CN108668102A - The method of area monitoring installation - Google Patents
The method of area monitoring installation Download PDFInfo
- Publication number
- CN108668102A CN108668102A CN201710188684.6A CN201710188684A CN108668102A CN 108668102 A CN108668102 A CN 108668102A CN 201710188684 A CN201710188684 A CN 201710188684A CN 108668102 A CN108668102 A CN 108668102A
- Authority
- CN
- China
- Prior art keywords
- monitoring
- area
- installation
- region
- monitoring device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N17/00—Diagnosis, testing or measuring for television systems or their details
- H04N17/002—Diagnosis, testing or measuring for television systems or their details for television cameras
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N7/00—Television systems
- H04N7/18—Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
Landscapes
- Engineering & Computer Science (AREA)
- Multimedia (AREA)
- Signal Processing (AREA)
- Health & Medical Sciences (AREA)
- Biomedical Technology (AREA)
- General Health & Medical Sciences (AREA)
- Alarm Systems (AREA)
Abstract
The present invention relates to a kind of methods of area monitoring installation, wherein choosing installation site in monitoring area, and install supervision equipment in installation site, are debugged to its monitor area in the supervision equipment installed, finally carry out dry run to the region.The method of this area monitoring installation is when installing monitoring, according to the structure of installation region, monitoring device is mounted on the region, ensures the monitoring integrality of monitoring device monitoring area, avoids dead angle from generating, satisfy the use demand.
Description
Technical field
The present invention relates to monitoring device technical field, especially a kind of method of area monitoring installation.
Background technology
Monitoring device is required to carry out monitoring area comprehensive covering monitoring when installation, but current
The mounting structure and mounting means of monitoring device cannot meet the needs of monitoring, and the monitoring in some higher spatials, monitoring is covered
Capping is poor, cannot meet actual use demand.
Invention content
In order to overcome the shortcomings of that existing monitoring device cannot satisfy the use demand, the present invention provides a kind of area monitorings
The method of installation.
The technical solution adopted by the present invention to solve the technical problems is:A kind of method of area monitoring installation, is monitoring
Installation site is chosen in region, and supervision equipment is installed in installation site, it is monitored in the supervision equipment installed
Region is debugged, and finally carries out dry run to the region.
According to another embodiment of the invention, further comprise, monitoring is installed on the commanding elevation in monitoring area and is set
It is standby, and 5 deciles are divided into the distance between commanding elevation to ground, and decile height in office installs monitoring device.
According to another embodiment of the invention, further comprise, the equipment installed carries out the adjustment of angle, needs
The monitoring of entire monitoring area can be covered.
According to another embodiment of the invention, further comprise, debugging carries out dry run, detection device after finishing
Integrality.
According to another embodiment of the invention, further comprise, in the region that installation monitoring finishes, in any one point
Upper someone must be in the monitoring range of monitoring device.
According to another embodiment of the invention, further comprise, needed between the monitoring area between monitoring device
The overlapping region of 2-5m.
The invention has the advantages that the method for this area monitoring installation install monitor when, according to installing zone
Monitoring device is mounted on the region, ensures the monitoring integrality of monitoring device monitoring area, dead angle is avoided to produce by the structure in domain
It is raw, it satisfies the use demand.
Description of the drawings
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is the detailed process schematic diagram of the present invention.
Specific implementation mode
If Fig. 1 is the detailed process schematic diagram of the present invention, a kind of method of area monitoring installation is chosen in monitoring area
Installation site, and supervision equipment is installed in installation site, its monitor area is adjusted in the supervision equipment installed
Examination finally carries out dry run to the region.
The monitoring integrality for ensureing monitoring device monitoring area by the monitoring device that this method is installed, avoids dead angle from producing
It is raw, ensure monitoring effect.
According to another embodiment of the invention, further comprise, monitoring is installed on the commanding elevation in monitoring area and is set
It is standby, and 5 deciles are divided into the distance between commanding elevation to ground, and decile height in office installs monitoring device.
Using the monitoring position of different height, ensure that the monitoring image in different location, extreme higher position can monitor the overall situation,
In the monitoring device that different isometry positions are placed, the monitoring of different clarity can be completed, ensures the clearness of monitoring.
According to another embodiment of the invention, further comprise, the equipment installed carries out the adjustment of angle, needs
The monitoring of entire monitoring area can be covered.
The monitored picture of monitoring device is required to cover entire monitoring area, avoids the generation at dead angle, ensures monitoring
Integrality satisfies the use demand.
According to another embodiment of the invention, further comprise, debugging carries out dry run, detection device after finishing
Integrality.
By dry run, the dead angle of monitoring installation is found out, and then improves installation effect, is satisfied the use demand.
According to another embodiment of the invention, further comprise, in the region that installation monitoring finishes, in any one point
Upper someone must be in the monitoring range of monitoring device.
When carrying out dry run to monitoring device, needing to meet on people from region any one point that there are people can
It is found out in monitoring device, avoids the occurrence of monitoring blind area.
According to another embodiment of the invention, further comprise, needed between the monitoring area between monitoring device
The overlapping region of 2-5m.
Overlapping region between monitoring device is to be able to facilitate the linking of monitoring, avoids the occurrence of what middle phantom caused
Monitoring data is lost, and ensures that monitoring is complete.
Described above to be merely exemplary for the purpose of the present invention, and not restrictive, those of ordinary skill in the art understand,
In the case where not departing from spirit and scope as defined in the appended claims, many modifications, variation or equivalent can be made, but all
It will fall within the scope of protection of the present invention.
Claims (6)
1. a kind of method of area monitoring installation, characterized in that choose installation site in monitoring area, and in installation site
Upper installation supervision equipment is debugged its monitor area in the supervision equipment installed, is finally simulated to the region
Operation.
2. the method for area monitoring installation according to claim 1, characterized in that pacify on the commanding elevation in monitoring area
Supervision equipment is filled, and 5 deciles, and decile height in office installation monitoring are divided into the distance between commanding elevation to ground
Equipment.
3. the method for area monitoring installation according to claim 1, characterized in that the equipment installed carries out angle
Adjustment, it is desirable to be able to cover the monitoring of entire monitoring area.
4. the method for area monitoring installation according to claim 1, characterized in that debugging carries out simulation fortune after finishing
Row, the integrality of detection device.
5. the method for area monitoring installation according to claim 1, characterized in that in the region that installation monitoring finishes,
The upper someone of any one point must be in the monitoring range of monitoring device.
6. the method for area monitoring according to claim 1 installation, characterized in that monitoring area between monitoring device it
Between need the overlapping region of 2-5m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710188684.6A CN108668102A (en) | 2017-03-27 | 2017-03-27 | The method of area monitoring installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710188684.6A CN108668102A (en) | 2017-03-27 | 2017-03-27 | The method of area monitoring installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108668102A true CN108668102A (en) | 2018-10-16 |
Family
ID=63786159
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710188684.6A Pending CN108668102A (en) | 2017-03-27 | 2017-03-27 | The method of area monitoring installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108668102A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110611795A (en) * | 2019-09-11 | 2019-12-24 | 长沙平安财富中心有限公司 | Communication monitoring system in building and communication monitoring point location determining method |
CN110784710A (en) * | 2019-10-25 | 2020-02-11 | 北京国信桥通信工程有限公司 | Debugging method of video monitoring system |
-
2017
- 2017-03-27 CN CN201710188684.6A patent/CN108668102A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110611795A (en) * | 2019-09-11 | 2019-12-24 | 长沙平安财富中心有限公司 | Communication monitoring system in building and communication monitoring point location determining method |
CN110611795B (en) * | 2019-09-11 | 2024-04-12 | 长沙平安财富中心有限公司 | Communication monitoring system in building and method for determining communication monitoring point position |
CN110784710A (en) * | 2019-10-25 | 2020-02-11 | 北京国信桥通信工程有限公司 | Debugging method of video monitoring system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108668102A (en) | The method of area monitoring installation | |
CN104897138A (en) | Tunnel detection apparatus with remote-transmission and flight functions | |
CN104897568A (en) | Novel tunnel detection apparatus with communication function | |
CN104897569A (en) | Tunnel detection apparatus with communication function | |
CN104890873A (en) | Novel tunnel detecting device with long-range transmission function and flight function | |
CN104897683A (en) | Tunnel detection apparatus with flight function | |
CN104897570A (en) | Tunnel detection apparatus with camera adjusting device | |
CN207766215U (en) | A kind of photovoltaic system scavenging period prior-warning device based on component glass transmission rate | |
CN105523183A (en) | Novel tunnel detection apparatus having flying function | |
CN108540767A (en) | The method of area monitoring installation | |
CN103324181B (en) | Screen cabinet cabinet door monitoring early-warning system | |
CN105513129A (en) | Laser 3D modeling-based automatic rod counting system | |
CN104793240A (en) | Real-time micro seismic data acquisition system based on wireless network technology | |
CN105573141A (en) | Touch-type photoelectric pod system emulator | |
CN204624400U (en) | A kind of can the rubbish container of remote monitor and control | |
CN104049610A (en) | Water conservancy sluice gate monitoring system | |
CN204856817U (en) | Bridge limit for height protection frame real time monitoring and alarm system | |
CN104064001B (en) | A kind of intelligent substation alarm inference method | |
CN107507384A (en) | Device for producing region patrol intelligent linkage | |
CN204442421U (en) | A kind of long distance service system | |
CN207717895U (en) | A kind of electrical appliance enclosure ground fault detection locating alarm device | |
CN203278091U (en) | Installing tool for bird repelling device of electric power circuit | |
CN203407122U (en) | Elevator single-layer control cabinet with machine room | |
CN205248721U (en) | Antiwind panel of being qualified for next round of competitions of multi -thread cable | |
CN204929497U (en) | Electric appliance cabinet easy to assemble |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181016 |