CN108665138A - A kind of modularization power supply plan selection method - Google Patents

A kind of modularization power supply plan selection method Download PDF

Info

Publication number
CN108665138A
CN108665138A CN201810258728.2A CN201810258728A CN108665138A CN 108665138 A CN108665138 A CN 108665138A CN 201810258728 A CN201810258728 A CN 201810258728A CN 108665138 A CN108665138 A CN 108665138A
Authority
CN
China
Prior art keywords
module
power supply
type
user
worksheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810258728.2A
Other languages
Chinese (zh)
Other versions
CN108665138B (en
Inventor
李振伟
赵树军
王晶
赵天翊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201810258728.2A priority Critical patent/CN108665138B/en
Publication of CN108665138A publication Critical patent/CN108665138A/en
Application granted granted Critical
Publication of CN108665138B publication Critical patent/CN108665138B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides and a kind of modularization power supply plan selection method then summarize fine tuning again by by the two-way standard modular of supply and demand, summarizing classification, then being matched step by step, finally efficiently easily make the power supply plan for meeting customer requirement;The power supply plan depth that the method is designed through the invention improves, and facilitates Customer design and construction, it is ensured that customer engineering high quality high standard, power grid security and strong can be ensured by accessing after power grid;It not only ensure that the important element of scheme and require the reference do not omitted, while also provided for design.

Description

A kind of modularization power supply plan selection method
Technical field
The present invention relates to power supply technique fields, and in particular to a kind of modularization power supply plan selection method.
Background technology
Power supply plan refers to meeting the supply of electric power specific implementation plan of customer electricity demand, is that client is set by electrical engineering Meter, planning path and construction foundation, be ensure client's power supply reliability, power supply quality and economical operation important ring Section, the establishment and audit of power supply plan directly affect the quality and efficiency of the entire engineering of client.There are following for previous programming Problem:
(One)Lack specification.Establishment power supply plan does not have fixed cannonical format at present, various due to being related to basic material content, Technical parameter 150 is multinomial, writes content disunity every time, is lack of consistency and preciseness.
(Two)It is less efficient.Power supply plan authorized personnel needs to reconnoitre to scene, records live basic condition, receipt Essential information is collected, arrange and is analyzed behind position, verifies power supply point, the technical standard of relevant parameter and management requirement etc. Deng after comprehensive various situations, then carrying out programming, the time needed is longer, and establishment is less efficient.
(Three)Scheme depth is inadequate.Electricity is influenced on cable in access system and client's power receiving equipment etc. in power supply plan at present The key parameter of net safety does not clearly state, and is not clearly stated to client's power receiving equipment side primary connection situation.So that setting It counts link and lacks data, check and accept link and lack foundation.
(Four)The requirement of the quick power transmission of client, while being also the demand of company's Stiffness agent.Accelerate client to be connect by electrical engineering Electric speed is one of the important measure that company reinforces service-type firm's construction, and previous programming pattern cannot be satisfied client increasingly The demand for services of growth, it is necessary to change original pattern, accelerates programming speed, so that Business Process System engineering is early designed, early construct, Early power transmission, shortens the period of surplus capacity, while company also increases and sold electricity.
Invention content
In order to solve the above technical problems, the present invention provides and a kind of modularization power supply plan selection method, pass through by The two-way standard modular of supply and demand, is then matched step by step, to select most suitable method of supplying power to, improves power supply plan selection Convenience.
The present invention is in order to solve the above technical problems, used technical solution is as follows:
The present invention includes the following steps:
1) the overall architectural plan provided according to user and specification, according to user type, user power utilization demand and preliminary The building is carried out modular classification number by electricity consumption scale, and is fabricated to electrical form, is worksheet one;
2) according to user power utilization it needs to be determined that the position of switchyard or switchgear house switchyard or switchgear house;
3) worksheet one and switchyard or switchgear house switchyard or switchgear house corresponding information SG186 systems are inputted to converge into row information Always;The SG186 systems are State Grid Corporation of China's integration firm grade information integrated platforms, and function is this with application method The common knowledge that field those of ordinary skill should learn is not done specifically repeat herein;
4) total connection plan is divided into three total modules:Wiring module, by electrical engineering module and metering and billing module;
5) Wiring module is divided into two submodules according to power supply type:Cable module and line module;It is described by electrical engineering Module is divided into Zhu Shang substations module, box-type substation module and power distribution station module according to type;The metering and billing module It is divided into two module of one module of stoichiometric point and stoichiometric point according to stoichiometric point;Total module and submodule block number are aggregated into database, from Module corresponding with user building modules is chosen in database, and makes electrical form, is worksheet two;
6) electric power safety equipment technical parameters are selected according to user power utilization type;
7) network system figure is called in SG186 systems, searches power supply point, capacity can be opened by power supply point lookup, it is ensured that electricity Source point is available;
8) it is selected step by step in each module in worksheet two, it, will be each until choosing minimum submodule Submodule is matched step by step with worksheet one, is then adjusted, and wiring diagram is generated;
9) wiring diagram of generation is verified and is adjusted.
Further, the worksheet one is multistage table, and level-one table is user type;Two level table is user power utilization Demand type;Tertiary table is user power utilization scale type;Level Four table is user's external power supply type.
Further, the step 9)Detailed process include:
A) can open capacity verification, apply to install capacity be less than can open capacity;
B) relevant parameter comparison verification;
C) parameter selection foundation and related request are verified.
In the construction process according to the plan view of antenna pole, ensure the equipment such as arrester, disconnecting switch is related to satisfaction peace Reload request, by electrical engineering combination power distribution station primary system figure, case become primary system figure and it is aerial become platform plan view carry out installation and Construction.
The present invention has the following technical effect that:
The present invention is used by by the two-way standard modular of supply and demand, summarizing classification, then being matched step by step, is then summarized again micro- It adjusts, finally efficiently easily makes the power supply plan for meeting customer requirement;
(One)The power supply plan depth that the method is designed through the invention improves, and facilitates Customer design and construction, it is ensured that Customer engineering high quality high standard can ensure power grid security and strong after accessing power grid.
(Two)It is unified and standard, while standard also improves.The same scheme, 100 people establishment is the result is that the same, and one Individual's 100 different schemes of establishment, the format of scheme is also unified, not only ensure that the important element of scheme and requirement do not have The reference omitted, while also provided for design.
(Three)The programming time substantially shortens, and achieves noticeable achievement, and by the parameter of Integrated Solution module, simplifies parameter meter It calculates and the search procedure of related data, power supply plan is related to speed and obviously accelerates, the time for replying averagely shortens 2 days.
To relatively simple by electrical engineering, in the case of most fast, 500 kilovolt-amperes and following industry expand project can be from original 15 working days(30 working days of dual power supply)It is reduced to 2 working days, first day live drawing up a plan is organized to examine behind receipt position Core scheme can reply client in second day.
(Four)Practical application, user service perceptibility are obviously improved, the power supply plan being related to through the invention, and client feels Conceptual design speed is obviously accelerated, and profound lesson has arrived the promotion of efficiency of service, has embodied clothes convenience-for-people, favorable to the people, for the people Business theory;Install convenient of the present invention, easy to operate, the requirement for expanding new model with industry mutually agrees with, and practical is strong;Design scheme When consider various situations, and be provided simultaneously with upgrade function, can be good at adapting to various management modes.
Specific implementation mode
Technical scheme of the present invention is further elaborated below in conjunction with specific embodiment.
The present invention includes the following steps:
1) user's architectural plan is made;According to architectural plan, the building is subjected to modular classification number according to house type, and It is fabricated to electrical form, is worksheet one;
2) according to user power utilization it needs to be determined that consumer unit position;The position of consumer unit should have both Electrical Safety and user Just;
3) worksheet one and consumer unit position input SG186 systems are summarized into row information;The SG186 systems are countries Grid company integration firm grade information integrated platform, function should be learnt with application method for those of ordinary skill in the art Common knowledge, do not do specifically repeat herein;
4) total connection plan is divided into three total modules:Wiring module, by electrical engineering module and metering and billing module;
5) Wiring module is divided into two submodules according to power supply type:Cable module and line module;It is described by electrical engineering Module is divided into Zhu Shang substations module, box-type substation module and power distribution station module according to type;The metering and billing module It is divided into two module of one module of stoichiometric point and stoichiometric point according to stoichiometric point;Total module and submodule block number are aggregated into database, from Module corresponding with user building modules is chosen in database, and makes electrical form, is worksheet two;
6) electric power safety equipment technical parameters are selected according to user power utilization type;
7) network system figure is called in SG186 systems, searches power supply point, capacity can be opened by power supply point lookup, it is ensured that electricity Source point is available;
8) it is selected step by step in each module in worksheet two, it, will be each until choosing minimum submodule position Submodule is matched step by step with worksheet one, is then adjusted, and wiring diagram is generated;
9) wiring diagram of generation is verified and is adjusted.
Further, since the design of many residential buildings has similarity, including house type, cell layout and floor cloth Similar house type, cell layout and floor layout are respectively defined as module by office, are carried out standard modular, are converged after number Assembly database;Therefore the worksheet one is multistage table, and level-one table is building type;Two level table is floor type; Tertiary table is cell type;Level Four table is house type, and corresponding module number is then chosen from database and is labeled;
Further, the step 9)Detailed process include:
A) can open capacity verification, apply to install capacity be more than can open capacity;
B) relevant parameter comparison verification;
C) parameter selection foundation and related request are verified.
In the construction process according to the plan view of antenna pole, ensure the equipment such as arrester, disconnecting switch is related to satisfaction peace Reload request, by electrical engineering combination power distribution station primary system figure, case become primary system figure and it is aerial become platform plan view carry out installation and Construction.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest range caused.

Claims (3)

1. a kind of modularization power supply plan selection method, which is characterized in that it includes the following steps:
1)The overall architectural plan provided according to user and specification, according to user type, user power utilization demand and preliminary The building is carried out modular classification number by electricity consumption scale, and is fabricated to electrical form, is worksheet one;
2)According to user power utilization it needs to be determined that the position of switchyard or switchgear house switchyard or switchgear house;
3)Worksheet one and switchyard or switchgear house switchyard or switchgear house corresponding information are inputted SG186 systems to converge into row information Always;
4)Total connection plan is divided into three total modules:Wiring module, by electrical engineering module and metering and billing module;
5)The Wiring module is divided into two submodules according to power supply type:Cable module and line module;It is described by electrical engineering Module is divided into Zhu Shang substations module, box-type substation module and power distribution station module according to type;The metering and billing module It is divided into two module of one module of stoichiometric point and stoichiometric point according to stoichiometric point;Total module and submodule are summarized into making electrical form, are Worksheet two;
6)Electric power safety equipment technical parameters are selected according to user power utilization type;
7)Network system figure is called in SG186 systems, searches power supply point, capacity can be opened by power supply point lookup, it is ensured that electricity Source point is available;
8)It is selected step by step in each module in worksheet two, it, will be each until choosing minimum submodule Submodule is matched step by step with worksheet one, is then adjusted, and wiring diagram is generated;
9)The wiring diagram of generation is verified and adjusted.
2. a kind of modularization power supply plan selection method according to claim 1, which is characterized in that the worksheet one is Multistage table, level-one table are user type;Two level table is user power utilization demand type;Tertiary table is user power utilization scale Type;Level Four table is user's external power supply type.
3. a kind of modularization power supply plan selection method according to claim 1, which is characterized in that the step 9)Tool Body process includes:
A) can open capacity verification, apply to install capacity be less than can open capacity;
B) relevant parameter comparison verification;
C) parameter selection foundation and related request are verified.
CN201810258728.2A 2018-03-27 2018-03-27 Modular power supply scheme selection method Active CN108665138B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810258728.2A CN108665138B (en) 2018-03-27 2018-03-27 Modular power supply scheme selection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810258728.2A CN108665138B (en) 2018-03-27 2018-03-27 Modular power supply scheme selection method

Publications (2)

Publication Number Publication Date
CN108665138A true CN108665138A (en) 2018-10-16
CN108665138B CN108665138B (en) 2021-09-24

Family

ID=63782594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810258728.2A Active CN108665138B (en) 2018-03-27 2018-03-27 Modular power supply scheme selection method

Country Status (1)

Country Link
CN (1) CN108665138B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109521672A (en) * 2018-10-22 2019-03-26 东北大学 A kind of intelligent selecting method of electric arc furnaces power supply curve

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104657824A (en) * 2015-02-12 2015-05-27 国家电网公司 Automatic generation system for power supply scheme of modern power distribution network
US9698597B1 (en) * 2012-11-14 2017-07-04 Atmel Corporation Adjustable power and system efficiency maximizing scheme using micro-controllers
CN106940826A (en) * 2017-02-27 2017-07-11 国家电网公司 Modularization power supply plan automatic generation method
CN106940827A (en) * 2017-02-27 2017-07-11 国家电网公司 Modularization power supply plan automatic generation method based on AR technologies and VR technologies

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9698597B1 (en) * 2012-11-14 2017-07-04 Atmel Corporation Adjustable power and system efficiency maximizing scheme using micro-controllers
CN104657824A (en) * 2015-02-12 2015-05-27 国家电网公司 Automatic generation system for power supply scheme of modern power distribution network
CN106940826A (en) * 2017-02-27 2017-07-11 国家电网公司 Modularization power supply plan automatic generation method
CN106940827A (en) * 2017-02-27 2017-07-11 国家电网公司 Modularization power supply plan automatic generation method based on AR technologies and VR technologies

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
李振伟等: "配电网多阶段多场景规划方式研究", 《电网与清洁能源》 *
梁标等: "考虑负荷特性的工业城市分区供电方案设计与优化研究", 《电力科学与技术学报》 *
赵树军等: "配电网负荷分区及其规划研究", 《电网与清洁能源》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109521672A (en) * 2018-10-22 2019-03-26 东北大学 A kind of intelligent selecting method of electric arc furnaces power supply curve
CN109521672B (en) * 2018-10-22 2021-08-13 东北大学 Intelligent selection method for power supply curve of electric arc furnace

Also Published As

Publication number Publication date
CN108665138B (en) 2021-09-24

Similar Documents

Publication Publication Date Title
CN104240139A (en) Multi-service system information fusion power grid comprehensive visualization method based on three-dimensional GIS
Strezoski et al. Integration of utility distributed energy resource management system and aggregators for evolving distribution system operators
Muñoz-Delgado et al. Integrated transmission and distribution system expansion planning under uncertainty
Yang et al. Multistage expansion planning of integrated biogas and electric power delivery system considering the regional availability of biomass
CN106651652A (en) Power grid GIS-based multi-business system information fused power grid visualization method
Repo et al. The IDE4L project: Defining, designing, and demonstrating the ideal grid for all
CN105553807B (en) A kind of 10kV low-voltage intelligent distribution network system with looped network communication structure
CN102800033A (en) Distribution production and marketing business integration system
CN106130189B (en) Construction site temporary power condition monitoring system and method
Ilo “Link”—The smart grid paradigm for a secure decentralized operation architecture
Rahman et al. Technologies required for efficient operation of a smart meter network
CN112134277B (en) Power grid topology optimization checking method and system based on full-grid marketing and distribution multi-source data
Hao et al. Locational marginal pricing in the campus power system at the power distribution level
Estebsari et al. IoT-enabled real-time management of smart grids with demand response aggregators
Seal Understanding derms
Wang et al. A practical large-scale distribution network planning model based on elite Ant-Q
CN108695847A (en) A method of realizing that power distribution network dynamic topology calculates using deep identification method
Boumaiza et al. Modeling a blockchain-enabled transactive energy system for community microgrids
Balijepalli et al. Towards Indian smart grids
CN108665138A (en) A kind of modularization power supply plan selection method
CN116566046B (en) Visual online intelligent management platform based on box-type substation
Arya et al. Role of smart grid to power system planning and operation in india
CN112234611B (en) Power distribution network setting calculation method and system based on computer modeling
Yang et al. A novel planning method for multi-scale integrated energy system
Moghadam et al. IoT-based Office Buildings Energy Management with Distributed Edge Computing Capability

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant