CN108661046A - The construction method of driven cast-in-place pile - Google Patents

The construction method of driven cast-in-place pile Download PDF

Info

Publication number
CN108661046A
CN108661046A CN201810428839.3A CN201810428839A CN108661046A CN 108661046 A CN108661046 A CN 108661046A CN 201810428839 A CN201810428839 A CN 201810428839A CN 108661046 A CN108661046 A CN 108661046A
Authority
CN
China
Prior art keywords
pile
pipe
pile pipe
concrete
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810428839.3A
Other languages
Chinese (zh)
Inventor
毕建宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810428839.3A priority Critical patent/CN108661046A/en
Publication of CN108661046A publication Critical patent/CN108661046A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes

Abstract

The present invention provides the construction methods of driven cast-in-place pile, it is characterized in that:Using having air inlet, the sealable pile pipe of other openings in addition to lower mouth;Concrete, upper pile jacking pipe or cooperation tube drawing are pushed using the blowing pressure, undergauge, folder mud, broken pile of existing driven cast-in-place pile and other issues can be well solved.

Description

The construction method of driven cast-in-place pile
Technical field
The present invention relates to the construction methods of driven cast-in-place pile, belong to piling Technology field.
Background technology
Existing driven cast-in-place pile is in the edge being eliminated because undergauge, folder mud, broken pile and other issues are more.
Invention content
To play the advantage of driven cast-in-place pile, immersed tube bored existing quality problems are solved, the present invention provides immersed tube fillings The construction method of stake is noted, it is characterized in that:(1) using having air inlet, the sealable pile pipe of other openings in addition to lower mouth;(2) Concrete, upper pile jacking pipe or cooperation tube drawing are pushed using the blowing pressure.
Steps are as follows for Specific construction:
A. press the prior art and complete the construction procedure before tube drawing, as needed under good steel reinforcement cage, preferably concrete once fills Foot;
B. pile pipe opening is closed, by air inlet to air is sent in pile pipe, pushes concrete, upper pile jacking pipe;
C. if air pressure is not enough to jack up pile pipe, tube drawing can be coordinated with original pipe drawing device, until pile pipe goes out ground, terminated;
D. pile pipe goes out in face of ground, if air pressure does not increase, can apply external pressure to pile pipe.
Advantageous effect
Concrete, upper pile jacking pipe are pushed with the blowing pressure, can be well solved undergauge, folder mud, broken pile and other issues is It will be apparent that needn't elaborate any further.
Specific implementation mode
The top-down soil layer situation of Site Soil:The silty of the miscellaneous fill of about 1m thickness, the thick soft modeling-plastic states of about 7m is viscous Soil, about 2m thickness is slightly close, in close state fine sand, middle sand, the completely decomposed mud stone of about 1m thickness, the intense weathering munstone of about 3m thickness, below For middle weathered mudstone.
Stake diameter 406mm, the long 15m of stake are designed, using C60 self-compacting concretes, ultimate bearing capacity 5200kN.
Using static-pressure driven cast-in-place pile, deep 2m is sent.
Pile pipe hypomere be D406*40 seamless steel pipes, long 20m, Q345 materials, epimere be D630*10 spiral steel pipes, long 5m, Q235 materials, 60 degree of taper tube transitions of upper and lower section;Mouth thickeies height 100mm to external upset (EU) 10mm under pile pipe, and pile top is steel- Combined concrete pile top, outer diameter D 426.
Using 800 tons of contracting static-pressure piling machines, band mast.
Construction procedure is as follows:
1. pile top is put in a point;
2. pile pipe mixes up verticality to good pile top, then start static pressure, immersed tube, 550 tons of end pressure, immersed tube depth is about 14.8m;
3. descending reinforcing cage, disposable that about 2.5 vertical C60 self-compacting concretes are perfused;
4. with closed buckle by pile pipe epimere it is suitable for reading it is closed after, by the air inlet on closed buckle, with air compressor machine to stake Air is sent in pipe, pushes concrete, upper pile jacking pipe;While supplying gas, pile pulling pipe on side, air pressure maintains 1~2MPa;To pile pipe in soil In there is also about when 10m, air pressure heads on to walk in pile pipe, do not have to stake machine coordinate tube drawing;Stop sending there is also about when 2m in soil to pile pipe Air extracts pile pipe, terminates.
Pile pipe epimere overstriking, is equivalent to hopper, to reduce pile pipe total length.Clip pile pipe hypomere is only embraced, is not embraced on clip pile pipe Section.

Claims (1)

1. the construction method of driven cast-in-place pile, it is characterized in that:(1) using having air inlet, other openings in addition to lower mouth Closed pile pipe;(2) the blowing pressure is utilized to push concrete, upper pile jacking pipe or cooperation tube drawing;Steps are as follows for Specific construction:
A. press the prior art and complete the construction procedure before tube drawing, as needed under good steel reinforcement cage, preferably concrete is once filled with enough;
B. pile pipe opening is closed, by air inlet to air is sent in pile pipe, pushes concrete, upper pile jacking pipe;
C. if air pressure is not enough to jack up pile pipe, tube drawing can be coordinated with original pipe drawing device, until pile pipe goes out ground, terminated;
D. pile pipe goes out in face of ground, if air pressure does not increase, can apply external pressure to pile pipe.
CN201810428839.3A 2018-04-25 2018-04-25 The construction method of driven cast-in-place pile Pending CN108661046A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810428839.3A CN108661046A (en) 2018-04-25 2018-04-25 The construction method of driven cast-in-place pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810428839.3A CN108661046A (en) 2018-04-25 2018-04-25 The construction method of driven cast-in-place pile

Publications (1)

Publication Number Publication Date
CN108661046A true CN108661046A (en) 2018-10-16

Family

ID=63778671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810428839.3A Pending CN108661046A (en) 2018-04-25 2018-04-25 The construction method of driven cast-in-place pile

Country Status (1)

Country Link
CN (1) CN108661046A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101024962A (en) * 2007-03-22 2007-08-29 建研地基基础工程有限责任公司 Vibration pipe-sinking wind pile-pressing machine
CN101575852A (en) * 2008-05-10 2009-11-11 夏传清 Construction method of wall-retaining bottom-expanding sinking-pipe cast-in-situ piles
CN102817359A (en) * 2012-08-27 2012-12-12 河北建设勘察研究院有限公司 Sealing device of receiving port and construction method of vibrating immersed tube type sand-gravel pile of muddy soft soil foundation via air pressure balance
CN104711988A (en) * 2015-03-18 2015-06-17 山东省水利科学研究院 Device and method for eliminating concrete falling rejection and pile end suspension of sinking pipe cast-in-place pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101024962A (en) * 2007-03-22 2007-08-29 建研地基基础工程有限责任公司 Vibration pipe-sinking wind pile-pressing machine
CN101575852A (en) * 2008-05-10 2009-11-11 夏传清 Construction method of wall-retaining bottom-expanding sinking-pipe cast-in-situ piles
CN102817359A (en) * 2012-08-27 2012-12-12 河北建设勘察研究院有限公司 Sealing device of receiving port and construction method of vibrating immersed tube type sand-gravel pile of muddy soft soil foundation via air pressure balance
CN104711988A (en) * 2015-03-18 2015-06-17 山东省水利科学研究院 Device and method for eliminating concrete falling rejection and pile end suspension of sinking pipe cast-in-place pile

Similar Documents

Publication Publication Date Title
CN105569560A (en) Full casing long-spiral bored pile machine and method of using same for construction
CN206646502U (en) A kind of steel pipe type soil nailing
CN106907157B (en) A kind of shield machine normal pressure opens the cabin operation construction method
CN105442532A (en) Construction method for pile-head-expanded bored pile
CN114517472B (en) Construction method of carrier pile
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN2370066Y (en) Channel slip casting steel bar concrete hollow prefabricated pile
CN112359815A (en) Dry-type vibroflotation gravel pile for soft foundation treatment and construction method thereof
CN105484270B (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN208472716U (en) Crack geology mortar leakage prevention drill-pouring pilework
CN108661046A (en) The construction method of driven cast-in-place pile
CN207846409U (en) A kind of consolidation layer of sand concrete reinforced pipe section broken stone pile
CN103590394B (en) The construction method of original state soil taking and filling pile
CN212248222U (en) Construction equipment for grouting thin-wall tubular pile
CN202202325U (en) Compacted and expanded micro mortar pile forming device
CN205501998U (en) Expand end combination end -bearing pile basis
CN103911986A (en) Method for constructing composite repeatedly driven steel pipe piles
CN102383422A (en) Compacted expansion mini-type mortar pile pile-forming method and pile-forming device
CN103556629A (en) Construction method of special-shaped pile
CN104929101B (en) Resistance to plucking prestress anchoraging broken stone pile and construction method that a kind of base expanding and base expanding multistage side is expanded
CN113373913A (en) Cast-in-place pile immersed tube and cast-in-place pile construction method
CN112144522A (en) Construction method of prestressed pipe pile and special prestressed pipe pile thereof
CN112144516A (en) Construction method of concrete pile
CN111636419A (en) Construction equipment and construction method for grouting thin-wall tubular pile
CN205116162U (en) Pile head enlarges drilling bored concrete pile clad steel and protects a section of thick bamboo

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181016