- Publication number
- CN108661298A CN108661298A CN201710202264.9A CN201710202264A CN108661298A CN 108661298 A CN108661298 A CN 108661298A CN 201710202264 A CN201710202264 A CN 201710202264A CN 108661298 A CN108661298 A CN 108661298A
- Authority
- CN
- China
- Prior art keywords
- connecting base
- construction frame
- frame according
- fixture block
- transverse tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/02—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means
- E04G1/04—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section
- E04G1/06—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section comprising members with rod-like or tubular portions fitting together end to end, with or without separate connecting pieces
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/02—Connections between parts of the scaffold with separate coupling elements
- E04G7/06—Stiff scaffolding clamps for connecting scaffold members of common shape
- E04G7/20—Stiff scaffolding clamps for connecting scaffold members of common shape for ends of members only, e.g. for connecting members in end-to-end relation
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The invention discloses construction framves, including vertical tube, transverse tube, the upper connecting base being fixed on the upper end of vertical tube and the lower connecting base being fixed on lower end;The upper connecting base and lower connecting base include pedestal and the inner cavity that is opened on pedestal, and the two is adapted;It is both provided with buckling groove in each inner cavity;The upper connecting base is connected with offering connecting hole on lower connecting base and wear connecting hole by connector;The both ends of the transverse tube are respectively arranged with the clamp being mutually clamped with the buckling groove.Vertical tube and transverse tube using the present invention build scaffold;Its is easy to operate;It installs more laborsaving, quick;Good airproof performance is not easy corrosion;The ability of the endurance of vertical tube and transverse tube is strong, and bonding strength is high;Security performance is high.
Description
Technical field
The present invention relates to the scaffolds built on a kind of construction site.
Background technology
Traditional construction frame of building is to add bolt to fasten using steel pipe and fastener.Such as prior art Publication No. CN
102312554 A, a kind of disclosed foot hand holder comprising inner oblique stay bars gate-type band foot of ladder hand cradle and brace;Inner oblique stay bars
Gate-type with the enterprise management that foot of ladder hand cradle includes left and right setting, down tube, upper lateral tube, lower transverse tubule and stull pipe, upper lateral tube in enterprise management
End is fixedly connected, and down tube is fixedly connected with upper lateral tube and enterprise management, and lower transverse tubule is fixedly connected with two down tubes, stull pipe with tiltedly
Stay tube is fixedly connected with enterprise management;Guan Zhongyi oblique pull pipe of two oblique pulls is solid with enterprise management upper end of the inner oblique stay bars gate-type with foot of ladder hand cradle
It connects calmly, the lower end of enterprise management of the other end inner oblique stay bars gate-type with foot of ladder hand cradle is fixedly connected, another oblique pull pipe one end interior leg brace
Enterprise management lower end of the bar gate-type with foot of ladder hand cradle is fixedly connected, the upper end of enterprise management of the other end inner oblique stay bars gate-type with foot of ladder hand cradle is solid
Fixed connection;Two brace intersection bolted splices;In addition, the foot hand holder further includes connecting tube and adjustable setting;Institute
Stating enterprise management upper end has a connecting tube, has a support plate, the connecting tube of support plate lower part to be inserted into enterprise management in the middle part of connecting tube, enterprise management
Upper end coordinates with support plate support;The adjustable setting includes bottom plate, screw rod and the adjusting nut on screw rod, is adjusted
The screw rod on nut top is inserted into enterprise management, and end pipe face coordinates with adjusting nut support under enterprise management.
Problem of the existing technology is:Each steel pipe will be bolted with fastener and be fixed together;Especially turning
At angle, three or four steel pipes will be stitched together by fastener;The worker in high-altitude is inconvenient in installation operation.
Invention content
The object of the present invention is to provide a kind of construction frame, installation, convenient disassemblies.
The present invention above-mentioned technical purpose technical scheme is that:Construction frame, including vertical tube
And transverse tube, further include the lower connecting base for having upper connecting base on the upper end for being fixed on vertical tube and being fixed on lower end;Institute
The inner cavity that state upper connecting base and lower connecting base include pedestal and is opened on pedestal, and the two is adapted;Each inner cavity
In be both provided with buckling groove;Connecting hole is offered on the upper connecting base and lower connecting base and connection is worn by connector
Hole is connected;The both ends of the transverse tube are respectively arranged with the clamp being mutually clamped with the buckling groove.
Using the technical program, vertical tube is arranged straight up, and transverse tube is transversely and horizontally set;When installation, first, transverse tube water
On vertical tube, the clamp at transverse tube both ends is clamped with the buckling groove of the upper connecting base on the vertical tube of the left and right sides flatrack respectively;Then, then
Another vertical tube is connected, upper connecting base is combined with lower connecting base lid and is fixed by connector;Complete upper and lower two
Root vertical tube docks.With existing pipe compared with pipe is by the fixed mode of fastener, of the invention the operation is more convenient, and installation is more
Add laborsaving, quick.
Further it is arranged, pyramidal carrier is provided on the bottom of the upper connecting base.
So set, pyramidal carrier constitutes the force structure of a triangle;Upper connecting base effect can be decomposed
Active force on vertical tube reinforces the ability of its endurance, improves bonding strength between the two.
Further setting, the clamp include the first fixture block being fixed on transverse tube and are set with first fixture block interval
The second fixture block set.
So set, the first fixture block with buckling groove for being fixedly connected;The wall surface of second fixture block and upper and lower connecting seat coordinates
For sealing;Rainwater is avoided to enter the inside of upper and lower connecting seat.
Further it is arranged, bayonet is offered on first fixture block.
Further it is arranged, the fixture block for matching and limiting the transverse tube rotation with the bayonet is provided in the buckling groove.
So set, the first fixture block is fastened in buckling groove, bayonet is matched with fixture block can limit transverse tube rotation.
It is provided on four angles of further setting, the upper connecting base and lower connecting base and is led with what the connecting hole communicated
Xiang Zhu.
Further setting, the connector include connecting pole, are fixed on the head of connecting pole upper end and are set to connection
Column lower end and the flexible clamp piece inwardly to be bounced back by radial load.
So set, connector is inserted into from the connecting hole of lower connecting base, guide post is passed through, in guide post is walked, elasticity
Fastener is in retracted state by the radial load of column wall is oriented to;Flexible clamp piece is pierced by from the connecting hole of upper connecting base, flexible clamp piece exhibition
It opens and is fixed with the bottom of upper connecting base;To realize being fixedly connected for upper and lower connecting seat.
Further setting, the connecting hole include counterbore and below the counterbore and aperture along counterbore to guide post
The endoporus that direction is gradually reduced.
Further setting, the counterbore are offered with endoporus intersection by the inner wall annular groove that surface direction is recessed outward.
Further it is arranged, is provided with and the matched ring body of the annular groove on the connecting pole.
Connector is inserted into connecting hole, and ring body, which is embedded in annular groove, forms a water blocking barrier;So set, to the close of connection hole
Feng Xingyou is further improved;Rainwater is avoided to enter inside by connecting hole;Meanwhile the clamping of ring body and annular groove exists to connector
The restricted effect of movement in axial direction;Connector is further prevented to be withdrawn out of connecting hole;Improve security performance.
In conclusion the invention has the advantages that:
1, vertical tube and transverse tube using the present invention build scaffold;Its is easy to operate;It installs more laborsaving, quick;
2, the good airproof performance of vertical tube and transverse tube of the present invention, is not easy corrosion;The ability of the endurance of vertical tube and transverse tube is strong, connection
Intensity is high;Security performance is high.
Description of the drawings
Fig. 1 is the overall structure diagram of the present embodiment;
Fig. 2 is the portions the A enlarged structure schematic diagram of Fig. 1;
Fig. 3 is the structural schematic diagram of the present embodiment upper connecting base;
Fig. 4 is the overlooking structure diagram of the present embodiment upper connecting base;
Fig. 5 is the structural schematic diagram of the present embodiment lower connecting base;
Fig. 6 is the portions the B enlarged structure schematic diagram of Fig. 5;
In figure:1, vertical tube;2, transverse tube;3, upper connecting base;4, pedestal;5, carrier;6, cavity;7, buckling groove;8, lower connecting base;
9, clamp;10, the first fixture block;11, the second fixture block;12, bayonet;13, fixture block;14, groove;15, connecting hole;16, guide post;
17, counterbore;18, endoporus;19, annular groove;20, connector;21, connecting pole;22, head;23, flexible clamp piece;24, ring body.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail.
It is built as shown in Figure 1, construction frame includes several vertical tubes 1 and transverse tube 2.Vertical tube 1 is set straight up
It sets, 2 transverse horizontal of transverse tube is placed.
See Fig. 2 and Fig. 3, upper connecting base 3 is welded on the upper end of vertical tube 1.The global shape of upper connecting base 3 is in " funnel "
Shape;Its include rectangular-shaped pedestal 4 and positioned at 4 bottom of pedestal and with pedestal 4 it is integrally manufactured made of carrier 5.Seat
Cavity 6 there are one being opened in body 4;Buckling groove 7 there are one being respectively provided on four inner walls of cavity 6.It is welded on the lower end of vertical tube 1
Lower connecting base 8.The structure of lower connecting base 8 is identical as the structure of upper connecting base 3.
See that Fig. 4 and Fig. 5, the both ends of transverse tube 2 are welded with clamp 9.Clamp 9 includes the first fixture block being fixed on transverse tube 2
10 and with 10 spaced second fixture block 11 of the first fixture block.Waiting 90 degree uniformly to open on first fixture block 10, there are four bayonets 12.
Clamp 9 is mounted on upper connecting base 3, and the lid of lower connecting base 8 closes on upper connecting base 3.The lower half portion of first fixture block 10 is embedded in upper
In the buckling groove 7 of connecting seat 3, top half is in the buckling groove 7 of lower connecting base 8.Four bayonets on first fixture block 10
12 corresponding respectively and both sides in the buckling groove 7 on upper and lower connecting seat 8 fixture blocks 13 fasten;Transverse tube 2 is limited to rotate.
With reference to figure 4, the shape of the second fixture block 11 can round, triangle or rectangle;The present embodiment is selected round.Reference chart
3, on the outer wall of upper and lower connecting seat, and the semicircle to match with 11 shape of the second fixture block is offered with 7 corresponding section of buckling groove
Groove 14.Upper connecting base 3 is grouped together into a complete groove 14 with lower connecting base 8.Second fixture block 11 is fastened on recessed
In slot 14.
With reference to figure 5, connecting hole 15 is offered on four angles of upper connecting base 3 and lower connecting base 8.If upper and lower two connect
Connecing hole 15 cannot connect connection;Guide post 16 can be set between them, them is made to be connected to.Connecting hole 15 include counterbore 17 with
And the endoporus 18 being gradually reduced to the direction of guide post 16 along counterbore 17 positioned at 17 lower section of counterbore and aperture.Counterbore 17 and endoporus
18 intersections are offered by the inner wall annular groove 19 that surface direction is recessed outward.
With reference to figure 5 and Fig. 6, connector 20 includes connecting pole 21, is fixed on head 22 and the setting of 21 upper end of connecting pole
In 21 lower end of connecting pole and the flexible clamp piece 23 that is inwardly bounced back by radial load.Connecting hole 15 of the connector 20 from lower connecting base 8
It is inserted into, passes through guide post 16, in guide post 16 is walked, flexible clamp piece 23 is in retraction shape by the radial load of 16 inner wall of guide post
State;Flexible clamp piece 23 is pierced by from the connecting hole 15 of upper connecting base 3, and flexible clamp piece 23 is unfolded and is fixed with the bottom of upper connecting base 3;
To realize being fixedly connected for upper and lower connecting seat.In addition, in order to ensure the firmness that connector 20 connects upper and lower connecting seat,
External screw thread is offered on the lower end of connecting pole 21, uses nut check.
In addition, with reference to figure 6, ring body 24 is provided on connecting pole 21.Connector 20 is inserted into connecting hole 15, and ring body 24 is embedded in
To form a water blocking barrier in annular groove 19;There is further raising to the leakproofness at connecting hole 15;Rainwater is avoided to pass through company
It connects hole 15 and enters inside;Meanwhile the clamping of ring body 24 and annular groove 19 is to the restricted effect of the movement of connector 20 in the axial direction;Into
One step prevents connector 20 from being withdrawn out of connecting hole 15;Improve security performance.
Installation instructions:First, 2 level frame of transverse tube on vertical tube 1, the clamp 9 at 2 both ends of transverse tube is perpendicular with the left and right sides respectively
The buckling groove 7 of upper connecting base 3 on pipe 1 is clamped;Then, then another vertical tube 1 is connected, upper connecting base 3 is closed with the lid of lower connecting base 8
It fixes together and by connector 20;Complete upper and lower two vertical tubes 1 docking.It is transversely mounted through transverse tube 2 one by one
With the splicing of upper and lower connecting seat.
Specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
The modification that not creative contribution can be made to the present embodiment as needed after reading this specification, but as long as in this hair
It is all protected by Patent Law in bright right.
Claims (10)
1. construction frame, including vertical tube (1) and transverse tube (2), characterized in that further include having the upper end for being fixed on vertical tube (1)
On upper connecting base (3) and the lower connecting base (8) that is fixed on lower end;The upper connecting base (3) and lower connecting base (8) are equal
The inner cavity for including pedestal (4) and being opened on pedestal (4), and the two is adapted;It is both provided with buckling groove in each inner cavity
(7);Connecting hole (15) is offered on the upper connecting base (3) and lower connecting base (8) and by connector (20) company of wearing
Hole (15) is connect to be connected;The both ends of the transverse tube (2) are respectively arranged with the clamp (9) being mutually clamped with the buckling groove (7).
2. construction frame according to claim 1, characterized in that be provided with cone on the bottom of the upper connecting base (3)
The carrier (5) of mesa-shaped.
3. construction frame according to claim 1, characterized in that the clamp (9) includes being fixed on transverse tube (2)
First fixture block (10) and with spaced second fixture block (11) of first fixture block (10).
4. construction frame according to claim 3, characterized in that offer bayonet on first fixture block (10)
(12)。
5. construction frame according to claim 4, characterized in that be provided with and the bayonet in the buckling groove (7)
(12) match and limit the fixture block (13) of the transverse tube (2) rotation.
6. construction frame according to claim 1 or 5, characterized in that the upper connecting base (3) and lower connecting base (8)
Four angles on be provided with the guide post (16) communicated with the connecting hole (15).
7. construction frame according to claim 6, characterized in that the connector (20) includes connecting pole (21), consolidates
Head (22) due to connecting pole (21) upper end and the bullet that is set to connecting pole (21) lower end and is inwardly bounced back by radial load
Property fastener (23).
8. construction frame according to claim 1, characterized in that the connecting hole (15) includes counterbore (17) and position
In the endoporus (18) that counterbore (17) lower section and aperture are gradually reduced along counterbore (17) to the direction of guide post (16).
9. construction frame according to claim 8, characterized in that the counterbore (17) opens up with endoporus (18) intersection
Have by the inner wall annular groove (19) that surface direction is recessed outward.
10. construction frame according to claim 9, characterized in that be provided with and the ring on the connecting pole (21)
Slot (19) matched ring body (24).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710202264.9A CN108661298B (en) | 2017-03-30 | 2017-03-30 | Construction frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710202264.9A CN108661298B (en) | 2017-03-30 | 2017-03-30 | Construction frame |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108661298A true CN108661298A (en) | 2018-10-16 |
CN108661298B CN108661298B (en) | 2020-11-10 |
Family
ID=63785447
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710202264.9A Active CN108661298B (en) | 2017-03-30 | 2017-03-30 | Construction frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108661298B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113338296A (en) * | 2020-03-02 | 2021-09-03 | 浙江明思特建筑支护技术有限公司 | Connecting piece for foundation pit steel pipe |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4101229A (en) * | 1976-02-19 | 1978-07-18 | Torsten Waloddi Weibull | Connection device |
CN2878488Y (en) * | 2006-04-21 | 2007-03-14 | 辛国树 | Anti-theft isolation guard bar |
CN202039654U (en) * | 2011-04-15 | 2011-11-16 | 李建军 | Novel barrier fastener |
CN202595911U (en) * | 2012-04-17 | 2012-12-12 | 李国耀 | Turnplate-type connector |
CN204552069U (en) * | 2015-03-27 | 2015-08-12 | 山西二建集团有限公司 | A kind of novel combination type scaffold |
-
2017
- 2017-03-30 CN CN201710202264.9A patent/CN108661298B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4101229A (en) * | 1976-02-19 | 1978-07-18 | Torsten Waloddi Weibull | Connection device |
CN2878488Y (en) * | 2006-04-21 | 2007-03-14 | 辛国树 | Anti-theft isolation guard bar |
CN202039654U (en) * | 2011-04-15 | 2011-11-16 | 李建军 | Novel barrier fastener |
CN202595911U (en) * | 2012-04-17 | 2012-12-12 | 李国耀 | Turnplate-type connector |
CN204552069U (en) * | 2015-03-27 | 2015-08-12 | 山西二建集团有限公司 | A kind of novel combination type scaffold |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113338296A (en) * | 2020-03-02 | 2021-09-03 | 浙江明思特建筑支护技术有限公司 | Connecting piece for foundation pit steel pipe |
CN113338296B (en) * | 2020-03-02 | 2022-05-13 | 浙江明思特建筑支护技术有限公司 | Connecting piece for foundation pit steel pipe |
Also Published As
Publication number | Publication date |
---|---|
CN108661298B (en) | 2020-11-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205604090U (en) | Cable -stay bridge space cable catheter positioning device | |
CN108661298A (en) | Construction frame | |
CN107869275B (en) | Telegraph pole adjusting device | |
CN104372939A (en) | Scaffold | |
CN104372928A (en) | Cantilever type scaffold assembly | |
CN207609232U (en) | A kind of holding pole structure and lamp stand communication tower | |
CN109440994A (en) | A kind of annular rope support construction and suspen-shell structure | |
CN203113761U (en) | Wall connection structure of scaffold | |
CN106150082B (en) | Formwork erection structure and erection method for pitched roof ridge cast-in-place structural | |
CN205975969U (en) | Combination framework and connecting piece of rack and truss antarafacial | |
CN211342082U (en) | Fence for building construction management | |
CN204174904U (en) | Scaffold | |
CN207686266U (en) | A kind of means for fastening scaffolding of fast demountable | |
CN207620481U (en) | A kind of 35 rice lamp shaft towers | |
CN206753017U (en) | A kind of pull-back cable Superimposed fastener | |
CN204163359U (en) | Scaffold | |
CN104372935A (en) | Scaffold | |
CN105839979B (en) | A kind of telescopic tower of communication iron tower | |
CN108412189A (en) | A kind of screw connection for steel pipe docking | |
CN204163365U (en) | A kind of overhanging scaffold assembly | |
CN104372940A (en) | Scaffold | |
CN104481032B (en) | One nuclear power plant body of wall hanger and construction method thereof | |
CN205531186U (en) | Adjustable supporting pedestal's connecting piece | |
CN218324024U (en) | Steel pipe faces limit protection combination external member | |
CN204174919U (en) | Scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: building construction frame Effective date of registration: 20220912 Granted publication date: 20201110 Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Jiaxing Branch Pledgor: ZHEJIANG YIDA CONSTRUCTION Co.,Ltd. Registration number: Y2022330002160 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |