CN108655670A - A kind of high pressure stainless steel acetylene filling pipe construction technique - Google Patents

A kind of high pressure stainless steel acetylene filling pipe construction technique Download PDF

Info

Publication number
CN108655670A
CN108655670A CN201810545804.8A CN201810545804A CN108655670A CN 108655670 A CN108655670 A CN 108655670A CN 201810545804 A CN201810545804 A CN 201810545804A CN 108655670 A CN108655670 A CN 108655670A
Authority
CN
China
Prior art keywords
pipe
sub
filling
stainless steel
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810545804.8A
Other languages
Chinese (zh)
Inventor
吴金宝
韩巨虎
高义龙
岳文璞
王艳忠
张彪
杜全林
要华林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Industrial Equipment Installation Group Co Ltd
Original Assignee
Shanxi Industrial Equipment Installation Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Industrial Equipment Installation Group Co Ltd filed Critical Shanxi Industrial Equipment Installation Group Co Ltd
Priority to CN201810545804.8A priority Critical patent/CN108655670A/en
Publication of CN108655670A publication Critical patent/CN108655670A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Abstract

The invention discloses a kind of high pressure stainless steel acetylene to fill pipe construction technique, includes the following steps:Step 1, the cutting stock number of main pipe;Step 2, retaining wall on slope;Step 3 carries out sub- pipe blanking according to main pipe;Step 4, son of polishing manage outer burr;Step 5 fills son pipe;Step 6, sub- pipe are levelling;Step 7, interior mill pipe;Step 8, filling sizing, spot welding sub- pipe;The group pair of step 9, straight pipe and straight pipe, step 10, pipe fitting, flange group pair;Step 11, pipe fitting fill filler;Step 12, setting pipe factoryization is prefabricated, the invention, and straight pipe is integral-filled:Research and development filling platform, is constructed using integral-filled method, solves the low, phenomenon of poor quality by the sub- tube efficiency of root filling;Integral-filled sub- pipe, sub- pipe arrangement spacing quality is preferable after filling, and without staggeredly collapse phenomenon, and progress is greatly improved, and revolutionizes traditional straight pipe filling construction technology.

Description

A kind of high pressure stainless steel acetylene filling pipe construction technique
Technical field
The present invention relates to acetylene filling Manifold technology field, specially a kind of high pressure stainless steel acetylene fills pipe construction technique.
Background technology
In recent years, Chinese BDO production capacity had occurred from a small scale to the trend of extensive development, BDO device cores Technique acetylene fill pipe, fill pipe construction belong to new process, and technology content is higher, and associated construction specification, scheme, technology are total Tie less, and medium is acetylene in managing, and belongs to Class A fuel gas, inflammable and explosive, filling pipe construction quality directly affects and is The safety in production of system.Existing acetylene fills pipe construction technique, be easy explosion and sub- pipe will appear staggeredly, metaboly, with Toward tubule fill method is used, workload is bigger, therefore designs a kind of high pressure stainless steel acetylene filling pipe construction technique.
Invention content
The purpose of the present invention is to provide a kind of high pressure stainless steel acetylene to fill pipe construction technique, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, the present invention provides the following technical solutions:A kind of high pressure stainless steel acetylene filling pipe construction work Skill includes the following steps:Step 1, the cutting stock number of main pipe;Step 2, retaining wall on slope;Step 3 carries out son according to main pipe Pipe blanking;Step 4, son of polishing manage outer burr;Step 5 fills son pipe;Step 6, sub- pipe are levelling;Step 7, interior mill pipe; Step 8, filling sizing, spot welding sub- pipe;The group pair of step 9, straight pipe and straight pipe, step 10, pipe fitting, flange group pair; Step 11, pipe fitting fill filler;Step 12, setting pipe factoryization are prefabricated;
Wherein in above-mentioned step one,
1) according to material, specification, model the selection of material as defined in pipeline axonometric drawing, prefabrication of tube section blanking should be reasonable;Adjustment section is pressed According to the length processing of field measurement;
2) the actual measurement size before pipe prefabrication, measurement method should be correct, and data are accurate, avoid returning because of lower wrong size Work;
3) stainless steel tube cut using special grinding wheel piece, reconditioning;
4) cut surface is answered smooth, and size should correctly and the oxides such as flawless, pipe, burr, convex-concave, necking and slag;
5)Pipe notch end face dip deviation should not exceed the 1% of tube outer diameter, and be not more than 3mm;
6)Pipeline number, length should be identified in time for blanking and prefabricated pipeline section;Under should being marked in corresponding pipeline axonometric drawing The pipeline section of material;
7)In prefabrication of tube section, finished product material, semi-finished product material and clout should be stacked and neatly carry out mark respectively;
Wherein in above-mentioned step two, joint form:Docking, groove type;V-type, bevel angle:60~65 °, root face;1~ 2mm, gap are 0~1mm;
Wherein in above-mentioned step three, first by sub- pipe every 10 bundled with adhesive tape, integral cutting, improve efficiency;Son pipe Should carry out blanking according to main pipe length and construction part;Cut surface is answered smooth, and size should be correct;
Wherein in above-mentioned step four, after the completion of sub- pipe cutting stock, outer burr of line up etc. is answered to be carried out clearly with sanding machine Reason is clean;
Wherein in above-mentioned step five, straight pipe is filled with the pipeline of Φ 10 when filling sub- pipe;When filling should at random to Discharge pipe, sub- tube spacing should be less than 8mm in main pipe;Longer straight pipe uses integral-filled method;
Wherein in above-mentioned step six, boss is made according to main pipe size and filling position, main pipe is sleeved on boss, main pipe It is sleeved on boss, makes sub- pipe protrusion main pipe 8cm, sub- bottom of the tube is smooth, carries out polishing end face according to actual conditions, one end has been handled At reprocessing other end;
Wherein in above-mentioned step seven, generally use goes flash removed, a bad processing of small pin for the case pipe inner burr, system using interior grinding machine Row hook is hooked into as burr to draw;
Wherein in above-mentioned step eight, want spot-welded together between sub- pipe, at most there are one solder joint on every pipe, filling pipe is exhausted To not allowing loose phenomenon occur, it is subject to all pipe fixations;Number of welds is as few as possible;In order to avoid influencing acetylene stream Speed;Several points are fixed with inner wall of the pipe spot welding, several cun of main pipe after sub- pipe positioning, the pipe of such as 4 〞 fixes at 4 points, and filling is prevented to manage It is mobile;
Wherein in above-mentioned step nine, straight pipe and straight pipe group clock synchronization, it is ensured that have gap between filling pipe;Work as pipeline Open nozzle should be closed in time by having in construction when interruption;Prefabricated pipeline section should be sealed in time, sundries is avoided enter into and block up Plug;Weld seam non-destructive testing should be timely, avoids the occurrence of phenomenon of doing over again;
Wherein in above-mentioned step ten,
1) pipe and pipe fitting group clock synchronization, inner wall should be concordant, and inner wall unfitness of butt joint is not more than 2mm no more than the 10% of thickness of pipe wall;
2)When flange is installed, flange sealing surface and gasket seal must not have the defects of cut, spot;
3)Flanged joint should be concentric with pipeline, and bolt should be able to freely pass into;Flange bolt answers span centre to arrange;It is answered between Flange Plane Keeping parallelism, deviation are not greater than the 0.15% of flange outer diameter and are not more than 2mm;The crooked not handy strong tight spiral shell of bump joint The method of bolt is eliminated;
4)Weldment surfaces externally and internally should be removed totally not less than oil, paint, embroidery, the burr etc. within the scope of 100mm, and end face must not have The defects of crackle, interlayer;
5)Within the scope of the stainless steel weldment groove each 100mm in both sides, should be taken before welding prevents spatter object from staiing weldment table The measure in face, preferably uses whiting;
Wherein in above-mentioned step ten one,
1) the position filling stainless steel Raschig ring of leaching etc. is led in pressure gauge, thermometer, emptying:The sub- end surfaces of A apart from exoculation position not It should be too close;B stainless steel Raschig rings huddle filling, and Raschig ring need not be compacted, pile with naturally;C can not horizontal group after filling out Raschig ring To pipeline section, make Raschig ring make closure plate, block filler, facilitate group to installation;
2) elbow, threeway, the filling at reduced pipe;Elbow will have one end upward when filling, and filling is huddled with stainless steel Raschig ring, Raschig ring need not be compacted, and be piled with naturally;
3)The filling of flange carries out blanking according to flange neck size, fills son pipe, after stoppering, wants spot-welded together between sub- pipe, To prevent filling pipe movement with flange inner wall spot welding after the positioning of sub- pipe, and to ensure sub- end surfaces away from end face of flange suitably away from From;
4)The filling of valve;A overcurrents, which are the plug valve of gas, to be needed to fill;B makes 6mm wooden units and is put into according to valve internal size Valve internal, for control sub- end surfaces and valve core chamber away from;Mold is made according to valve specification, then utilizes sub- pipe pipe nipple therefrom Between to both sides be discharged into valve successively, cutting polishing, levelling, spot welding are carried out after marking;
Wherein in above-mentioned step ten two, establish pipe prefabrication station so that pipe prefabrication be mounted on time, space and tissue On be completely separated.
According to above-mentioned technical proposal, in step 6, main construction material prepares:Stainless steel plate δ 6mm, stainless steel tube, electric welding Machine, cutting machine, δ 3mm polyfluortetraethylene plates etc..
According to above-mentioned technical proposal, in step 5, integral-filled method is that have made operation using channel steel, steel plate etc. flat Platform, tube bank fixture is made using pipeline main pipe clout, and tube bank fixture concentricity is placed one for every 0.5 meter, sub- pipe is filled into It restrains in fixture, sub- pipe is inserted in main pipe one end, the other end, which is placed, shrinks baffle, pulls baffle by jack, main pipe is made to slide, Sub- pipe integrally enters in main pipe.
According to above-mentioned technical proposal, in step 2, groove is polished using sanding machine stainless steel special grinding wheel piece.
According to above-mentioned technical proposal, in step 5, often last a few root pipes filling difficulty are big when filling, and when filling can be used Hand hammer gently taps main pipe, enters convenient for sub- pipe.
According to above-mentioned technical proposal, in step 9, gap is 6mm~8mm.
According to above-mentioned technical proposal, in step 11, distance of the sub- end surfaces away from end face of flange 3mm.
According to above-mentioned technical proposal, in step 1, a section adjustment section should be respectively stayed according to X, Y direction in pipeline axonometric drawing.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention,(1)Straight pipe is integral-filled:Research and development filling is flat Platform is constructed using integral-filled method, solves the low, phenomenon of poor quality by the sub- tube efficiency of root filling;Integral-filled sub- pipe, filling Sub- pipe arrangement spacing quality is preferable afterwards, and without staggeredly collapse phenomenon, and progress is greatly improved, and revolutionizes traditional straight tube Section filling construction technology;(2)Pipe fitting is filled:Pipe fitting purchases finished product, and packing material is changed to Raschig ring, and it is western using drawing to block Raschig ring Ring closure plate, changes the sub- pipe filling of tradition, and the method that pipe fitting field lofting makes reduces the workloads such as polishing, welding;It has There is the features such as operating efficiency is high, construction quality is good, easy to operate, changes traditional pipe fitting filling construction technology;(3)Boss is answered With:Boss is developed according to main pipe size and filling position, main pipe is sleeved on boss, keeps the sub- bottom of the tube in bottom smooth, according to reality Border situation carries out polishing end face, adjusts sub- tube spacing, welds the processes such as sub- pipe;One end processing is completed, in processing other end;It Have the characteristics that construction quality is good, easy to operate;(4)BIM technology application:In drawing joint examination, working procedure simulation, 3-D technology Tell somebody what one's real intentions are, goods and materials and cost control, quality control, stringing measure, welding control measure this several big application points carry out technology explorations with It breaks through.
Description of the drawings
Fig. 1 is the construction flow chart of the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, a kind of high pressure stainless steel acetylene filling pipe construction technique includes the following steps:Step 1, main pipe are cut Cut off material number;Step 2, retaining wall on slope;Step 3 carries out sub- pipe blanking according to main pipe;Step 4, son of polishing manage outer burr;Step Rapid five, fill son pipe;Step 6, sub- pipe are levelling;Step 7, interior mill pipe;Step 8, filling sizing, spot welding sub- pipe;Step Nine, the group pair of straight pipe and straight pipe, step 10, pipe fitting, flange group pair;Step 11, pipe fitting fill filler;Step 10 Two, setting pipe factoryization is prefabricated;
Wherein in above-mentioned step one,
1) according to material, specification, model the selection of material as defined in pipeline axonometric drawing, prefabrication of tube section blanking should be reasonable, should be according to pipe X, Y direction respectively stay a section adjustment section in road axonometric drawing;Adjustment section according to field measurement length processing;
2) the actual measurement size before pipe prefabrication, measurement method should be correct, and data are accurate, avoid returning because of lower wrong size Work;
3) stainless steel tube cut using special grinding wheel piece, reconditioning;
4) cut surface is answered smooth, and size should correctly and the oxides such as flawless, pipe, burr, convex-concave, necking and slag;
5)Pipe notch end face dip deviation should not exceed the 1% of tube outer diameter, and be not more than 3mm;
6)Pipeline number, length should be identified in time for blanking and prefabricated pipeline section;Under should being marked in corresponding pipeline axonometric drawing The pipeline section of material;
7)In prefabrication of tube section, finished product material, semi-finished product material and clout should be stacked and neatly carry out mark respectively;
Wherein in above-mentioned step two, joint form:Docking, groove type;V-type, bevel angle:60~65 °, root face;1~ 2mm, gap are 0~1mm;Groove is polished using sanding machine stainless steel special grinding wheel piece;
Wherein in above-mentioned step three, first by sub- pipe every 10 bundled with adhesive tape, integral cutting, improve efficiency;Son pipe Should carry out blanking according to main pipe length and construction part;Cut surface is answered smooth, and size should be correct;
Wherein in above-mentioned step four, after the completion of sub- pipe cutting stock, outer burr of line up etc. is answered to be carried out clearly with sanding machine Reason is clean;
Wherein in above-mentioned step five, straight pipe is filled with the pipeline of Φ 10 when filling sub- pipe;When filling should at random to Discharge pipe, sub- tube spacing should be less than 8mm in main pipe;Often last a few root pipes filling difficulty are big when filling, and when filling can be used Hand hammer gently taps main pipe, enters convenient for sub- pipe, and it is to utilize slot that longer straight pipe, which uses integral-filled method, integral-filled method, Steel, steel plate etc. have made operating platform, make tube bank fixture using pipeline main pipe clout, will restrain every 0.5 meter of fixture concentricity One is placed, sub- pipe is filled into tube bank fixture, sub- pipe is inserted in main pipe one end, the other end, which is placed, shrinks baffle, by falling Chain pulls baffle, so that main pipe is slided, sub- pipe integrally enters in main pipe;
Wherein in above-mentioned step six, boss is made according to main pipe size and filling position, main pipe is sleeved on boss, main pipe It is sleeved on boss, makes sub- pipe protrusion main pipe 8cm, sub- bottom of the tube is smooth, carries out polishing end face according to actual conditions, one end has been handled At reprocessing other end, main construction material prepares:Stainless steel plate δ 6mm, stainless steel tube, electric welding machine, cutting machine, δ 3mm are poly- Tetrafluoroethene plate etc.;
Wherein in above-mentioned step seven, generally use goes flash removed, a bad processing of small pin for the case pipe inner burr, system using interior grinding machine Row hook is hooked into as burr to draw;
Wherein in above-mentioned step eight, want spot-welded together between sub- pipe, at most there are one solder joint on every pipe, filling pipe is exhausted To not allowing loose phenomenon occur, it is subject to all pipe fixations;Number of welds is as few as possible;In order to avoid influencing acetylene stream Speed;Several points are fixed with inner wall of the pipe spot welding, several cun of main pipe after sub- pipe positioning, the pipe of such as 4 〞 fixes at 4 points, and filling is prevented to manage It is mobile;
Wherein in above-mentioned step nine, straight pipe and straight pipe group clock synchronization, it is ensured that the gap of 6mm~8mm between filling pipe; Open nozzle should be closed in time when there is interruption in pipeline construction;Prefabricated pipeline section should be sealed in time, avoided enter into miscellaneous Object and block;Weld seam non-destructive testing should be timely, avoids the occurrence of phenomenon of doing over again;
Wherein in above-mentioned step ten,
1) pipe and pipe fitting group clock synchronization, inner wall should be concordant, and inner wall unfitness of butt joint is not more than 2mm no more than the 10% of thickness of pipe wall;
2)When flange is installed, flange sealing surface and gasket seal must not have the defects of cut, spot;
3)Flanged joint should be concentric with pipeline, and bolt should be able to freely pass into;Flange bolt answers span centre to arrange;It is answered between Flange Plane Keeping parallelism, deviation are not greater than the 0.15% of flange outer diameter and are not more than 2mm;The crooked not handy strong tight spiral shell of bump joint The method of bolt is eliminated;
4)Weldment surfaces externally and internally should be removed totally not less than oil, paint, embroidery, the burr etc. within the scope of 100mm, and end face must not have The defects of crackle, interlayer;
5)Within the scope of the stainless steel weldment groove each 100mm in both sides, should be taken before welding prevents spatter object from staiing weldment table The measure in face, preferably uses whiting;
Wherein in above-mentioned step ten one,
1) the position filling stainless steel Raschig ring of leaching etc. is led in pressure gauge, thermometer, emptying:The sub- end surfaces of A apart from exoculation position not It should be too close;B stainless steel Raschig rings huddle filling, and Raschig ring need not be compacted, pile with naturally;C can not horizontal group after filling out Raschig ring To pipeline section, make Raschig ring make closure plate, block filler, facilitate group to installation;
2) elbow, threeway, the filling at reduced pipe;Elbow will have one end upward when filling, and filling is huddled with stainless steel Raschig ring, Raschig ring need not be compacted, and be piled with naturally;
3)The filling of flange carries out blanking according to flange neck size, fills son pipe, after stoppering, wants spot-welded together between sub- pipe, To prevent filling pipe movement with flange inner wall spot welding after the positioning of sub- pipe, and to ensure sub- end surfaces away from end face of flange 3mm away from From;
4)The filling of valve;A overcurrents, which are the plug valve of gas, to be needed to fill;B makes 6mm wooden units and is put into according to valve internal size Valve internal, for control sub- end surfaces and valve core chamber away from;Mold is made according to valve specification, then utilizes sub- pipe pipe nipple therefrom Between to both sides be discharged into valve successively, cutting polishing, levelling, spot welding are carried out after marking;
Wherein in above-mentioned step ten two, establish pipe prefabrication station so that pipe prefabrication be mounted on time, space and tissue On be completely separated.
Based on above-mentioned, it is an advantage of the current invention that of the invention, it is thinner to fill sub- pipe caliber, when being filled when straight pipe is longer Sub- pipe will appear deformation, staggeredly phenomenon;In order to avoid this phenomenon, filling platform is developed, integral-filled sub- pipe is carried out, it is sub after filling Pipe arrangement spacing quality is preferable, and without staggeredly phenomenon, and progress is greatly improved;Operation has been made using channel steel, steel plate etc. Platform, tube bank fixture is made using pipeline main pipe clout, and tube bank fixture concentricity is placed one for every 0.5 meter, sub- pipe is filled Into tube bank fixture, sub- pipe is inserted in main pipe one end, the other end, which is placed, shrinks baffle, pulls baffle by jack, main pipe is made to slide Dynamic, sub- pipe integrally enters in main pipe;Sub- pipe arrangement spacing quality is preferable after filling, and without staggeredly collapse phenomenon, and progress has Prodigious raising;Boss is made according to main pipe size and filling position, facilitates sub- pipe to go the work such as flash removed, levelling, according to mother Pipe size and filling position make boss, and main pipe is sleeved on boss, and main pipe is sleeved on boss, make sub- pipe protrusion main pipe 8cm, son Bottom of the tube is smooth, carries out polishing end face according to actual conditions, one end processing is completed, and in processing other end, solves sub- pipe position In in main pipe remove deburring operation it is inconvenient the problems such as;Filling Raschig ring effectively reduces tube manufacture, cutting, welding engineering Amount, reduces the pollution to environment, reduces workload, solve the problems, such as after filling Raschig ring can not horizontal group to pipeline section, solution Determined after filling Raschig ring can not horizontal group to pipeline section problem;Using BIM technology application:Drawing joint examination, working procedure simulation, 3-D technology tells somebody what one's real intentions are, goods and materials and cost control, quality control, stringing measure, welding control measure this several big application points carry out skills Art is explored and is broken through.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of high pressure stainless steel acetylene fills pipe construction technique, include the following steps:The cutting stock of step 1, main pipe is compiled Number;Step 2, retaining wall on slope;Step 3 carries out sub- pipe blanking according to main pipe;Step 4, son of polishing manage outer burr;Step 5 is filled out Fill sub- pipe;Step 6, sub- pipe are levelling;Step 7, interior mill pipe;Step 8, filling sizing, spot welding sub- pipe;Step 9, straight pipe With the group pair of straight pipe, step 10, pipe fitting, flange group pair;Step 11, pipe fitting fill filler;Pipeline is arranged in step 12 Batch production is prefabricated;It is characterized in that:
Wherein in above-mentioned step one,
1) according to material, specification, model the selection of material as defined in pipeline axonometric drawing, prefabrication of tube section blanking should be reasonable;Adjustment section is pressed According to the length processing of field measurement;
2) the actual measurement size before pipe prefabrication, measurement method should be correct, and data are accurate, avoid returning because of lower wrong size Work;
3) stainless steel tube cut using special grinding wheel piece, reconditioning;
4) cut surface is answered smooth, and size should correctly and the oxides such as flawless, pipe, burr, convex-concave, necking and slag;
5)Pipe notch end face dip deviation should not exceed the 1% of tube outer diameter, and be not more than 3mm;
6)Pipeline number, length should be identified in time for blanking and prefabricated pipeline section;Under should being marked in corresponding pipeline axonometric drawing The pipeline section of material;
7)In prefabrication of tube section, finished product material, semi-finished product material and clout should be stacked and neatly carry out mark respectively;
Wherein in above-mentioned step two, joint form:Docking, groove type;V-type, bevel angle:60~65 °, root face;1~ 2mm, gap are 0~1mm;
Wherein in above-mentioned step three, first by sub- pipe every 10 bundled with adhesive tape, integral cutting, improve efficiency;Son pipe Should carry out blanking according to main pipe length and construction part;Cut surface is answered smooth, and size should be correct;
Wherein in above-mentioned step four, after the completion of sub- pipe cutting stock, outer burr of line up etc. is answered to be carried out clearly with sanding machine Reason is clean;
Wherein in above-mentioned step five, straight pipe is filled with the pipeline of Φ 10 when filling sub- pipe;When filling should at random to Discharge pipe, sub- tube spacing should be less than 8mm in main pipe;Longer straight pipe uses integral-filled method;
Wherein in above-mentioned step six, boss is made according to main pipe size and filling position, main pipe is sleeved on boss, main pipe It is sleeved on boss, makes sub- pipe protrusion main pipe 8cm, sub- bottom of the tube is smooth, carries out polishing end face according to actual conditions, one end has been handled At reprocessing other end;
Wherein in above-mentioned step seven, generally use goes flash removed, a bad processing of small pin for the case pipe inner burr, system using interior grinding machine Row hook is hooked into as burr to draw;
Wherein in above-mentioned step eight, want spot-welded together between sub- pipe, at most there are one solder joint on every pipe, filling pipe is exhausted To not allowing loose phenomenon occur, it is subject to all pipe fixations;Number of welds is as few as possible;In order to avoid influencing acetylene stream Speed;Several points are fixed with inner wall of the pipe spot welding, several cun of main pipe after sub- pipe positioning, the pipe of such as 4 〞 fixes at 4 points, and filling is prevented to manage It is mobile;
Wherein in above-mentioned step nine, straight pipe and straight pipe group clock synchronization, it is ensured that have gap between filling pipe;Work as pipeline Open nozzle should be closed in time by having in construction when interruption;Prefabricated pipeline section should be sealed in time, sundries is avoided enter into and block up Plug;Weld seam non-destructive testing should be timely, avoids the occurrence of phenomenon of doing over again;
Wherein in above-mentioned step ten,
1) pipe and pipe fitting group clock synchronization, inner wall should be concordant, and inner wall unfitness of butt joint is not more than 2mm no more than the 10% of thickness of pipe wall;
2)When flange is installed, flange sealing surface and gasket seal must not have the defects of cut, spot;
3)Flanged joint should be concentric with pipeline, and bolt should be able to freely pass into;Flange bolt answers span centre to arrange;It is answered between Flange Plane Keeping parallelism, deviation are not greater than the 0.15% of flange outer diameter and are not more than 2mm;The crooked not handy strong tight spiral shell of bump joint The method of bolt is eliminated;
4)Weldment surfaces externally and internally should be removed totally not less than oil, paint, embroidery, the burr etc. within the scope of 100mm, and end face must not have The defects of crackle, interlayer;
5)Within the scope of the stainless steel weldment groove each 100mm in both sides, should be taken before welding prevents spatter object from staiing weldment table The measure in face, preferably uses whiting;
Wherein in above-mentioned step ten one,
1) the position filling stainless steel Raschig ring of leaching etc. is led in pressure gauge, thermometer, emptying:The sub- end surfaces of A apart from exoculation position not It should be too close;B stainless steel Raschig rings huddle filling, and Raschig ring need not be compacted, pile with naturally;C can not horizontal group after filling out Raschig ring To pipeline section, make Raschig ring make closure plate, block filler, facilitate group to installation;
2) elbow, threeway, the filling at reduced pipe;Elbow will have one end upward when filling, and filling is huddled with stainless steel Raschig ring, Raschig ring need not be compacted, and be piled with naturally;
3)The filling of flange carries out blanking according to flange neck size, fills son pipe, after stoppering, wants spot-welded together between sub- pipe, To prevent filling pipe movement with flange inner wall spot welding after the positioning of sub- pipe, and to ensure sub- end surfaces away from end face of flange suitably away from From;
4)The filling of valve;A overcurrents, which are the plug valve of gas, to be needed to fill;B makes 6mm wooden units and is put into according to valve internal size Valve internal, for control sub- end surfaces and valve core chamber away from;Mold is made according to valve specification, then utilizes sub- pipe pipe nipple therefrom Between to both sides be discharged into valve successively, cutting polishing, levelling, spot welding are carried out after marking;
Wherein in above-mentioned step ten two, establish pipe prefabrication station so that pipe prefabrication be mounted on time, space and tissue On be completely separated.
2. a kind of high pressure stainless steel acetylene according to claim 1 fills pipe construction technique, it is characterised in that:It is main in step 6 Construction material is wanted to prepare:Stainless steel plate δ 6mm, stainless steel tube, electric welding machine, cutting machine, δ 3mm polyfluortetraethylene plates etc..
3. a kind of high pressure stainless steel acetylene according to claim 1 fills pipe construction technique, it is characterised in that:It is whole in step 5 Body fill method is to have made operating platform using channel steel, steel plate etc., makes tube bank fixture using pipeline main pipe clout, will restrain Every 0.5 meter of fixture concentricity places one, and sub- pipe is filled into tube bank fixture, sub- pipe is inserted in main pipe one end, the other end is put Contraction baffle is set, baffle is pulled by jack, so that main pipe is slided, sub- pipe integrally enters in main pipe.
4. a kind of high pressure stainless steel acetylene according to claim 1 fills pipe construction technique, it is characterised in that:In step 2, slope Mouth is polished using sanding machine stainless steel special grinding wheel piece.
5. a kind of high pressure stainless steel acetylene according to claim 1 fills pipe construction technique, it is characterised in that:In step 5, fill out Often last a few root pipes filling difficulty are big when filling, and when filling can gently tap main pipe with hand hammer, enter convenient for sub- pipe.
6. a kind of high pressure stainless steel acetylene according to claim 1 fills pipe construction technique, it is characterised in that:In step 9, Gap is 6mm~8mm.
7. a kind of high pressure stainless steel acetylene according to claim 1 fills pipe construction technique, it is characterised in that:In step 11, Distance of the sub- end surfaces away from end face of flange 3mm.
8. a kind of high pressure stainless steel acetylene according to claim 1 fills pipe construction technique, it is characterised in that:In step 1, answer A section adjustment section is respectively stayed according to X, Y direction in pipeline axonometric drawing.
CN201810545804.8A 2018-05-31 2018-05-31 A kind of high pressure stainless steel acetylene filling pipe construction technique Pending CN108655670A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810545804.8A CN108655670A (en) 2018-05-31 2018-05-31 A kind of high pressure stainless steel acetylene filling pipe construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810545804.8A CN108655670A (en) 2018-05-31 2018-05-31 A kind of high pressure stainless steel acetylene filling pipe construction technique

Publications (1)

Publication Number Publication Date
CN108655670A true CN108655670A (en) 2018-10-16

Family

ID=63774811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810545804.8A Pending CN108655670A (en) 2018-05-31 2018-05-31 A kind of high pressure stainless steel acetylene filling pipe construction technique

Country Status (1)

Country Link
CN (1) CN108655670A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111069852A (en) * 2019-12-09 2020-04-28 东台市润丰法兰制造有限公司 Composite layer flange connection process
CN113953632A (en) * 2021-12-22 2022-01-21 江苏利柏特股份有限公司 Welding process method for large-diameter thick-pipe-wall elbow baffle plate

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101463923A (en) * 2008-12-30 2009-06-24 二十三冶建设集团有限公司 Assembling method for jacketed pipe and its pipe lining apparatus
CN102758966A (en) * 2011-04-27 2012-10-31 五冶集团上海有限公司 Construction method for mounting benzene hydrogenation engineering pressure pipeline
CN102927399A (en) * 2012-11-08 2013-02-13 上海天森辰业化工工程技术有限公司 Pipe fitting for conveying high pressure acetylene
CN104075028A (en) * 2014-07-18 2014-10-01 中国二十二冶集团有限公司 Pipe gallery pipe penetrating construction method
CN105013427A (en) * 2015-07-03 2015-11-04 苏州市科迪石化工程有限公司 Raschig ring filling material
CN105135131A (en) * 2015-08-13 2015-12-09 中化二建集团有限公司 High-pressure acetylene conveying pipe and manufacturing method thereof
CN204986045U (en) * 2015-08-13 2016-01-20 中化二建集团有限公司 High pressure acetylene pipeline
CN105729052A (en) * 2014-12-09 2016-07-06 重庆金国凯畅机床厂 Technology for cutting and groove processing of pipeline
CN205978999U (en) * 2016-08-12 2017-02-22 中冶天工集团有限公司 Be used for insulating tube to wear sheathed tube pulley device
CN106624639A (en) * 2016-12-09 2017-05-10 广西建工集团第五建筑工程有限责任公司 Manufacturing and hoisting method for pre-spliced short joint of large valve and large-diameter pipeline

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101463923A (en) * 2008-12-30 2009-06-24 二十三冶建设集团有限公司 Assembling method for jacketed pipe and its pipe lining apparatus
CN102758966A (en) * 2011-04-27 2012-10-31 五冶集团上海有限公司 Construction method for mounting benzene hydrogenation engineering pressure pipeline
CN102927399A (en) * 2012-11-08 2013-02-13 上海天森辰业化工工程技术有限公司 Pipe fitting for conveying high pressure acetylene
CN104075028A (en) * 2014-07-18 2014-10-01 中国二十二冶集团有限公司 Pipe gallery pipe penetrating construction method
CN105729052A (en) * 2014-12-09 2016-07-06 重庆金国凯畅机床厂 Technology for cutting and groove processing of pipeline
CN105013427A (en) * 2015-07-03 2015-11-04 苏州市科迪石化工程有限公司 Raschig ring filling material
CN105135131A (en) * 2015-08-13 2015-12-09 中化二建集团有限公司 High-pressure acetylene conveying pipe and manufacturing method thereof
CN204986045U (en) * 2015-08-13 2016-01-20 中化二建集团有限公司 High pressure acetylene pipeline
CN205978999U (en) * 2016-08-12 2017-02-22 中冶天工集团有限公司 Be used for insulating tube to wear sheathed tube pulley device
CN106624639A (en) * 2016-12-09 2017-05-10 广西建工集团第五建筑工程有限责任公司 Manufacturing and hoisting method for pre-spliced short joint of large valve and large-diameter pipeline

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吉宋敏: "高压乙炔填充管制作安装施工工艺", 《山西化工》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111069852A (en) * 2019-12-09 2020-04-28 东台市润丰法兰制造有限公司 Composite layer flange connection process
CN113953632A (en) * 2021-12-22 2022-01-21 江苏利柏特股份有限公司 Welding process method for large-diameter thick-pipe-wall elbow baffle plate
CN113953632B (en) * 2021-12-22 2022-02-25 江苏利柏特股份有限公司 Welding process method for large-diameter thick-pipe-wall elbow baffle plate

Similar Documents

Publication Publication Date Title
CN103612003B (en) The full-automatic butt weld technologies for steel of a kind of composite bimetal pipe
CN108655670A (en) A kind of high pressure stainless steel acetylene filling pipe construction technique
CN107401175B (en) A kind of method of construction of the upper guide pipe support of six pile leaders frame
CN104843357B (en) Tank of benzene hydrogenation engineering and manufacturing and mounting method thereof
CN104233960B (en) For workpiece and the construction method of the grouting of bridge continuous beam web
CN206405570U (en) Double-wall pipe argon arc welding argon gas protects system
CN103008999B (en) Spiral seam submerged-arc welded pipe butt joint process
CN115302051B (en) Manual tungsten electrode argon arc welding process method for super dual-phase steel process pipeline or plate
CN103258577B (en) Nuclear power station high energy line leakage test cut analogy method
WO2019015260A1 (en) Construction process of lower assembly of offshore voltage booster substation
CN102513787A (en) Process for production line of an ocean engineering structural steel pipes
CN106975675B (en) System and shell rolling technique is monitored and controlled in the light sensation of veneer reeling machine
CN110576939A (en) Construction method for large conical cylinder segments
CN102390002B (en) Automatic submerged-arc welding method for large insertion-type adapting pipe on cone
CN204018703U (en) A kind of Novel welding cinder ladle being applicable to copper ashes retarded cooling process
CN107900499A (en) A kind of welding method
CN108581260B (en) Robot full-automatic welding process method for corrugated wall of distribution transformer oil tank
CN101704164A (en) High-energy beam current welding penetration multiplying method
CN113579418A (en) Method for manufacturing nickel-based alloy coating, processor and medium
CN108581378A (en) A kind of production method of hull elbow connection pipe
CN109489731A (en) A kind of quality detecting method after bellows assembling
CN116275909A (en) Manufacturing method of heavy round square variable diameter node
CN104985280A (en) Welding procedure method for ore pulp pipe to slip mass, collapse body and earthquake fault zone
CN102500886A (en) High-strength nickel-iron-chromium alloy and chromium-nickel stainless steel plate welding method and application to preparation of polysilicon cold hydrogenation reactors
CN104801565A (en) Manufacturing method of large-diameter pipeline elbows

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181016

WD01 Invention patent application deemed withdrawn after publication