CN108667078A - It is a kind of based on generating set operating cost parsing area's external power be led to the ancillary service method of cost accounting - Google Patents

It is a kind of based on generating set operating cost parsing area's external power be led to the ancillary service method of cost accounting Download PDF

Info

Publication number
CN108667078A
CN108667078A CN201810320124.6A CN201810320124A CN108667078A CN 108667078 A CN108667078 A CN 108667078A CN 201810320124 A CN201810320124 A CN 201810320124A CN 108667078 A CN108667078 A CN 108667078A
Authority
CN
China
Prior art keywords
cost
unit
area
external power
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810320124.6A
Other languages
Chinese (zh)
Other versions
CN108667078B (en
Inventor
张剑楠
王蓓蓓
赵楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201810320124.6A priority Critical patent/CN108667078B/en
Publication of CN108667078A publication Critical patent/CN108667078A/en
Application granted granted Critical
Publication of CN108667078B publication Critical patent/CN108667078B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/24Arrangements for preventing or reducing oscillations of power in networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Abstract

The invention discloses a kind of area's external powers based on the parsing of generating set operating cost to be led to the ancillary service method of cost accounting, is related to Operation of Electric Systems, economic analysis field.The present invention is in order to promote assisted hatching fair, based on simulating actual schedule result, calculates the ancillary service cost being led to by area's external power.Area's external power regulating power and system frequency stability requirement are considered in power economic dispatch model;It respectively obtains newly-increased area's external power and replaces the machine unit scheduling result increased newly under area's external power two schemes;It is constituted according to generator operating cost, the ancillary service cost decomposition that area's external power is led to;Calculate spare opportunity cost, the loss of peak regulation mean unit cost of electricity-generating and the start and stop peak regulation cost allowance being led to by area's external power.It can be used for area's external power to share ancillary service cost and to the criterion calculation that conventional power unit compensates, improve China's ancillary service management system, improve the enthusiasm that power plant provides ancillary service.

Description

It is a kind of based on generating set operating cost parsing area's external power be led to ancillary service at This computational methods
Technical field
The present invention relates to technical field of electric power more particularly to a kind of area's external powers based on the parsing of generating set operating cost It is led to the ancillary service method of cost accounting.
Background technology
CHINESE REGION economic development and the characteristics of contrary distribution is geographically presented with energy resources, eastern and central regions economy Prosperity, electricity needs is big, but primary energy inadequate resource, and west area can provide enough supplies of electric power, therefore Chinese extra-high voltage Alternating current-direct current builds rapid, " transferring electricity from the west to the east " fast development.The year two thousand twenty is expected, " transferring electricity from the west to the east " capacity reaches two in 2015 Times so that Eastern China power grid is mostly high proportion receiving end power grid.
For receiving end power grid, the access of large capacity area external power has positive work to economics of power generation, environmental protection etc. With.However, due to outside area power of alterating and direct current have peak modulation capacity relative mistake, single back line capacity big and frequency modulation and standby be not provided The features such as with service, these features make operational management and the safety and stability problem one side increase system auxiliary of systems face Demand for services, another aspect area external power do not provide frequency modulation and spare equal ancillary services generally, will make the routine of receiving end power grid Unit shares more ancillary service ratios.Both sides acts on, and prodigious shadow is generated to the operating status of receiving end power grid unit It rings, unit may run on uneconomical operating mode even extreme operating condition, and receiving end power grid unit is to provide ancillary service needs to pay more More operating cost.In existing regulation, it is not included in the examination to area's external power ancillary service, the examination to conventional power unit and benefit Repay also relatively coarse, there are unjust phenomenons.In order to improve the enthusiasm for providing ancillary service, area's external power should be calculated first and is drawn The ancillary service cost of cause, and then consider rational cost recovery measure.
Has the ancillary service method of cost accounting that is led to of wind-powered electricity generation in the prior art, but area's external power and simple wind-powered electricity generation go out Force characteristic is different, and cost impact is not quite identical, only meter and spinning reserve capacity constraint, does not count and primary frequency modulation spare capacity Constraint, and ancillary service cost is not subjected to analytical Calculation, it is difficult to for the specified of cost recovery standard.
Invention content
Goal of the invention:In view of the problems of the existing technology the present invention, provides a kind of based on generating set operating cost solution Area's external power of analysis is led to the ancillary service method of cost accounting, and this method considers area's external power regulating power and system frequency is steady Qualitative requirement is constituted according to generator operating cost, and the ancillary service cost decomposition that area's external power is led to calculates, and contributes to area The propulsion that external power participates in ancillary service compensation and shares.
Technical solution:It is of the present invention based on generating set operating cost parsing area's external power be led to ancillary service at This computational methods includes the following steps:
(1) the economic load dispatching model that area's external power participates in receiving end power grid is established, the constraint of the economic load dispatching model considers The peaking performance and frequency modulation spare capacity of area's external power constrain;
(2) according to the economic load dispatching model, it is horizontal and leave and take to optimize all kinds of unit startup-shutdown states, output inside and outside area Spare capacity obtains the scheduling result of newly-increased area's external power;
(3) combination that newly-increased area's external power is replaced with to the conventional thermal power generation unit of equal capacity, further according to the warp of foundation Help scheduling model, optimizes the spare capacity that all kinds of unit startup-shutdown states, output are horizontal and leave and take, after obtaining replacement area external power Scheduling result;
(4) according to the possible operating status of unit and economic parameters, parsing may cause unit due to the access of area's external power The composition of operating cost variation;
(5) according to the scheduling result after newly-increased area's external power and replacement area external power, all units in the case of calculating two kinds Opportunity cost, unit cost of electricity-generating and start-up and shut-down costs, calculate both difference obtain the ancillary service cost that area's external power is led to.
Further, economic load dispatching model described in step (1) is specially:
Min ∑ F=min ∑s (CGk+Cout)+∑SGk
Wherein, F is cost of electricity-generating, CGkFor the energy cost that generates electricity, CoutFor start-up and shut-down costs, SGkFor area's external power electricity at This, the constraint of economic load dispatching model includes:System power Constraints of Equilibrium, the constraint of system spinning reserve capacity, generating set go out Force constraint and spare capacity constraint, unit ramping rate constraints, minimum startup-shutdown time-constrain, while considering the tune of area's external power Peak performance and the constraint of frequency modulation spare capacity.
Further, the constraint of the economic load dispatching model includes:
A, the peaking performance constraint of area's external power:
In formula, Pout,tFor the output, maximum output, minimum load sent a telegram here outside area, NtFor institute's dispatching cycle Timesharing hop count,For the per day output sent a telegram here outside the area;
B, frequency modulation spare capacity constrains:
Wherein,The primary frequency modulation spare capacity of primary frequency modulation unit, max { P are participated in for t period kth platformsout,tBe t when The maximum power vacancy of section, Δ f*For the maximum allowable frequency offset of system, KL*For the perunit of the unit power regulation of load Value, PLoad,tFor the system loading of t moment;σ * are the difference coefficient of generator, Pk,NFor the rated capacity of unit k, Yk,tFor t when Carve the open state of kth platform unit, Pk,maxIt contributes for the maximum technology of kth platform unit, Pk,tFor the reality of t moment kth platform unit It arranges to contribute.
Further, in step (4) area's external power access may cause unit operation cost change composition be:
A. the opportunity cost of spare capacity:Cop=(ρprice-CN)×(PN-Pt)×Δt;
B. the unit cost of electricity-generating loss of drop output peak regulation:Closs=Ct-CN
C. the Unit Commitment cost of start and stop peak regulation;
Wherein, ρpriceFor the rate for incorporation into the power network of such unit, CN、PNGenerated output respectively under declared working condition and unit hair Electric cost, Pt、CtGenerated output respectively under actual operating mode and unit cost of electricity-generating, Δ t are interval time section.
Further, the opportunity cost, unit cost of electricity-generating and start-up and shut-down costs calculation formula of unit are as follows in step (5):
A. single period, all conventional power units run spare opportunity cost
B. single period, the mean unit cost of electricity-generating of all conventional power units
C. in dispatching cycle, the start-up and shut-down costs of all units
Wherein,For the rate for incorporation into the power network of the affiliated types of unit k, C () is unit unit cost of electricity-generating function, Pk,tFor t The practical arrangement of moment power unit k is contributed, C (Pk,t) it is unit cost of electricity-generatings of the power unit k in the t periods, Δ t is each The length of period, Pk,NFor the rated capacity of unit k, Yk,tFor the open state of t moment kth platform unit, NGFor power unit collection It closes, NtFor institute's timesharing hop count dispatching cycle, Ck,stUnit k starts or shuts down primary cost.
By above formula, calculate increase newly corresponding cost under two kinds of scheduling results of area's external power and replacement area external power it Difference, spare opportunity cost, the loss of peak regulation mean unit cost of electricity-generating and the start and stop peak regulation cost damage that as area's external power is led to It loses.
Advantageous effect:Compared with prior art, the present invention its remarkable advantage is:The present invention is to simulate actual schedule result Basis calculates the ancillary service cost being led to by area's external power, it is contemplated that area's external power regulating power and system frequency stability It is required that and being constituted according to generator operating cost, the ancillary service cost decomposition calculating that area's external power is led to.It can be used for outside area Power supply shares ancillary service cost and to the criterion calculation that conventional power unit compensates, and improves China's ancillary service managing system Degree improves the enthusiasm that power plant provides ancillary service, promotes high proportion receiving end electricity net safety stable economical operation.
Description of the drawings
Fig. 1 is the general flow chart of the method for the present invention;
Fig. 2 is the relational graph of single unit unit cost of electricity-generating and generated output;
Fig. 3 is to be led to that opportunity cost and unit cost of electricity-generating calculate based on area's external power that generating set operating cost parses As a result.
Specific implementation mode
Technical solution of the present invention is described in further detail with reference to specific embodiment, so that the skill of this field Art personnel can be better understood from the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
It present embodiments provides a kind of area's external power parsed based on generating set operating cost and is led to ancillary service cost Computational methods, as shown in Figure 1, including the following steps:
(1) the economic load dispatching model that area's external power participates in receiving end power grid is established, the constraint of the economic load dispatching model considers The peaking performance and frequency modulation spare capacity of area's external power constrain.
Scheduling model with the minimum optimization aim of cost of electricity-generating, object function include local all kinds of units power generation electricity at This CGkWith start-up and shut-down costs Cout, area's external power energy cost SGk
Min ∑ F=min ∑s (CGk+Cout)+∑SGk
Constraints in model includes:System power Constraints of Equilibrium, the constraint of system spinning reserve capacity, generating set Units limits and spare capacity constraint, unit ramping rate constraints, minimum startup-shutdown time-constrain.Above-mentioned constraint is all existing skill Art, details are not described herein.This model also considers peaking performance and the constraint of frequency modulation spare capacity of area's external power simultaneously, specially:
A, the peaking performance constraint of area's external power:
In formula, Pout,tFor the output, maximum output, minimum load sent a telegram here outside area, NtFor institute's dispatching cycle Timesharing hop count,For the per day output sent a telegram here outside the area;
B, frequency modulation spare capacity constrains:
Wherein,The primary frequency modulation spare capacity of primary frequency modulation unit, max { P are participated in for t period kth platformsout,tBe t when The maximum power vacancy of section, Δ f*For the maximum allowable frequency offset of system, KL*For the perunit of the unit power regulation of load Value, PLoad,tFor the system loading of t moment;σ * are the difference coefficient of generator, Pk,NFor the rated capacity of unit k, Yk,tFor t when Carve the open state of kth platform unit, Pk,maxIt contributes for the maximum technology of kth platform unit, Pk,tFor the reality of t moment kth platform unit It arranges to contribute.
According to practical experience, constant value KL*=1.8, σ*=5%;According to《National interconnected network management and running regulation》 In, it is desirable that frequency must not exceed 50 ± 0.2Hz, this example takes maximum frequency deviation Δ f=0.2Hz;Finally, the power of day part Vacancy max { Pout,tIt is taken as the largest passages transmission power of the period extra-high voltage exterior power supply, when dispatching cycle is 24 on the one Section.
(2) according to the economic load dispatching model, it is horizontal and leave and take to optimize all kinds of unit startup-shutdown states, output inside and outside area Spare capacity obtains the scheduling result of newly-increased area's external power;
For example, being designed according to certain provincial power network, unit information and system loading etc. relatively meet reality.Receiving end power grid machine Group information is shown in Table 1, and area's dispatch from foreign news agency source information is shown in Table 2.
1 each unit parameter of receiving end power grid of table
2 area's external power parameter of table
In area's external power, number 6-11 is newly-increased area's external power.
(3) combination that newly-increased area's external power is replaced with to the conventional thermal power generation unit of equal capacity, further according to the warp of foundation Help scheduling model, optimizes the spare capacity that all kinds of unit startup-shutdown states, output are horizontal and leave and take, after obtaining replacement area external power Scheduling result;
Example is connected, increases area's external power capacity and about 3800MW newly, replaces with total capacity as the equal capacity thermal motor of 3900MW Group, information are shown in Table 3.
Table 3 is used to replace each unit parameter of receiving end power grid of newly-increased area's external power
(4) according to the possible operating status of unit and economic parameters, parsing may cause unit due to the access of area's external power The composition of operating cost variation.
Generally had according to large copacity power supply outside area peak modulation capacity is poor, area's external power single back line capacity greatly, reliability not Stable feature needs local conventional power unit to undertake more peak regulation tasks, reserves more spinning reserve capacities and primary tune Frequency capacity causes conventional power unit to need the start and stop number for reducing operation of contributing, increasing unit.Cause in unit cost of electricity-generating It rises, is peak regulation cost, the opportunity cost of idle capacity increases, and is spare capacity cost;Unit Commitment may be caused by simultaneously Number increases, additional to increase Unit Commitment peak regulation cost.
As shown in Fig. 2, oblique line is the relationship of single unit unit cost of electricity-generating and generated output, ρpriceFor such unit Rate for incorporation into the power network.Consider that the influence of area's external power, generating set are to provide peak regulation and spare equal ancillary services, make unit operation point from A is moved to B.Unit cost of electricity-generating rises, and is peak regulation cost, and the opportunity cost of idle capacity increases, and is spare capacity cost.Together Shi Keneng is caused by the increase of Unit Commitment number, additional to increase Unit Commitment peak regulation cost.
For single unit, the ancillary service increase cost that area's external power may be led to is configured to:
A. the opportunity cost of spare capacity:Cop=(ρprice-CN)×(PN-Pt)×Δt
B. the unit cost of electricity-generating loss of drop output peak regulation:Closs=Ct-CN
C. the Unit Commitment cost of start and stop peak regulation
Wherein, CN、PNGenerated output respectively under declared working condition and unit cost of electricity-generating, Pt、CtRespectively actual motion Generated output under operating mode and unit cost of electricity-generating.
(5) according to the scheduling result after newly-increased area's external power and replacement area external power, all units in the case of calculating two kinds Opportunity cost, unit cost of electricity-generating and start-up and shut-down costs, calculate both difference obtain the ancillary service cost that area's external power is led to.
A. single period, all conventional power units run spare opportunity cost:
B. single period, the mean unit cost of electricity-generating of all conventional power units:
C. in dispatching cycle, the start-up and shut-down costs of all units:
Wherein,For the rate for incorporation into the power network of the affiliated types of unit k, C () unit unit cost of electricity-generating function, C (Pk,t) be Unit cost of electricity-generatings of the power unit k in the t periods, Δ t are the length of each period, Ck,stUnit k starts or shuts down primary Cost.
Fired power generating unit rate for incorporation into the power network is 391 yuan/MWh, and the rate for incorporation into the power network of Gas Generator Set is 690 yuan/MWh.
By above formula, calculate increase newly corresponding cost under two kinds of scheduling results of area's external power and replacement area external power it Difference, spare opportunity cost, the loss of peak regulation mean unit cost of electricity-generating and the start and stop peak regulation cost damage that as area's external power is led to It loses, is shown in Table 4.
4 area's external power of table is led to ancillary service cost calculation result
By table 4, in terms of opportunity cost, increase newly twice that the opportunity cost under area's external power scheme is more than alternative solution, it can Group leads to a large amount of idle booting capacity, to cause to provide peak regulation, more spinning reserves and primary frequency modulation capacity according to circumstances The sharp increase of opportunity cost, the spare opportunity cost of fired power generating unit and Gas Generator Set that area's external power is led to is respectively 6,270,000 yuan, 340,000 Member amounts to 6,610,000 yuan.Gas Generator Set installation total amount is small, also corresponding smaller in the accounting of cost, but the cost of electricity-generating of Gas Generator Set Far above fired power generating unit, it is 31.6 yuan/MWh that area's external power, which is led to that peak regulation unit cost of electricity-generating increases, is led to peak regulation start-up and shut-down costs 3910000 yuan.
Fig. 3 compared being led to opportunity cost and unit cost of electricity-generating based on area's external power that generating set operating cost parses Result of calculation, it can be seen that:Area's external power is led to that the unit cost of electricity-generating of internal heat motor group increases ratio about 6%-14%, relatively Uniformly;And the opportunity cost increase ratio that area's external power is led to is larger in day part difference.

Claims (5)

1. a kind of area's external power based on the parsing of generating set operating cost is led to that the ancillary service method of cost accounting, feature exist In including the following steps:
(1) the economic load dispatching model that area's external power participates in receiving end power grid is established, the constraint of the economic load dispatching model considers outside area The peaking performance and frequency modulation spare capacity of power supply constrain;
(2) according to the economic load dispatching model, optimize all kinds of unit startup-shutdown states inside and outside area, output level and leave and take spare Capacity obtains the scheduling result of newly-increased area's external power;
(3) combination that newly-increased area's external power is replaced with to the conventional thermal power generation unit of equal capacity, is adjusted further according to the economy of foundation Model is spent, optimizes the spare capacity that all kinds of unit startup-shutdown states, output are horizontal and leave and take, obtains the tune after replacement area external power Spend result;
(4) according to the possible operating status of unit and economic parameters, parsing may cause unit operation due to the access of area's external power The composition of cost variation;
(5) according to the scheduling result after newly-increased area's external power and replacement area external power, the machine of all units in the case of two kinds is calculated Meeting cost, unit cost of electricity-generating and start-up and shut-down costs calculate the two difference and obtain the ancillary service cost that area's external power is led to.
2. it is according to claim 1 it is a kind of based on generating set operating cost parsing area's external power be led to ancillary service at This computational methods, it is characterised in that:Economic load dispatching model is specially described in step (1):
Min ∑ F=min ∑s (CGk+Cout)+∑SGk
Wherein, F is cost of electricity-generating, CGkFor the energy cost that generates electricity, CoutFor start-up and shut-down costs, SGkFor the energy cost of area's external power, warp Ji scheduling model constraint include:System power Constraints of Equilibrium, system spinning reserve capacity constraint, generating set units limits With spare capacity constraint, unit ramping rate constraints, minimum startup-shutdown time-constrain, while the peaking performance of area's external power is considered It is constrained with frequency modulation spare capacity.
3. it is according to claim 2 it is a kind of based on generating set operating cost parsing area's external power be led to ancillary service at This computational methods, it is characterised in that:The constraint of the economic load dispatching model includes:
A, the peaking performance constraint of area's external power:
In formula, Pout,tFor the output, maximum output, minimum load sent a telegram here outside area, NtFor institute's timesharing dispatching cycle Hop count,For the per day output sent a telegram here outside the area;
B, frequency modulation spare capacity constrains:
Wherein,The primary frequency modulation spare capacity of primary frequency modulation unit, max { P are participated in for t period kth platformsout,tIt is the t periods Maximum power vacancy, Δ f*For the maximum allowable frequency offset of system, KL*For the perunit value of the unit power regulation of load, PLoad,tFor the system loading of t moment;σ * are the difference coefficient of generator, Pk,NFor the rated capacity of unit k, Yk,tFor t moment The open state of k platform units, Pk,maxIt contributes for the maximum technology of kth platform unit, Pk,tFor the practical arrangement of t moment kth platform unit It contributes.
4. it is according to claim 1 it is a kind of based on generating set operating cost parsing area's external power be led to ancillary service at This computational methods, it is characterised in that:In step (4) area's external power access may cause unit operation cost change composition be:
A. the opportunity cost of spare capacity:Cop=(ρprice-CN)×(PN-Pt)×Δt;
B. the unit cost of electricity-generating loss of drop output peak regulation:Closs=Ct-CN
C. the Unit Commitment cost of start and stop peak regulation;
Wherein, ρpriceFor the rate for incorporation into the power network of such unit, CN、PNGenerated output respectively under declared working condition and unit power generation at This, Pt、CtGenerated output respectively under actual operating mode and unit cost of electricity-generating, Δ t are interval time section.
5. it is according to claim 1 it is a kind of based on generating set operating cost parsing area's external power be led to ancillary service at This computational methods, it is characterised in that:The opportunity cost, unit cost of electricity-generating and start-up and shut-down costs calculation formula of unit in step (5) It is as follows:
A. single period, all conventional power units run spare opportunity cost
B. single period, the mean unit cost of electricity-generating of all conventional power units
C. in dispatching cycle, the start-up and shut-down costs of all units
Wherein,For the rate for incorporation into the power network of the affiliated types of unit k, C () is unit unit cost of electricity-generating function, Pk,tFor t moment The practical arrangement of power unit k is contributed, C (Pk,t) it is unit cost of electricity-generatings of the power unit k in the t periods, Δ t is each period Length, Pk,NFor the rated capacity of unit k, Yk,tFor the open state of t moment kth platform unit, NGFor power unit set, Nt For institute's timesharing hop count dispatching cycle, Ck,stUnit k starts or shuts down primary cost.
CN201810320124.6A 2018-04-11 2018-04-11 method for calculating auxiliary service cost caused by external power supply Active CN108667078B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810320124.6A CN108667078B (en) 2018-04-11 2018-04-11 method for calculating auxiliary service cost caused by external power supply

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810320124.6A CN108667078B (en) 2018-04-11 2018-04-11 method for calculating auxiliary service cost caused by external power supply

Publications (2)

Publication Number Publication Date
CN108667078A true CN108667078A (en) 2018-10-16
CN108667078B CN108667078B (en) 2019-12-10

Family

ID=63783435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810320124.6A Active CN108667078B (en) 2018-04-11 2018-04-11 method for calculating auxiliary service cost caused by external power supply

Country Status (1)

Country Link
CN (1) CN108667078B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111382935A (en) * 2020-03-05 2020-07-07 海南电网有限责任公司 Method, device and system for adjusting peak shaving auxiliary service
CN111415041A (en) * 2020-03-20 2020-07-14 海南电网有限责任公司 Method for evaluating economy of power grid planning scheme
CN112003270A (en) * 2020-08-06 2020-11-27 国网浙江省电力有限公司衢州供电公司 Reactive auxiliary service optimization scheduling method applied to power market environment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103390904A (en) * 2013-07-18 2013-11-13 国家电网公司 Analysis method of renewable energy grid-connected power generation
CN103854066A (en) * 2012-12-05 2014-06-11 国网能源研究院 Data optimization method and system for multi-energy source electric power remote transmission
US20150268644A1 (en) * 2014-03-20 2015-09-24 Tsinghua University Optimal control method and apparatus for power system
CN106992555A (en) * 2017-04-25 2017-07-28 国网吉林省电力有限公司 A kind of CHP system distributed scheduling method under assisted hatching environment
US20180026445A1 (en) * 2012-12-31 2018-01-25 Battelle Memorial Institute Distributed hierarchical control architecture for integrating smart grid assets during normal and disrupted operations

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103854066A (en) * 2012-12-05 2014-06-11 国网能源研究院 Data optimization method and system for multi-energy source electric power remote transmission
US20180026445A1 (en) * 2012-12-31 2018-01-25 Battelle Memorial Institute Distributed hierarchical control architecture for integrating smart grid assets during normal and disrupted operations
CN103390904A (en) * 2013-07-18 2013-11-13 国家电网公司 Analysis method of renewable energy grid-connected power generation
US20150268644A1 (en) * 2014-03-20 2015-09-24 Tsinghua University Optimal control method and apparatus for power system
CN106992555A (en) * 2017-04-25 2017-07-28 国网吉林省电力有限公司 A kind of CHP system distributed scheduling method under assisted hatching environment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
BAI HONG ET AL.: "《2014 International Conference on Power System Technology (POWERCON 2014) 》", 22 October 2014 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111382935A (en) * 2020-03-05 2020-07-07 海南电网有限责任公司 Method, device and system for adjusting peak shaving auxiliary service
CN111382935B (en) * 2020-03-05 2023-09-29 海南电网有限责任公司 Peak-shaving auxiliary service adjusting method, device and system
CN111415041A (en) * 2020-03-20 2020-07-14 海南电网有限责任公司 Method for evaluating economy of power grid planning scheme
CN111415041B (en) * 2020-03-20 2024-01-05 海南电网有限责任公司 Method for evaluating economy of power grid planning scheme
CN112003270A (en) * 2020-08-06 2020-11-27 国网浙江省电力有限公司衢州供电公司 Reactive auxiliary service optimization scheduling method applied to power market environment
CN112003270B (en) * 2020-08-06 2022-03-18 国网浙江省电力有限公司衢州供电公司 Reactive auxiliary service optimization scheduling method applied to power market environment

Also Published As

Publication number Publication date
CN108667078B (en) 2019-12-10

Similar Documents

Publication Publication Date Title
CN109149571B (en) Energy storage optimal configuration method considering characteristics of system gas and thermal power generating unit
CN106485352B (en) A kind of multiclass power supply generation schedule combination decision-making method
CN104578176B (en) Method for making power generation plan in consideration of direct current interaction
CN106026184B (en) A kind of hydroenergy storage station towards peak load regulation network and wind-powered electricity generation association system and its Optimization Scheduling
CN108539731B (en) Compensation and allocation calculation method for peak regulation auxiliary service cost
CN108667078A (en) It is a kind of based on generating set operating cost parsing area's external power be led to the ancillary service method of cost accounting
CN113300396B (en) Method and system for optimizing direct current transmission limit in planning period
CN108336764A (en) A kind of extensive wind-light-electricity extra-high voltage alternating current-direct current sending peak regulation control method
CN108197755A (en) A kind of Unit Combination Optimization Scheduling a few days ago for considering large receiving-end grid primary frequency modulation performance
CN109992818A (en) The Unit Combination model and method for solving of large-scale wind power participation primary frequency modulation
CN106684928B (en) Power grid peak regulation margin calculation method based on peak regulation cost
CN103208086A (en) Electric power and energy balance method for accurately calculating wind power contributions
CN115800264A (en) Method, device and medium for accessing data center to power distribution network cluster
JP2005102357A (en) Method and device for preparing start/stop plan of generator, recording medium for recording process program thereof
CN104484772B (en) The feasibility method of calibration and system of electricity plan
CN108764543A (en) A kind of power dispatching method and system
CN114583762A (en) Daily power and electric quantity balance analysis method considering multi-partition thermal power balance scheduling
CN115719132A (en) Method for day-ahead plan layered progressive optimization of provincial power grid comprising multiple pumped storage power stations
CN109510195B (en) Method and device for configuring black start capacity of power system
CN107453377A (en) Analysis method is matched based on the optimal solar energy thermal-power-generating heat accumulation of system cost benefit
CN114465226A (en) Method for establishing multi-level standby acquisition joint optimization model of power system
CN117273810B (en) Comprehensive energy sharing scheduling method and system with excitation compatibility
Hu et al. Virtual prosumer aggregator in joint energy and auxiliary service market: A robust cooperative game approach
CN112366706B (en) Load side peak regulation resource scale demand prediction method
CN116050734A (en) Method and system for dividing local standby and external standby composition proportion

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant