CN108646065A - Electrical equipment testing jig and its test method - Google Patents

Electrical equipment testing jig and its test method Download PDF

Info

Publication number
CN108646065A
CN108646065A CN201810793622.2A CN201810793622A CN108646065A CN 108646065 A CN108646065 A CN 108646065A CN 201810793622 A CN201810793622 A CN 201810793622A CN 108646065 A CN108646065 A CN 108646065A
Authority
CN
China
Prior art keywords
test
electrical equipment
tested
testing jig
monolithic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810793622.2A
Other languages
Chinese (zh)
Inventor
欧阳联华
欧阳勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen City Will Technology Co Ltd
Original Assignee
Shenzhen City Will Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen City Will Technology Co Ltd filed Critical Shenzhen City Will Technology Co Ltd
Priority to CN201810793622.2A priority Critical patent/CN108646065A/en
Publication of CN108646065A publication Critical patent/CN108646065A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/04Housings; Supporting members; Arrangements of terminals
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/04Housings; Supporting members; Arrangements of terminals
    • G01R1/0408Test fixtures or contact fields; Connectors or connecting adaptors; Test clips; Test sockets
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The invention discloses a kind of electrical equipment testing jig and its test method, testing jig ontology includes test section and control zone, and test section is connected with control zone using conducting wire;Test section is located at the upper end of testing jig ontology, test zone is equipped with isolation board, test section is divided into multiple test subregions by isolation board, test monolithic is installed in test subregion, test monolithic is provided with multiple, it is evenly distributed in test subregion, tests in monolithic and electrical equipment to be tested is installed;Control zone is located at the lower end of testing jig ontology, and control zone includes control panel and multiple signal generators, and signal generator is electrically connected by conducting wire and test monolithic, and then is tested the electrical equipment on test monolithic.Device structure of the present invention is simple, and multiple test subregions are mutual indepedent, are independent of each other, can both test, and also can be used alone simultaneously, after equipment is fixed, is deep into equipment and is tested using motor driving detection probe, testing efficiency greatly improves.

Description

Electrical equipment testing jig and its test method
Technical field
The present invention relates to test equipment field more particularly to a kind of electrical equipment testing jig and its test methods.
Background technology
Security against fire and each of us security of the lives and property are closely bound up, and fire fighting device is built also increasingly by people Attention.With progress of the epoch, electrified equipment is gradual universal, also slowly occurs electrical equipment on the market, to electric appliance Fire equipment, which goes wrong, makes timely early warning, to exclude hidden danger, guarantees personal safety.
These electrical equipments need to be detected in manufacture, only can just put into market by the electrical equipment of test It uses, otherwise easily cause wrong report or can not alarm to cause security risk;But in actual production, it is tested All be troublesome step, lack relative to equipment, can only use and manually be tested, when progress manual testing, need by Corresponding testing source is inserted on the corresponding position of electrical equipment, low to cause testing efficiency, serious blow enterprise The enthusiasm for production of industry.
Invention content
To solve the above-mentioned problems, a kind of electrical equipment testing jig of present invention offer and its test method, it is intended to realization pair Electrical equipment carries out intelligent, high-speeding detection, only needs one that multiple electrical equipments can be carried out while be detected, improves to electricity The detection efficiency and accuracy rate of gas equipment reduce enterprise's production cost.
To achieve the above object, the present invention provides a kind of electrical equipment testing jig, including testing jig ontology, the testing jig Ontology includes test section and control zone, and the test section is connected with the control zone using conducting wire;The test section is located at described The upper end of testing jig ontology, the test zone are equipped with isolation board, and test section is divided into multiple test sub-districts by the isolation board Domain, is equipped with test monolithic in the test subregion, and the test monolithic is provided with multiple, is evenly distributed on test In region, electrical equipment to be tested is installed in the test monolithic;The control zone is located at the lower end of the testing jig ontology, The control zone includes control panel and multiple signal generators, and the signal generator is carried out by conducting wire and the test monolithic It is electrically connected, and then the electrical equipment on test monolithic is tested.
Preferably, multiple test monolithics be combined into one test module, the test module be symmetrically distributed in described in every From on plate;It is tested using a test module as test cell when being tested.
Preferably, the test module includes four test monolithics, monolithic is rectangular is distributed in support plate for four tests On, the middle part of the support plate is equipped with current sensor, there are four the current sensor is set altogether, the number with the test monolithic Amount is consistent.
Preferably, the test monolithic includes fixed frame, test probe, atmospheric pressure board and motor, the fixed frame is from four Week, around electrical equipment to be tested, electrical equipment to be tested was fixed on the supporting plate;It is adopted between the fixed frame and atmospheric pressure board It is attached with supporting rod, the supporting rod is retractable structure;The atmospheric pressure board is equipped with towards electrical equipment one end to be tested The test probe, the front end tested on probe are equipped with pressure sensor, and the test probe includes a plurality of needles head;It is described The atmospheric pressure board other end is equipped with motor, and the topmost of the motor abuts the isolation board, and the motor is servo motor.
Preferably, further including a fixing buckle in the test monolithic, the fixing buckle is located at the middle part of the fixed frame Position snaps onto on the fixed frame, and when the fixed frame surround electrical equipment to be tested from surrounding, the fixing buckle is therefrom Portion snaps onto on electrical equipment to be tested, on the supporting plate by electrical equipment to be tested pressing.
Preferably, there are many switches, including power switch and test to switch for setting on the isolation board, the power supply is opened Pass is arranged in the side of the isolation board, controls the power supply of the test subregion residing for the isolation board;The test switch is set The plane residing for test monolithic is set, the test of detecting electric equipment is treated in control.
Preferably, the control zone includes control panel and signal generator, the control panel and signal generator are electrical It is connected, the signal generator includes arc signal generator, temperature signal generating device and residual current generator, the signal Generator is connected by conducting wire with test probe, and the control panel control signal generator generates test signal by testing probe Act on electrical equipment to be tested.
The invention also discloses a kind of test methods of electrical equipment testing jig, include the following steps:
S1:Electrical equipment to be tested is mounted in test monolithic, while snapping is carried out using fixing buckle and is fixed;
S2:Power on switch, press test switch, driving servo motor movement, test probe connects with electrical equipment to be measured It touches;
S3:After test probe is in contact with electrical equipment to be measured, servo motor revolution, test probe breaks with electrical equipment to be measured Connection is opened,
S4:Fixing buckle is stirred, electrical equipment to be tested is taken out.
Further include a judgment step preferably, in step S2 and S3:Pressure sensor pair on test probe Pressure suffered by test probe is measured in real time, while detection signal is fed back to control panel, when detecting that pressure reaches When given threshold, control panel discriminating test probe is completely attached to electrical equipment to be tested, controls plate control signal at this time Device generates test signal and acts on electrical equipment to be tested.
Preferably, in step s3, the time that test probe is contacted with electrical equipment to be measured is 5-10 seconds.
The beneficial effects of the invention are as follows:The present invention provides a kind of electrical equipment testing jigs, first by testing on monolithic Fixed frame electrical equipment to be measured is fixed from surrounding, while in order to ensure that all electrical equipments to be measured are in same water In flat height, also further fixed using fixing buckle;After to be fixed, atmospheric pressure board is driven to be transported using motor It is dynamic so that test probe, which is deep into electrical equipment to be measured, tests equipment;Control zone positioned at testing jig bottom is used for Control is carried out to the test process of entire testing jig, multiple signal generators are set in control zone, are occurred using these signals Device carries out electrical equipment to be measured the simulation test of actual motion environment, to obtain the operation shape in actual motion environment State, and then know whether electrical equipment complies with standard, the configuration of the present invention is simple need to only utilize and manually be put into electrical equipment to be measured Fixed and taking-up, other testing procedures are carried out by Manipulation of the machine, can be detected simultaneously to multiple equipment, each detection Between unit independently of each other, it does not interfere with each other, to improve the accuracy for greatly improving detection efficiency and detection.
Description of the drawings
Fig. 1 is main structure chart of the present invention;
Fig. 2 is the test module figure of the present invention;
Fig. 3 is the control zone structural schematic diagram of the present invention.
Main element symbol description is as follows:
1, test section 2, control zone
3, isolation board 4, test monolithic
5, module 6, electrical equipment to be measured are tested
21, control panel 22, arc signal generator
23, temperature signal generating device 24, residual current generator
31, switch 32, power switch are tested
41, motor 42, atmospheric pressure board
43, supporting rod 44, current sensor
45, fixed frame 46, fixing buckle
47, probe 48, support plate are tested.
Specific implementation mode
In order to more clearly state the present invention, using electric fire alarm as specific embodiment, in conjunction with attached drawing to this hair It is bright to be further described.
Referring to Fig. 1, the present invention provides a kind of electrical equipment testing jig, including testing jig ontology, testing jig ontology include Test section 1 and control zone 2, test section 1 are connected with control zone 2 using conducting wire;Test section 2 is located at the upper end of testing jig ontology, surveys It tries region and is equipped with isolation board 3, test section is divided into multiple test subregions by isolation board 3, is tested in subregion and is equipped with test Monolithic 4, test monolithic 4 are provided with multiple, are evenly distributed in test subregion, test in monolithic 4 be equipped with it is to be tested electrical Equipment 6;Control zone 2 is located at the lower end of testing jig ontology, and control zone 2 includes control panel 21 and multiple signal generators, signal hair Raw device is electrically connected by conducting wire and test monolithic 4, so to positioned at the electrical equipment to be tested 6 tested on monolithic 4 into Row test.In the present embodiment, it is provided with isolation board, test zone is divided into multiple test subregions, each test sub-district Between domain independently of each other, it does not interfere with each other, to ensure the accuracy of test;Even if a test subregion goes wrong, other Test subregion can still work normally, and not delay the normal work to electrical equipment.
It please refers to Fig.1 and Fig. 2 is combined into a test module 5, test using multiple test monolithics 4 in the present embodiment Module 5 is symmetrically distributed on isolation board 3;It is tested using a test module as test cell when being tested;More Particularly, test module 5 includes four test monolithics 4, and monolithic 4 is rectangular is distributed in support plate 48 for four tests, supports The middle part of plate 48 is equipped with current sensor 44, there are four current sensor 44 is set altogether, is consistent with the quantity of test monolithic 4; By current sensor setting by test monolithic, can be effectively avoided so remote to reduce the influence of resistance in conducting wire Electric current reduces when transmission, and when being detected to electrical equipment to be measured, testing requirement such case is not achieved in the numerical value of electric current, simultaneously Reduce production cost.
In the present embodiment, test monolithic 4 includes fixed frame 45, test probe 47, atmospheric pressure board 42 and motor 41, fixed frame 45 are arranged in the upper end of support plate 48, and cooperation support plate 48 surround electrical equipment 6 to be tested from surrounding, by electrical equipment to be tested 6 are fixed in support plate 48;It is attached using supporting rod 43 between fixed frame 45 and atmospheric pressure board 42, supporting rod 43 is scalable Structure;Atmospheric pressure board 42 is equipped with test probe 47 towards 6 one end of electrical equipment to be tested, and the front end tested on probe 47 is equipped with pressure Sensor, test probe 47 include a plurality of needles head;42 other end of atmospheric pressure board is equipped with motor 41, and the topmost of motor 41 abuts isolation Plate 3, motor 41 are servo motor;It further includes a fixing buckle 46 to test in monolithic 4, and fixing buckle 46 is located at the middle position of fixed frame 45 It sets, snaps onto on fixed frame 45, when fixed frame 45 surround electrical equipment to be tested from surrounding, fixing buckle 46 is snapped onto from middle part On electrical equipment 6 to be tested, by electrical equipment 6 to be tested pressing in support plate 48, more specifically, a test monolithic In two electrical equipments to be tested can be detected simultaneously, intermediate in two electrical equipments to be tested is arranged fixing buckle, one Aspect demarcates two equipment, on the other hand fixed frame is coordinated to realize the fixation for treating detecting electric equipment, prevents from testing It shifts in the process;The upper end of motor abuts isolation board, and supporting rod is stretching structure, ensures that motor can stablize drive in this way Pressing plate of taking offence moves downward, so that test probe is inserted into electrical equipment to be tested.
In the present embodiment, there are many switch, including power switch 32 and test switch 31, power supply is opened for setting on isolation board It closes 32 to be arranged in the side of isolation board 3, controls the power supply of the test subregion residing for the isolation board 3;Switch 31 is tested to be arranged The test of detecting electric equipment is treated in the plane residing for test monolithic 4, control.Setting controls different respectively there are two types of switch Control system, each test subregion are all worked independently from each other, are not interfere with each other.
Referring to Fig. 3, control zone 2 includes control panel 21 and signal generator, control panel 21 and the electrical phase of signal generator Even, signal generator includes arc signal generator 21, temperature signal generating device 22 and residual current generator 23, and signal occurs Device is connected by conducting wire with test probe, and 2 control signal generator of control panel generates test signal and acted on by testing probe Electrical equipment to be tested;Signal generator is all disposed in control zone, the signal that a signal generator is sent out passes through survey It sounds out needle and acts on multiple electrical equipments to be measured, ensure that the received signal intensity of each electrical equipment to be measured is identical , to avoid the change due to signal strength from causing the detection to electrical equipment to be measured inaccurate.
For the electrical equipment with warning function, if the prior-warning device carried in the electrical equipment that goes wrong can be sent out Raw warning, for the electrical equipment of not warning function, can by other electrical equipments of observation test simultaneously thus Comparison discovers whether that there are problems, while also can be arranged whether a prewarning unit asks electrical equipment to be measured by test monolithic Topic carries out early warning.
The invention also discloses a kind of test methods of electrical equipment testing jig, include the following steps:
S1:Electrical equipment to be tested is mounted in test monolithic, while snapping is carried out using fixing buckle and is fixed;
S2:Power on switch, press test switch, driving servo motor movement, test probe connects with electrical equipment to be measured It touches;
S3:After test probe is in contact with electrical equipment to be measured, servo motor revolution, test probe breaks with electrical equipment to be measured Connection is opened,
S4:Fixing buckle is stirred, electrical equipment to be tested is taken out.
Further include a judgment step in the present embodiment in step S2 and S3:Pressure sensing on test probe Device is measured in real time the pressure suffered by test probe, while detection signal is fed back to control panel, when detecting pressure When reaching given threshold, control panel discriminating test probe is completely attached to electrical equipment to be tested, controls plate control signal at this time Generator generates test signal and acts on electrical equipment to be tested;In step s3, test probe is contacted with electrical equipment to be measured Time be 5-10 seconds;It is further preferred that the time that test probe is contacted with electrical equipment to be measured is 6 seconds;In this 6 seconds, The signal that signal generator is sent out is freely combined and is uninterruptedly inputted to test equipment by control panel, signal generator The signal strength sent out is freely up and down fluctuated in the threshold value of electrical equipment institute to be measured early warning.
Advantage of the invention is that:
1)Test zone is divided by multiple test subregions using isolation board, is tested between subregion independently of each other, mutually not shadow It rings, ensures the Accuracy and high efficiency of test;
2)Fix electrical equipment to be tested using multiple structures so that during the test electrical equipment to be measured be not displaced from And influence detection;
3)Multiple signal generators are arranged in control area, are uniformly input in electrical equipment to be tested, it is ensured that all waits for Detecting electric equipment received signal intensity is identical;
4)Multiple switch is set, different control is carried out for different structures, ensure that safety and effectiveness when test.
Disclosed above is only several specific embodiments of the present invention, but the present invention is not limited to this, any ability What the technical staff in domain can think variation should all fall into protection scope of the present invention.

Claims (10)

1. a kind of electrical equipment testing jig, including testing jig ontology, which is characterized in that the testing jig ontology include test section and Control zone, the test section are connected with the control zone using conducting wire;The test section is located at the upper end of the testing jig ontology, The test zone is equipped with isolation board, and test section is divided into multiple test subregions, the test subregion by the isolation board Test monolithic is inside installed, the test monolithic is provided with multiple, is evenly distributed in the test subregion, the test is single Electrical equipment to be tested is installed in block;The control zone is located at the lower end of the testing jig ontology, and the control zone includes control Making sheet and multiple signal generators, the signal generator are electrically connected by conducting wire and the test monolithic, and then right Electrical equipment on test monolithic is tested.
2. electrical equipment testing jig according to claim 1, which is characterized in that multiple test monolithics are combined into a test Module, the test module are symmetrically distributed on the isolation board;It is single using a test module as test when being tested Member is tested.
3. electrical equipment testing jig according to claim 2, which is characterized in that the test module includes that four tests are single Block, on the supporting plate, the middle part of the support plate is equipped with current sensor, the electric current for four rectangular distributions of test monolithic It is consistent with the test quantity of monolithic there are four sensor is set altogether.
4. electrical equipment testing jig according to claim 1, which is characterized in that the test monolithic includes fixed frame, surveys Needle, atmospheric pressure board and motor are soundd out, the fixed frame, around electrical equipment to be tested, electrical equipment to be tested is fixed on from surrounding In support plate;It is attached using supporting rod between the fixed frame and atmospheric pressure board, the supporting rod is retractable structure;It is described Atmospheric pressure board is equipped with the test probe towards electrical equipment one end to be tested, and the front end on the test probe is equipped with pressure sensing Device, the test probe includes a plurality of needles head;The atmospheric pressure board other end is equipped with motor, described in the topmost of the motor abuts Isolation board, the motor are servo motor.
5. electrical equipment testing jig according to claim 4, which is characterized in that further include a fixation in the test monolithic Button, the fixing buckle is located at the medium position of the fixed frame, snaps onto on the fixed frame, when the fixed frame is from four chow rings When around electrical equipment to be tested, the fixing buckle is snapped onto from middle part on electrical equipment to be tested, and electrical equipment to be tested is pressed Pressure is on the supporting plate.
6. electrical equipment testing jig according to claim 1, which is characterized in that there are many open for setting on the isolation board It closes, including power switch and test switch, the power switch is arranged in the side of the isolation board, controls the isolation board institute The power supply of the test subregion at place;Detecting electric equipment is treated in the setting of test switch plane, control residing for test monolithic Test.
7. electrical equipment testing jig according to claim 1, which is characterized in that the control zone includes control panel and signal Generator, the control panel are electrical connected with signal generator, and the signal generator includes arc signal generator, temperature letter Number generator and residual current generator, the signal generator are connected by conducting wire with test probe, and the control panel controls Signal generator generates test signal and acts on electrical equipment to be tested by testing probe.
8. a kind of test method of electrical equipment testing jig, which is characterized in that include the following steps:
S1:Electrical equipment to be tested is mounted in test monolithic, while snapping is carried out using fixing buckle and is fixed;
S2:Power on switch, press test switch, driving servo motor movement, test probe connects with electrical equipment to be measured It touches;
S3:After test probe is in contact with electrical equipment to be measured, servo motor revolution, test probe breaks with electrical equipment to be measured Connection is opened,
S4:Fixing buckle is stirred, electrical equipment to be tested is taken out.
9. the test method of electrical equipment testing jig according to claim 8, which is characterized in that in step S2 and S3, It further include a judgment step:Pressure sensor on test probe examines the pressure suffered by test probe in real time Survey, at the same by detection signal feed back to control panel, when detecting that pressure reaches given threshold, control panel discriminating test probe with Electrical equipment to be tested completely attaches to, and control panel control signal generator, which generates test signal and acts on, at this time to be tested electrically sets It is standby.
10. the test method of electrical equipment testing jig according to claim 8, which is characterized in that in step s3, test The time that probe is contacted with electrical equipment to be measured is 5-10 seconds.
CN201810793622.2A 2018-07-19 2018-07-19 Electrical equipment testing jig and its test method Pending CN108646065A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810793622.2A CN108646065A (en) 2018-07-19 2018-07-19 Electrical equipment testing jig and its test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810793622.2A CN108646065A (en) 2018-07-19 2018-07-19 Electrical equipment testing jig and its test method

Publications (1)

Publication Number Publication Date
CN108646065A true CN108646065A (en) 2018-10-12

Family

ID=63759862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810793622.2A Pending CN108646065A (en) 2018-07-19 2018-07-19 Electrical equipment testing jig and its test method

Country Status (1)

Country Link
CN (1) CN108646065A (en)

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2770029A1 (en) * 1997-10-22 1999-04-23 Sgs Thomson Microelectronics TEST RANGE WITH AUTOMATIC MICROSONIC POSITIONING AND METHOD FOR CARRYING OUT SUCH A TEST RANGE
FR2823300A1 (en) * 2001-04-10 2002-10-11 Vai Clecim Method for detecting irregularities or faults in the smoothness of a metallic band product applied under traction over an angular section of a measurement roller during a hot lamination process
JP2006303187A (en) * 2005-04-20 2006-11-02 Toshiba Corp Manufacturing method for semiconductor device and semiconductor wafer
CN202204886U (en) * 2011-08-23 2012-04-25 北京新风机械厂 Integrated test platform for initiating explosive devices of aircraft
JP2013142613A (en) * 2012-01-11 2013-07-22 Seiko Epson Corp Sensor substrate, detector, electronic apparatus and robot
CN203376354U (en) * 2013-07-09 2014-01-01 东莞华贝电子科技有限公司 Aging test support for cell phone or flat computer
CN203535200U (en) * 2013-10-25 2014-04-09 惠州市桑莱士光电有限公司 Service life test device of flash lamp of mobile phone camera module
JP2014236595A (en) * 2013-06-03 2014-12-15 三菱電機株式会社 Motor drive unit
CN204065343U (en) * 2014-07-01 2014-12-31 上海奇电电气科技有限公司 A kind of frequency converter control panel function test fixture
CN204102121U (en) * 2014-08-29 2015-01-14 深圳市嘉合劲威电子科技有限公司 Flash chip testing jig
CN104391139A (en) * 2014-12-08 2015-03-04 大族激光科技产业集团股份有限公司 Method and device for monitoring pressure of test probe
CN205192692U (en) * 2015-11-13 2016-04-27 南昌理工学院 Solenoid valve test jig
CN105826251A (en) * 2015-01-09 2016-08-03 中芯国际集成电路制造(上海)有限公司 Cutting method
KR20160094503A (en) * 2015-01-30 2016-08-10 엘지디스플레이 주식회사 Testing method of mother substrate for display device
CN206378548U (en) * 2017-01-22 2017-08-04 中山市领邦照明有限公司 A kind of automatic temperature-controlled life tests burn-in test cabinet
CN206906430U (en) * 2017-07-11 2018-01-19 安徽省中测电子科技有限公司 A kind of multi channel signals ConvertBox
CN207353127U (en) * 2017-09-28 2018-05-11 深圳市优迪泰自动化科技有限公司 A kind of mechanism for testing in microswitch kludge
CN108120937A (en) * 2017-12-06 2018-06-05 浙江衡远新能源科技有限公司 A kind of power battery internal short-circuit test method and device
CN208654198U (en) * 2018-07-19 2019-03-26 深圳市将臣科技有限公司 Electrical equipment testing jig

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2770029A1 (en) * 1997-10-22 1999-04-23 Sgs Thomson Microelectronics TEST RANGE WITH AUTOMATIC MICROSONIC POSITIONING AND METHOD FOR CARRYING OUT SUCH A TEST RANGE
FR2823300A1 (en) * 2001-04-10 2002-10-11 Vai Clecim Method for detecting irregularities or faults in the smoothness of a metallic band product applied under traction over an angular section of a measurement roller during a hot lamination process
JP2006303187A (en) * 2005-04-20 2006-11-02 Toshiba Corp Manufacturing method for semiconductor device and semiconductor wafer
CN202204886U (en) * 2011-08-23 2012-04-25 北京新风机械厂 Integrated test platform for initiating explosive devices of aircraft
JP2013142613A (en) * 2012-01-11 2013-07-22 Seiko Epson Corp Sensor substrate, detector, electronic apparatus and robot
JP2014236595A (en) * 2013-06-03 2014-12-15 三菱電機株式会社 Motor drive unit
CN203376354U (en) * 2013-07-09 2014-01-01 东莞华贝电子科技有限公司 Aging test support for cell phone or flat computer
CN203535200U (en) * 2013-10-25 2014-04-09 惠州市桑莱士光电有限公司 Service life test device of flash lamp of mobile phone camera module
CN204065343U (en) * 2014-07-01 2014-12-31 上海奇电电气科技有限公司 A kind of frequency converter control panel function test fixture
CN204102121U (en) * 2014-08-29 2015-01-14 深圳市嘉合劲威电子科技有限公司 Flash chip testing jig
CN104391139A (en) * 2014-12-08 2015-03-04 大族激光科技产业集团股份有限公司 Method and device for monitoring pressure of test probe
CN105826251A (en) * 2015-01-09 2016-08-03 中芯国际集成电路制造(上海)有限公司 Cutting method
KR20160094503A (en) * 2015-01-30 2016-08-10 엘지디스플레이 주식회사 Testing method of mother substrate for display device
CN205192692U (en) * 2015-11-13 2016-04-27 南昌理工学院 Solenoid valve test jig
CN206378548U (en) * 2017-01-22 2017-08-04 中山市领邦照明有限公司 A kind of automatic temperature-controlled life tests burn-in test cabinet
CN206906430U (en) * 2017-07-11 2018-01-19 安徽省中测电子科技有限公司 A kind of multi channel signals ConvertBox
CN207353127U (en) * 2017-09-28 2018-05-11 深圳市优迪泰自动化科技有限公司 A kind of mechanism for testing in microswitch kludge
CN108120937A (en) * 2017-12-06 2018-06-05 浙江衡远新能源科技有限公司 A kind of power battery internal short-circuit test method and device
CN208654198U (en) * 2018-07-19 2019-03-26 深圳市将臣科技有限公司 Electrical equipment testing jig

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
PETER GÖTTLICHER: "electronics in the detector head of the AGIPD detector — A 1MPixel, 5MHz camera for the European XFEL", 《2009 IEEE NUCLEAR SCIENCE SYMPOSIUM CONFERENCE RECORD (NSS/MIC)》 *
唐志国等: "新型断路器自动测试系统设计", 《电气传动》, vol. 36, no. 7 *

Similar Documents

Publication Publication Date Title
CN205539367U (en) PCBA function automatic test system
CN208654198U (en) Electrical equipment testing jig
CN108646065A (en) Electrical equipment testing jig and its test method
CN212989572U (en) Quick-witted circuit board testing arrangement sweeps floor
CN203870215U (en) Testing apparatus of control main board of liquid crystal display television set
CN211263695U (en) Electric device testing equipment of anastomat
CN209543739U (en) A kind of elevator brake actual training device
CN204577882U (en) The self-monitoring switch cubicle of levelness
CN208384010U (en) Power amplifier board test fixture
CN202794402U (en) Screen painting function testing device of touch screen
CN202362411U (en) Device for testing installing accuracy of speed regulation line
CN110726926A (en) Intelligent door lock mainboard PCBA aging test method
CN109675765A (en) A kind of dispensing detection method of touch and its detection system
CN212321771U (en) GaN high-temperature function test system
CN203535157U (en) Detection device for vehicle wiring panel and vehicle wiring harness
CN206248760U (en) PCB rosin joint joint welding automatic testing equipments
CN208335698U (en) A kind of test desk of automatic detection display function
CN112858881A (en) Circuit fault overhauling device for electronic technology major
CN207308374U (en) The temperature sorting and pressure-resistant automatic test machine of a kind of 17AM temperature protectors
CN214041629U (en) Voltage testing jig
CN221078853U (en) Switch power supply single board signal acquisition and detection tool
CN213209908U (en) Non-woven fabric tester
CN209802686U (en) Dehumidifier testing arrangement with from judging production mode
CN220794444U (en) Temperature rise and temperature circulation test unattended equipment
CN220872615U (en) Air conditioner touch key function detection device and air conditioner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: NO.402, No.1 Factory building, No.4, No.2 Industrial Park Road, Xinyuan community, Pinghu street, Longgang District, Shenzhen, Guangdong 518000

Applicant after: SHENZHEN JIANGCHEN TECHNOLOGY Co.,Ltd.

Address before: 518000 area B, building 5, Yangtaishan Industrial Zone, guantian community, Shiyan street, Bao'an District, Shenzhen City, Guangdong Province

Applicant before: SHENZHEN JIANGCHEN TECHNOLOGY Co.,Ltd.