CN108657949A - Pneumatic monorail crane mounting device and installation method - Google Patents
Pneumatic monorail crane mounting device and installation method Download PDFInfo
- Publication number
- CN108657949A CN108657949A CN201810438275.1A CN201810438275A CN108657949A CN 108657949 A CN108657949 A CN 108657949A CN 201810438275 A CN201810438275 A CN 201810438275A CN 108657949 A CN108657949 A CN 108657949A
- Authority
- CN
- China
- Prior art keywords
- attachment rail
- monorail crane
- pneumatic monorail
- bracket
- pneumatic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 38
- 238000000034 method Methods 0.000 title claims abstract description 19
- 230000007704 transition Effects 0.000 claims description 9
- 238000003032 molecular docking Methods 0.000 claims description 5
- 238000005065 mining Methods 0.000 abstract description 3
- 238000010276 construction Methods 0.000 abstract description 2
- 229910000831 Steel Inorganic materials 0.000 description 5
- 230000000694 effects Effects 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 238000011900 installation process Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000686 essence Substances 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C11/00—Trolleys or crabs, e.g. operating above runways
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C9/00—Travelling gear incorporated in or fitted to trolleys or cranes
- B66C9/14—Trolley or crane travel drives
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F13/00—Transport specially adapted to underground conditions
- E21F13/02—Transport of mined mineral in galleries
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
The present invention provides a kind of pneumatic monorail crane mounting devices, belong to mining construction technical field, include the attachment rail for lifting pneumatic monorail crane and the bracket for being slided in mine laneway, attachment rail is set to the top of bracket, attachment rail is identical as the trapped orbit specification at the top of mine laneway, bracket is set to the lower section of attachment rail, and bracket is flexibly connected with attachment rail, and the top of attachment rail is equipped with the lifting gear for lifting attachment rail;Additionally provide a kind of pneumatic monorail crane installation method.Pneumatic monorail crane mounting device and installation method provided by the invention, pneumatic monorail crane is mounted on attachment rail in advance, the installation site of pneumatic monorail crane is slided into mine laneway with bracket support attachment rail, it will be promoted to the height that can be docked with trapped orbit equipped with the attachment rail of pneumatic monorail crane using lifting gear, after attachment rail is docked with trapped orbit, pneumatic monorail crane is driven into trapped orbit from attachment rail, completes the installation of pneumatic monorail crane.
Description
Technical field
The invention belongs to mining construction technical fields, more specifically, be related to a kind of pneumatic monorail crane mounting device and
Installation method.
Background technology
Pneumatic monorail crane makes because its investment is small, easy to use in mining area as a kind of safe and efficient auxiliary conveying equipments
By consistent favorable comment in.At the same time, pneumatic monorail crane is as a kind of new product, because its connector is more, leaf stomatal resistance is multiple
It is miscellaneous, in severe underground site installation process, there is installation labor intensity it is big, installation accuracy is not high the problems such as, and
Also some potential safety problems can be brought in installation process to installer and equipment itself.So designing one for pneumatic monorail crane
The safe and efficient installation method of kind is particularly important.
Invention content
The purpose of the present invention is to provide a kind of pneumatic monorail crane mounting device and installation methods, to solve in the prior art
Existing pneumatic monorail crane installation difficulty is big, there is technical issues that.
To achieve the above object, the technical solution adopted by the present invention is:A kind of pneumatic monorail crane mounting device, including be used for
The attachment rail of pneumatic monorail crane and the bracket for being slided in mine laneway are lifted, the attachment rail is set to the support
The top of frame, the attachment rail is identical as the trapped orbit specification at the top of mine laneway, and the bracket is set to the mounting rail
The lower section in road, the bracket are flexibly connected with the attachment rail, and the top of the attachment rail is equipped with for lifting the peace
Fill the lifting gear of track.
Further, the bracket includes bottom girder and column, and the bracket includes bottom girder and column, the bottom end of the column
It is fixed on the upper surface of the bottom girder, the top of the column is flexibly connected with the attachment rail.
Further, the top of the column is bolted with the attachment rail, and the bolt is U-bolt, described
The top of column is equipped with connecting plate, and the bolt head of the U-bolt is located at the both sides of the attachment rail and is passed down through
The connecting plate setting, the bolt head of the U-bolt are equipped with matched nut.
Further, the both ends of the bottom girder are upturned, are arranged in obtuse angle with the middle part of the bottom girder, the bottom girder
Both ends and middle part junction be arranged round-corner transition.
Further, the top of the lifting gear and fixing piece mounting, bottom and the installation at the top of mine laneway
The top of track mounts.
Further, the length of the attachment rail is less than the internal diameter of mine shaft.
The present invention also provides a kind of pneumatic monorail crane installation methods, and steps are as follows:
(1) attachment rail is erected at pallet top;
(2) pneumatic monorail crane is mounted in attachment rail;
(3) attachment rail and bracket are transferred by vertical shaft to mine bottom;
(4) bracket is dragged to the installation site of pneumatic monorail crane along mine laneway;
(5) attachment rail and bracket be increased to the height of trapped orbit together with lifting gear, and by attachment rail with
Trapped orbit docks;
(6) bracket is removed from attachment rail;
(7) pneumatic monorail crane is driven into trapped orbit.
Further, in step (3), by equipped with pneumatic monorail crane the attachment rail and the bracket be packed into mine together
In the cage of well well head, the cage is fallen into the shaft bottom of mine.
Further, in step (5), when the attachment rail is docked with the trapped orbit, the attachment rail with
Transition rail is installed in the butt end of the trapped orbit, and the transition rail is cut with scissors with the attachment rail and the trapped orbit respectively
It connects.
Further, in step (4), the bottom of the bracket is contacted with the basal sliding of mine laneway.
The advantageous effect of pneumatic monorail crane mounting device and installation method provided by the invention is:With prior art phase
Than pneumatic monorail crane is mounted on attachment rail, with bracket support by the pneumatic monorail crane mounting device of the present invention and installation method in advance
Attachment rail slides into the installation site of pneumatic monorail crane in mine laneway, will be equipped with pneumatic monorail crane using lifting gear
Attachment rail is promoted to the height that can be docked with trapped orbit, after attachment rail is docked with trapped orbit, by pneumatic monorail crane
Trapped orbit is driven into from attachment rail, completes the installation of pneumatic monorail crane.
Description of the drawings
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art
Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description be only the present invention some
Embodiment for those of ordinary skill in the art without having to pay creative labor, can also be according to these
Attached drawing obtains other attached drawings.
Fig. 1 is the structural schematic diagram of pneumatic monorail crane mounting device provided in an embodiment of the present invention;
Fig. 2 is the schematic diagram that pneumatic monorail crane mounting device provided in an embodiment of the present invention is in installation condition;
Wherein, each reference numeral in figure:
1- attachment rails;2- bottom girders;3- columns;The pneumatic monorail cranies of 4-;5-U type bolts;6- connection otic placodes;7- hanging codes;8-
Upper overlap joint block;Block is overlapped under 9-;10- transition rails;11- trapped orbits;12- chain blocks.
Specific implementation mode
In order to make technical problems, technical solutions and advantages to be solved be more clearly understood, tie below
Accompanying drawings and embodiments are closed, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only
To explain the present invention, it is not intended to limit the present invention.
It should be noted that when element is referred to as " being fixed on " or " being set to " another element, it can be directly another
On one element or it is connected on another element.When an element is known as " being connected to " another element, it can
To be directly to another element or be indirectly connected on another element.
It is to be appreciated that term " length ", " width ", "upper", "lower", "front", "rear", "left", "right", "vertical",
The orientation or positional relationship of the instructions such as "horizontal", "top", "bottom" "inner", "outside" is that orientation based on ... shown in the drawings or position are closed
System, is merely for convenience of description of the present invention and simplification of the description, not indicating or implying the indicated device or element must have
Specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply relative importance
Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or
Implicitly include one or more this feature.In the description of the present invention, " multiple ", " several " be meant that two or
Two or more, unless otherwise specifically defined.
Also referring to Fig. 1 and Fig. 2, now pneumatic monorail crane mounting device provided by the invention and installation method are said
It is bright.Pneumatic monorail crane mounting device is illustrated first:Pneumatic monorail crane mounting device, including attachment rail 1 and bracket, peace
It is identical with 11 specification of trapped orbit at the top of mine laneway to fill track 1, is I-steel, the top of pneumatic monorail crane 4 is set
There are idler wheel, idler wheel to be matched with I-steel, fit system is to be equipped with idler wheel, and idler wheel and I-steel in the both sides of I-steel
Inside bottom surface be in rolling contact, idler wheel drives pneumatic monorail crane 4 along attachment rail 1 and trapped orbit in I-steel roll inside
11 movements.Bracket is arranged in the lower section of attachment rail 1, is used for support attachment rail 1, and bracket and attachment rail 1 can be dismantled, because
After the completion of docking for attachment rail 1 and trapped orbit 11, need pneumatic monorail crane 4 driving into trapped orbit 11 from attachment rail 1,
During driving into, it is tower structure that bracket, which can hinder the movement of pneumatic monorail crane 4, bracket, and pneumatic monorail crane 4 is wrapped in
Inside, the bottom of bracket and the bottom of mine laneway are in direct contact.The top of attachment rail 1 is equipped with lifting gear, lifting gear
For chain block 12, because chain block 12 carries chain, and chain block 12 can promote big quality by manpower
Object, the top of chain block 12 is connected on the fixing piece at the top of mine laneway, the hanging code of 1 upper surface of bottom and attachment rail
7 connections, chain block 12 sling attachment rail 1 for slinging attachment rail 1 together with pneumatic monorail crane 4 and bracket
When with 11 grade height of trapped orbit, attachment rail 1 and trapped orbit 11 dock, and pneumatic monorail crane 4 can drive into from attachment rail 1
Trapped orbit 11 completes the installation of pneumatic monorail crane 4.
Pneumatic monorail crane is mounted in installation by pneumatic monorail crane mounting device provided by the invention in advance compared with prior art
On track, the installation site of pneumatic monorail crane is slided into mine laneway with bracket support attachment rail, utilizes lifting gear
It will be promoted to the height that can be docked with trapped orbit, attachment rail and trapped orbit pair equipped with the attachment rail of pneumatic monorail crane
After connecing, pneumatic monorail crane is driven into trapped orbit from attachment rail, completes the installation of pneumatic monorail crane.
Further, referring to Fig. 1, a kind of specific embodiment party as pneumatic monorail crane mounting device provided by the invention
Formula, bracket include bottom girder 2 and two root posts 3, and 3 symmetrically arranged bottom girder 2 of column is close to the position at both ends, the bottom of column 3
Be welded on the upper surface of bottom girder 2, top is bolted on the lower surface of attachment rail 1, be bolted and facilitate installation
The dismounting of track 1 and bracket.After pneumatic monorail crane 4 is installed to attachment rail 1, pneumatic monorail crane 4 is located in two root posts 3
Between, when transporting pneumatic monorail crane 4 in mine laneway, column 3 plays the role of limiting the displacement of pneumatic monorail crane 4, prevents gas
Dynamic monorail crane 4 is skidded off from the both ends of attachment rail 1, during dragging bracket, although pneumatic monorail crane 4 is filled with brake
It sets, but due to swinging, pneumatic monorail crane 4 still inevitably collides with column 3, and flexible material is arranged in the inside of column 3
Liner prevents from causing to damage to pneumatic monorail crane 4 in collision.
Further, referring to Fig. 1, a kind of specific embodiment party as pneumatic monorail crane mounting device provided by the invention
Formula, attachment rail 1 and bracket are connected with U-bolt 5, and one flat plate is welded at the top of column 3, and tablet is as connecting plate and installation
The lower surface of track 1 contacts, and U-bolt 5 tips upside down on attachment rail 1, and the both sides of U-bolt 5 are stuck in attachment rail 1
Both sides, by the hoop of attachment rail 1 in inside, the bolt head of U-bolt 5 passes through the connecting plate at 3 top of column from the top down, and spiral shell is used in combination
Mother is fixed.When needing to remove bracket, nut is unloaded.
Further, refering to fig. 1, a kind of specific embodiment party as pneumatic monorail crane mounting device provided by the invention
Formula, bottom girder 2 and the bottom of mine laneway are in direct contact, and bracket is dragged in tunnel to transport pneumatic monorail crane 4, the bottom in tunnel
Out-of-flatness, in the dragging process of bracket, bottom girder 2 is easy to be stuck at the bumps of tunnel bottom, and the both ends of bottom girder 2 are folded upward at
15 °~20 °, and round-corner transition is processed into bending place, after the both ends of bottom girder 2 are upturned, bottom girder 2 can be suitable in tunnel
Profit slides.
Further, referring to Fig. 1, a kind of specific embodiment party as pneumatic monorail crane mounting device provided by the invention
Formula, lifting gear are chain block 12, and the fixing piece for hanging trapped orbit 11, attachment rail are pre-set at the top of tunnel
Two fixed codes 7 are welded in 1 upper surface, and the interval of two fixed codes 7 is identical as the interval of fixing piece, one end of chain block 12
It hangs on fixing piece, the other end is hung in fixed code 7, firmly pulls the chain of two chain blocks 12 that can sling mounting rail
Road 1, pneumatic monorail crane 4 and bracket rise together with attachment rail 1.
Further, a kind of specific implementation mode as pneumatic monorail crane mounting device provided by the invention, in order to make
Attachment rail 1 can smoothly fall into the bottom of mine laneway, and ensure that attachment rail 1 can the side of adjustment in mine shaft
To the length of attachment rail 1 is less than the internal diameter of mine shaft.
Pneumatic monorail crane installation method is illustrated now:Pneumatic monorail crane installation method, includes the following steps:
(1) attachment rail 1 is connect with bracket, specific connection type is:The top of column 3 is resisted into attachment rail 1
Lower surface, by 5 lock ring attachment rail 1 of U-bolt, the bolt head of U-bolt 5 passes through the connecting plate at 3 top of column, will with nut
The connecting plate of column 3 is fastened with U-bolt 5, after being connected attachment rail 1 with bracket with U-bolt 5, promotes attachment rail 1 then
Bracket is lifted together.
(2) after attachment rail 1 is connect with bracket, bracket is erected, the parts combination of pneumatic monorail crane 4 is mounted on peace
It fills on track 1, mounting means and the side that pneumatic monorail crane 4 is installed on the trapped orbit 11 at the top of mine laneway in the prior art
Formula is identical, and only from the transition of operation of underground to ground, because the operating space on ground is big, and attachment rail 1 is not fixed, energy
Enough coordinate the line position that is installed into of pneumatic monorail crane 4 to set adjustment, install more convenient, also ensures personnel in installation process
Safety.
(3) after pneumatic monorail crane 4 is installed to attachment rail 1, attachment rail 1, pneumatic monorail crane 4 and bracket are put together
Enter for into the cage of mine inside transport equipment and personnel, the size of cage to be suitable with the size of mine shaft, if tank
Cage is cylindrical shape, then the length of attachment rail 1 is necessarily less than the internal diameter of cage, if cage is rectangular-shape, attachment rail 1
Length be necessarily less than the length of cage.
(4) after cage drops to mine bottom, bracket is hauled out into cage, and bracket, the bottom of bracket are dragged along mine laneway
2 both ends of beam are upturned, and in dragging process, bottom girder 2 will not be stuck with rough tunnel bottom, also, this type
Labour-saving effect can be played like the shape of skis when dragging bracket.
(5) bracket is dragged to the installation site of pneumatic monorail crane 4, that is, the broken end of trapped orbit 11, with by hand
One end of cucurbit 12 is drawn to hang in the hanging code 7 that 1 top of attachment rail is welded, the other end hangs over the fixing piece pre-installed at the top of tunnel
On because the installation of trapped orbit 11 is also to be lifted on the top in tunnel, tunnel top along the extension side of trapped orbit 11
To interval mounting fixing parts, fixing piece is embedded in the rock or soil layer at the top of tunnel and is reinforced, and trapped orbit 11 is logical
Cross the top that fixing piece is lifted on tunnel.Because the fixing piece interval setting at the top of tunnel leans on two close end in attachment rail 1
A hanging code 7 is respectively installed in the position in portion, and the spacing of two hanging codes 7 is identical as the spacing of two neighboring fixing piece, each fixing piece
It is connected with a chain block 12 between its corresponding hanging code 7, when lifting by crane attachment rail 1, while pulling two chain blocks
12, attachment rail 1 is lifted to the height and position with trapped orbit 11.
With reference to Fig. 2, after attachment rail 1 to be lifted to the height at 11 place of trapped orbit, by attachment rail 1 and trapped orbit
11 docking, because attachment rail 1 and trapped orbit 11 are rigid member, are inconvenient to adjust attachment rail 1 during docking
Position and angle, need at this time between attachment rail 1 and trapped orbit 11 install additional one section of twilight orbit 10, twilight orbit 10
Length be 1 length of attachment rail 1/10.Trapped orbit 11 at the top of tunnel is also that merogenesis splicing is installed, and is often saved
The top both ends of trapped orbit 11 are equipped with connection otic placode 6, and two adjacent sections trapped orbit 11 is connected as one by connection otic placode 6
Body, what attachment rail 1 was selected is a section trapped orbit 11, so also respectively there are one engaging lugs at the top both ends of attachment rail 1
Plate 6, in order to complete the connection of attachment rail 1 and twilight orbit 10 and the connection of twilight orbit 10 and trapped orbit 11, in mistake
A connection otic placode 6 is also respectively installed at the top both ends for crossing track 10, and above each installation otic placode 6 is respectively provided with pin hole, wherein is located at
The pin hole of the connection otic placode 6 of twilight orbit 10 is lateral oval pinhole, is located at the connection otic placode of attachment rail 1 and trapped orbit 11
6 pin hole is round hole, will be the reason of being arranged to lateral oval pinhole positioned at the pin hole of the connection otic placode 6 of twilight orbit 10:
After attachment rail 1 is docked with twilight orbit 10 and twilight orbit 10 with trapped orbit 11, two components of interconnection need
There is certain activity space, after installing axis pin in the pin hole of connection otic placode 6, axis pin can have certain in oval pin hole
Activity space.
With reference to Fig. 2, at the bottom both ends of every section trapped orbit 11, respectively one overlap joint block of welding, one end are upper overlap joint block 8, separately
One end is lower overlap joint block 9, and the upper surface of lower overlap joint block 9 is equipped with the groove to match with upper overlap joint block 8, is connected in trapped orbit 11
When, first upper overlap joint block 8 is caught in the groove of the lower overlap joint block 9 of adjacent section trapped orbit 11, then adjacent two are passed through with axis pin
Save the pin hole of the connection otic placode 6 at trapped orbit 11 top both ends, complete the connection of trapped orbit 11, similarly, attachment rail 1 with
And overlap joint block 8 and lower overlap joint block 9 are also welded in the bottom both ends of twilight orbit 10, and the upper overlap joint block 8 of twilight orbit 10 is caught in
The groove of the lower overlap joint block 9 of attachment rail 11, the upper overlap joint block 8 of attachment rail 1 are caught in the recessed of the lower overlap joint block 9 of twilight orbit 10
Slot, then attachment rail 1, twilight orbit 10 are connected with the connection otic placode of trapped orbit 11 by axis pin.Connect attachment rail 1
Afterwards, it because allowing certain activity space, attachment rail 1 that can tilt certain angle, is carried for the dismounting of subsequent bracket
For convenient.
(6) nut of U-bolt 5 is removed, during tearing nut open, lifts bracket upwards, after U-bolt 5 is removed,
Bracket is detached with attachment rail 1, and bracket is leaned against to the side wall in tunnel,
(7) it gives pneumatic monorail crane 4 to connect air source, starts pneumatic monorail crane 4, by pneumatic monorail crane 4 by connecting track 10
Trapped orbit 11 is driven into, limited block then is installed in the end of trapped orbit 11, prevents pneumatic monorail crane 4 from during normal use sliding
Go out trapped orbit.After pneumatic monorail crane 4 drives into trapped orbit, attachment rail 1 and twilight orbit 10 remove, by attachment rail 1, support
Frame, twilight orbit 10 transport mine by mine shaft together.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention
All any modification, equivalent and improvement etc., should all be included in the protection scope of the present invention made by within refreshing and principle.
Claims (10)
1. pneumatic monorail crane mounting device, it is characterised in that:Include attachment rail for lifting pneumatic monorail crane and for
The bracket slided in mine laneway, the attachment rail are set to the top of the bracket, the attachment rail and mine laneway
The trapped orbit specification at top is identical, and the bracket is set to the lower section of the attachment rail, the bracket and the attachment rail
Flexible connection, the top of the attachment rail are equipped with the lifting gear for lifting the attachment rail.
2. pneumatic monorail crane mounting device as described in claim 1, it is characterised in that:The bracket includes bottom girder and column,
The upper surface of the bottom girder is fixed in the bottom end of the column, and the top of the column is flexibly connected with the attachment rail.
3. pneumatic monorail crane mounting device as claimed in claim 2, it is characterised in that:The top of the column and the installation
Track bolt connects, and the bolt is U-bolt, and the top of the column is equipped with connecting plate, the bolt head point of the U-bolt
Not Wei Yu the attachment rail both sides and be passed down through connecting plate setting, the bolt head of the U-bolt is equipped with and it
The nut to match.
4. pneumatic monorail crane mounting device as claimed in claim 2, it is characterised in that:It tilts upward at the both ends of the bottom girder
It rises, be arranged in obtuse angle with the middle part of the bottom girder, the both ends of the bottom girder and the junction setting round-corner transition at middle part.
5. pneumatic monorail crane mounting device as described in claim 1, it is characterised in that:The top of the lifting gear and mine
Fixing piece mounting, bottom and the top of the attachment rail at the top of tunnel mount.
6. pneumatic monorail crane mounting device as described in claim 1, it is characterised in that:The length of the attachment rail is less than mine
The internal diameter of well vertical shaft.
7. using the installation method of pneumatic monorail crane mounting device as claimed in any one of claims 1 to 6, it is characterised in that:Packet
Include following steps:
(1) attachment rail is erected at pallet top;
(2) pneumatic monorail crane is mounted in attachment rail;
(3) attachment rail and bracket are transferred by vertical shaft to mine bottom;
(4) bracket is dragged to the installation site of pneumatic monorail crane along mine laneway;
(5) attachment rail and bracket be increased to the height of trapped orbit together with lifting gear, and by attachment rail and fixation
Orbital docking;
(6) bracket is removed from attachment rail;
(7) pneumatic monorail crane is driven into trapped orbit.
8. pneumatic monorail crane installation method as claimed in claim 7, it is characterised in that:In step (3), pneumatic single track will be housed
The attachment rail and the bracket hung is packed into together in the cage of mine well head, and the cage is fallen into the shaft bottom of mine.
9. pneumatic monorail crane installation method as claimed in claim 7, it is characterised in that:In step (5), the attachment rail with
When the trapped orbit docking, transition rail, the transition rail are installed in the butt end of the attachment rail and the trapped orbit
It is hinged with the attachment rail and the trapped orbit respectively.
10. pneumatic monorail crane installation method as claimed in claim 7, it is characterised in that:In step (4), the bottom of the bracket
Portion is contacted with the basal sliding of mine laneway.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810438275.1A CN108657949B (en) | 2018-05-09 | 2018-05-09 | Pneumatic monorail crane installation device and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810438275.1A CN108657949B (en) | 2018-05-09 | 2018-05-09 | Pneumatic monorail crane installation device and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108657949A true CN108657949A (en) | 2018-10-16 |
CN108657949B CN108657949B (en) | 2020-05-12 |
Family
ID=63778268
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810438275.1A Active CN108657949B (en) | 2018-05-09 | 2018-05-09 | Pneumatic monorail crane installation device and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108657949B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109458187A (en) * | 2018-12-31 | 2019-03-12 | 厦门厦工中铁重型机械有限公司 | A kind of shield machine cutter transfer device |
CN110847952A (en) * | 2019-10-23 | 2020-02-28 | 石家庄中航机电装备制造有限公司 | Single-rail movable air source for coal mine tunnel |
CN113602963A (en) * | 2021-08-20 | 2021-11-05 | 内蒙古上海庙矿业有限责任公司 | Monorail crane installation method |
CN118026067A (en) * | 2024-04-12 | 2024-05-14 | 石家庄煤矿机械有限责任公司 | Auxiliary device for laying track of monorail crane |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3618440A1 (en) * | 1986-05-31 | 1987-12-03 | Gewerk Eisenhuette Westfalia | Excavation frame for use in inclined and semi-inclined stratification |
CN102748055A (en) * | 2012-07-18 | 2012-10-24 | 沈阳天安矿山机械科技有限公司 | Circulation advancing type forepoling support |
CN203200622U (en) * | 2013-04-24 | 2013-09-18 | 北京凯润机电设备制造有限责任公司 | Monorail crane rail connection suspension device |
CN103738352A (en) * | 2013-12-24 | 2014-04-23 | 山东新阳能源有限公司 | Complete moving method of monorail crane |
CN103742175A (en) * | 2013-12-16 | 2014-04-23 | 国投新集能源股份有限公司 | Method for installing monorail crane rail in coal mine roadway |
CN203667819U (en) * | 2013-12-13 | 2014-06-25 | 新汶矿业集团有限责任公司华丰煤矿 | Large-dip angle lane monorail crane transporting device |
CN105545334A (en) * | 2016-03-07 | 2016-05-04 | 山东科技大学 | Continuous operation variable section type temporary supporting bracket and operation method thereof |
CN205675037U (en) * | 2016-06-24 | 2016-11-09 | 永城煤电控股集团有限公司 | A kind of monorail crane locomotive inclined drift vehicle block fence |
CN207005642U (en) * | 2017-07-21 | 2018-02-13 | 陕西陕煤黄陵矿业有限公司 | A kind of monorail crane jack device |
-
2018
- 2018-05-09 CN CN201810438275.1A patent/CN108657949B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3618440A1 (en) * | 1986-05-31 | 1987-12-03 | Gewerk Eisenhuette Westfalia | Excavation frame for use in inclined and semi-inclined stratification |
CN102748055A (en) * | 2012-07-18 | 2012-10-24 | 沈阳天安矿山机械科技有限公司 | Circulation advancing type forepoling support |
CN203200622U (en) * | 2013-04-24 | 2013-09-18 | 北京凯润机电设备制造有限责任公司 | Monorail crane rail connection suspension device |
CN203667819U (en) * | 2013-12-13 | 2014-06-25 | 新汶矿业集团有限责任公司华丰煤矿 | Large-dip angle lane monorail crane transporting device |
CN103742175A (en) * | 2013-12-16 | 2014-04-23 | 国投新集能源股份有限公司 | Method for installing monorail crane rail in coal mine roadway |
CN103738352A (en) * | 2013-12-24 | 2014-04-23 | 山东新阳能源有限公司 | Complete moving method of monorail crane |
CN105545334A (en) * | 2016-03-07 | 2016-05-04 | 山东科技大学 | Continuous operation variable section type temporary supporting bracket and operation method thereof |
CN205675037U (en) * | 2016-06-24 | 2016-11-09 | 永城煤电控股集团有限公司 | A kind of monorail crane locomotive inclined drift vehicle block fence |
CN207005642U (en) * | 2017-07-21 | 2018-02-13 | 陕西陕煤黄陵矿业有限公司 | A kind of monorail crane jack device |
Non-Patent Citations (1)
Title |
---|
邢远提: "单轨吊机车快速安装与拆除技术", 《内蒙古煤炭经济》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109458187A (en) * | 2018-12-31 | 2019-03-12 | 厦门厦工中铁重型机械有限公司 | A kind of shield machine cutter transfer device |
CN109458187B (en) * | 2018-12-31 | 2023-11-24 | 厦门厦工中铁重型机械有限公司 | Cutter transferring device of shield tunneling machine |
CN110847952A (en) * | 2019-10-23 | 2020-02-28 | 石家庄中航机电装备制造有限公司 | Single-rail movable air source for coal mine tunnel |
CN110847952B (en) * | 2019-10-23 | 2021-03-02 | 石家庄中航机电装备制造有限公司 | Single-rail movable air source for coal mine tunnel |
CN113602963A (en) * | 2021-08-20 | 2021-11-05 | 内蒙古上海庙矿业有限责任公司 | Monorail crane installation method |
CN113602963B (en) * | 2021-08-20 | 2023-11-24 | 内蒙古上海庙矿业有限责任公司 | Monorail crane installation method |
CN118026067A (en) * | 2024-04-12 | 2024-05-14 | 石家庄煤矿机械有限责任公司 | Auxiliary device for laying track of monorail crane |
CN118026067B (en) * | 2024-04-12 | 2024-07-12 | 石家庄煤矿机械有限责任公司 | Auxiliary device for laying track of monorail crane |
Also Published As
Publication number | Publication date |
---|---|
CN108657949B (en) | 2020-05-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108657949A (en) | Pneumatic monorail crane mounting device and installation method | |
CN104775825B (en) | Single-well integral starting construction method of shield tunneling machine | |
MX2008011437A (en) | System for conducting jointed pipe and coiled tubing operations. | |
CN108361034A (en) | A kind of order mining large-mining-height working surface is quickly moved technique | |
CN104712356B (en) | A kind of hydraulic pressure supports tunnel sectional shelf-unit and construction method from moving circulation | |
WO2020098394A1 (en) | Gob-side entry confined concrete supporting construction device and mechanized construction method | |
CN201546176U (en) | Curtain board mounting trolley | |
CN114033398A (en) | Construction method for returning of low gravity center dragging method shield back matching trolley tunnel | |
CN109368137A (en) | A kind of dumping plough transition dislocation method | |
CN111287498B (en) | Protective shed frame for construction of overhead bridge box girder crossing railway and erection method | |
CN107858925A (en) | Platform structure for the operation of pier stud overhead connection | |
CN106869982B (en) | A kind of mobile device for underground heavy type holder | |
CN205532273U (en) | Moment of torsion multiplier fixing device and roofbolter | |
CN103663172B (en) | A kind of comprehensive get beam partly turn round cantilever crane | |
CN114109416B (en) | Method for replacing TBM main bearing in tunnel | |
CN206650408U (en) | A kind of coal cutting roadway is servo-actuated cable-pulling chain car | |
CN109703999A (en) | A kind of pipe gallery is with can get higher overturn-preventing intelligent track vehicle | |
CN208330428U (en) | A kind of suspension device for coal mine driving | |
CN104372746A (en) | Prefabricated post-tensioning-method simply-supported T-girder concrete injection formwork support and mounting process thereof of railway bridge | |
CN210087340U (en) | High-speed railway tunnel detects and maintenance platform truck | |
CN103708370B (en) | The pneumatic lift rope supporting device of mining inclined tunnel | |
CN208326713U (en) | Opencut across stope transport steel construction belt conveyor bridge | |
CN208328708U (en) | A kind of lifting construction platform of overhead top of bridge pier operation | |
DE3839001C2 (en) | ||
CN109630167A (en) | A kind of coal mine underground hydraulic support frame loading/unloading platform and loading-unloading vehicle method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 054000 No.126 Tuanjie West Street, Qiaoxi District, Xingtai City, Hebei Province Patentee after: Hebei Coal Science Research Institute Co.,Ltd. Address before: 054000 No.126 Tuanjie West Street, Qiaoxi District, Xingtai City, Hebei Province Patentee before: HEBEI COAL Research Institute |