CN108649311A - A kind of production method of cavity coupler - Google Patents

A kind of production method of cavity coupler Download PDF

Info

Publication number
CN108649311A
CN108649311A CN201810886508.4A CN201810886508A CN108649311A CN 108649311 A CN108649311 A CN 108649311A CN 201810886508 A CN201810886508 A CN 201810886508A CN 108649311 A CN108649311 A CN 108649311A
Authority
CN
China
Prior art keywords
cavity
initial
intermediate bulkhead
processing
coupler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810886508.4A
Other languages
Chinese (zh)
Other versions
CN108649311B (en
Inventor
刘思
付纳新
卞玉柱
黄鹤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Institute of Radio Measurement
Original Assignee
Beijing Institute of Radio Measurement
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Institute of Radio Measurement filed Critical Beijing Institute of Radio Measurement
Priority to CN201810886508.4A priority Critical patent/CN108649311B/en
Publication of CN108649311A publication Critical patent/CN108649311A/en
Application granted granted Critical
Publication of CN108649311B publication Critical patent/CN108649311B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01PWAVEGUIDES; RESONATORS, LINES, OR OTHER DEVICES OF THE WAVEGUIDE TYPE
    • H01P11/00Apparatus or processes specially adapted for manufacturing waveguides or resonators, lines, or other devices of the waveguide type

Abstract

The present embodiments relate to a kind of production methods of cavity coupler.This method includes:It is split treating process chambers coupler, after obtaining initial upper cavity, initial lower chamber and initial intermediate bulkhead, the flatness of initial upper cavity, initial lower chamber and initial intermediate bulkhead is handled respectively, obtain upper cavity, lower chamber and intermediate bulkhead, after carrying out clamping processing to upper cavity, lower chamber and intermediate bulkhead, clamping cavity coupler is obtained, to obtaining after clamping cavity coupler measures processing, obtaining cavity coupler.The technical solution provided through this embodiment, on the one hand, avoid in the prior art, welding times are on the high side, reduce the technology drawback of production efficiency, realize the technique effect for improving production efficiency;On the other hand, influence of the operating personnel to production itself is avoided, the stability of production and the technique effect of reliability are improved;In another aspect, realizing raising production precision, the technique effect of yield rate is improved.

Description

A kind of production method of cavity coupler
Technical field
The present embodiments relate to coupler technique manufacture technology field more particularly to a kind of making sides of cavity coupler Method.
Background technology
The function of cavity coupler is to carry out power distribution in the ratio of design and direction and export, and general structure is complicated, Interior step, partition are numerous, and when manufacture need to divide multistage processing again by multiple Welding at one integral piece.Manufacture difficulty is big, production Period is long, yield rate and low production efficiency.How to improve yield rate and production efficiency is technical barrier urgently to be resolved hurrily.
In the prior art, cavity coupler designs the two-way waveguiding structure that is made of multiple discrete parts, in waveguide Portion's step chamber is numerous, is welded together by aluminium soldering between each part, to waveguide air-tightness and three waveguides during use The bulk of mouth requires stringent.
Technological difficulties present in production mainly have:
1. multiple parts need first to carry out vacuum Aluminum brazing in cavity coupler, re-segmenting carries out multiple Manual flame weldering It connects, 30 many places of weld seam, postwelding accumulated deformation is big.When segmentation carries out Manual flame soldering, vacuum brazing solder early period two is easily caused Secondary fusing leads to gas leakage, can only carry out leak stopping by multiple repair welding after welding, product quality is poor.And it is based on existing structure, hand Weld seam can not be directly heated and be observed at the multiple steps being affected to electrical specifications when work flame welding, solder dissolve and pricker Material heap product situation is difficult to observe.Simultaneously because two waveguide bend weld seams are up to 225mm, postwelding end stress concentration is serious, later stage dress Timing easily causes waveguide bend end to be snapped.
2. the bulk between liang waveguide mouth only leans on end cavity in connection to ensure have between two waveguide bends super The hanging of 200mm is crossed, post welding distortion is big, two waveguide mouth central space distances 25.05 0.1 of drawing requirement, 75 ° of space angle ± 10 ' extremely difficult guarantees, can only be by postwelding school shape, but school shape process easily leads to weld cracking.
3. step piece cavity is the vital part for influencing transmitting-receiving feed insertion loss, step piece thickness only 1mm therein, warp After crossing processing and welding, the deformation of step piece is serious, it is difficult to ensure that symmetry ± 0.05mm.
4. the deeply narrow chamber of cavity part and step cavity configuration feature in cavity coupler are at present external coordination electrical discharge machining, add Work efficiency rate is low, of high cost, and part process cycle is long, restricts model batch production progress.
Invention content
To solve at least one of above-mentioned background technology technical problem, an embodiment of the present invention provides a kind of couplings of cavity The production method of device, the method includes:
It treats process chambers coupler and carries out deconsolidation process, obtain initial upper cavity, initial lower chamber and initial middle interval Plate;
Respectively to the flatness of the initial upper cavity, the initial lower chamber and the initial intermediate bulkhead at Reason, obtains upper cavity, lower chamber and intermediate bulkhead;
Clamping processing is carried out to the upper cavity, the lower chamber and the intermediate bulkhead, obtains clamping cavity coupler;
Processing is measured to the clamping cavity coupler, obtains cavity coupler.
It provides through this embodiment:Split treating process chambers coupler, obtain initial upper cavity, it is initial under After cavity and initial intermediate bulkhead, respectively to the flatness of initial upper cavity, initial lower chamber and initial intermediate bulkhead at Reason, obtains upper cavity, lower chamber and intermediate bulkhead, after carrying out clamping processing to upper cavity, lower chamber and intermediate bulkhead, obtains Clamping cavity coupler obtains the technical solution of cavity coupler to obtaining after clamping cavity coupler measures processing, and one Aspect avoids in the prior art, and welding times are on the high side, reduces the technology drawback of production efficiency, realizes raising production effect The technique effect of rate;On the other hand, influence of the operating personnel to production itself is avoided, the stability of production and reliable is improved The technique effect of property;In another aspect, realizing raising production precision, the technique effect of yield rate is improved.
Preferably, the flatness of the initial upper cavity and the initial lower chamber is handled, is specifically included:
Respectively to the initial upper cavity and the initial lower chamber carry out successively the processing of milling side, the processing of milling inner cavity, Heat treatment, the again processing of milling inner cavity, deburring processing and back chipping processing.
It provides through this embodiment:Milling side's processing, primary is carried out successively to initial upper cavity and initial lower chamber respectively The technical solution of the processing of milling inner cavity, heat treatment, the again processing of milling inner cavity, deburring processing and back chipping processing, realizes and moves back completely The technique effect that residual stress influences is eliminated in fiery destressing, ensure that carry out flatness treated initial upper cavity and The technique effect of the Pingdu degree accuracy of initial lower chamber.
Preferably, the flatness of the initial intermediate bulkhead is handled, is specifically included:
Assembly processing, hot smoothing process, milling processing and deburring is carried out to the initial intermediate bulkhead successively to handle.
It provides through this embodiment:Assembly processing, hot smoothing process, milling processing are carried out to initial intermediate bulkhead and gone The technical solution of burr processing realizes the technology effect of the flatness of the high accuracy for the initial intermediate bulkhead that ensures that treated Fruit.
Preferably, assembly processing is carried out to the initial intermediate bulkhead, specifically included:
The coating lubricating oil on working plate;
The initial intermediate bulkhead is pushed into the working plate so that the initial intermediate bulkhead is fastened on the working plate Fixed baffle and the active block stop of the working plate between.
It provides through this embodiment:Working plate intermediate bulkhead being pushed into after coating lubricating oil so that intermediate bulkhead card Technical solution between fixed baffle and active block stop is closed, realizes and easy, at low cost clamping is carried out to intermediate bulkhead Technique effect, and avoid the technology drawback that deformation is easy tod produce in clamping process in the prior art, in realizing and ensuring The technique effect of the flatness of spacing board.
Preferably, in the milling processing procedure, use the tool cutting edge angle of blade for 45 ° of wire rod quality.
It provides through this embodiment:The tool cutting edge angle of blade is used to be realized in milling for the technical solution of 45 ° of wire rod quality It cuts in processing procedure, a component is provided always, intermediate bulkhead is pressed on working plate, reduced in milling processing procedure Vibration ensure that milling treated the flatness and roughness of intermediate bulkhead.
Preferably, described that clamping processing is carried out to the upper cavity, the lower chamber and the intermediate bulkhead, it is specific to wrap It includes:
Set the first SiC plates to lower plate;
Set the 2nd SiC plates to upper layer locating back;
The lower chamber, the intermediate bulkhead and described are set gradually between the lower plate and the upper layer locating back Upper cavity, and placed between the lower chamber and the intermediate bulkhead and between the intermediate bulkhead and the upper cavity Solder;
Wherein, the lower plate is bonded with the lower chamber, and the upper layer locating back is bonded with the upper cavity.
It provides through this embodiment:Set gradually between lower plate and upper layer locating back lower chamber, intermediate bulkhead, on Cavity, and between lower chamber and intermediate bulkhead, the technical solution of solder is placed between intermediate bulkhead and upper cavity respectively, both really Pressing force has been protected, has also ensured higher flatness and the coefficient of heat conduction, has also ensured the technology of lower linear expansion coefficient Effect.
Preferably, the method further includes:
The fitting setting cast iron pressing plate on the upper layer locating back.
It provides through this embodiment:The technical solution of cast iron pressing plate is set on the locating back of upper layer, is further ensured Pressing force.
Preferably, described that processing is measured to the clamping cavity coupler, cavity coupler is obtained, is specifically included:
Gap between the lower plate and the lower chamber measures, and obtains measurement result;
The measurement result is compared with preset measurement threshold value, if the measurement result, which is less than, measures threshold value, The clamping cavity coupler is determined as the cavity coupler.
It provides through this embodiment:Measurement result is compared with threshold value is measured, measurement result is less than and measures threshold The clamping cavity coupler of value is determined as the technical solution of cavity coupler, it is ensured that the accuracy of obtained cavity coupler, Stability and reliability.
Wherein, the measurement threshold value is 0.05mm.
Preferably, the method further includes:
Vacuum brazing processing is carried out to the cavity coupler, obtains target cavity coupler.
It provides through this embodiment:Vacuum brazing processing is carried out to cavity coupler, obtains target cavity coupler Technical solution realizes solder and melts flowing well, the excellent technique effect of weldquality.
Description of the drawings
Fig. 1 is a kind of flow diagram of the production method of cavity coupler provided in an embodiment of the present invention.
Specific implementation mode
In being described below, for illustration and not for limitation, it is proposed that such as specific system structure, interface, technology it The detail of class, to understand thoroughly the present invention.However, it will be clear to one skilled in the art that there is no these specific The present invention can also be realized in the other embodiments of details.In other situations, it omits to well-known and method detailed Describe in detail it is bright, in order to avoid unnecessary details interfere description of the invention.
An embodiment of the present invention provides a kind of production methods of cavity coupler.
First embodiment:
Referring to Fig. 1, Fig. 1 is a kind of flow signal of production method of cavity coupler provided in an embodiment of the present invention Figure.
As shown in Figure 1, this method includes:
S100:Treat process chambers coupler and carry out deconsolidation process, obtain initial upper cavity, initial lower chamber and it is initial in Spacing board.
The threedimensional model of each discrete part can be built using ProE on the basis of two-dimentional drawing.That is, passing through ProE pairs Pending cavity coupler is split, and discrete part (initial upper cavity, initial lower chamber and initial intermediate bulkhead) is obtained.
S200:The flatness of initial upper cavity, initial lower chamber and initial intermediate bulkhead is handled respectively, is obtained Cavity, lower chamber and intermediate bulkhead.
The flatness of initial upper cavity, initial lower chamber and initial intermediate bulkhead is handled respectively, to ensure to handle The accurately flatness of the upper cavity, lower chamber and the intermediate bulkhead that obtain afterwards.
S300:Clamping processing is carried out to upper cavity, lower chamber and intermediate bulkhead, obtains clamping cavity coupler;
S400:Processing is measured to clamping cavity coupler, obtains cavity coupler.
Wherein, the aluminum alloy blank that F states are replaced using the aluminum alloy blank of annealed condition (O), as pending cavity The composition material of coupler.
It provides through this embodiment:Split treating process chambers coupler, obtain initial upper cavity, it is initial under After cavity and initial intermediate bulkhead, respectively to the flatness of initial upper cavity, initial lower chamber and initial intermediate bulkhead at Reason, obtains upper cavity, lower chamber and intermediate bulkhead, after carrying out clamping processing to upper cavity, lower chamber and intermediate bulkhead, obtains Clamping cavity coupler obtains the technical solution of cavity coupler to obtaining after clamping cavity coupler measures processing, and one Aspect avoids in the prior art, and welding times are on the high side, reduces the technology drawback of production efficiency, realizes raising production effect The technique effect of rate;On the other hand, influence of the operating personnel to production itself is avoided, the stability of production and reliable is improved The technique effect of property;In another aspect, realizing raising production precision, the technique effect of yield rate is improved.
Second embodiment:
The present embodiment is based on first embodiment.In the present embodiment, S200 is specifically included:
The processing of milling side is carried out successively to initial upper cavity and initial lower chamber respectively, a milling inner cavity processing, is heat-treated, again Secondary milling inner cavity processing, deburring processing and back chipping processing.
To ensure the flatness of upper cavity and lower chamber, made allowance 1mm is handled a milling inner cavity, passes through heat together later The process of processing eliminates the influence of residual stress as possible so as to full annealing destressing.It is carried out after heat treatment at milling inner cavity again Reason, residual stress that treated to reduce milling inner cavity again to the greatest extent.
It provides through this embodiment:Milling side's processing, primary is carried out successively to initial upper cavity and initial lower chamber respectively The technical solution of the processing of milling inner cavity, heat treatment, the again processing of milling inner cavity, deburring processing and back chipping processing, realizes and moves back completely The technique effect that residual stress influences is eliminated in fiery destressing, ensure that carry out flatness treated initial upper cavity and The technique effect of the Pingdu degree accuracy of initial lower chamber.
3rd embodiment:
The present embodiment is based on first or second embodiments.In the present embodiment, S200 is also specifically included:
Assembly processing, hot smoothing process, milling processing and deburring is carried out to initial intermediate bulkhead successively to handle.
Wherein, initial intermediate bulkhead is the thin plate of 400 200 (mm).
It provides through this embodiment:Assembly processing, hot smoothing process, milling processing are carried out to initial intermediate bulkhead and gone The technical solution of burr processing realizes the technology effect of the flatness of the high accuracy for the initial intermediate bulkhead that ensures that treated Fruit.
Fourth embodiment:
The present embodiment is based on 3rd embodiment.In the present embodiment, assembly processing is carried out to initial intermediate bulkhead, had Body includes:
The coating lubricating oil on working plate;
Initial intermediate bulkhead is pushed into working plate so that initial intermediate bulkhead is fastened on the fixed baffle and tooling of working plate Between the active block stop of plate.
In the prior art, assembly processing can be carried out to initial intermediate bulkhead by vacuum cup installation way.
Certainly, also initial intermediate bulkhead can be pressed in certain using screw by the surrounding milling counterbore in initial intermediate bulkhead In fixed plate.Using this kind of mode, have it is simple, and it is opposite use vacuum cup installation way, have at low cost excellent Gesture.
But due to the restriction of the quantity of the counterbore on initial intermediate bulkhead and position so that away from the region of counterbore farther out Thin plate is not easy to be compacted.And housing screw limits the deformation that initial intermediate bulkhead is generated by cutting force, causes not by spiral shell The region that nail compresses generates deformation of arching upward, or even will produce the technology drawback of tiny step.
In the present embodiment, using principle of negative pressure, multiple blind holes to oil storage are processed on working plate, working plate Fixed baffle is arranged in one end, and the thickness of fixed baffle is 4.5mm, and active block stop is arranged in the other end of working plate.
When carrying out assembly processing to initial intermediate bulkhead, when screw is pushed, it can be ensured that active block stop is close to tooling Plate presses to initial intermediate bulkhead, and initial intermediate bulkhead attaches working plate when ensureing to compress.
When assembling processing, first a facing cut of initial intermediate bulkhead is put down, after suitable lubricating oil is smeared on working plate, It is required that oil mass there was not oil storage hole (i.e. blind hole), initial intermediate bulkhead is pushed into working plate from side, screws housing screw so that just Beginning intermediate bulkhead is fastened between the fixed baffle of working plate and the active block stop of working plate.
It provides through this embodiment:Working plate intermediate bulkhead being pushed into after coating lubricating oil so that intermediate bulkhead card Technical solution between fixed baffle and active block stop is closed, realizes and easy, at low cost clamping is carried out to intermediate bulkhead Technique effect, and avoid the technology drawback that deformation is easy tod produce in clamping process in the prior art, in realizing and ensuring The technique effect of the flatness of spacing board.
5th embodiment:
The present embodiment is based on third or four embodiments.In the present embodiment, in milling processing procedure, using blade Tool cutting edge angle be 45 ° of wire rod quality.
To ensure that initial intermediate bulkhead is compacted on working plate always in milling processing procedure, is needed processed to milling Cutting force direction in journey is planned, in order to obtain a point for pressing to working plate always in entire milling processing procedure Power, it is 45 wire rod qualities to have selected the tool cutting edge angle of blade.In milling processing procedure, during a component general can be provided always initially Spacing board is pressed on working plate, squeezes out the bubble between initial intermediate bulkhead and working plate, is formed negative pressure, is made initial intermediate bulkhead It is fitted tightly on working plate, reduces the vibration in milling processing procedure, ensure that milling treated initial intermediate bulkhead Flatness and surface roughness.
It provides through this embodiment:The tool cutting edge angle of blade is used to be realized in milling for the technical solution of 45 ° of wire rod quality It cuts in processing procedure, a component is provided always, intermediate bulkhead is pressed on working plate, reduced in milling processing procedure Vibration ensure that milling treated the flatness and roughness of intermediate bulkhead.
Sixth embodiment:
The present embodiment is based on any embodiment in the first to the 5th embodiment.In the present embodiment, S300 is specific Including:
Set the first SiC plates to lower plate;
Set the 2nd SiC plates to upper layer locating back;
Set gradually lower chamber, intermediate bulkhead and upper cavity between lower plate and upper layer locating back, and in lower chamber and Solder is placed between intermediate bulkhead and between intermediate bulkhead and upper cavity;
Wherein, lower plate is bonded with lower chamber, and upper layer locating back is bonded with upper cavity.
Ensureing enough pressing forces simultaneously, is needing to select suitable upper layer locating back, should ensure higher flatness And the coefficient of heat conduction, also there is lower linear expansion coefficient, while stable chemical performance, cannot react with aluminium.Through It screens, selects using SiC plates as lower plate and upper layer locating back, the SiC plate coefficients of heat conduction of use reach after layer by layer 120W/ (mK) is four times of alumina ceramic plate, while linear expansion coefficient is only 3 10-6/K, is shown in Table 1.
1 SiC plates of table and alumina plate performance comparison
Specifically installation way is:
Bottom places monoblock SiC bottom plates (lower plate), and lower chamber+solder+intermediate bulkhead+solder+upper cavity assembles postposition In on bottom plate, then place the monoblock SiC plates (upper layer flat clamp) of same specification.
It provides through this embodiment:Set gradually between lower plate and upper layer locating back lower chamber, intermediate bulkhead, on Cavity, and between lower chamber and intermediate bulkhead, the technical solution of solder is placed between intermediate bulkhead and upper cavity respectively, both really Pressing force has been protected, has also ensured higher flatness and the coefficient of heat conduction, has also ensured the technology of lower linear expansion coefficient Effect.
7th embodiment:
The present embodiment is based on any embodiment in sixth embodiment.In the present embodiment, this method further includes:
The fitting setting cast iron pressing plate on the locating back of upper layer.
Monoblock 20mm cast iron pressing plates are pressed on SiC plates (upper layer locating back).
It provides through this embodiment:The technical solution of cast iron pressing plate is set on the locating back of upper layer, is further ensured Pressing force.
8th embodiment:
The present embodiment is based on the 6th or the 7th embodiment.In the present embodiment, clamping cavity coupler is surveyed Amount processing, obtains cavity coupler, specifically includes:
Gap between lower plate and lower chamber measures, and obtains measurement result;
Measurement result is compared with preset measurement threshold value, if measurement result, which is less than, measures threshold value, by clamping chamber Body coupler is determined as cavity coupler.
Wherein, it is 0.05mm to measure threshold value.
Specifically, using clearance gauge measurement gap size, the clearance gauge of 0.05mm can not be inserted into, meet the requirements, that is, be determined as chamber Body coupler.
9th embodiment:
The present embodiment is based on any embodiment in the first to the 8th embodiment.In the present embodiment, this method is also Including:
Vacuum brazing processing is carried out to cavity coupler, obtains target cavity coupler.
After carrying out vacuum brazing processing to cavity coupler, it is found that solder melts flowing well, weldquality is excellent.For It more accurately monitors actual temperature in Process of Vacuum Brazing and rises situation, optimize three thermocouples in aluminium vacuum drying oven and be positioned over cavity The position of coupler.Two thermocouples at rear portion are positioned over upper cavity top surface edge in vacuum drying oven, to monitor cavity The temperature of the outside surrounding of coupler.A thermocouple in the middle part of vacuum drying oven passes through the venthole between upper cavity and intermediate bulkhead It is inserted into the inside of cavity coupler, the temperature of the bosom of test chamber coupler.By optimizing the placement location of thermocouple, It can be with the real time temperature of cavity coupler in accurate measurements Process of Vacuum Brazing.It is monitoring the result shows that:Upper cavity, lower chamber The big surplus removal of large area solid area after temperature rise uneven problem and greatly improved.
Reader should be understood that in the description of this specification reference term " one embodiment ", " is shown " some embodiments " The description of example ", " specific example " or " some examples " etc. means specific features described in conjunction with this embodiment or example, structure Or feature is included at least one embodiment or example of the invention.In the present specification, to the schematic of above-mentioned term Statement need not be directed to identical embodiment or example.Moreover, specific features, structure or the feature of description can be any It can be combined in any suitable manner in a or multiple embodiments or example.In addition, without conflicting with each other, the technology of this field The feature of different embodiments or examples described in this specification and different embodiments or examples can be combined by personnel And combination.
It should also be understood that in various embodiments of the present invention, size of the sequence numbers of the above procedures is not meant to execute sequence Priority, each process execution sequence should be determined by its function and internal logic, without cope with the embodiment of the present invention implementation Journey constitutes any restriction.
More than, specific implementation mode only of the invention, but scope of protection of the present invention is not limited thereto, and it is any to be familiar with Those skilled in the art in the technical scope disclosed by the present invention, can readily occur in various equivalent modifications or substitutions, These modifications or substitutions should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be wanted with right Subject to the protection domain asked.

Claims (10)

1. a kind of production method of cavity coupler, which is characterized in that the method includes:.
It treats process chambers coupler and carries out deconsolidation process, obtain initial upper cavity, initial lower chamber and initial intermediate bulkhead;
The flatness of the initial upper cavity, the initial lower chamber and the initial intermediate bulkhead is handled respectively, is obtained To upper cavity, lower chamber and intermediate bulkhead;
Clamping processing is carried out to the upper cavity, the lower chamber and the intermediate bulkhead, obtains clamping cavity coupler;
Processing is measured to the clamping cavity coupler, obtains cavity coupler.
2. a kind of production method of cavity coupler according to claim 1, which is characterized in that the initial upper cavity It is handled, is specifically included with the flatness of the initial lower chamber:
The processing of milling side is carried out successively to the initial upper cavity and the initial lower chamber respectively, a milling inner cavity is handled, at heat Reason, the again processing of milling inner cavity, deburring processing and back chipping processing.
3. a kind of production method of cavity coupler according to claim 1, which is characterized in that the initial middle interval The flatness of plate is handled, and is specifically included:
Assembly processing, hot smoothing process, milling processing and deburring is carried out to the initial intermediate bulkhead successively to handle.
4. a kind of production method of cavity coupler according to claim 3, which is characterized in that the initial middle interval Plate carries out assembly processing, specifically includes:
The coating lubricating oil on working plate;
The initial intermediate bulkhead is pushed into the working plate so that the initial intermediate bulkhead is fastened on consolidating for the working plate Determine between baffle and the active block stop of the working plate.
5. a kind of production method of cavity coupler according to claim 3, which is characterized in that
In the milling processing procedure, use the tool cutting edge angle of blade for 45 ° of wire rod quality.
6. a kind of production method of cavity coupler according to any one of claims 1-5, which is characterized in that described right The upper cavity, the lower chamber and the intermediate bulkhead carry out clamping processing, specifically include:
Set the first SiC plates to lower plate;
Set the 2nd SiC plates to upper layer locating back;
The lower chamber, the intermediate bulkhead and the epicoele are set gradually between the lower plate and the upper layer locating back Body, and place solder between the lower chamber and the intermediate bulkhead and between the intermediate bulkhead and the upper cavity;
Wherein, the lower plate is bonded with the lower chamber, and the upper layer locating back is bonded with the upper cavity.
7. a kind of production method of cavity coupler according to claim 6, which is characterized in that the method further includes:
The fitting setting cast iron pressing plate on the upper layer locating back.
8. a kind of production method of cavity coupler according to claim 6, which is characterized in that described to the clamping chamber Body coupler measures processing, obtains cavity coupler, specifically includes:
Gap between the lower plate and the lower chamber measures, and obtains measurement result;
The measurement result is compared with preset measurement threshold value, if the measurement result, which is less than, measures threshold value, by institute It states clamping cavity coupler and is determined as the cavity coupler.
9. a kind of production method of cavity coupler according to claim 8, which is characterized in that
The measurement threshold value is 0.05mm.
10. a kind of production method of cavity coupler according to any one of claim 1-5,7-9, which is characterized in that The method further includes:
Vacuum brazing processing is carried out to the cavity coupler, obtains target cavity coupler.
CN201810886508.4A 2018-08-06 2018-08-06 Manufacturing method of cavity coupler Active CN108649311B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810886508.4A CN108649311B (en) 2018-08-06 2018-08-06 Manufacturing method of cavity coupler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810886508.4A CN108649311B (en) 2018-08-06 2018-08-06 Manufacturing method of cavity coupler

Publications (2)

Publication Number Publication Date
CN108649311A true CN108649311A (en) 2018-10-12
CN108649311B CN108649311B (en) 2021-01-29

Family

ID=63760791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810886508.4A Active CN108649311B (en) 2018-08-06 2018-08-06 Manufacturing method of cavity coupler

Country Status (1)

Country Link
CN (1) CN108649311B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7168152B1 (en) * 2004-10-18 2007-01-30 Lockheed Martin Corporation Method for making an integrated active antenna element
CN201011955Y (en) * 2007-02-07 2008-01-30 孙岳铮 Rotary book shelf
CN101234467A (en) * 2008-03-04 2008-08-06 常州市鼎亨机电设备有限公司 QS-4 elastic body processing technique for sensor
CN104347923A (en) * 2014-11-22 2015-02-11 成都锦江电子系统工程有限公司 Y-shaped power divider manufacturing technology
US20160226125A1 (en) * 2015-01-29 2016-08-04 Radio Frequency Systems,Inc. RF Notch Filters And Related Methods
CN205900761U (en) * 2016-08-18 2017-01-18 上海肯汀通讯科技有限公司 Coupler

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7168152B1 (en) * 2004-10-18 2007-01-30 Lockheed Martin Corporation Method for making an integrated active antenna element
CN201011955Y (en) * 2007-02-07 2008-01-30 孙岳铮 Rotary book shelf
CN101234467A (en) * 2008-03-04 2008-08-06 常州市鼎亨机电设备有限公司 QS-4 elastic body processing technique for sensor
CN104347923A (en) * 2014-11-22 2015-02-11 成都锦江电子系统工程有限公司 Y-shaped power divider manufacturing technology
US20160226125A1 (en) * 2015-01-29 2016-08-04 Radio Frequency Systems,Inc. RF Notch Filters And Related Methods
CN205900761U (en) * 2016-08-18 2017-01-18 上海肯汀通讯科技有限公司 Coupler

Also Published As

Publication number Publication date
CN108649311B (en) 2021-01-29

Similar Documents

Publication Publication Date Title
Balogun et al. Specific energy based evaluation of machining efficiency
KR100313260B1 (en) Method of cleaving a brittle material
CN107322251B (en) A kind of production technology of aluminium alloy microchannel heat sink
CN102956583A (en) Temperature equalization plate structure and manufacturing method thereof
CN105758791A (en) Device and method for measuring bonding strength of metal composite interface, sample and manufacturing method for sample
Wu et al. Design of a modular green closed internal cooling turning tool for applications
CN105643039A (en) In-situ visualization method for cavitation behavior of fused brazing filler metal in solid liquid interface in ultrasonic-assisted brazing
CN108649311A (en) A kind of production method of cavity coupler
Härtel et al. Heat generation during mechanical joining processes–by the example of flat-clinching
EP3247521B1 (en) A heat exchanger comprising micro channels and manufacturing thereof
CN107931763A (en) A kind of method for welding being reliably connected and improve Ti Al Nb alloy self performances
CN103433491B (en) Silicon carbide IGBT (Insulated Gate Bipolar Transistor) substrate framework vacuum pressure aluminizing device and double-sided aluminum coating method
CN110416677A (en) A kind of liquid cooling microwave cavity device and processing method
Mourad et al. Measurement and numerical simulation of the cutting temperature in cutting tool during turning operation
Kim et al. Development of a one-axis manipulator for laser-assisted machining
CN208991957U (en) For spreading the vacuum hot extrusion furnace of connection steel Al bimetal composite material
CN209207020U (en) A kind of metal plate cutting adjustable cutter device of length
CN108754055B (en) Copper cooling wall with boss and manufacturing method thereof
CN102760642A (en) Metallic packaging shell sintering mould capable of controlling uniformity of leads in height
US9757784B2 (en) Temperature measurement device for metal sheet
Kant et al. State of the art and experimental investigation on edge effect in laser bending process
CN105277466B (en) A kind of solder clearance fillability test method
CN218860805U (en) Workpiece body coupling connecting block for heat treatment of cast-forged pieces
CN103424091B (en) Ultra-thin pneumatic measuring head and processing method thereof
JP3725966B2 (en) Plate brick fixing mechanism for sliding nozzle device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant