CN108581378A - A kind of production method of hull elbow connection pipe - Google Patents

A kind of production method of hull elbow connection pipe Download PDF

Info

Publication number
CN108581378A
CN108581378A CN201810330734.4A CN201810330734A CN108581378A CN 108581378 A CN108581378 A CN 108581378A CN 201810330734 A CN201810330734 A CN 201810330734A CN 108581378 A CN108581378 A CN 108581378A
Authority
CN
China
Prior art keywords
connection pipe
elbow connection
pipe unit
elbow
hull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810330734.4A
Other languages
Chinese (zh)
Inventor
晏波
李锦辉
肖锋
吴艳强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Original Assignee
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSSC Huangpu Wenchong Shipbuilding Co Ltd filed Critical CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority to CN201810330734.4A priority Critical patent/CN108581378A/en
Publication of CN108581378A publication Critical patent/CN108581378A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Branch Pipes, Bends, And The Like (AREA)

Abstract

The present invention provides a kind of production methods of hull elbow connection pipe, by the basic parameter value of each elbow connection pipe unit of computer solving, and the drafting of engineering drawing are carried out to each elbow connection pipe unit;Two-dimensional development is carried out to each elbow connection pipe unit, and generates the two-dimensional development figure of each elbow connection pipe unit;Using computer lofting technology, solid modelling is carried out to elbow connection pipe, setting-out is carried out to elbow connection pipe, draws the part drawing after each elbow connection pipe unit setting-out;Carry out jacking is carried out to the part drawing after elbow connection pipe unit setting-out, and exports machining information and clear related processing parameters;According to the machining information and related processing parameters of jacking figure, cutting stock is carried out to plate to be processed, forms the entity of elbow connection pipe unit;The entity of each elbow connection pipe unit after cutting is rolled, and the entity of each elbow connection pipe unit after rolling assembles, and completes the processing of elbow connection pipe.

Description

A kind of production method of hull elbow connection pipe
Technical field
The present invention relates to a kind of piping production method more particularly to a kind of production methods of hull elbow connection pipe.
Background technology
In the prior art, in the manufacturing process to hull package, there are some hull package outer diameter is larger and (usually exist Between 300mm~1200mm), the making of the larger hull package of outer diameter is more demanding, but the hull package permission that outer diameter is larger It is stitched in the presence of in.The cost of the larger hull package of outer diameter is higher and fabrication cycle is longer, the bending of the larger hull package of outer diameter Part generally use hull elbow connection pipe is spliced.
The production process of hull elbow connection pipe in the prior art is mainly:Plate cutting, roll in pipe, weldering seam, Parameter that is round as a ball, calculating hull elbow connection pipe, setting-out hull elbow connection pipe, cutting hull elbow connection on hull package The multiple working procedures such as pipe, hull elbow connection pipe bevel, assembled hull elbow connection pipe, butt welding weld seam and polishing.It is above-mentioned The process of hull elbow connection pipe is made mainly based on artificial, less efficient, unstable quality.It is especially curved in cutting hull When head connecting tube and hull elbow connection pipe bevel carry out this two procedures, since hull elbow connection pipe caliber is larger, add Work person can only cut lamp or the plasma cutting gun hand cut on hull package by oxy-acetylene, and speed is slow, slot out-of-flatness, So that the fabrication cycle of the hull elbow connection pipe made is longer and second-rate, while also influencing school dress size and weld seam matter Amount.
Invention content
Based on this, the purpose of the present invention is to provide a kind of production methods of hull elbow connection pipe, to solve existing skill The longer and second-rate problem of hull elbow connection pipe fabrication cycle in art.
The technical scheme is that:A kind of production method of hull elbow connection pipe, includes the following steps:
S1, be made up of computer solving the elbow connection pipe each elbow connection pipe unit basic parameter value, And the drafting of engineering drawing is carried out to each elbow connection pipe unit;
S2, two-dimensional development is carried out to each elbow connection pipe unit, and generates each elbow connection pipe unit Two-dimensional development figure;
S3, each elbow connection pipe is drawn to elbow connection pipe progress setting-out using computer lofting technology Part drawing after unit setting-out;
S4, jacking is carried out to the part drawing after the elbow connection pipe unit setting-out, and exports machining information;
S5, according to the machining information and related processing parameters of the jacking figure, cutting stock, shape are carried out to plate to be processed At the entity of the elbow connection pipe unit;
S6, the entity of each elbow connection pipe unit after being cut in step S5 is rolled, and will rolled The entity of each elbow connection pipe unit afterwards is assembled.
Optionally, in the step S1, the basic parameter value of each elbow connection pipe unit include structural parameters, by Power situation, form dimension, location dimension and overall dimension.
Optionally, the step S1 further include the form dimension to each elbow connection pipe unit, location dimension and Overall dimension is labeled.
Optionally, in the step S5, the plate to be processed carries out cutting stock by cutter device.
Optionally, the cutter device is numerical control cutting machine.
Optionally, in the step S6, by the entity of each elbow connection pipe unit after cutting by rolling dress It sets and is rolled, make the shape crimped of the entity of the elbow connection pipe unit at tubular.
Optionally, in the step S6, by being welded to connect between the elbow connection pipe unit of each tubular.
Optionally, in the step S5, the machining information includes the cutting sequence of the elbow connection pipe unit, places Face and groove type.
Implement the embodiment of the present invention, has the advantages that:
The production method of the hull elbow connection pipe of the present invention forms each curved of elbow connection pipe by computer solving The basic parameter value of head connection pipe unit, improves the efficiency for solving elbow connection pipe unit basic parameter value, saves solution The time of elbow connection pipe unit basic parameter value, and convenient for the drafting of elbow connection pipe element project figure;By connecting to elbow Take over carry out two-dimensional development, consequently facilitating choosing the type of plate to be processed;By being carried out in a computer to elbow connection pipe Solid modelling carries out setting-out to elbow connection pipe and draws the part drawing after elbow connection pipe unit setting-out, entire curved as a result, The setting-out of head connecting tube is to carry out in a computer, convenient for the setting out data of very intuitive collocation elbow connection pipe, is formed curved The whole computer data of head connecting tube setting-out process;By being designed jacking to the part drawing after elbow connection pipe setting-out Figure improves the processing efficiency to elbow connection pipe so as to allow processor convenient for understanding machining information;By to plate to be processed It carries out cutting stock and is formed by elbow connection pipe element entity since plate to be processed is to be processed in the plane Section mouth it is more smooth, Angular Dimension is more accurate so that the assembled quality and welding quality of elbow connection pipe obtain further It improves;Each elbow connection by being rolled to each elbow connection pipe element entity after cutting, and after rolling Pipe unit entity carries out assembly, it is therefore not necessary to additionally increase process allowance.To sum up, the making side of this hull elbow connection pipe Method is related to 6 method and steps, and middle elbow connection pipe production method is related to a method and step more than 10 compared with the prior art, therefore, The present invention has simplified the production process of elbow connection pipe, and the manufacture difficulty of elbow connection pipe is made to substantially reduce, and reduces construction Working hour can effectively reduce the use costs such as kinetic energy and place.
Description of the drawings
Fig. 1 is the flow chart of the production method of the hull elbow connection pipe of the present invention.
Fig. 2 is the corresponding structural schematic diagrams of step S1 of the production method of the hull elbow connection pipe of the present invention.
Fig. 3 is the corresponding structural schematic diagrams of step S2 of the production method of the hull elbow connection pipe of the present invention.
Fig. 4 is the corresponding structural schematic diagrams of step S3 of the production method of the hull elbow connection pipe of the present invention.
Fig. 5 is the corresponding structural schematic diagrams of step S5 of the production method of the hull elbow connection pipe of the present invention.
Fig. 6 is the corresponding structural schematic diagrams of step S6 of the production method of the hull elbow connection pipe of the present invention.
Reference sign:
1, elbow connection pipe;11, the first elbow connection pipe unit;12, the second elbow connection pipe unit;13, third elbow Connect pipe unit;2, the first groove;3, the second groove;4, third groove;5, the 4th groove;6, plate to be processed.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without creative efforts Embodiment shall fall within the protection scope of the present invention.
As shown in figs. 1 to 6, a kind of production method for hull elbow connection pipe that the embodiment of the present invention is provided, including with Lower step:
S1, by computer solving form elbow connection pipe 1 each elbow connection pipe unit basic parameter value, and The drafting of engineering drawing is carried out to each elbow connection pipe unit;
S2, two-dimensional development is carried out to each elbow connection pipe unit, and generates the two-dimentional exhibition of each elbow connection pipe unit Open figure;
S3, is drawn by each elbow connection pipe unit and is put for the progress setting-out of elbow connection pipe 1 using computer lofting technology Part drawing after sample;
S4, jacking is carried out to the part drawing after elbow connection pipe unit setting-out, and exports machining information;
S5, machining information and related processing parameters according to jacking figure carry out cutting stock to plate 6 to be processed, are formed The entity of elbow connection pipe unit;
S6, the entity of each elbow connection pipe unit after being cut in step S5 is rolled, and after rolling The entity of each elbow connection pipe unit is assembled.
Based on above-mentioned setting, the production method of hull elbow connection pipe of the invention forms elbow by computer solving The basic parameter value of each elbow connection pipe unit of connecting tube 1 improves and solves elbow connection pipe unit basic parameter value Efficiency saves the time for solving elbow connection pipe unit basic parameter value, and painting convenient for elbow connection pipe element project figure System;By carrying out two-dimensional development to elbow connection pipe 1, consequently facilitating choosing the type of plate 6 to be processed;By in a computer Solid modelling is carried out to elbow connection pipe 1, after the progress setting-out of elbow connection pipe 1 and drawing elbow connection pipe unit setting-out Part drawing, wherein setting-out refers to connecting to form elbow using the two-dimensional development figure of elbow connection pipe 1 as the section in certain path The 3-D view of take over 1, the setting-out of entire elbow connection pipe 1 as a result, is to carry out in a computer, is convenient for very intuitive collocation The setting out data of elbow connection pipe 1 forms the whole computer data of 1 setting-out process of elbow connection pipe, and further, whole The setting-out of a elbow connection pipe 1 is completed in plane process, has simplified the manufacturing process of elbow connection pipe 1;By connecting to elbow Part drawing after 1 setting-out of take over is designed jacking figure, so as to allow processor convenient for understanding machining information, improves and connects to elbow The processing efficiency of take over 1, wherein jacking figure refers to that machining information is guided out on part on the part drawing after setting-out, so as to Processor is processed part, to achieve the purpose that material-saving saving of labor;By carrying out cutting stock to plate 6 to be processed, by It is to be processed in the plane, therefore the section mouth for being formed by elbow connection pipe element entity is more smooth in plate 6 to be processed, angle It is more accurate to spend size so that the assembled quality and welding quality of elbow connection pipe 1 are further improved;By to cutting Each elbow connection pipe element entity afterwards is rolled, and each elbow connection pipe element entity after rolling is spelled Dress, it is therefore not necessary to additionally increase process allowance.To sum up, the production method of this hull elbow connection pipe is related to 6 method steps Suddenly, middle 1 production method of elbow connection pipe is related to a method and step more than 10 compared with the prior art, and therefore, the present invention has simplified curved The production process of head connecting tube 1, makes the manufacture difficulty of elbow connection pipe 1 substantially reduce, and reduces construction working hour, can effectively drop The low use costs such as kinetic energy and place.
In the present embodiment, as illustrated in fig. 1 and 2, in step S1, the basic parameter value of each elbow connection pipe unit includes knot Structure parameter, stressing conditions, form dimension, location dimension and overall dimension are convenient for determine the parameter value of elbow connection pipe 1 The processing of elbow connection pipe 1.
In the present embodiment, as illustrated in fig. 1 and 2, step S1 further includes to the form dimension of each elbow connection pipe unit, fixed Position size and overall dimension are labeled, so as to the selection of 6 type of plate to be processed, to improve the effect of whole process Rate.
In the present embodiment, as described in figures 1 and 5, in step S5, plate 6 to be processed carries out cutting stock by cutter device, So as to the formation of each elbow connection pipe unit.Specifically, plate 6 to be processed is steel plate, the intensity and thickness of steel plate are higher, fit It shares in connection hull package.
In the present embodiment, as described in figures 1 and 5, in order to further increase the effect that each elbow connection pipe unit is formed, step In rapid S5, cutter device is numerical control cutting machine.Specifically, the elbow connection pipe 1 of the embodiment of the present invention is by the first elbow connection pipe Unit 11, the second elbow connection pipe unit 12 and third elbow connection pipe unit 13 form, according to the first elbow connection pipe unit 11, the size of the second elbow connection pipe unit 12 and third elbow connection pipe unit 13, processor can pass through Numerical control cutting Machine is cut on plate 6 to be processed, the both sides of the first elbow connection pipe unit 11, the second elbow connection pipe unit 12 two Side and the both sides of third elbow connection pipe unit 13 cut into arc-shaped, and numerical control cutting machine pair with numerical control cutting machine respectively The groove of one elbow connection pipe unit 11, the second elbow connection pipe unit 12 and third elbow connection pipe unit 13 is processed, So as to mutual between the first elbow connection pipe unit 11, the second elbow connection pipe unit 12 and third elbow connection pipe unit 13 Connection, as a result, cuts the shape of each elbow connection pipe unit by numerical control cutting machine, connects to form each elbow The groove and shape of take over unit make, and eliminate and are processed to the shape of each elbow connection pipe unit with manpower so that The manufacture difficulty of elbow connection pipe unit declines, further, each elbow connection pipe unit of the present embodiment is in plane work It is carried out in sequence, to improve the easy making process of each elbow connection pipe unit.
In the present embodiment, as shown in figs. 1 and 6, in order to further increase the effect that rolls of elbow connection pipe unit, step S6 In, the entity of each elbow connection pipe unit after cutting is rolled by rolling device, makes elbow connection pipe unit The shape crimped of entity is at tubular.Specifically, rolling device is rolling machine.The both ends crimped of elbow connection pipe unit is at tubular Afterwards, processor can be stitched in the both ends junction of elbow connection pipe unit by welding in formation, to each elbow connection pipe list Member is not easy to stretch after forming tubular.
In the present embodiment, as described in figures 1 and 5, in order to further increase the processing effect of elbow connection pipe unit, step S5 In, machining information includes cutting sequence, placed side and the groove type of elbow connection pipe unit.According to each elbow connection pipe list The cutting sequence of member, determines location information and shape information of each elbow connection pipe unit in plate 6 to be processed;By true Determine placed side, elbow connection pipe unit can be fixed;By determining groove type, each elbow connection pipe unit can be further strengthened Between connection tightness, wherein groove type can be V-type or Y types, and processor can select as needed, this reality Example is applied not to be limited.
In the present embodiment, as shown in figs. 1 and 6, in order to further increase the elbow connection pipe list of each tubular after rolling Connection tightness between member, in step S6, by being welded to connect between the elbow connection pipe unit of each tubular.Specifically, By the way that the second groove 3 of 12 side of the first groove 2 and the second elbow connection pipe unit of the first elbow connection pipe unit 11 is welded It connects, the first elbow connection pipe unit 11 and the second elbow connection pipe unit 12 can be realized connection, likewise, by by second 4th groove 5 of 13 side of third groove 4 and third elbow connection pipe unit of 12 other side of elbow connection pipe unit welds, i.e., Second elbow connection pipe unit 12 and third elbow connection pipe unit 13 can be realized to connection, and the good connecting effect welded and just In the operation of processor.
To sum up, the production method of a kind of hull elbow connection pipe provided by the invention, elbow is formed by computer solving The basic parameter value of each elbow connection pipe unit of connecting tube 1, and setting-out and jacking are carried out to elbow connection pipe 1, after being The making of the elbow connection pipe 1 of phase provides information, consequently facilitating the processing of elbow connection pipe 1.Therefore, the present invention greatly reduces The manufacture difficulty of elbow connection pipe 1 shortens the fabrication cycle of elbow connection pipe 1, improves the producing efficiency of elbow connection pipe 1 And production quality, and effectively pushed automation and lean technology and applied in piping making.
The above is the preferred embodiment of the present invention, it is noted that for those skilled in the art For, without departing from the principle of the present invention, several improvement and deformations can also be made, these improvement and deformations are also considered as Protection scope of the present invention.

Claims (8)

1. a kind of production method of hull elbow connection pipe, which is characterized in that include the following steps:
S1, be made up of computer solving the elbow connection pipe each elbow connection pipe unit basic parameter value, and The drafting of engineering drawing is carried out to each elbow connection pipe unit;
S2, two-dimensional development is carried out to each elbow connection pipe unit, and generates the two of each elbow connection pipe unit Tie up expanded view;
S3, each elbow connection pipe unit is drawn to elbow connection pipe progress setting-out using computer lofting technology Part drawing after setting-out;
S4, carry out jacking is carried out to the part drawing after the elbow connection pipe unit setting-out, and exports machining information;
S5, institute is formed to plate to be processed progress cutting stock according to the machining information and related processing parameters of the jacking figure State the entity of elbow connection pipe unit;
S6, the entity of each elbow connection pipe unit after being cut in step S5 is rolled, and after rolling The entity of each elbow connection pipe unit is assembled.
2. the production method of hull elbow connection pipe as described in claim 1, which is characterized in that each in the step S1 The basic parameter value of the elbow connection pipe unit includes structural parameters, stressing conditions, form dimension, location dimension and overall ruler It is very little.
3. the production method of hull elbow connection pipe as claimed in claim 2, which is characterized in that the step S1 further includes pair Form dimension, location dimension and the overall dimension of each elbow connection pipe unit are labeled.
4. the production method of hull elbow connection pipe as described in claim 1, which is characterized in that described in the step S5 Plate to be processed carries out cutting stock by cutter device.
5. the production method of hull elbow connection pipe as claimed in claim 3, which is characterized in that the cutter device is numerical control Cutting machine.
6. the production method of hull elbow connection pipe as described in claim 1, which is characterized in that in the step S6, will cut The entity of each elbow connection pipe unit after cutting is rolled by rolling device, makes the elbow connection pipe unit The shape crimped of entity is at tubular.
7. the production method of hull elbow connection pipe as claimed in claim 5, which is characterized in that each in the step S6 By being welded to connect between the elbow connection pipe unit of tubular.
8. the production method of hull elbow connection pipe as described in claim 1, which is characterized in that described in the step S5 Machining information includes cutting sequence, placed side and the groove type of the elbow connection pipe unit.
CN201810330734.4A 2018-04-13 2018-04-13 A kind of production method of hull elbow connection pipe Pending CN108581378A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810330734.4A CN108581378A (en) 2018-04-13 2018-04-13 A kind of production method of hull elbow connection pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810330734.4A CN108581378A (en) 2018-04-13 2018-04-13 A kind of production method of hull elbow connection pipe

Publications (1)

Publication Number Publication Date
CN108581378A true CN108581378A (en) 2018-09-28

Family

ID=63622295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810330734.4A Pending CN108581378A (en) 2018-04-13 2018-04-13 A kind of production method of hull elbow connection pipe

Country Status (1)

Country Link
CN (1) CN108581378A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110280920A (en) * 2019-06-28 2019-09-27 中国航发南方工业有限公司 The production method of profiled metal air hose
CN112570998A (en) * 2020-12-06 2021-03-30 中国二冶集团有限公司 Manufacturing process method of air cooling pipeline of thermal generator set
CN113000980A (en) * 2021-02-05 2021-06-22 海洋石油工程(青岛)有限公司 Construction process method for pipeline blanking

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3979809A (en) * 1973-12-24 1976-09-14 Johann Friedrich Schneider Pipe elbow and method of making same
CN102489941A (en) * 2011-11-25 2012-06-13 株洲南方燃气轮机成套制造安装有限公司 Method for manufacturing metal elbow
CN102941446A (en) * 2012-11-15 2013-02-27 江阴中南重工股份有限公司 Production method for equal-strength symmetrical weld joint steel plate elbow
CN103692171A (en) * 2014-01-10 2014-04-02 点夺机电工程江苏有限公司 Making method of shrimp elbow
CN106041430A (en) * 2016-07-05 2016-10-26 重庆铁马工业集团有限公司 Auxiliary molding method for shrimp bend of panel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3979809A (en) * 1973-12-24 1976-09-14 Johann Friedrich Schneider Pipe elbow and method of making same
CN102489941A (en) * 2011-11-25 2012-06-13 株洲南方燃气轮机成套制造安装有限公司 Method for manufacturing metal elbow
CN102941446A (en) * 2012-11-15 2013-02-27 江阴中南重工股份有限公司 Production method for equal-strength symmetrical weld joint steel plate elbow
CN103692171A (en) * 2014-01-10 2014-04-02 点夺机电工程江苏有限公司 Making method of shrimp elbow
CN106041430A (en) * 2016-07-05 2016-10-26 重庆铁马工业集团有限公司 Auxiliary molding method for shrimp bend of panel

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110280920A (en) * 2019-06-28 2019-09-27 中国航发南方工业有限公司 The production method of profiled metal air hose
CN110280920B (en) * 2019-06-28 2021-06-25 中国航发南方工业有限公司 Method for manufacturing special-shaped metal air pipe
CN112570998A (en) * 2020-12-06 2021-03-30 中国二冶集团有限公司 Manufacturing process method of air cooling pipeline of thermal generator set
CN112570998B (en) * 2020-12-06 2024-01-05 中国二冶集团有限公司 Manufacturing process method of air cooling pipeline of thermal generator set
CN113000980A (en) * 2021-02-05 2021-06-22 海洋石油工程(青岛)有限公司 Construction process method for pipeline blanking

Similar Documents

Publication Publication Date Title
CN108581378A (en) A kind of production method of hull elbow connection pipe
CN104923894B (en) Large H-shaped steel full penetration angle welding exempts from back chipping welding procedure
CN105081595A (en) Fillet weld welding structure for K-type grooves of moderately-thick plate without back chipping and welding technology of fillet weld welding structure
CN103551750B (en) Welded tube and manufacture method thereof
CN103817180B (en) The continuous cold bending shaping method of roll-type of light section sheet pile CSPL2
CN103934693B (en) The processing technology of box-structure post/beam shaping
CN107378407B (en) The construction method of round tube steel member is mutually passed through in a kind of big section
CN103692171A (en) Making method of shrimp elbow
CN104723205A (en) Fast machining method of minor-diameter steel pipe intersecting line
CN105252116A (en) Bi-metal metallurgy composite pipe welding method
CN102426613A (en) Making method for large-aperture spatial bend pipe intersection line and bevel
CN106780763A (en) Three-dimensional surface intersection section geometric figure and the space broken line method of development
CN108581256A (en) A kind of two phase stainless steel complete penetraction and fusion in welding fillet weld automatic welding method
CN101458508A (en) Tube-tube connection saddle surface welding and incising method
CN105921862A (en) Welding treatment method suitable for oblique crossing combined forming of steel pipes
CN113486414B (en) Method for obtaining accurate manufacturing process diagram of overflowing surface horizontal steel bifurcated pipe through three-dimensional modeling
CN114211089A (en) Pipeline flexible assembly and automatic welding composite working method
CN106141368B (en) A kind of FLAME NC cutting method of steel pipe full penetration intersection groove
CN201969996U (en) Longitudinal submerged-arc welding production line for stainless-steel pipe and carbon steel pipe
CN206622471U (en) A kind of conical steel pipe deployed configuration with complex intersection curve
CN105817841B (en) Shape tube forming method
CN207757111U (en) Cross-section welding groove for header saddle-shaped pipe joint
CN105014319B (en) A kind of production method of complex intersection curve hot rolling Steel Tube Joint
CN102042440B (en) Combined eccentric reducing pipe and manufacturing method thereof
CN103128503B (en) Without surplus circular configuration steel pipe support complete processing and tube support structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180928