance of upper surface of support beam, and the front and rear edges of electromagnet lower end also is provided with chamfering.
When electromagnet does not touch block, the spring of both sides makes it keep equilibrium state, during piston rod stretching, electromagnetism When iron starts to brush up against block, since the force of sliding friction of supporting beam is smaller, spring does not deform, when supporting beam encounters workbench When, piston rod continues to stretch out and spring is made to deform, and baffle is taken advantage of a situation rotation, loses the barrier effect to electromagnet, electromagnet It is moved at mold after block, electromagnet is attracted after being powered with mold, is equally first to keep off during piston rod is retracted Supporting beam is driven to retract under the blocking of block, after supporting beam is by baffle, electromagnet pushes block rotation and passes through block, most Whole piston rod is fully retracted.
Beneficial effects of the present invention are:Straight seam welding pipe is become by traditional hot-cast abnormal shape production technology, according to final The shape and structure of special-shaped product carry out secondary cold-bending molding technology, and forming process is uniform, and coaxial speed ratio is small, are not likely to produce and draw Wound, product surface quality is good, also improves the molding qualification rate and performance of product;The die-changing apparatus used when production can incite somebody to action Left and right mold pushes in place simultaneously, and ensure that positivity, improve die change efficiency, ensure that high molding qualification Rate.
Description of the drawings
Fig. 1 is host production technological process of the present invention;
Fig. 2 ~ Fig. 6 is shaping round tube plain-barreled roll first of the present invention to the 5th frame shaping schematic view;
Fig. 7 ~ Fig. 9 is shaping round tube edger roll first of the present invention to third frame shaping schematic view;
Figure 10 ~ Figure 12 is the silent molding first of pipe of the present invention to third frame shaping schematic view;
Figure 13 is pipe welding fabrication schematic diagram of the present invention;
Figure 14 ~ Figure 22 is pipe gradual change shape tube first of the present invention to the 9th frame shaping schematic view;
Figure 23 ~ Figure 31 is pipe gradual change shape tube first of the present invention to the corresponding mold squeezed state schematic diagram of the 9th frame;
Figure 32 is the die-changing apparatus structural schematic diagram in the embodiment of the present invention one;
Figure 33 is the die-changing apparatus structural schematic diagram in the embodiment of the present invention two;
Figure 34 is block scheme of installation;
As shown in the figure:
1, mold, 2, electromagnet, 3, two-way hydraulic cylinder, 4, baffle, 5, elastic barrier resetting apparatus, 6, torsional spring, 7, block, 8, branch Support beam, 9, small car body, 10, track box, 11, spring.
Specific implementation mode
In order to clarify the technical characteristics of the invention, below by specific implementation mode, this programme is illustrated.
Embodiment one:
A kind of automobile buffer beam straight seam welding Rollforming Shaped Tube technique, it is specific as follows:
Uncoiling installs steel coil strip to uncoiler, is driven steel coil strip to rotate from uncoiler and coil of strip is dismantled with perching knife. The center of steel coil strip is located on unit centre line, and micro- brake apparatus is arranged on uncoiler, steel band when preventing from stopping in emergency Rollback is to play loose winding.
Leveling, steel band is taken the lead to dismantle by pressure roller with perching knife cooperation uncoiler in straight peen gripping leveling machine, and steel band is sent into Straight peen gripping leveling machine.Steel band is sent into pinch roller by perching knife cooperation straight peen pressure roller after being aligned steel band head, pinches roll-in It is lower by steel belt clamping, steel band is sent into pinch roller by rotation main motor, while perching knife withdraws in situ, unreel formula on perching knife.Straight peen roller Original position is withdrawn, unreel pressure roller pushes down coil of strip on uncoiler, after preventing steel roll tower shaped, steel band from entering gripping leveling machine, leveling roll-in Down toward suitable position, steel band is sent into Shearing Butt Resistance Welder, and Shearing Butt Resistance Welder is coordinated to complete shearing butt welding work.
The head of steel band after leveling and tail portion are carried out shearing tack by tack and butt welding respectively, and will be after shearing tack Steel band material tail welds together with the material head after next steel band shearing tack, and the steel band being welded is conveyed toward next station. Detailed process is that steel band head enters shearing position suitable length(It is more than shearing cutting edge that head, which need to shear part,)Afterwards, it pinches and rectifys Flat owner's electric motor clutch is opened, while pressure roller motor stops, and uncoiler motor stops, and hydraulic shear cutting edge is made in high pressure oil at this time Steel band head is sheared with lower.Steel band after shearing is sent into kink under the action of preceding pinch roller, when steel band tail portion enters shearing When butt welding, stop kink main motor, steel band adjusts good position under the action of sending roller later, steel band tail portion cut off, steel band exists Advance under the action of pinch roller afterwards, after steel band tail portion reaches butt welding position, steel band tail portion is fixed on to welding position by rear fender pressure Place is set, the material head of next coiled strip is waited for.It is sent to butt welding position after the head of next coil of strip is clipped, centralising device adjusts steel band Front pressuring plate is depressed after being aligned end to end, compresses steel band head, steel band is welded.By front and back pressing plate liter after steel band welding It rises, rear pinch roller clutch is opened, and steel band is sent into kink under the action of kink main motor.
It prestores, kink storage bin will be sent into welding steel band, for storing steel band, when ensureing unit continuous production not It is influenced by material volume replacement.For steel band when into kink, steel band is deflected to vertical state by entrance arrangement for deflecting, and steel band enters kink Pinch roller.For steel band after storage bin and spiral frame, steel band goes out spiral frame vertically, steel band after exporting arrangement for deflecting, Steel band go to horizontality and to welding line upward.After steel band enters kink pinch roller, kink pinch roller clamps steel band, kink Steel band is sent into kink storage bin by main motor, and kink main motor rotates simultaneously with storage bin outer ring motor at this time, storage bin motor Ratio value between rotating speed and kink main motor rotating speed is set in PLC.Kink storage bin motor speed is according to kink master The variation of motor speed and change automatically, it is ensured that steel band will not ringfeder in feed bin.Similarly, spiral frame inner ring motor with Molding machine main motor synchronizes, and reduces molding machine when pulling in steel band, pulling force suffered by steel band and caused by deflection.
Molding, the steel band in kink storage bin is sent to molding machine, bends to pipe to be welded gradually according to certain order The two sides of steel band are first gone out segmental arc to homonymy symmetrical molding, are gradually lengthened the segmental arc of both sides by being molded several times by base, until The segmental arc of both sides formed to semicircle.Molding machine row arrangement form be:Five frame two roller machine framves, four erect roller arrangement, three framves Four-roll rack, transmission device add gear-box to pass through Hooks coupling universal coupling and breast roller axis connection, driving by motor acceleration and deceleration machine Roll mandrel rotates.
The both ends that pipe is connected to each other are squeezed and carry out high-frequency welding after forming certain angular aperture, welded by high-frequency welding Cheng Hou, the weld seam burr removing formed when welding is clean and curling collects, then by tumbling rack the hair of commissure Pierce flattening-out.Welding and deburring device are oriented to roller frame, four-roller type extruding roll stand, external burr removing machine and dual roll type by dual roll type The part such as pressure roller rack forms.Dual roll type is oriented to roller frame and front and back up and down can adjust, to ensure soldering angle when welding, to Ensure the quality of welding.Upper two roller and left and right edger roll in four-roller extruding rack are all made of electronic adjustment, and left and right edger roll is Dullness, upper two roller can be adjusted, can also be adjusted separately simultaneously.Each roller adjustment position is motor band turbine lead screw lift adjustment.
Water cooling is cooled to room temperature the steel pipe of high-frequency welding by spray mode, and spray tube can be removed, same as needed When or individually open, steel tube guiding device is equipped in water tank, facilitates the movement of steel pipe.
Special-shaped gradual change sizing, by the steel pipe after water cooling by frame gradual change sizing to required caliber, and through turks-head roll(Four Roller straightener)Steel pipe is aligned.Sizing unit horizontal frames structure is identical as shaping machine set precisive shaped segment structure.Specifically, will Steel pipe after water cooling carries out sizing by being equipped with the sizing unit of upper/lower die and left and right mold, and upper/lower die, which fastens, to be formed It is identical as the section of shape tube that cavity cross section shape and left and right mold fasten the cavity cross section shape to be formed, left when sizing Right mould has and upper/lower die alternately squeezes steel pipe, and left and right mold or upper/lower die do not act primary, steel pipe and each mould The compactness of tool increases a part, until steel pipe wall fastens the cavity to be formed with left and right mold or upper/lower die and is bonded completely, Sizing Process gradually carries out, and avoids a direction one-pass molding and is damaged caused by tube wall and inhomogeneities, also avoids steel Tube wall occurs carrying out the dynamic situation of inflection, ensure that the intensity of tube wall.It carries and parts a little in Sizing Process, between the rack of sizing unit There is cut to avoid steel tube surface in Force system.
When horizontal frames hole type design different size, and dimension roll is replaced, substitute mode is being pressed in rack Lower device removes, then roll shafting is taken out from top.Turks-head roll roll and bearing, axis are integrated, only need to be whole by this Body dismounting is other replaceable corresponding rolls, and turks-head roll ontology need not move greatly.
Copying imitates the steel that type milling formula flying saw is cut into the continuous steel pipe after sizing specific length using numerical control Pipe.Steel pipe is cut into fixed length by 2 milling cutter head type cutting heads, and 2 milling heads are operated along the outer wheels profile of pipe, saw It cuts with 2 saw blades.When cutting, fly buck vehicle by direct current generator by gear, rack drives, steel pipe continuous production passes through increment type Encoder surveys length, and measuring motion is mounted on unit, and measuring roller is contacted with steel pipe, and the numerical value of measurement is transmitted to digital control system.Number It controls the startup point of system-computed trolley, acceleration curve, deceleration curve, maximum return speed and shows trolley operation curve, so as to System is set to be in optimal operational condition.Position and speed on trolley is also measured by an incremental encoder, is mounted on trolley Driving motor on, be transferred to digital control system, with accurately control driving to required cutting position on pipe, in cutting process The velocity variations of middle steel pipe do not influence control accuracy.
Runout table, by the steel pipe market of specific length after cutting to product collecting region.
Product is collected, by the steel pipe collecting of specific length, pile.
The production cost of the present embodiment is low, environmentally protective, and the self structure of straight seam welding steel tubes is stablized, each mechanicalness Energy intensity etc. is relatively high, and mould structure is simple, simplifies mold processing capacity, the few cooperation list between mold and roll mandrel of drop Member, while also improving the positioning accuracy of mold, that is, improve the molding qualification rate and performance of product.
It during being produced using the above method, needs repeatedly to replace mold, effect is replaced in order to improve Rate, while reducing equipment occupation space, a kind of automobile buffer beam straight seam welding Rollforming Shaped Tube mould is used in the present embodiment Have more changing device comprising small car body 9 with wheel and the track box 10 being installed on the small car body, and it is installed in institute State the two-way hydraulic cylinder 3 on track box.
Two-way hydraulic cylinder 3 includes cylinder body and slips two pistons in cylinder body, and oriented both sides are respectively and fixedly connected on two-piston Hydraulic fluid port is respectively set on cylinder body corresponding with both sides rod chamber on the cylinder body between two-piston in the piston rod of stretching.Bidirectional hydraulic The both sides piston rod end of cylinder 3 is installed with electromagnet 2 respectively, and electromagnet 2 is equipped with towards the side of mold 1 and is adapted to mold side Protrusion.
Offer the skidway hole consistent with the piston rod direction of two-way hydraulic cylinder in track box, interposition in the skidway hole It sets and is installed with a baffle 4, being slipped respectively in the skidway hole of 4 both sides of the baffle has supporting beam 8, the surface of supporting beam and skidway hole The smooth setting of inner wall, to reduce frictional force between the two.
Supporting beam 8 is equipped with elastic barrier resetting apparatus 5, and supporting beam stretches out one end of skidway hole and elastic barrier resets dress The width for being not less than mold 1 the distance between is set, conllinear mold sliding slot is additionally provided in the supporting beam of both sides, mold is along mold Sliding slot move, ensure that left and right mold when mounted to positivity, save mould aligning adjustment time.
Preferably, the elastic barrier resetting apparatus 5 in the present embodiment includes hanging down with the piston rod of two-way hydraulic cylinder 3 The straight and cross bar affixed with supporting beam is arranged torsional spring 6 on the cross bar, and the block affixed with the spring body of the torsional spring 7, the spring silk both ends of the torsional spring 6 and supporting beam are affixed, and the block is T shapes, and the lower edge of block upper boss both sides is all provided with Circular arc chamfering is set, the distance of cross bar axis to block lower boss front and back sides is less than to the distance of upper surface of support beam, electromagnetism The front and rear edges of iron lower end also is provided with circular arc chamfering.
When electromagnet encounters block, since the force of sliding friction of supporting beam is smaller, torsional spring does not deform, supporting beam with It the stretching of piston rod and is stretched out to workbench, when supporting beam encounters workbench, piston rod continues to stretch out and make torsional spring Deformation, block rotates therewith under the action of chamfering, loses the barrier effect to electromagnet, and electromagnet is moved to after block At mold, electromagnet is attracted after being powered with mold, is equally that branch is first driven under the blocking of block during piston rod is retracted It supports beam to retract, after supporting beam is by baffle, electromagnet pushes block rotation and passes through block, and final piston rod contracts completely It returns.
Embodiment two
The difference between this embodiment and the first embodiment lies in elastic barrier resetting apparatus 5 includes hanging down with the piston rod of two-way hydraulic cylinder The straight and cross bar affixed with supporting beam, and it is arranged block 7 on the cross bar, the both sides of the block are respectively equipped with and prop up The spring 11 of beam connection is supportted, two springs are arranged in splayed, and the tie point of spring and block is higher than cross bar axis, and the block is T shapes, the lower edges of block upper boss both sides are respectively provided with circular arc chamfering, cross bar axis to block lower boss front and back sides away from From less than to a distance from upper surface of support beam, the front and rear edges of electromagnet lower end also is provided with circular arc chamfering.
When electromagnet does not touch block, the spring of both sides makes it keep equilibrium state, during piston rod stretching, electromagnetism When iron starts to brush up against block, since the force of sliding friction of supporting beam is smaller, spring does not deform, when supporting beam encounters workbench When, piston rod continues to stretch out and spring is made to deform, and baffle is taken advantage of a situation rotation, loses the barrier effect to electromagnet, electromagnet It is moved at mold after block, electromagnet is attracted after being powered with mold, is equally first to keep off during piston rod is retracted Supporting beam is driven to retract under the blocking of block, after supporting beam is by baffle, electromagnet pushes block rotation and passes through block, most Whole piston rod is fully retracted.
Certainly, above description is also not limited to the example above, technical characteristic of the present invention without description can by or It is realized using the prior art, details are not described herein;Above example and attached drawing are only used to illustrate the technical scheme of the present invention not It is limitation of the present invention, is described the invention in detail with reference to preferred embodiment, the ordinary skill people of this field Member is it should be appreciated that variation, remodeling, the addition that those skilled in the art are made in the essential scope of the present invention Or replace the claims that should also belong to the present invention without departure from spirit of the invention.

Claims (8)

1. a kind of automobile buffer beam straight seam welding Rollforming Shaped Tube technique, it is characterised in that:
(1)Steel coil strip is unfolded for uncoiling;
(2)Leveling carries out leveling to the steel band after expansion, and steel band is conveyed toward next station;
(3)The head of steel band after leveling and tail portion are carried out shearing tack by tack and butt welding respectively, and will shear the steel after tack Strip tail welds together with the material head after next steel band shearing tack, and the steel band being welded is conveyed toward next station;
(4)It prestores, kink storage bin will be sent into welding steel band;
(5)Molding, the steel band in kink storage bin is sent to molding machine, bends to pipe to be welded gradually according to certain order Base;
(6)The both ends that pipe is connected to each other are squeezed and carry out high-frequency welding after forming certain angular aperture by high-frequency welding, and welding is completed Afterwards by tumbling rack the burr flattening-out of commissure;
(7)Water cooling is cooled to room temperature the steel pipe of high-frequency welding by spray mode;
(8)Special-shaped gradual change sizing carries out the steel pipe after water cooling by being equipped with the sizing unit of upper/lower die and left and right mold Sizing, upper/lower die fastens the cavity cross section shape to be formed and left and right mold fasten the cavity cross section shape to be formed with it is different The section of type pipe is identical, and when sizing, left and right mold and upper/lower die alternately squeeze steel pipe, until steel pipe wall with it is left Right mould has or upper/lower die fastens the cavity to be formed and is bonded completely;
(9)Steel pipe cutting after sizing is specific length by copying;
(10)Runout table, by the steel pipe market of specific length after cutting to product collecting region;
(11)Product is collected, by the steel pipe collecting of specific length, pile.
2. automobile buffer beam according to claim 1 straight seam welding Rollforming Shaped Tube technique, it is characterised in that:It is described Step(4)In, when steel band enters kink storage bin, steel band is deflected to by vertical state by import arrangement for deflecting, in kink Steel band is deflected to the outlet arrangement for deflecting of horizontality by the outlet setting of storage bin.
3. automobile buffer beam according to claim 1 straight seam welding Rollforming Shaped Tube technique, it is characterised in that:It is described Step(5)In a graded refer to the two sides of steel band first being gone out into segmental arc to homonymy symmetrical molding, by being molded several times by two The segmental arc of side gradually lengthens, until the segmental arc of both sides formed to semicircle.
4. automobile buffer beam according to claim 1 straight seam welding Rollforming Shaped Tube technique, it is characterised in that:It is described Step(9)In by the way that the measuring roller of incremental encoder is contacted and be equipped with steel pipe carry out survey length, cutting equipment obtains increment Cut-off is determined after the signal of encoder.
5. a kind of automobile buffer beam straight seam welding Rollforming Shaped Tube die-changing apparatus, it is characterised in that:Including small car body (9)With the track box being installed on the small car body(10), and the two-way hydraulic cylinder that is installed on the track box(3), institute State two-way hydraulic cylinder(3)Both sides piston rod end be installed with electromagnet respectively(2), offer and two-way liquid in the track box The consistent skidway hole in the piston rod direction of cylinder pressure is installed with a baffle in the skidway hole(4), the baffle(4)The cunning of both sides Being slipped respectively in road hole has supporting beam(8), the supporting beam(8)It is equipped with elastic barrier resetting apparatus(5), supporting beam, which is stretched out, to be slided The distance between the one end in road hole and elastic barrier resetting apparatus are not less than mold(1)Width, in the supporting beam of both sides also Equipped with conllinear mold sliding slot.
6. a kind of semitrailer guardrail Rollforming Shaped Tube die-changing apparatus according to claim 5, it is characterised in that: The electromagnet(2)Towards mold(1)Side be equipped with the protrusion that is adapted to mold side.
7. a kind of semitrailer guardrail Rollforming Shaped Tube die-changing apparatus according to claim 5, it is characterised in that: The elastic barrier resetting apparatus(5)Including with two-way hydraulic cylinder(3)Piston rod is vertical and the cross bar affixed with supporting beam, set If torsional spring on the cross bar(6), and the block affixed with the spring body of the torsional spring(7), the torsional spring(6)Spring silk two End is affixed with supporting beam, and the block is T shapes, and the lower edge of block upper boss both sides is respectively provided with chamfering, cross bar axis to gear The distance of block lower boss front and back sides is less than to the distance of upper surface of support beam, and the front and rear edges of electromagnet lower end also is provided with down Angle.
8. a kind of semitrailer guardrail Rollforming Shaped Tube die-changing apparatus according to claim 5, it is characterised in that: The elastic barrier resetting apparatus(5)Include vertical with the piston rod of two-way hydraulic cylinder and affixed with supporting beam cross bar, and It is arranged block on the cross bar(7), the both sides of the block are respectively equipped with the spring being connect with supporting beam(11), the gear Block is T shapes, and the lower edges of block upper boss both sides is respectively provided with chamfering, cross bar axis to block lower boss front and back sides away from From less than to a distance from upper surface of support beam, the front and rear edges of electromagnet lower end also is provided with chamfering.
CN201810342933.7A 2018-04-17 2018-04-17 Automobile buffer beam straight seam welding Rollforming Shaped Tube technique and die-changing apparatus Active CN108673058B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810342933.7A CN108673058B (en) 2018-04-17 2018-04-17 Automobile buffer beam straight seam welding Rollforming Shaped Tube technique and die-changing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810342933.7A CN108673058B (en) 2018-04-17 2018-04-17 Automobile buffer beam straight seam welding Rollforming Shaped Tube technique and die-changing apparatus

Publications (2)

Publication Number Publication Date
CN108673058A true CN108673058A (en) 2018-10-19
CN108673058B CN108673058B (en) 2019-11-19

Family

ID=63801007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810342933.7A Active CN108673058B (en) 2018-04-17 2018-04-17 Automobile buffer beam straight seam welding Rollforming Shaped Tube technique and die-changing apparatus

Country Status (1)

Country Link
CN (1) CN108673058B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108526241A (en) * 2018-04-17 2018-09-14 山东舜世高科实业有限公司 A kind of semitrailer guardrail Rollforming Shaped Tube technique and die-changing apparatus
CN108687161A (en) * 2018-04-17 2018-10-23 山东舜世高科实业有限公司 A kind of splitting Oil cylinder shape tube moulding process and die-changing apparatus
CN110076568A (en) * 2019-05-31 2019-08-02 张家港华程机车精密制管有限公司 A kind of process units of the welded still pipe for crawler crane string abdomen arm
CN110142310A (en) * 2019-05-31 2019-08-20 常熟市盈博钢管有限公司 A kind of production technology of steel pipes with straight
CN112008333A (en) * 2019-05-28 2020-12-01 现代自动车株式会社 Method for forming a vehicle body component
CN114178792A (en) * 2021-12-14 2022-03-15 安徽楚江特钢有限公司 Production method of D-shaped pipe
CN116422744A (en) * 2023-06-13 2023-07-14 湖南益格特钢科技有限公司 Special-shaped steel pipe forming die

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007098397A (en) * 2005-09-30 2007-04-19 Jfe Steel Kk Method for manufacturing low yield ratio seam welded steel pipe for line pipe
CN103846620A (en) * 2012-12-08 2014-06-11 大连优力特换热设备制造有限公司 Special pipe processing technology
CN105127236A (en) * 2015-08-18 2015-12-09 马鞍山市华科实业有限公司 Manufacturing method for special-shaped steel pipes special for logistics shelves
CN106660094A (en) * 2014-05-23 2017-05-10 特鲁普机械奥地利有限公司及两合公司 Tool changing device for a forming press
CN107900226A (en) * 2017-11-29 2018-04-13 芜湖戎征达伺服驱动技术有限公司 The mold-change trolley of automobile production automatic production line
CN108526241A (en) * 2018-04-17 2018-09-14 山东舜世高科实业有限公司 A kind of semitrailer guardrail Rollforming Shaped Tube technique and die-changing apparatus
CN108687161A (en) * 2018-04-17 2018-10-23 山东舜世高科实业有限公司 A kind of splitting Oil cylinder shape tube moulding process and die-changing apparatus

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007098397A (en) * 2005-09-30 2007-04-19 Jfe Steel Kk Method for manufacturing low yield ratio seam welded steel pipe for line pipe
CN103846620A (en) * 2012-12-08 2014-06-11 大连优力特换热设备制造有限公司 Special pipe processing technology
CN106660094A (en) * 2014-05-23 2017-05-10 特鲁普机械奥地利有限公司及两合公司 Tool changing device for a forming press
CN105127236A (en) * 2015-08-18 2015-12-09 马鞍山市华科实业有限公司 Manufacturing method for special-shaped steel pipes special for logistics shelves
CN107900226A (en) * 2017-11-29 2018-04-13 芜湖戎征达伺服驱动技术有限公司 The mold-change trolley of automobile production automatic production line
CN108526241A (en) * 2018-04-17 2018-09-14 山东舜世高科实业有限公司 A kind of semitrailer guardrail Rollforming Shaped Tube technique and die-changing apparatus
CN108687161A (en) * 2018-04-17 2018-10-23 山东舜世高科实业有限公司 A kind of splitting Oil cylinder shape tube moulding process and die-changing apparatus

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108526241A (en) * 2018-04-17 2018-09-14 山东舜世高科实业有限公司 A kind of semitrailer guardrail Rollforming Shaped Tube technique and die-changing apparatus
CN108687161A (en) * 2018-04-17 2018-10-23 山东舜世高科实业有限公司 A kind of splitting Oil cylinder shape tube moulding process and die-changing apparatus
CN112008333A (en) * 2019-05-28 2020-12-01 现代自动车株式会社 Method for forming a vehicle body component
CN110076568A (en) * 2019-05-31 2019-08-02 张家港华程机车精密制管有限公司 A kind of process units of the welded still pipe for crawler crane string abdomen arm
CN110142310A (en) * 2019-05-31 2019-08-20 常熟市盈博钢管有限公司 A kind of production technology of steel pipes with straight
CN114178792A (en) * 2021-12-14 2022-03-15 安徽楚江特钢有限公司 Production method of D-shaped pipe
CN116422744A (en) * 2023-06-13 2023-07-14 湖南益格特钢科技有限公司 Special-shaped steel pipe forming die
CN116422744B (en) * 2023-06-13 2023-08-18 湖南益格特钢科技有限公司 Special-shaped steel pipe forming die

Also Published As

Publication number Publication date
CN108673058B (en) 2019-11-19

Similar Documents

Publication Publication Date Title
CN108673058B (en) Automobile buffer beam straight seam welding Rollforming Shaped Tube technique and die-changing apparatus
CN108687161A (en) A kind of splitting Oil cylinder shape tube moulding process and die-changing apparatus
CN102784821B (en) Coreless pipe-bending machine
CN105458727A (en) Rolling forming production line of square tubes of multiple specifications
CN108526241A (en) A kind of semitrailer guardrail Rollforming Shaped Tube technique and die-changing apparatus
SU845759A3 (en) Machine for making finite-length tubular articles
CN203390052U (en) Waved plate production line
CN203972513U (en) A kind of threaded steel pipe automatic coiled pipe shaping machine set
CN201070644Y (en) Automatic four-shaft plate rolling device
CN102581566A (en) Sleeve rolling process
CN101342562A (en) Screw blade coiling and molding method, and molding equipment thereof
US20130239642A1 (en) Production line of large diameter longitudinal welded pipe
CN205342455U (en) Shaping production line of many specifications side pipe roll extrusion
CN205436708U (en) Flexible line wheel elbow aluminum alloy excircle bounding wall automated production equipment
US4236299A (en) Method and device for winding spiral fins onto oval tubing
CN106238501B (en) A kind of steel strip tube coiling Automatic Production System
CN101869948A (en) Horn mouth expansion machine
CN106238609A (en) A kind of manufacture method of flat spiral coil pipe
CN207642584U (en) A kind of heat preservation pipe prefabricated metal outer protection tube rolling forming device
CN217024744U (en) Uncoiling, longitudinal shearing and coiling unit
CN207071843U (en) Evener inside and outside a kind of stainless steel tube
CN108772448A (en) Prepare the bending machine of U-tube
CN208476684U (en) A kind of aluminium drill pipe aligning and full-scale load-detecting system
CN203470733U (en) Heat exchanger finned tube manufacturing machine
CN210147451U (en) Production device for welded steel pipes of crawler crane chord web arm

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201202

Address after: 271000 No.5, Shangdong Taishan steel market, manzhuang Town, Daiyue district, Tai'an City, Shandong Province

Patentee after: Shandong Huashun Heavy Industry Group Co.,Ltd.

Address before: 271000 Taishan steel market, Tai'an Town, Daiyue District, Shandong, China

Patentee before: SHANDONG SHUNSHI HIGH-TECH INDUSTRIAL Ltd.

TR01 Transfer of patent right