CN108661223A - A kind of prefabricated superimposed sheet of assembled architecture reserves the construction technology of wire casing - Google Patents
A kind of prefabricated superimposed sheet of assembled architecture reserves the construction technology of wire casing Download PDFInfo
- Publication number
- CN108661223A CN108661223A CN201810426268.XA CN201810426268A CN108661223A CN 108661223 A CN108661223 A CN 108661223A CN 201810426268 A CN201810426268 A CN 201810426268A CN 108661223 A CN108661223 A CN 108661223A
- Authority
- CN
- China
- Prior art keywords
- superimposed sheet
- electric pipeline
- pipeline
- slot
- laying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/44—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
- E04C2/50—Self-supporting slabs specially adapted for making floors ceilings, or roofs, e.g. able to be loaded
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/44—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
- E04C2/52—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G15/00—Forms or shutterings for making openings, cavities, slits, or channels
- E04G15/06—Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
Abstract
The present invention relates to technical field of building construction, and in particular to a kind of prefabricated superimposed sheet of assembled architecture reserves the construction technology of wire casing.The technique is by using BIM technology synthetic assembly model and civil engineering model, accurate electric pipeline laying figure is provided, then in the stage that pours of the preformed layer of preformed plate, progress electrical junction box is embedding and electric pipeline stays staying for slot to set, then pouring for in-situ layer is carried out, to obtain final finished product.This method under the premise of ensureing that superimposed sheet is not laid influence by spool, arranges enough spools as much as possible.
Description
Technical field
The present invention relates to technical field of building construction, and in particular to a kind of prefabricated superimposed sheet of assembled architecture reserves wire casing
Construction technology.
Background technology
It is built made of assemble in site by prefabricated component component, referred to as assembled architecture.By prefabricated components form and
Construction method is divided into building block building, plank building, boxlike building, frame board material construction structural and lift slab and rises five types such as layer building.
In recent years, the fast development with assembled architecture at home, create assembled architecture as emerging rapidly in large numbersBamboo shoots after a spring rain
Numerous and confused construction in all parts of the country.But since the face of assembly concrete component layer thickness of cast-in-place concrete is relatively thin, house class engineering
Hydroelectric line distribution it is more, should ensure the normal pre-buried of hydroelectric line, ensure that the protective layer thickness of surfacing steel bar is full again
Foot requires, it is therefore desirable to a kind of construction method for being simply and easily suitable for assembled architecture and reserving wire casing.
Prefabricated superimposed sheet is since floor is divided into in-situ layer and precast floor slab two layers, in traditional cast-in-place building, house class
Slab thickness be generally 100-120mm, but want there is specification and atlas according to assembled architecture, the thickness of precast floor slab is general
Thickness for 60mm, cast-in-situ floor is generally 70mm, and the arrangement that hydroelectric line is carried out above superimposed sheet often has cross-connecting area
Domain, the diameter of common hydroelectric line pvc pipe is about between 20mm-30mm, if two pvc pipes are spread after intersecting above water pipe
If reinforcing bar can cause the protective layer thickness of surfacing steel bar undesirable, there are the construction quality problems such as dew muscle, it is therefore desirable to one
Kind is suitable for the construction method that prefabricated superimposed sheet reserves wire casing.
Invention content
The purpose of the present invention is to solve the above problem, a kind of prefabricated superimposed sheet of assembled architecture is provided and reserves wire casing
Construction technology.
In order to reach foregoing invention purpose, the present invention uses following technical scheme:
A kind of prefabricated superimposed sheet of assembled architecture reserves the construction technology of wire casing, includes the following steps:
Step 1:In the design phase absolute altitude of internal pipeline is adjusted by using BIM technology synthetic assembly model and civil engineering model
And position, it determines that pipeline specifically moves towards, and optimize the laying-out of floor electric pipeline, provides accurate electric pipeline laying
Figure;
Step 2:In the production and processing stage of superimposed sheet, carry out the pouring construction of preformed layer in factory for prefabrication, specifically, first will
The framework of steel reinforcement bound is placed into specified mold, then carries out concreting, and concreting reaches initial setting strength
Afterwards, foundation electric pipeline laying figure progress electrical junction box is embedding and electric pipeline stays staying for slot to set, and it is U-shaped that electric pipeline, which stays slot,
PVC wire casings;Cable tube hole is reserved at electrical junction box side four sides, and the lower part of electrical junction box is embedded in the concrete poured i.e.
In preformed layer, U-shaped PVC wire casings pass through the spool hole of electrical junction box to be arranged;
Step 3:After the completion of superimposed sheet on-site hoisting, according to staying the scene for being located at the reserved U-shaped PVC wire casings of superimposed sheet and carrying out pipeline
Bending and laying;
Step 4:The reinforcing bar binding for finally carrying out the in-situ layer of superimposed sheet, then carries out pouring for the concrete of the in-situ layer of superimposed sheet
It builds.
Further, in step 1, using BIM software synthesis arrangement floor electric pipeline and electric pipeline laying figure is provided.
Further, in step 2 electric pipeline stay slot stay that set operation be concreting in the preformed layer of superimposed sheet
Completion and intensity carry out after reaching initial set, and electric pipeline stays the indwelling width of slot and depth to match with electric pipeline.
Further, the spool hole at least half region is located in the concrete that preformed layer pours.
Further, the electric pipeline laying of live superimposed sheet stays applying for slot according to the electric pipeline of superimposed sheet in step 3
If line alignment carries out electrical tubular object extruding and laying.
Further, the length size of electrical junction box is 85mm, 85mm, 85mm, and electric pipeline stays the width of slot
For 30mm, depth 30mm, it is 15mm that electric pipeline, which stays the arc radius of the U-shaped bottom of slot,.
Compared with prior art, the present invention advantageous effect is:Constructing operation is simple, manual operation, without mainframe
Tool, it is low-cost;Construction is flexibly convenient, and installation and time used are short;Reliable construction quality, work progress is simple, and constructs
Effect is preferable;Construction material is simple light and pipeline is by comprehensive arrangement, pipeline, avoids scene economic benefit of doing over again bright
It is aobvious;It can be in the thickness range of limited superimposed sheet, as much as possible before ensureing that superimposed sheet is not laid influence by spool
It puts, arranges enough spools.
Description of the drawings
Fig. 1 is the structural schematic diagram of the preformed plate of the present invention;
Fig. 2 is the structural schematic diagram after the in-situ layer of the preformed plate of the present invention pours.
In figure:1 preformed layer, 2 in-situ layers, 3 electrical junction boxes, 4 electric pipelines stay slot, 5 spool holes, 6 electric pipelines, 7 steel
Muscle.
Specific implementation mode
Explanation is further described to technical scheme of the present invention below by specific embodiment.
If without specified otherwise, the raw material employed in the embodiment of the present invention is raw material commonly used in the art, is implemented
Method employed in example, is the conventional method of this field.
Embodiment 1:
The construction technology that a kind of prefabricated superimposed sheet of assembled architecture reserves wire casing includes the following steps as depicted in figs. 1 and 2:
Step 1:In the design phase absolute altitude of internal pipeline is adjusted by using BIM technology synthetic assembly model and civil engineering model
And position, it determines that pipeline specifically moves towards, and optimize the laying-out of floor electric pipeline, provides accurate electric pipeline laying
Figure;It specially uses BIM software synthesis arrangement floor electric pipeline and provides electric pipeline laying figure;It adjusts inside Mechatronic Systems
The absolute altitude and position problems of pipeline, and determine pipeline specifically trend carries out that wire box is embedding and wire casing cloth in the superimposed sheet production phase
It sets, avoids generating conflict when subsequent field cross pipe-line;
Step 2:The production and processing stage of superimposed sheet in factory for prefabrication carries out the pouring construction of preformed layer 1, specifically, first
7 skeleton of reinforcing bar bound is placed into specified mold, concreting is then carried out, concreting reaches pre-hardening strong
After degree, foundation electric pipeline laying figure progress electrical junction box 3 is embedding and electric pipeline stays staying for slot 4 to set, and electric pipeline stays slot 4
For U-shaped PVC wire casings;Cable tube hole 5 is reserved at 3 side of electrical junction box four sides, the lower part of electrical junction box 3 be embedded in pour it is mixed
It is in preformed layer 1 in solidifying soil, U-shaped PVC wire casings pass through the spool hole 5 of electrical junction box 3 to be arranged;Electric pipeline stays staying for slot 4 to set
Operation is carried out after the concreting completion of the preformed layer 1 of superimposed sheet and intensity reach initial set, and electric pipeline stays staying for slot 4
Width and depth is set with electric pipeline 6 to match;At least half region of the spool hole 5 is located in the concrete that preformed layer pours;
The length size of electrical junction box is 85mm, 85mm, 85mm, and electric pipeline stays the width of slot for 30mm, depth 30mm,
It is 15mm that electric pipeline, which stays the arc radius of the U-shaped bottom of slot,;
Step 3:After the completion of superimposed sheet on-site hoisting, the reserved U-shaped PVC wire casings progress electric pipeline 6 of superimposed sheet is located at according to staying
Scene bending and laying;The electric pipeline 6 of live superimposed sheet lays the laying-out that slot is stayed according to the electric pipeline of superimposed sheet
It moves towards to carry out electrical tubular object extruding and laying;
Step 4:The reinforcing bar binding for finally carrying out the in-situ layer 2 of superimposed sheet, then carries out the concrete of the in-situ layer 2 of superimposed sheet
It pours.
Claims (6)
1. a kind of prefabricated superimposed sheet of assembled architecture reserves the construction technology of wire casing, which is characterized in that include the following steps:
Step 1:In the design phase absolute altitude of internal pipeline is adjusted by using BIM technology synthetic assembly model and civil engineering model
And position, it determines that pipeline specifically moves towards, and optimize the laying-out of floor electric pipeline, provides accurate electric pipeline laying
Figure;
Step 2:In the production and processing stage of superimposed sheet, carry out the pouring construction of preformed layer in factory for prefabrication, specifically, first will
The framework of steel reinforcement bound is placed into specified mold, then carries out concreting, and concreting reaches initial setting strength
Afterwards, foundation electric pipeline laying figure progress electrical junction box is embedding and electric pipeline stays staying for slot to set, and it is U-shaped that electric pipeline, which stays slot,
PVC wire casings;Cable tube hole is reserved at electrical junction box side four sides, and the lower part of electrical junction box is embedded in the concrete poured i.e.
In preformed layer, U-shaped PVC wire casings pass through the spool hole of electrical junction box to be arranged;
Step 3:After the completion of superimposed sheet on-site hoisting, according to staying the scene for being located at the reserved U-shaped PVC wire casings of superimposed sheet and carrying out pipeline
Bending and laying;
Step 4:The reinforcing bar binding for finally carrying out the in-situ layer of superimposed sheet, then carries out pouring for the concrete of the in-situ layer of superimposed sheet
It builds.
2. the prefabricated superimposed sheet of a kind of assembled architecture according to claim 1 reserves the construction technology of wire casing, feature exists
In in step 1, being arranged using BIM software synthesis and floor electric pipeline and provide electric pipeline laying figure.
3. the prefabricated superimposed sheet of a kind of assembled architecture according to claim 1 reserves the construction technology of wire casing, feature exists
In what electric pipeline stayed slot in step 2 stays that set operation reached in the concreting completion of the preformed layer of superimposed sheet and intensity
It is carried out after initial set, electric pipeline stays the indwelling width of slot and depth to match with electric pipeline.
4. the prefabricated superimposed sheet of a kind of assembled architecture according to claim 1 reserves the construction technology of wire casing, feature exists
In the spool hole at least half region is located in the concrete that preformed layer pours.
5. the prefabricated superimposed sheet of a kind of assembled architecture according to claim 1 reserves the construction technology of wire casing, feature exists
In the electric pipeline of live superimposed sheet is laid in step 3 stays the laying-out of slot to move towards to carry out according to the electric pipeline of superimposed sheet
Electrical tubular object extruding and laying.
6. the prefabricated superimposed sheet of a kind of assembled architecture according to claim 1 reserves the construction technology of wire casing, feature exists
In the length size of electrical junction box is 85mm, 85mm, 85mm, and it is 30mm that electric pipeline, which stays the width of slot, and depth is
30mm, it is 15mm that electric pipeline, which stays the arc radius of the U-shaped bottom of slot,.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810426268.XA CN108661223A (en) | 2018-05-07 | 2018-05-07 | A kind of prefabricated superimposed sheet of assembled architecture reserves the construction technology of wire casing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810426268.XA CN108661223A (en) | 2018-05-07 | 2018-05-07 | A kind of prefabricated superimposed sheet of assembled architecture reserves the construction technology of wire casing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108661223A true CN108661223A (en) | 2018-10-16 |
Family
ID=63778512
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810426268.XA Pending CN108661223A (en) | 2018-05-07 | 2018-05-07 | A kind of prefabricated superimposed sheet of assembled architecture reserves the construction technology of wire casing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108661223A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109577535A (en) * | 2018-12-10 | 2019-04-05 | 中建二局第二建筑工程有限公司 | Assembled architecture PC superimposed sheet and the electromechanical installation built-in process of dry wall combination |
CN110042963A (en) * | 2019-04-25 | 2019-07-23 | 江苏浩森建筑设计有限公司 | A method of reducing assembled floor superimposed sheet thickness |
CN110238960A (en) * | 2019-06-18 | 2019-09-17 | 孟凡林 | The method of electric wire box is placed in after a kind of precast concrete superimposed sheet bottom plate |
CN110748017A (en) * | 2019-10-31 | 2020-02-04 | 中国一冶集团有限公司 | High-injection alloy honeycomb core secondary hole opening sealing and waterproof method |
CN111884121A (en) * | 2020-07-31 | 2020-11-03 | 中国二十二冶集团有限公司 | Pre-buried wiring method for standardized pipeline of assembled laminated slab |
CN113152888A (en) * | 2021-05-01 | 2021-07-23 | 中国建筑第七工程局有限公司 | Drilling-free pipeline installation construction method based on BIM technology |
CN114045977A (en) * | 2021-10-21 | 2022-02-15 | 浙江省送变电工程有限公司 | UHPC large-module integrated external wall panel and mounting structure and manufacturing method thereof |
CN115450372A (en) * | 2022-08-12 | 2022-12-09 | 中国电建集团贵阳勘测设计研究院有限公司 | A wire casing for assembly type structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS488024U (en) * | 1971-06-08 | 1973-01-29 | ||
JPH02132245A (en) * | 1988-11-10 | 1990-05-21 | Shimizu Corp | Floor structure and execution method thereof for building |
FR2887320B1 (en) * | 2005-06-15 | 2007-09-07 | Tolemecane Sarl | FORMWORK AND TRAVERSE SUPPORT FOR CONDUITS, CABLES AND FLEXIBLE. |
CN204983658U (en) * | 2015-09-30 | 2016-01-20 | 长沙远大住宅工业集团有限公司 | Prefabricated component is with box of pre -buried electric end and have prefabricated component of this box of electric end |
CN206195283U (en) * | 2016-11-24 | 2017-05-24 | 上海宝岳住宅工业有限公司 | Pre -buried line box of prefabricated coincide floor |
CN107663947A (en) * | 2017-10-31 | 2018-02-06 | 中国冶集团有限公司 | Autoclaved aerated concrete slab construction method in assembled architecture based on BIM |
-
2018
- 2018-05-07 CN CN201810426268.XA patent/CN108661223A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS488024U (en) * | 1971-06-08 | 1973-01-29 | ||
JPH02132245A (en) * | 1988-11-10 | 1990-05-21 | Shimizu Corp | Floor structure and execution method thereof for building |
FR2887320B1 (en) * | 2005-06-15 | 2007-09-07 | Tolemecane Sarl | FORMWORK AND TRAVERSE SUPPORT FOR CONDUITS, CABLES AND FLEXIBLE. |
CN204983658U (en) * | 2015-09-30 | 2016-01-20 | 长沙远大住宅工业集团有限公司 | Prefabricated component is with box of pre -buried electric end and have prefabricated component of this box of electric end |
CN206195283U (en) * | 2016-11-24 | 2017-05-24 | 上海宝岳住宅工业有限公司 | Pre -buried line box of prefabricated coincide floor |
CN107663947A (en) * | 2017-10-31 | 2018-02-06 | 中国冶集团有限公司 | Autoclaved aerated concrete slab construction method in assembled architecture based on BIM |
Non-Patent Citations (2)
Title |
---|
陈意 等: ""装配式住宅管线敷设质量控制要点"", 《住宅与房地产》 * |
黄俊权 等: ""预制装配式建筑电气设计"", 《电气设计》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109577535A (en) * | 2018-12-10 | 2019-04-05 | 中建二局第二建筑工程有限公司 | Assembled architecture PC superimposed sheet and the electromechanical installation built-in process of dry wall combination |
CN110042963A (en) * | 2019-04-25 | 2019-07-23 | 江苏浩森建筑设计有限公司 | A method of reducing assembled floor superimposed sheet thickness |
CN110238960A (en) * | 2019-06-18 | 2019-09-17 | 孟凡林 | The method of electric wire box is placed in after a kind of precast concrete superimposed sheet bottom plate |
CN110748017A (en) * | 2019-10-31 | 2020-02-04 | 中国一冶集团有限公司 | High-injection alloy honeycomb core secondary hole opening sealing and waterproof method |
CN111884121A (en) * | 2020-07-31 | 2020-11-03 | 中国二十二冶集团有限公司 | Pre-buried wiring method for standardized pipeline of assembled laminated slab |
CN113152888A (en) * | 2021-05-01 | 2021-07-23 | 中国建筑第七工程局有限公司 | Drilling-free pipeline installation construction method based on BIM technology |
CN114045977A (en) * | 2021-10-21 | 2022-02-15 | 浙江省送变电工程有限公司 | UHPC large-module integrated external wall panel and mounting structure and manufacturing method thereof |
CN115450372A (en) * | 2022-08-12 | 2022-12-09 | 中国电建集团贵阳勘测设计研究院有限公司 | A wire casing for assembly type structure |
CN115450372B (en) * | 2022-08-12 | 2023-10-03 | 中国电建集团贵阳勘测设计研究院有限公司 | Wire slot for assembled building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108661223A (en) | A kind of prefabricated superimposed sheet of assembled architecture reserves the construction technology of wire casing | |
CN105178357B (en) | Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition | |
CN105421222B (en) | Bridge prefabrication pier column and cushion cap socket type connecting structure and its assembling method | |
CN102758451B (en) | Concrete cable channel construction process | |
CN109577535A (en) | Assembled architecture PC superimposed sheet and the electromechanical installation built-in process of dry wall combination | |
CN106013228A (en) | Overlapping integral type prefabricated assembly structure for comprehensive pipe gallery and construction method thereof | |
CN105544798B (en) | Assembled hollow slab shear wall structure and construction method thereof | |
CN205776348U (en) | A kind of overlapping monoblock type pipe gallery prefabricated assembly structural | |
CN108301466B (en) | Integral prefabricated bathroom caisson, bathroom caisson structure and construction method thereof | |
CN110295700A (en) | Assembled Sloping roof construction method | |
CN106759420A (en) | Prefabricated assembled transformer substation foundation structure | |
CN112575886A (en) | Low-level and multi-level fully-prefabricated assembled concrete structure and design, production and installation method | |
CN205223840U (en) | Bridge prefabrication pier stand and cushion cap socket joint formula connection structure | |
CN111064155B (en) | Calandria array installation and encapsulation construction method | |
CN104810744A (en) | Free pre-burying construction method of wall pipeline | |
CN107268675A (en) | The laying method and structure of a kind of many storehouse underground pipe galleries of combined type | |
CN106193120A (en) | Basement is encorbelmented, and base plate is inverse makees structure and construction method | |
CN207063610U (en) | A kind of transformer station by prefabricated components splicing builds | |
CN105756377A (en) | Swimming pool and construction method thereof | |
CN110219413A (en) | A kind of autoclaved aerated concrete slab and preparation method thereof | |
CN206635786U (en) | Prefabricated assembled transformer substation foundation structure | |
CN211850319U (en) | Laminated plate | |
CN210151784U (en) | Integration template piping lane | |
CN105951986A (en) | Edge joint connecting structure and method of prefabricated integrated type frame column beam | |
CN205116719U (en) | Mould of hole prefabricated section is reserved in preparation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181016 |
|
RJ01 | Rejection of invention patent application after publication |