CN108664699A - A kind of residual exploiting field Upward mining feasibility determination method of tool post of quiet disturbance load - Google Patents

A kind of residual exploiting field Upward mining feasibility determination method of tool post of quiet disturbance load Download PDF

Info

Publication number
CN108664699A
CN108664699A CN201810290013.5A CN201810290013A CN108664699A CN 108664699 A CN108664699 A CN 108664699A CN 201810290013 A CN201810290013 A CN 201810290013A CN 108664699 A CN108664699 A CN 108664699A
Authority
CN
China
Prior art keywords
rock stratum
tool post
exploiting field
coal
residual exploiting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810290013.5A
Other languages
Chinese (zh)
Other versions
CN108664699B (en
Inventor
冯国瑞
张玉江
杨文博
闫勇敢
白锦文
杜云楼
牛利凯
王胜伟
康立勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan University of Technology
Original Assignee
Taiyuan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Technology filed Critical Taiyuan University of Technology
Priority to CN201810290013.5A priority Critical patent/CN108664699B/en
Publication of CN108664699A publication Critical patent/CN108664699A/en
Application granted granted Critical
Publication of CN108664699B publication Critical patent/CN108664699B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/06Power analysis or power optimisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Remote Sensing (AREA)
  • Computer Hardware Design (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a kind of residual exploiting field Upward mining feasibility determination methods of tool post of quiet disturbance load, belong to technical field of coal exploitation.The residual exploiting field of tool post is found out first and leaves the distributing position in coal seam, obtains rock stratum composition, structure and the physical and mechanical parameter situation of interlayer rock stratum, and to interlayer rock stratum universal formulation and number from the bottom to top;Then the position for determining control rock stratum calculates separately support pressure and leaves coal column by acting on the residual exploiting field of tool post after propagation attenuation and control the disturbing load size on rock stratum;Finally consider that the effect of quiet disturbance load, the residual exploiting field of analysis tool post leave coal column and control the stability of rock stratum, obtains the feasible sex determination result of the residual exploiting field Upward mining of tool post.The situation that the present invention avoids empirical approach error larger provides theoretical foundation for the residual coal safe working of the residual exploiting field uplink of tool post, improves the rate of recovery of the residual exploiting field top coal resources of tool post, effectively extends the length of service of mine.

Description

A kind of residual exploiting field Upward mining feasibility determination method of tool post of quiet disturbance load
Technical field
The invention belongs to technical field of coal exploitation, and in particular to a kind of residual exploiting field Upward mining of tool post of quiet disturbance load Feasibility determination method.
Background technology
With the increase of coal mining intensity, many preferable coal resources of mining area exploitation condition gradually decrease.Residual exploiting field The reserves that coal seam is left on top are considerable, have good extraction value, safe working problem increasingly prominent.
The determination method of existing residual exploiting field Upward mining mainly uses for reference the method for discrimination for being caving uplink order mining, i.e. ratio Diagnostic method, " three bands " diagnostic method and country rock balancing method.These determination methods are substantially around interlamellar spacing and adopt thick progress, main It has the following problems:
(1) above method is not suitable for the judgement of the residual exploiting field Upward mining of tool post, and only rests on qualitative experience level, The requirement of production practices cannot be met;
(2) coal column and layer are not all left in the residual exploiting field of tool post by the residual exploiting field Upward mining feasibility determination method of existing tool post Between rock stratum carry out stability study as system, and do not provide the quantitative judgement formula of stability;
(3) existing determination method does not account for top and leaves the disturbing load generated when seam mining to tool post residual exploiting field something lost Stay the effect of coal column and interlayer rock stratum system, and disturbing load be an important factor for causing coal column and interlayer rock stratum system unstability it One.
In addition, in existing mine, it is loose, broken, unstable with rock stratum that roof is left on the residual exploiting field top that has The characteristics of, its top plate is with adopting with falling and be compacted the residual exploiting field almost restored to the stress of primary rock, and had again when leaving seam mining Roof Rock Strata of Coal Seam is left in based on hard, competent bed in top, its top plate is not easy across falling when leaving seam mining, and different is residual Exploiting field have the characteristics that it is different, exploitation difficulty must not make sweeping generalizations;Moreover, control rock stratum on disturbing load active width with The relationship of the hanging span in interlayer rock stratum between two layers of coal also contributes to the safety of coal mining.Therefore, it is badly in need of proposing a kind of With more the residual exploiting field Upward mining feasibility determination method of tool post of safety and practical application.
Invention content
The present invention overcomes the shortcomings of the prior art, in order to avoid the situation that empirical method error is larger, fully considers The effect of coal column and interlayer rock stratum system is left tool post residual exploiting field in quiet disturbance load, and technical problem to be solved is:It carries For a kind of residual exploiting field Upward mining feasibility determination method of tool post suitable for quiet disturbance load, to improve mining feasibility judgement Accuracy.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:A kind of tool post of quiet disturbance load is residual to be adopted Area's Upward mining feasibility determination method, includes the following steps:
S1, according to mine shaft geology data and exploitation data, find out and the residual exploiting field of tool post and leave the distributing position in coal seam, draw It the residual exploiting field of tool post and leaves coal seam distributional pattern figure, and determines that mine operating mode belongs to quiet disturbance loading type;
S2, rock stratum composition, structure and the physical and mechanical parameter situation for determining interlayer rock stratum, and from the bottom to top to interlayer rock stratum Universal formulation and number;
S3, according to the thickness h of pressure observation data and rock stratum composition, strata structure and the i-th rock stratumi, unit weight γi, springform Measure Ei, the position of judgement control rock stratum;
S4, the support pressure that is generated when leaving seam mining is calculated separately to act on tool post after decaying residual by transmitting It leaves the disturbing load size on coal column and acts on the disturbing load size on control rock stratum in exploiting field;
S5, pass through formulaQuiet disturbance loading effect is calculated to cut Leave the vertical stress maximum value σ suffered by coal column in the residual exploiting field of columnM, max, wherein qmIt indicates because of the residual exploiting field overlying rock dead weight of tool post And the uniform load formed;lxIndicate the hanging span in interlayer rock stratum;bmIndicate that coal pillar width is left in the residual exploiting field of tool post;It indicates to lose The support pressure generated when seam mining is stayed to act on the residual exploiting field of tool post by transmitting after decaying and leave disturbance on coal column Load;l1Indicate disturbing loadActive width;Then the vertical of the coal column of scaled down is measured with servo-pressing machine to face Boundary destroys compression stress otm,c, compare σm,maxWith σm,cNumerical values recited, if σm,max≥σm,c, then coal column unstability, judges that tool post is residual and adopts It leaves on top coal seam and can not adopt in area;If σm,max< σm,c, then coal column stabilization, continues step S6;
S6, pass through formulaIt calculates and controls maximum suffered by rock stratum draw under quiet disturbance loading effect Stress σk,maxValue, wherein qkIndicate the uniform load formed because controlling the dead weight of rock stratum overlying rock, including control rock stratum is certainly Weight;Indicate to leave the support pressure generated when seam mining in the disturbance acted on later on control rock stratum by transmitting decaying Load;K indicates that the number of control rock stratum, n indicate the number of plies of interlayer rock stratum,It indicates from control rock stratum to the height for leaving coal seam Degree;Then control rock stratum tensile strength sigma is determinedk,tValue, compare σk,maxWith σk,tNumerical values recited, if σk,max≥σk,t, then control Rock stratum unstability processed, coal seam is left on the residual exploiting field top of judgement tool post to adopt;If σk,max< σk,t, then control rock stratum and keep stablizing, sentence Being set to can adopt.
In the step S2, rock stratum composition, the structure that interlayer rock stratum is obtained with the method for boring and coring are pried through by drilling And physical and mechanical parameter situation.
In the step S3, the judgement formula for controlling rock stratum is:
Meet the kth rock stratum of above formula rock stratum in order to control, in formula, k=j+1;K, j indicate rock stratum number.
In the step S4, the calculation formula of disturbing load size is:
In formula, γ indicates to leave the volume-weighted average of Strata Overlying The Seam;H indicates to leave the thickness of Strata Overlying The Seam;x0 The length of seam mining work rock pressure is left in expression;l0Indicate the width of support pressure;kiIndicate load concentration factor;z Indicate the depth that disturbing load transmits.
The present invention has the advantages that compared with prior art:
(1) determination method provided by the invention suitable for the residual exploiting field Upward mining of tool post, fully considers that coal is left on top The disturbing load generated when layer exploitation leaves tool post residual exploiting field the effect of coal column and interlayer rock stratum system, and it is feasible to give exploitation Property quantitative judgement formula, and effectively avoid the decision errors of empirical approach, improve the accuracy of mining feasibility judgement;
(2) practical application of the invention can improve the rate of recovery of the residual exploiting field top coal resources of tool post, economize on resources, have Effect extends the length of service of mine.
Description of the drawings
Fig. 1 is the residual exploiting field of tool post and leaves the distributional pattern figure in coal seam;
Fig. 2 is a kind of stream of the residual exploiting field Upward mining feasibility determination method of tool post of quiet disturbance load proposed by the present invention Cheng Tu;
Fig. 3 is that the most easy unstability state model figure of coal column is left in the residual exploiting field of tool post under quiet disturbance loading effect;
Fig. 4 is that the most easy unstability state model figure in rock stratum is controlled under quiet disturbance loading effect;
Fig. 5 is certain coal mine distribution of strata aspect graph used in the embodiment of the present invention;
In figure:Leave coal column in the residual exploiting field of A-tool post;B-tool post goaf;C-leaves coal seam;D-interlayer rock stratum;E— Leave Strata Overlying The Seam and topsoil.
Specific implementation mode
It in order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below will be in the embodiment of the present invention Technical solution be clearly and completely described, it is clear that described embodiment be the present invention a part of the embodiment, without It is whole embodiment;Based on the embodiments of the present invention, those of ordinary skill in the art are not before making creative work The every other embodiment obtained is put, shall fall within the protection scope of the present invention.
As shown in Figure 1, for the residual exploiting field of tool post and the distributional pattern figure for leaving coal seam, wherein A indicates that the residual exploiting field of tool post is left Coal column;B indicates tool post goaf;Coal seam is left in C expressions;D indicates interlayer rock stratum;Strata Overlying The Seam and table soil are left in E expressions Layer.
The present invention provides it is a kind of it is quiet disturbance load the residual exploiting field Upward mining feasibility determination method of tool post, it is suitable for The mine operating mode of quiet disturbance load.Its qualifications is:It is loose, broken, unstable to leave Roof Rock Strata of Coal Seam, leaves coal seam and opens Its top plate is with adopting with falling and be compacted almost restore to the stress of primary rock again when adopting;Control the disturbing load active width on rock stratum More than or equal to the hanging span in interlayer rock stratum, the movement of disturbing load does not have an impact the judgement result for controlling rock stratum stability. In addition, the determination method of the present invention is only applicable to the mine that mine coal seam is flat seam.
As shown in Fig. 2, the residual exploiting field Upward mining feasibility determination method of tool post of the quiet disturbance load of the present invention specifically walks Suddenly include:
S1, according to mine shaft geology data and exploitation data, find out and the residual exploiting field of tool post and leave the distributing position in coal seam, draw It the residual exploiting field of tool post as shown in Figure 1 and leaves coal seam distributional pattern figure, and determines that mine operating mode belongs to quiet disturbance loading type, i.e., It is loose, broken, unstable to leave Roof Rock Strata of Coal Seam, its top plate is with adopting with falling and be compacted almost restore to original again when exploitation Rock stress, and control the disturbing load active width on rock stratum and be more than or equal to the hanging span in interlayer rock stratum.
S2, the method with boring and coring is pried through by drilling, determines rock stratum composition, structure and the physical mechanics of interlayer rock stratum Parameter situation, and to interlayer rock stratum universal formulation and number from the bottom to top.
S3, according to the thickness h of pressure observation data and rock stratum composition, strata structure and the i-th rock stratumi, unit weight γi, springform Measure Ei, the position of judgement control rock stratum.
Wherein, the judgement formula for controlling rock stratum is:
Meet the kth rock stratum of above formula (1) rock stratum in order to control, in formula, k=j+1;K, j indicate rock stratum number.
S4, the support pressure that is generated when leaving seam mining is calculated separately to act on tool post after decaying residual by transmitting Leave the disturbing load on coal column in exploiting fieldValue and act on control rock stratum on disturbing loadValue;Wherein, disturbance carries The calculation formula of lotus is:
In formula (2), γ indicates to leave the volume-weighted average of Strata Overlying The Seam;H indicates to leave the thickness of Strata Overlying The Seam; x0The length of seam mining work rock pressure is left in expression;l0The width of seam mining work rock pressure is left in expression; kiIndicate load concentration factor;Z indicates the depth that disturbing load transmits.Coal column z corresponding with control rock stratum will be left and substitute into formula (2), then it can calculate separately to obtainWithValue.
S5, the stability of coal column under quiet disturbance loading effect is analyzed.It calculates first under quiet disturbance loading effect Leave the vertical stress maximum value σ suffered by coal column in the residual exploiting field of tool postM, max, the coal of scaled down is then measured with servo-pressing machine The vertical critical slope langth compression stress ot of columnm,c, compare σm,maxWith σm,cNumerical values recited, if σm,max≥σm,c, then coal column unstability, sentences Coal seam is left on the residual exploiting field top of stationary knife column to adopt;If σm,max< σm,c, then coal column stabilization, continues step S6.
In order to determine, vertical stress maximum value σ suffered by coal column is left in the residual exploiting field of tool post under quiet disturbance loading effectM, max's Calculation formula, leaves coal column by the residual exploiting field of tool post and is reduced to fixed-hinged support, and the interlayer rock stratum between two layers of coal is reduced to beam, The mechanics simplified model that the most easy instability status of coal column is left in the residual exploiting field of tool post under quiet disturbance loading effect is obtained, as shown in Figure 3.Mould In type, qmIndicate the uniform load formed by the residual exploiting field overlying rock dead weight of tool post;lxIndicate the hanging span in interlayer rock stratum;bm Indicate that coal pillar width is left in the residual exploiting field of tool post;Indicate to leave the support pressure generated when seam mining by transmitting decaying The residual exploiting field of tool post is acted on afterwards leaves disturbing load on coal column;l1Indicate disturbing loadActive width.Bearing 2 in model The vertical pressure that (coal column) is born is maximum, is that model is divided into left and right two parts by boundary with bearing 2, if bearing 2 is in left-half In the pressure born be Fm1, according to torque equilibrium equation (∑ M2(F)=0 it), can obtain:
It can be obtained by formula (3),What if bearing 2 was born in right half part Pressure is Fm2, because model is symmetrical structure in Fig. 3, therefore the pressure that bearing 2 is born in the two parts of left and right is identical, i.e. Fm2 =Fm1.Finally, the vertical pressure that bearing 2 is born is:FM, max=Fm2+Fm1, it is known that the width b of coal columnm, byDerive σM, maxCalculation formula be:
S6, the stability of control rock stratum under quiet disturbance loading effect is analyzed.Quiet disturbance load is calculated first to make The maximum tension stress σ suffered by lower control rock stratumk,maxValue, then determine control rock stratum tensile strength sigmak,tValue, wherein control Rock stratum tensile strength sigmak,tValue can also can directly be searched from mine data by being measured with Brazilian diametral compression test; Finally compare σk,maxWith σk,tNumerical values recited, if σk,max≥σk,t, then rock stratum unstability is controlled, the residual exploiting field top of judgement tool post is lost Stay coal seam that can not adopt;If σk,max< σk,t, then control rock stratum and keep stablizing, be judged to adopt.
Maximum tension stress σ suffered by rock stratum is controlled under quiet disturbance loading effect in order to determinek,maxCalculation formula, coal will be left The composite structure of column and interlayer rock stratum is reduced to simple beam structure, obtains controlling the most easy unstability shape in rock stratum under quiet disturbance loading effect The mechanics simplified model of state, as shown in Figure 4.In model, qkIndicate the uniformly distributed load formed because controlling the dead weight of rock stratum overlying rock Lotus, including the dead weight of control rock stratum;Indicate that leave the support pressure generated when seam mining acts on later by transmitting decaying Disturbing load on control rock stratum;It indicates from control rock stratum to the height for leaving coal seam.Because model is symmetrical junction in Fig. 4 Structure, therefore the end reaction of bearing 1 and bearing 2 isIt is maximum to control moment of flexure at the span centre of rock stratum, thus it is maximum curved SquareFor a height ofWidth is the rectangular section of unit width, bending resistant section system NumberThen according to the calculation formula of Beam in Transverse Bending section maximum (normal) stress:It can derive Go out and controls maximum tension stress σ suffered by rock stratum under quiet disturbance loading effectk,maxCalculation formula be:
Below by taking certain coal mine as an example, illustrate the specific implementation mode of the present invention.
Certain coal mine is the typical old mine of resource scarcity type, and mining area minable coal seam is 2 layers, respectively No. 7, No. 8 coal seams, coal seam Inclination angle is 1~6 degree, belongs to flat seam.No. 7 Roof Rock Strata of Coal Seam are loose, broken, unstable;No. 8 Roof Rock Strata of Coal Seam with In based on hard, competent bed.The last century Mo coal mine spans No. 7 coal seams, has preferentially exploited No. 8 coal seams using tool post method.This Sample, No. 7 coal seams just become leaves coal seam above the residual exploiting field of tool post.Since No. 7 coal seam reserves are considerable, No. 7 coal seams Exploitation can improve the recovery ratio of coal resources, improve Business Economic Benefit, extend mine service life, and now quasi- longwell is across falling Coal-mining method exploits No. 7 coal seams.For the above situation, now the feasibility of No. 7 seam minings is judged, specific implementation step is such as Under:
1, by the original geologic information of the coal mine and exploitation data the study found that being lost in No. 8 residual exploiting fields of coal seam tool post It is 8m, average height 3.8m to stay coal column mean breadth, and stability is preferable;Goaf mean breadth is 24m, and average height is 3.8m.No. 7, No. 8 coal seams interlayer rock stratum average thickness be 21.7m, draw and the residual exploiting field of tool post and leave coal seam distributional pattern figure, such as Shown in Fig. 5.No. 7 Roof Rock Strata of Coal Seam are loose, broken, unstable, its top plate is almost extensive with falling and being compacted again with adopting when exploitation Again to the stress of primary rock;Control the disturbing load active width l on rock stratum2=30m, the hanging span l in interlayer rock stratumx=24m, l2> lx, then confirm that the operating mode belongs to quiet disturbance loading type.
2, rock stratum composition, structure and the physics that the coal mine interlayer rock stratum is obtained with the method for boring and coring are pried through using drilling Mechanics parameter situation, and to interlayer rock stratum universal formulation and number from the bottom to top, as shown in figure 5, from top to bottom by interlayer rock stratum Number consecutively is 1~6.
3, according to the rock stratum composition of gained, structure and the thickness h of the i-th rock stratum in pressure observation data and step 2i, unit weight γi, elastic modulus EiEqual physical and mechanical parameters situation.In conjunction with Fig. 5 control rock stratum is obtained using the judgement formula of control rock stratum Position:
···
It is calculated, as k=3, meets formula (1), i.e., the 3rd layer is control rock stratum.
4, known parameters are substituted into formula (2), calculates separately support pressure residual by acting on tool post after propagation attenuation Leave the disturbing load on coal column in exploiting fieldWith act on control rock stratum on disturbing loadIt is big that disturbing load is calculated It is small to be respectivelyWith
5, according to existing operating mode, consider the effect of quiet disturbance load.Known by step 4Substitute into formula:The residual exploiting field of tool post under quiet disturbance loading effect is calculated and leaves coal column Suffered vertical stress maximum value σM, max=3.6Mpa, meanwhile, measure the vertical critical slope langth compression stress ot for obtaining coal columnm,c= 4.4Mpa。σm,max< σm,c, then coal column stabilization, continues step 6.
6, it will act on the disturbing load value on control rock stratumSubstitute into formula It is calculated under quiet disturbance loading effect and controls maximum tension stress σ suffered by rock stratumk,max=3.8Mpa, actually measured control rock stratum are anti- Tensile strength σk,t=4.0Mpa, σk,max< σk,t, then control rock stratum and keep stablizing, be judged to adopt.
In conclusion under quiet disturbance loading effect, the coal mine 7 is lost with No. 8 coal seams interlayer rock stratum and the residual exploiting field of tool post Coal column is stayed to keep stable.Therefore, No. 7 coal seams of the residual exploiting field Upward mining of the coal mine tool post have feasibility.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Present invention has been described in detail with reference to the aforementioned embodiments for pipe, it will be understood by those of ordinary skill in the art that:Its according to So can with technical scheme described in the above embodiments is modified, either to which part or all technical features into Row equivalent replacement;And these modifications or replacements, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (4)

1. a kind of residual exploiting field Upward mining feasibility determination method of tool post of quiet disturbance load, which is characterized in that including following step Suddenly:
S1, according to mine shaft geology data and exploitation data, find out the residual exploiting field of tool post and leave the distributing position in coal seam, draw tool post It residual exploiting field and leaves coal seam distributional pattern figure, and determines that mine operating mode belongs to quiet disturbance loading type;
S2, rock stratum composition, structure and the physical and mechanical parameter situation for determining interlayer rock stratum, and interlayer rock stratum is unified from the bottom to top It divides and numbers;
S3, according to the thickness h of pressure observation data and rock stratum composition, strata structure and the i-th rock stratumi, unit weight γi, elasticity modulus Ei, the position of judgement control rock stratum;
S4, it calculates separately the support pressure that is generated when leaving seam mining and is acting on the residual exploiting field of tool post after decaying by transmitting It leaves the disturbing load size on coal column and acts on the disturbing load size on control rock stratum;
S5, pass through formulaCalculate under quiet disturbance loading effect that tool post is residual to be adopted Leave the vertical stress maximum value σ suffered by coal column in areaM, max, wherein qmIt indicates to be formed because of the residual exploiting field overlying rock dead weight of tool post Uniform load;lxIndicate the hanging span in interlayer rock stratum;bmIndicate that coal pillar width is left in the residual exploiting field of tool post;Coal seam is left in expression The support pressure generated when exploitation acts on the residual exploiting field of tool post after decaying and leaves disturbing load on coal column by transmitting;l1 Indicate disturbing loadActive width;Then the vertical critical slope langth pressure of the coal column of scaled down is measured with servo-pressing machine Stress σm,c, compare σm,maxWith σm,cNumerical values recited, if σm,max≥σm,c, then coal column unstability, the residual exploiting field top of judgement tool post are lost Stay coal seam that can not adopt;If σm,max< σm,c, then coal column stabilization, continues step S6;
S6, pass through formulaIt calculates and controls maximum tension stress suffered by rock stratum under quiet disturbance loading effect σk,maxValue, wherein qkIndicate the uniform load formed because controlling the dead weight of rock stratum overlying rock, including the dead weight of control rock stratum;Indicate that leave the support pressure generated when seam mining carries by transmitting the disturbance that decaying is acted on later on control rock stratum Lotus;K indicates that the number of control rock stratum, n indicate the number of plies of interlayer rock stratum,It indicates from control rock stratum to the height for leaving coal seam Degree;Then control rock stratum tensile strength sigma is determinedk,tValue, compare σk,maxWith σk,tNumerical values recited, if σk,max≥σk,t, then control Rock stratum unstability processed, coal seam is left on the residual exploiting field top of judgement tool post to adopt;If σk,max< σk,t, then control rock stratum and keep stablizing, sentence Being set to can adopt.
2. a kind of residual exploiting field Upward mining feasibility determination method of tool post of quiet disturbance load according to claim 1, It is characterized in that, in the step S2, rock stratum composition, the structure for obtaining interlayer rock stratum with the method for boring and coring is pried through by drilling And physical and mechanical parameter situation.
3. a kind of residual exploiting field Upward mining feasibility determination method of tool post of quiet disturbance load according to claim 1, It is characterized in that, in the step S3, the judgement formula for controlling rock stratum is:
Meet the kth rock stratum of above formula rock stratum in order to control, in formula, k=j+1;K, j indicate rock stratum number.
4. a kind of residual exploiting field Upward mining feasibility determination method of tool post of quiet disturbance load according to claim 1, It is characterized in that, in the step S4, the calculation formula of disturbing load size is:
In formula, γ indicates to leave the volume-weighted average of Strata Overlying The Seam;H indicates to leave the thickness of Strata Overlying The Seam;x0It indicates to lose Stay the length of seam mining work rock pressure;l0The width of seam mining work rock pressure is left in expression;kiIt indicates to carry Lotus coefficient of concentration;Z indicates the depth that disturbing load transmits.
CN201810290013.5A 2018-04-03 2018-04-03 A kind of residual exploiting field Upward mining feasibility determination method of tool post of quiet disturbance load Active CN108664699B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810290013.5A CN108664699B (en) 2018-04-03 2018-04-03 A kind of residual exploiting field Upward mining feasibility determination method of tool post of quiet disturbance load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810290013.5A CN108664699B (en) 2018-04-03 2018-04-03 A kind of residual exploiting field Upward mining feasibility determination method of tool post of quiet disturbance load

Publications (2)

Publication Number Publication Date
CN108664699A true CN108664699A (en) 2018-10-16
CN108664699B CN108664699B (en) 2019-09-27

Family

ID=63782904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810290013.5A Active CN108664699B (en) 2018-04-03 2018-04-03 A kind of residual exploiting field Upward mining feasibility determination method of tool post of quiet disturbance load

Country Status (1)

Country Link
CN (1) CN108664699B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112131732A (en) * 2020-09-15 2020-12-25 太原理工大学 Cutter post method residual mining area stability analysis method based on variable load effect
CN112903460A (en) * 2021-02-04 2021-06-04 太原理工大学 Device and method for testing multi-row group column single-shaft bearing of inclined goaf under disturbance influence
CN113792402A (en) * 2021-09-18 2021-12-14 辽宁工程技术大学 Method for designing parameters of pillar mining at end slope of composite coal seam

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102636382A (en) * 2012-03-31 2012-08-15 中国矿业大学(北京) Experimental equipment for simulating impact-type rock explosion
US20130248328A1 (en) * 2012-03-23 2013-09-26 Tim Lasley Modified push beams for highwall mining
CN103454139A (en) * 2013-09-06 2013-12-18 安徽理工大学 Determination method for key influence factors and important degree of dilatation of gas-containing coal-rock mass
CN106055892A (en) * 2016-05-27 2016-10-26 太原理工大学 Method for determining exploitation feasibility of middle-layer abandoned coal in composite pillar type ascending mining area
CN107729604A (en) * 2017-09-05 2018-02-23 太原理工大学 The compound residual exploiting field Upward mining feasibility decision method of surface contact block girder construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130248328A1 (en) * 2012-03-23 2013-09-26 Tim Lasley Modified push beams for highwall mining
CN102636382A (en) * 2012-03-31 2012-08-15 中国矿业大学(北京) Experimental equipment for simulating impact-type rock explosion
CN103454139A (en) * 2013-09-06 2013-12-18 安徽理工大学 Determination method for key influence factors and important degree of dilatation of gas-containing coal-rock mass
CN106055892A (en) * 2016-05-27 2016-10-26 太原理工大学 Method for determining exploitation feasibility of middle-layer abandoned coal in composite pillar type ascending mining area
CN107729604A (en) * 2017-09-05 2018-02-23 太原理工大学 The compound residual exploiting field Upward mining feasibility decision method of surface contact block girder construction

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
YIN HUIYONG 等: "Application of Strip-partial Mining to Prevent Water Inrush from Coalbed Floor in Nanding Coal Mine", 《2009 INTERNATIONAL CONFERENCE ON INFORMATION ENGINEERING AND COMPUTER SCIENCE》 *
YONGHAI TENG 等: "Evaluation of Foundation Stability in Coal Mine Subsidence Area and Deformation Resistance Technology", 《2017 25TH INTERNATIONAL CONFERENCE ON GEOINFORMATICS》 *
冯国瑞 等: ""上柱-下垮"复合残采区中部残煤开采可行性评价", 《煤炭学报》 *
冯国瑞 等: "刀柱采空区上方遗弃煤层上行开采可行性判定", 《煤炭学报》 *
冯国瑞: "《煤矿残采区上行开采基础理论与实践》", 30 September 2010, 北京:煤炭工业出版社 *
张晶 等: "刀柱式残采区上行开采可行性研究", 《煤炭技术》 *
杨英明: "采动影响下巷式残采区上行开采可行性判定", 《煤炭与化工》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112131732A (en) * 2020-09-15 2020-12-25 太原理工大学 Cutter post method residual mining area stability analysis method based on variable load effect
CN112903460A (en) * 2021-02-04 2021-06-04 太原理工大学 Device and method for testing multi-row group column single-shaft bearing of inclined goaf under disturbance influence
CN113792402A (en) * 2021-09-18 2021-12-14 辽宁工程技术大学 Method for designing parameters of pillar mining at end slope of composite coal seam

Also Published As

Publication number Publication date
CN108664699B (en) 2019-09-27

Similar Documents

Publication Publication Date Title
CN108694272A (en) A kind of residual exploiting field Upward mining feasibility determination method of tool post of dynamic disturbance load
CN108664699B (en) A kind of residual exploiting field Upward mining feasibility determination method of tool post of quiet disturbance load
CN108681620A (en) A kind of quiet disturbance adds the residual exploiting field Upward mining feasibility determination method of tool post of unloading
Song et al. A numerical modelling study of longwall face stability in mining thick coal seams in China
CN108399302B (en) Method for judging coal wall caving of fully mechanized mining face with shallow coal seam and large mining height
CN108664698B (en) A kind of dynamic disturbance adds the residual exploiting field Upward mining feasibility determination method of tool post of unloading
CN107060761B (en) A kind of nearly horizontal mining in combined mining thick coal seam stope base object model first breaking space computing method
Ming-Gao A study of the behaviour of overlying strata in longwall mining and its application to strata control
CN107729604B (en) Composite residual mining area ascending mining feasibility determination method based on rotation deformation instability
CN103422847A (en) Gas extraction method based on mining-induced fracture circular rectangular half-space zone
CN106815445A (en) A kind of shallow buried coal seam section coal pillar LOAD FOR model and its computational methods
CN107657084B (en) Compound residual exploiting field Upward mining feasibility based on sliding instability quantitatively judges method
CN113435014A (en) Dynamic prediction method for mining overburden rock movement deformation
CN114996963B (en) Mining rock stratum arch shell structure stability analysis method
CN107609247B (en) Method for judging ascending mining feasibility of composite residual mining area of surface contact block beam structure
CN115130051A (en) Overburden separation layer discrimination method considering horizontal stress and mining unloading effect
CN110096833B (en) Surrounding rock load calculation method suitable for bedding bias tunnel
CN107657085B (en) A kind of quantitative judgement method of compound residual exploiting field Upward mining feasibility
CN109165452A (en) The method for numerical simulation and system that a kind of normal fault induces bump
Lu et al. Roadway failure and support in a coal seam underlying a previously mined coal seam
CN112131732A (en) Cutter post method residual mining area stability analysis method based on variable load effect
CN108595807B (en) A kind of calculation method of roadway floor release groove width
Zhang Catastrophe analysis of deep tunnel above water-filled caves
CN115758046B (en) Working face limit exploitation width calculation method, readable storage medium and electronic equipment
Chang et al. Design of coal pillar with roadway driving along goaf in fully mechanized top-coal caving face

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant