CN108672188A - A kind of construction site construction steel tube surface spray-painting plant - Google Patents

A kind of construction site construction steel tube surface spray-painting plant Download PDF

Info

Publication number
CN108672188A
CN108672188A CN201810608237.6A CN201810608237A CN108672188A CN 108672188 A CN108672188 A CN 108672188A CN 201810608237 A CN201810608237 A CN 201810608237A CN 108672188 A CN108672188 A CN 108672188A
Authority
CN
China
Prior art keywords
pipe
spray
cored slab
pipeline
tube surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810608237.6A
Other languages
Chinese (zh)
Other versions
CN108672188B (en
Inventor
徐建辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Taoyang Construction Engineering Co.,Ltd.
Original Assignee
徐建辉
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 徐建辉 filed Critical 徐建辉
Priority to CN201810608237.6A priority Critical patent/CN108672188B/en
Publication of CN108672188A publication Critical patent/CN108672188A/en
Application granted granted Critical
Publication of CN108672188B publication Critical patent/CN108672188B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/20Arrangements for spraying in combination with other operations, e.g. drying; Arrangements enabling a combination of spraying operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0207Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the work being an elongated body, e.g. wire or pipe
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0221Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
    • B05B13/0235Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts the movement of the objects being a combination of rotation and linear displacement
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B14/00Arrangements for collecting, re-using or eliminating excess spraying material
    • B05B14/40Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths
    • B05B14/44Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths using walls specially adapted for promoting separation of the excess material from the air, e.g. baffle plates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B15/00Details of spraying plant or spraying apparatus not otherwise provided for; Accessories
    • B05B15/60Arrangements for mounting, supporting or holding spraying apparatus
    • B05B15/68Arrangements for adjusting the position of spray heads
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Abstract

The invention discloses a kind of construction site construction steel tube surface spray-painting plants, the output shaft of the motor is connect with rotating shaft transmission, the top left side of the pedestal is equipped with the first steel plate, first hydraulic cylinder is installed on the outside of first steel plate, the hydraulic stem of the first hydraulic cylinder is connected with roller frame through the first steel plate, the roller frame is connected with roller, and the top of the pedestal is equipped with the babinet that setting is opened wide in the left and right sides, and the babinet is located at the right side of the first steel plate;The device drives shaft rotation, the outside of shaft that spiral lamination is arranged by motor so that when being conveyed to steel pipe, steel pipe can rotate conveying so that when painting to steel pipe, steel tube surface being capable of comprehensive even application;The exhaust gas that the device is generated by the stomata on the outside of U-shaped cored slab when absorbing spray painting reduces the air pollution generated when spray painting, by being recycled to drying gas heat, reaches energy-saving effect.

Description

A kind of construction site construction steel tube surface spray-painting plant
Technical field
The invention belongs to paint spraying apparatus technical fields, and in particular to a kind of construction site construction steel tube surface spray painting dress It sets.
Background technology
Construction site is to develop construction project at one, carries out the place of civil engineering, and range often has coaming plate, iron wire Net or enclosure wall are closed, and the disengaging of personnel and material, machinery and vehicle is limited.There is estate management administrator to guard.Discrepancy can Identity can be registered, and to dress safety cap etc..
It is stacked material when construction site is constructed outdoors more, due to outdoor environment complexity, is easy to corrode steel pipe, It needing to protect steel tube surface coating paint vehicle, existing paint spraying apparatus is easy pollution environment, and harm is brought to staff, For this purpose, proposing a kind of construction site construction steel tube surface spray-painting plant.
Invention content
The purpose of the present invention is to provide a kind of construction site construction steel tube surface spray-painting plants, to solve above-mentioned background The existing paint spraying apparatus proposed in technology is easy pollution environment, and the problem of endangering is brought to staff.
To achieve the above object, present invention employs following technical solutions:
A kind of construction site construction steel tube surface spray-painting plant, including pedestal, the top left side of the pedestal is by turning Bracing strut is connected with shaft, and the outside of the shaft is equipped with spiral lamination, motor, the electricity are equipped on the outside of the rotary shaft rack The output shaft of machine is connect with rotating shaft transmission, and the top left side of the pedestal is equipped with the first steel plate, and the outside of first steel plate is pacified Equipped with first hydraulic cylinder, the hydraulic stem of the first hydraulic cylinder is connected with roller frame, the roller frame connection through the first steel plate There are roller, the top of the pedestal to be equipped with the babinet that setting is opened wide in the left and right sides, the babinet is located at the right side of the first steel plate, institute The top for stating babinet is equipped with cylinder, and the cylinder rod of the cylinder is connected with spray painting pipe through babinet, and the bottom of the spray painting pipe is set There is nozzle, paint vehicle delivery pipe is communicated at the top of the spray painting pipe, the inside of the babinet is equipped with U-shaped cored slab, the U-shaped sky Core is communicated with by first pipe in the side of negative-pressure cup, and the top right side of the pedestal is equipped with line slide rail, the straight line The top slide of sliding rail is connected with sliding block, and the top of the sliding block is equipped with second hydraulic cylinder, the top liquid of the second hydraulic cylinder Roll shaft is equipped on the left of compression bar, the top right side of the pedestal is equipped with the second steel plate, second is connected at the top of second steel plate Cored slab, the top right side of the pedestal are equipped with the first cored slab being located at immediately below the second cored slab, first cored slab Top uniformly through there is a first through hole, uniformly through there is the second through-hole, described second is hollow for the bottom of second cored slab The top of plate is equipped with air heater and air blower, and the gas delivery port of the air heater passes through second pipe and air blower It is connected, the gas delivery port of the air blower is connected by third pipeline with the second cored slab, the air heater Gas input port is connected by the 4th pipeline with the first cored slab.
Preferably, the top of the pedestal is equipped with dust cover.
Preferably, air cavity is equipped in the U-shaped cored slab, the outside of the U-shaped cored slab, which is uniformly run through, to be had and air cavity phase The stomata of connection.
Preferably, the top of the negative-pressure cup is equipped with aspiration pump, and the gas input port of the aspiration pump passes through the 5th pipeline It is connected with negative-pressure cup, the first filter screen is equipped at the nozzle of the 5th pipeline.
Preferably, collector pipe is equipped in the negative-pressure cup, the outside of the collector pipe is uniformly communicated with injection spray pipe, the spray Spray nozzle is uniformly provided on the outside of mist pipe, the outside of the negative-pressure cup is equipped with water pump, and the delivery outlet of the water pump passes through the 6th pipe Road is connected with collector pipe.
Preferably, the bottom of the negative-pressure cup is communicated with the 7th pipeline being inserted in primary sedimentation tank, the 7th pipeline Bottom is equipped with the first blow-off pipe, and valve is equipped at the nozzle of the first blow-off pipe.
Preferably, the side of the primary sedimentation tank is connected by the 9th pipeline with clarifying basin, and the bottom of the clarifying basin is set There is the second blow-off pipe, is equipped with valve at the nozzle of second blow-off pipe, the liquid inlet of the water pump, which is communicated with, to be inserted in The 8th pipeline in clarifying basin.
Preferably, the second filter screen is equipped at the nozzle of the 8th pipeline.
The technique effect and advantage of the present invention:A kind of construction site construction proposed by the present invention is painted with steel tube surface to be filled Set, compared with prior art, have it is following a little:
1, the device drives shaft rotation, the outside of shaft that spiral lamination is arranged by motor so that defeated to steel pipe progress When sending, steel pipe can rotate conveying so that when painting to steel pipe, steel tube surface being capable of comprehensive even application;
2, the exhaust gas that the device is generated by the stomata on the outside of U-shaped cored slab when absorbing spray painting produces when reducing spray painting Raw air pollution reaches energy-saving effect by being recycled to drying gas heat.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the side structure schematic diagram of the present invention;
Fig. 3 is the first steel plate structure schematic diagram of the present invention;
Fig. 4 is the first hollow plate structure schematic diagram of the present invention;
Fig. 5 is the negative-pressure cup structural schematic diagram of the present invention;
Fig. 6 is the U-shaped hollow plate structure schematic diagram of the present invention.
In figure:1 pedestal, 2 first steel plates, 3 rotary shaft racks, 4 shafts, 5 spiral laminations, 6 motors, 7 babinets, 8U types cored slab, 9 Cylinder, 10 spray painting pipes, 11 nozzles, 12 paint vehicle delivery pipes, 13 first pipes, 14 negative-pressure cups, 15 line slide rails, 16 sliding blocks, 17 the Two hydraulic cylinders, 18 roll shafts, 19 first cored slabs, 20 second cored slabs, 21 second steel plates, 22 first through hole, 23 second through-holes, 24 Air heater, 25 air blowers, 26 second pipes, 27 third pipelines, 28 the 4th pipelines, 29 aspiration pumps, 30 the 5th pipelines, 31 One filter screen, 32 water pumps, 33 the 6th pipelines, 34 collector pipes, 35 injection spray pipes, 36 spray nozzles, 37 the 7th pipelines, 38 primary sedimentation tanks, 39 It is first blow-off pipe, 40 air cavitys, 41 stomatas, 42 clarifying basins, 43 second blow-off pipes, 44 the 8th pipelines, 45 the 9th pipelines, 46 dust-proof Cover, 47 second filter screens, 48 first hydraulic cylinders, 49 roller framves, 50 rollers.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Herein Described specific embodiment is only used to explain the present invention, is not intended to limit the present invention.Based on the embodiments of the present invention, Every other embodiment obtained by those of ordinary skill in the art without making creative efforts, belongs to this hair The range of bright protection.
The present invention provides a kind of construction site construction steel tube surface spray-painting plants as shown in figures 1 to 6, including pedestal 1, the top left side of the pedestal 1 is connected with shaft 4 by rotary shaft rack 3, and the outside of the shaft 4 is equipped with spiral lamination 5, described The outside of rotary shaft rack 3 is equipped with motor 6, and output shaft and the shaft 4 of the motor 6 are sequentially connected, the top left of the pedestal 1 Side is equipped with the first steel plate 2, and the outside of first steel plate 2 is equipped with first hydraulic cylinder 48, the hydraulic pressure of the first hydraulic cylinder 48 Bar is connected with roller frame 49 through the first steel plate 2, and the roller frame 49 is connected with roller 50, and the top of the pedestal 1 is equipped with a left side The babinet 7 of setting is opened wide in right both sides, and the babinet 7 is located at the right side of the first steel plate 2, and the top of the babinet 7 is equipped with cylinder 9, The cylinder rod of the cylinder 9 is connected with spray painting pipe 10 through babinet 7, and the bottom of the spray painting pipe 10 is equipped with nozzle 11, the spray The top of paint pipe 10 is communicated with paint vehicle delivery pipe 12, and the inside of the babinet 7 is equipped with U-shaped cored slab 8, and the U-shaped cored slab 8 is logical It crosses first pipe 13 to be communicated in the side of negative-pressure cup 14, the top right side of the pedestal 1 is equipped with line slide rail 15, the straight line The top slide of sliding rail 15 is connected with sliding block 16, and the top of the sliding block 16 is equipped with second hydraulic cylinder 17, the second hydraulic cylinder Roll shaft 18 is equipped on the left of 17 top hydraulic stem, the top right side of the pedestal 1 is equipped with the second steel plate 21, second steel plate 21 Top be connected with the second cored slab 20, the top right side of the pedestal 1 is equipped be located at immediately below the second cored slab 20 first Cored slab 19, the top of first cored slab 19, which is uniformly run through, has first through hole 22, the bottom of second cored slab 20 equal It is even through there is the second through-hole 23, the top of second cored slab 20 is equipped with air heater 24 and air blower 25, the air The gas delivery port of heater 24 is connected by second pipe 26 with air blower 25, and the gas delivery port of the air blower 25 is logical Third pipeline 27 is crossed with the second cored slab 20 to be connected, the gas input port of the air heater 24 by the 4th pipeline 28 with First cored slab 19 is connected.
Preferably, the top of the pedestal 1 is equipped with dust cover 46.
By using above-mentioned technical proposal, dust cover 46 is used to prevent the paint vehicle outside dust contact steel pipe, improves paint vehicle Pure property.
Preferably, be equipped with air cavity 40 in the U-shaped cored slab 8, the outside of the U-shaped cored slab 8 is uniformly through having and gas The stomata 41 that chamber 40 is connected.
By using above-mentioned technical proposal, multiple stomatas 41 enable gas quickly to suck in air cavity 40 so that paint body It can quickly be recovered.
Preferably, the top of the negative-pressure cup 14 is equipped with aspiration pump 29, the gas input port of the aspiration pump 29 passes through the Five pipelines 30 are connected with negative-pressure cup 14, and the first filter screen 31 is equipped at the nozzle of the 5th pipeline 30.
By using above-mentioned technical proposal, aspiration pump 29 is used to extract the gas in negative-pressure cup 14 out so that is generated when spray painting Paint vehicle exhaust gas can be quickly in negative suction tank 14.
Preferably, being equipped with collector pipe 34 in the negative-pressure cup 14, the outside of the collector pipe 34 is uniformly communicated with injection spray pipe 35, the outside of the injection spray pipe 35 is uniformly provided with spray nozzle 36, and the outside of the negative-pressure cup 14 is equipped with water pump 32, the water pump 32 Delivery outlet be connected with collector pipe 34 by the 6th pipeline 33.
By using above-mentioned technical proposal, spray nozzle 36 is used for water atomisation so that water can be with the paint in gas Material condensation, reduces the paint vehicle in gas.
Preferably, the bottom of the negative-pressure cup 14 is communicated with the 7th pipeline 37 being inserted in primary sedimentation tank 38, the described 7th The bottom of pipeline 37 is equipped with the first blow-off pipe 39, and valve is equipped at the nozzle of the first blow-off pipe 39.
By using above-mentioned technical proposal, the paint vehicle that primary sedimentation tank 38 is used in bottom water is precipitated, and is convenient to remove in water Paint vehicle.
Preferably, the side of the primary sedimentation tank 38 is connected by the 9th pipeline 45 with clarifying basin 42, the clarifying basin 42 Bottom be equipped with the second blow-off pipe 43, valve is equipped at the nozzle of second blow-off pipe 43, the liquid of the water pump 32 inputs Mouth is communicated with the 8th pipeline 44 being inserted in clarifying basin 42.
By using above-mentioned technical proposal, clarifying basin 42 can carry out secondary settlement to water, improve the clean level of water.
Preferably, being equipped with the second filter screen 47 at the nozzle of the 8th pipeline 44.
By using above-mentioned technical proposal, the second filter screen 47 is used for impurity screening, prevents impurity from blocking pipeline.
Operation principle:Steel pipe to be painted is placed on to the top of shaft 4, control first hydraulic cylinder 48 push roller 50 with Steel pipe contacts so that steel pipe is not easy to shake, and then controls motor 6 and shaft 4 is driven to rotate so that spiral lamination 5 drives steel pipe rotary And conveyed, steel pipe enters in babinet 7, and the pipe 10 that paints is controlled by cylinder 9 and is moved up and down to adjust between nozzle 11 and steel pipe Gap, by paint vehicle delivery pipe 12 to spray painting pipe 10 convey paint vehicle, paint vehicle paints to steel pipe through nozzle 11, due to steel pipe It is rotatably to convey so that steel tube surface can paint comprehensively, and when spray painting, aspiration pump 29 takes out gas in negative-pressure cup 14 Go out so that negative pressure is formed in negative-pressure cup 14 so that the extra coating cloud for generation of painting is sucked by stomata 41 in air cavity 40, and convey into Enter in negative-pressure cup 14, while the water in clarifying basin 42 is extracted out and delivered into collector pipe 34 by water pump 32, water is by injection spray pipe 35 The spray nozzle 36 in outside carries out injection and nebulizes so that the coating cloud in negative suction tank 14 can be condensed by water mist, to remove Paint vehicle in gas prevents air pollution, and the water after condensation paint vehicle, which enters from the 7th pipeline 37 in primary sedimentation tank 38, to be precipitated, and is sunk Clear water behind shallow lake is flowed into through the 9th pipeline 45 in clarifying basin 42 to be settled again, so that water can recycle, saves water money Source;Steel pipe nozzle after spray painting is inserted into roll shaft 18 so that steel pipe can be supported, and prevent steel pipe from tilting, and pass through second hydraulic cylinder The height of 17 adjustment roll shafts 18 can make roll shaft 18 adapt to the steel pipe of different pore size, and air heater 24 heats gas, adds Gas after heat is inputted through air blower 25 in the second cored slab 20, and hot gas is blown out through the second through-hole 23 to steel pipe so that steel pipe table The paint in face can flash baking, first through hole 22 of the hot gas through the top of the first cored slab 19 sucks simultaneously inhales from the 4th pipeline 28 again Enter in the 4th pipeline 28, to reach saving can purpose, steel pipe can move up under the sliding of sliding block 16 from line slide rail 15 It moves to outside, facilitates taking-up steel pipe.
Finally it should be noted that:The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used With technical scheme described in the above embodiments is modified or equivalent replacement of some of the technical features, All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in the present invention's Within protection domain.

Claims (8)

1. a kind of construction site construction steel tube surface spray-painting plant, including pedestal (1), it is characterised in that:The pedestal (1) Top left side is connected with shaft (4) by rotary shaft rack (3), and the outside of the shaft (4) is equipped with spiral lamination (5), the shaft Motor (6) is installed, output shaft and the shaft (4) of the motor (6) are sequentially connected, the pedestal (1) on the outside of holder (3) Top left side is equipped with the first steel plate (2), and first hydraulic cylinder (48), first liquid are equipped on the outside of first steel plate (2) The hydraulic stem of cylinder pressure (48) is connected with roller frame (49) through the first steel plate (2), and the roller frame (49) is connected with roller (50), The top of the pedestal (1) is equipped with the babinet (7) that setting is opened wide in the left and right sides, and the babinet (7) is located at the right side of the first steel plate (2) The top of side, the babinet (7) is equipped with cylinder (9), and the cylinder rod of the cylinder (9) is connected with spray painting pipe through babinet (7) (10), the bottom of the spray painting pipe (10) is equipped with nozzle (11), and paint vehicle delivery pipe is communicated at the top of the spray painting pipe (10) (12), the inside of the babinet (7) is equipped with U-shaped cored slab (8), and the U-shaped cored slab (8) is communicated with by first pipe (13) The top right side of side in negative-pressure cup (14), the pedestal (1) is equipped with line slide rail (15), the top of the line slide rail (15) Portion slidably connects sliding block (16), and the top of the sliding block (16) is equipped with second hydraulic cylinder (17), the second hydraulic cylinder (17) Top hydraulic stem on the left of be equipped with roll shaft (18), the top right side of the pedestal (1) is equipped with the second steel plate (21), second steel The second cored slab (20) is connected at the top of plate (21), the top right side of the pedestal (1), which is equipped with, is located at the second cored slab (20) The first cored slab (19) of underface, the top of first cored slab (19) is uniformly through there is a first through hole (22), and described the The bottom of two cored slabs (20) is uniformly through there is the second through-hole (23), and the top of second cored slab (20) is equipped with air heating The gas delivery port of device (24) and air blower (25), the air heater (24) passes through second pipe (26) and air blower (25) It is connected, the gas delivery port of the air blower (25) is connected by third pipeline (27) with the second cored slab (20), described The gas input port of air heater (24) is connected by the 4th pipeline (28) with the first cored slab (19).
2. a kind of construction site construction steel tube surface spray-painting plant according to claim 1, it is characterised in that:The bottom The top of seat (1) is equipped with dust cover (46).
3. a kind of construction site construction steel tube surface spray-painting plant according to claim 1, it is characterised in that:The U It is equipped with air cavity (40) in type cored slab (8), the outside of the U-shaped cored slab (8) is uniformly connected with air cavity (40) through having Stomata (41).
4. a kind of construction site construction steel tube surface spray-painting plant according to claim 1, it is characterised in that:It is described negative The top of tank (14) is pressed to be equipped with aspiration pump (29), the gas input port of the aspiration pump (29) passes through the 5th pipeline (30) and negative pressure Tank (14) is connected, and the first filter screen (31) is equipped at the nozzle of the 5th pipeline (30).
5. a kind of construction site construction steel tube surface spray-painting plant according to claim 1, it is characterised in that:It is described negative It presses and is equipped with collector pipe (34) in tank (14), the outside of the collector pipe (34) is uniformly communicated with injection spray pipe (35), the injection spray pipe (35) spray nozzle (36) is uniformly provided on the outside of, the outside of the negative-pressure cup (14) is equipped with water pump (32), the water pump (32) Delivery outlet is connected by the 6th pipeline (33) with collector pipe (34).
6. a kind of construction site construction steel tube surface spray-painting plant according to claim 5, it is characterised in that:It is described negative The bottom of pressure tank (14) is communicated with the 7th pipeline (37) being inserted in primary sedimentation tank (38), and the bottom of the 7th pipeline (37) is set There is the first blow-off pipe (39), and is equipped with valve at the nozzle of the first blow-off pipe (39).
7. a kind of construction site construction steel tube surface spray-painting plant according to claim 6, it is characterised in that:It is described first The side of heavy pond (38) is connected by the 9th pipeline (45) with clarifying basin (42), and the bottom of the clarifying basin (42) is equipped with second Blow-off pipe (43), valve is equipped at the nozzle of second blow-off pipe (43), and the liquid inlet of the water pump (32) is communicated with The 8th pipeline (44) being inserted in clarifying basin (42).
8. a kind of construction site construction steel tube surface spray-painting plant according to claim 7, it is characterised in that:Described The second filter screen (47) is equipped at the nozzle of eight pipelines (44).
CN201810608237.6A 2018-06-13 2018-06-13 Steel pipe surface paint spraying apparatus for construction site construction Active CN108672188B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810608237.6A CN108672188B (en) 2018-06-13 2018-06-13 Steel pipe surface paint spraying apparatus for construction site construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810608237.6A CN108672188B (en) 2018-06-13 2018-06-13 Steel pipe surface paint spraying apparatus for construction site construction

Publications (2)

Publication Number Publication Date
CN108672188A true CN108672188A (en) 2018-10-19
CN108672188B CN108672188B (en) 2021-10-29

Family

ID=63810996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810608237.6A Active CN108672188B (en) 2018-06-13 2018-06-13 Steel pipe surface paint spraying apparatus for construction site construction

Country Status (1)

Country Link
CN (1) CN108672188B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110665697A (en) * 2019-11-13 2020-01-10 三门秋兰喷涂机科技有限公司 Steel pipe surface diversified type spraying line device
CN111097621A (en) * 2019-11-07 2020-05-05 柳州钢铁股份有限公司 Rust-proof and demisting device for bars
CN111482309A (en) * 2020-04-23 2020-08-04 孟娜妮 Environment-friendly building inner tube protection painting device
CN111686968A (en) * 2020-05-09 2020-09-22 宫涛 Fire hose paint spraying apparatus for security protection
CN111822182A (en) * 2020-06-30 2020-10-27 河北新兴铸管有限公司 Nodular cast iron pipe spraying device
CN112090632A (en) * 2020-09-08 2020-12-18 苏州祝伟电器有限公司 Processing equipment and processing method for fireplace
CN112246503A (en) * 2020-10-16 2021-01-22 苏州豪诗意数码科技有限公司 Plastic spraying and curing cooling integrated device for processing lamp post of photographic lamp
CN112495640A (en) * 2020-12-11 2021-03-16 瑞安市倪工电线科技有限公司 Copper conductor anti-oxidation structure for overhead transmission line
CN112934552A (en) * 2021-01-28 2021-06-11 唐得琼 Steel construction painting device
CN113731684A (en) * 2021-09-26 2021-12-03 湖南天卓管业有限公司 Spraying equipment is used in anticorrosive steel pipe production of environment-friendly PE

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101927222A (en) * 2010-07-13 2010-12-29 杭州浙大精益机电技术工程有限公司 Antirust spraying device on outer surface of steel pipe
CN104043321A (en) * 2014-05-30 2014-09-17 珠海市一致电工有限公司 System for purifying exhaust gas generated during baking of enamelled wires
JP2016179415A (en) * 2015-03-23 2016-10-13 株式会社栗本鐵工所 Coating apparatus of pipe and coating method of outer surface of pipe
EP3117906A1 (en) * 2015-07-17 2017-01-18 Zachodniopomorski Uniwersytet Technologiczny w Szczecinie Spray booth with heat recovery
CN106391359A (en) * 2016-11-23 2017-02-15 郑州天舜电子技术有限公司 Oiling and drying equipment for steel pipe manufacturing
CN206950902U (en) * 2017-07-18 2018-02-02 深圳市丰绿环保科技有限公司 A kind of nebulization dust purifier
CN207401611U (en) * 2017-09-12 2018-05-25 长沙天卓塑胶有限公司 Epoxy powder spraying device inside and outside a kind of steel pipe suspension type

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101927222A (en) * 2010-07-13 2010-12-29 杭州浙大精益机电技术工程有限公司 Antirust spraying device on outer surface of steel pipe
CN104043321A (en) * 2014-05-30 2014-09-17 珠海市一致电工有限公司 System for purifying exhaust gas generated during baking of enamelled wires
JP2016179415A (en) * 2015-03-23 2016-10-13 株式会社栗本鐵工所 Coating apparatus of pipe and coating method of outer surface of pipe
EP3117906A1 (en) * 2015-07-17 2017-01-18 Zachodniopomorski Uniwersytet Technologiczny w Szczecinie Spray booth with heat recovery
CN106391359A (en) * 2016-11-23 2017-02-15 郑州天舜电子技术有限公司 Oiling and drying equipment for steel pipe manufacturing
CN206950902U (en) * 2017-07-18 2018-02-02 深圳市丰绿环保科技有限公司 A kind of nebulization dust purifier
CN207401611U (en) * 2017-09-12 2018-05-25 长沙天卓塑胶有限公司 Epoxy powder spraying device inside and outside a kind of steel pipe suspension type

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111097621A (en) * 2019-11-07 2020-05-05 柳州钢铁股份有限公司 Rust-proof and demisting device for bars
CN110665697A (en) * 2019-11-13 2020-01-10 三门秋兰喷涂机科技有限公司 Steel pipe surface diversified type spraying line device
CN111482309B (en) * 2020-04-23 2021-11-23 庄小芳 Environment-friendly building inner tube protection painting device
CN111482309A (en) * 2020-04-23 2020-08-04 孟娜妮 Environment-friendly building inner tube protection painting device
CN111686968A (en) * 2020-05-09 2020-09-22 宫涛 Fire hose paint spraying apparatus for security protection
CN111822182A (en) * 2020-06-30 2020-10-27 河北新兴铸管有限公司 Nodular cast iron pipe spraying device
CN111822182B (en) * 2020-06-30 2022-02-01 河北新兴铸管有限公司 Nodular cast iron pipe spraying device
CN112090632A (en) * 2020-09-08 2020-12-18 苏州祝伟电器有限公司 Processing equipment and processing method for fireplace
CN112246503A (en) * 2020-10-16 2021-01-22 苏州豪诗意数码科技有限公司 Plastic spraying and curing cooling integrated device for processing lamp post of photographic lamp
CN112495640A (en) * 2020-12-11 2021-03-16 瑞安市倪工电线科技有限公司 Copper conductor anti-oxidation structure for overhead transmission line
CN112934552A (en) * 2021-01-28 2021-06-11 唐得琼 Steel construction painting device
CN113731684A (en) * 2021-09-26 2021-12-03 湖南天卓管业有限公司 Spraying equipment is used in anticorrosive steel pipe production of environment-friendly PE
CN113731684B (en) * 2021-09-26 2022-05-27 湖南天卓管业有限公司 Spraying equipment is used in anticorrosive steel pipe production of environment-friendly PE

Also Published As

Publication number Publication date
CN108672188B (en) 2021-10-29

Similar Documents

Publication Publication Date Title
CN108672188A (en) A kind of construction site construction steel tube surface spray-painting plant
CN203648937U (en) Apparatus for cleaning inner wall of steel pipe and calandria and atomizing and spraying butter
CN103657941B (en) A kind of automatic fuel spray device and automatic oil spout method thereof
CN104492643B (en) A kind of continous way paint line
CN110369200A (en) A kind of intelligent flush coater of adjustable spray range
CN107261721A (en) A kind of urban operating mechanism high effect dust cleaner
CN207430584U (en) A kind of curtain wall rock cotton board spray-painting plant
CN205673132U (en) The reciprocal spray equipment of both arms of spraying reciprocating machine
CN107649326A (en) Metallic element antirust oiling device and method
CN204685374U (en) Novel two stage cascade spray booth
CN203695294U (en) Automatic oil injection device
CN206897071U (en) One kind building dedusting and cleaning device
CN103700416A (en) Method for removing radioactive contamination dust
CN216262694U (en) Land remediation device for preventing and treating pesticide residues
CN206730750U (en) A kind of Water spray two level apparatus for treating cooking fume
CN205673131U (en) The purification spray booth of spraying reciprocating machine
CN214487518U (en) Steel structure coating machine with waste gas treatment system
CN211799662U (en) Dust device for building engineering
CN107998895A (en) A kind of plate membrane on-line cleaning device and its cleaning method
CN211275123U (en) Paint spraying device for processing horizontal slurry pump
CN107213800A (en) A kind of novel cross flow rotary ceramic membranous system
CN209188380U (en) A kind of coal mining dust-extraction unit
CN206168656U (en) Novel coiled material production environmental protection spray booth
CN206844034U (en) A kind of civil engineering depositing dust spray system
CN207751038U (en) A kind of smoke hood type electrostatic fume removal unit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20211009

Address after: 402100 No. 32-3, Yuwang Road, Chenshi office, Yongchuan District, Chongqing

Applicant after: Chongqing Taoyang Construction Engineering Co.,Ltd.

Address before: 710048 Xi'an University of technology, No. 5 Jinhua South Road, Shaanxi, Xi'an

Applicant before: Xu Jianhui

GR01 Patent grant