CN108643454A - A kind of the prestressed group anchorage system and its construction method of internal single beam sealing - Google Patents

A kind of the prestressed group anchorage system and its construction method of internal single beam sealing Download PDF

Info

Publication number
CN108643454A
CN108643454A CN201810785628.5A CN201810785628A CN108643454A CN 108643454 A CN108643454 A CN 108643454A CN 201810785628 A CN201810785628 A CN 201810785628A CN 108643454 A CN108643454 A CN 108643454A
Authority
CN
China
Prior art keywords
anchor slab
reinforcing steel
sealing
presstressed reinforcing
tapered sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810785628.5A
Other languages
Chinese (zh)
Other versions
CN108643454B (en
Inventor
刘进
温朝臣
黄颖
莫鲤木
左海宁
覃广志
曾航宇
经凤明
周杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liuzhou OVM Machinery Co Ltd
Original Assignee
Liuzhou OVM Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liuzhou OVM Machinery Co Ltd filed Critical Liuzhou OVM Machinery Co Ltd
Priority to CN201810785628.5A priority Critical patent/CN108643454B/en
Publication of CN108643454A publication Critical patent/CN108643454A/en
Application granted granted Critical
Publication of CN108643454B publication Critical patent/CN108643454B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions
    • E04C5/12Anchoring devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

A kind of prestressed group anchorage system of internal single beam sealing; the presstressed reinforcing steel and pre-buried duct, the sealing anchor slab component sealed including protection shade assembly, work clip sheet, sealing anchor slab component, anchor plate, more single beams includes work anchor slab, rubber tapered sleeve, plastics stop collar and pressure plate;The rubber tapered sleeve is multiple-piece wedge-shaped rubber coil structures, and plastics stop collar is not isometrical hollow round sleeve with the level;Under installation condition, every presstressed reinforcing steel is each passed through the taper hole I of pressure plate, plastics stop collar, the rubber tapered sleeve in taper hole II and the anchor slab that works, work clip sheet clamps presstressed reinforcing steel, and squeezed tight coordinates between rubber tapered sleeve and work anchor slab taper hole II, between rubber tapered sleeve and presstressed reinforcing steel PE sheaths;This group of anchor systems are mainly used for the operating mode of vertical replaceable presstressed reinforcing steel in vivo, effectively seal against connection presstressed reinforcing steel PE sheath exposed parts by sealing anchor slab component, are effectively sealed anti-corrosion protection to presstressed reinforcing steel, construction is simple, and operability is strong.

Description

A kind of the prestressed group anchorage system and its construction method of internal single beam sealing
Technical field
The present invention relates to a kind of prestressed group anchorage system sealed in vivo and its construction method more particularly to a kind of internal lists The prestressed group anchorage system and its construction method of beam sealing.
Background technology
In post-tensioned concrete structure, to ensure presstressed reinforcing steel reliability long-term under high-stress state, answer Effective anti-corrosion is carried out to presstressed reinforcing steel, generally use monofilament spraying epoxy coating technology protects steel wire at present, then leads to Grease and PE sheaths are wrapped up in outside crossing to protect single beam presstressed reinforcing steel, are protected again to play the role of 3 to compressor wire.
But this three-layer protection can be destroyed in anchor head holding position, either Extruded anchoring tool or strand tapered anchorage, Can be because of the destruction for protecting medium and by environmental corrosion, therefore can generally increase protective cover and sealing device at anchor head to folder The part that the place of holding divests PE sheaths carries out anti-corrosion protection, and sealing device here is usually the form that anti-corrosion medium is filled in cylinder Integral sealing protection, such as a kind of patent of invention " dragline anchorage using single sealing " (patent are carried out to multi beam presstressed reinforcing steel 106638309 A Figure 10 of publication No. CN), the sealing device of the invention patent be exactly by sealing drum, positioning plate, compression ring, The mating connection of steel strand wires casing seals, and a large amount of easily cure pastes are perfused into sealing drum and carry out anti-corrosion, therefore this Kind sealing device has need to be prefabricated in advance, and occupied space is big, and filling preserving timber doses is big, the higher disadvantage of cost.If being applied to In-body prestressed structure then will increase the reserving hole channel diameter of structure, weaken structural strength, and be not easy to installation.
Invention content
It is an object of the invention to:It provides a kind of applied in prestressed reinforced concrete construction body and without the list of sealing off and covering anchorage protection Beam seals soap-free emulsion polymeization anchoring system, and the part for removing PE sheaths to unbonded prestressing tendon by sealing anchor slab component carries out effectively Sealed connection and protection, so that every beam presstressed reinforcing steel is environmentally isolated with, to solve above-mentioned technical problem.
The technical solution to solve the above problems is:A kind of prestressed group anchorage system of internal single beam sealing, including protective cover Component, work clip sheet, anchor slab, anchor plate, m roots unbonded prestressing tendon, pre-buried duct, it is characterised in that:The soap-free emulsion polymeization Presstressed reinforcing steel is the presstressed reinforcing steel of single beam sealing, and the anchor slab is sealing anchor slab component, which includes work Anchor slab, rubber tapered sleeve, plastics stop collar and pressure plate, the one end for the anchor slab that works are provided with the taper hole I for installing intermediate plate, work anchor The other end of plate is provided with groove, pressure plate is located in the groove, and there is taper hole II in straight hole tail portion in the anchor slab that works;
The rubber tapered sleeve is multiple-piece wedge-shaped rubber coil structures, and plastics stop collar is not isometrical hollow round sleeve with the level, Rubber cone covers upper every wedge shape rubber block can only carry out radial displacement by respective card slot limitation on plastics stop collar;
Under installation condition, every presstressed reinforcing steel be each passed through pressure plate, plastics stop collar, the rubber tapered sleeve in taper hole II and The taper hole I of work anchor slab, work clip sheet clamp presstressed reinforcing steel, and PE sheaths withstand work anchor slab lower face taper hole II, hexagonal spiral shell Bolt and nut check work anchor slab and pressure plate, rubber tapered sleeve and work anchor slab taper hole II form wedging cooperation, rubber tapered sleeve with Squeezed tight coordinates between work anchor slab taper hole II, between rubber tapered sleeve and presstressed reinforcing steel PE sheaths;Protect shade assembly and sealing Luminal perfusion has flowable anti-corrosion medium in gap between the work anchor slab of anchor slab component;The value range of above-mentioned m is:m For the integer more than or equal to 2.
Its further technical solution is:The angle of taper α of the rubber tapered sleeve and the angle beta of anchor slab small end taper hole are opposite It answers, value range is 10~30 °.
Its further technical solution is:It is characterized in that:Being put on plastics stop collar has an O-ring seals.
Relevant another technical solution is:A kind of construction method of the prestressed group anchorage system of above-mentioned internal single beam sealing, It includes the following steps:
A, prepare before construction:It is prefabricated in the factory and seals each component of anchor slab component, including work anchor slab, rubber tapered sleeve, plastics limit Position set and pressure plate;
B, positioning and anchor plate and pre-buried duct are installed(Bellows or withdrawing pipe)Afterwards, casting concrete;
C, after concrete reaches demand intensity, presstressed reinforcing steel is passed through into duct, divests presstressed reinforcing steel end sections PE sheaths;
D, installation sealing anchor slab component:
Sealing anchor slab component is mounted on anchor plate, and promotes certain altitude, so as to lashing;
E, lashing:
Every presstressed reinforcing steel is each passed through pressure plate, positioning sleeve, rubber tapered sleeve and work anchor slab, PE sheaths is allowed to withstand work anchor After the taper hole of plate lower face, installment work intermediate plate clamps presstressed reinforcing steel end, makes it that can not generate displacement because conducting oneself with dignity or colliding with;
F:Locking, sealing:
After completing all presstressed reinforcing steel lashings, by hex bolts and nut check pressure plate, rubber tapered sleeve wedge shaped squeeze is utilized The PE sheaths and anchor slab lower end taper hole of presstressed reinforcing steel, to reach sealing effect;
G:Other end anchorage uses same structure type, cuts off steel strand wires on demand and divests PE sheaths, repeats step D~F, Complete the installation of a whole set of anchorage;
H:One end is selected to carry out presstressed reinforcing steel preload and integral tension;
I:After completing tensioning, at both ends, anchor head is respectively mounted protection shade assembly, and is situated between to the flowable anti-corrosion of protective cover luminal perfusion Matter.
A kind of further technical solution of the construction method of the prestressed group anchorage system of internal single beam sealing is:In F: Locking, sealing step, being put on plastics stop collar has an O-ring seals.
Due to taking above structure, the present invention's《A kind of the prestressed group anchorage system and its construction party of internal single beam sealing Method》It has the advantages that:
1, independent sealed, be not likely to produce anti-corrosion failure, sealed reliable:
1. prestressed group anchorage system of the present invention covers whole beam and provides PE sheaths and carried out with sealing anchor slab component 4 by using grease The mode being effectively tightly connected, being isolated with extraneous corrosive substance per beam presstressed reinforcing steel, to be substantially effectively prestressing force Muscle provides protection.
2. the unbonded prestressing tendon 6 realizes that single beam seals by sealing anchor slab component 4, sealed reliable:
The sealing anchor slab component 4 includes work anchor slab 41, rubber tapered sleeve 42, plastics stop collar 43 and pressure plate 44, and work anchor slab 41 one end is provided with the taper hole I 411 for installing intermediate plate, and the other end of work anchor slab 41 is provided with groove 414, pressure plate 44 is located at In the groove 414, rubber tapered sleeve 42 uses multiple-piece wedge-shaped rubber coil structures, every wedge shape rubber block on rubber tapered sleeve 42 equal Radial displacement can only be carried out by respective card slot limitation on plastics stop collar 43(Referring to Fig. 3), before unlocked tight pressure plate 44, there are Enough aperture Φ d allow presstressed reinforcing steel to pass through(Referring to Fig. 3, Fig. 7, Fig. 8), after locking pressure plate 44, tightly packed PE sheaths Gap JX2 between gap JX1 and plastics stop collar 43 between rubber tapered sleeve 42 and work anchor slab 41 reaches sealing and connects The effect connect;The friction coefficient of rubber ring and PE sheaths is high, in vertical structure, can also provide a more reliable frictional power Prevent PE sheaths in steel strand tension or because PE sheaths dead weight generate sliding.
2, easy for construction, easy to operate, construction efficiency is high;
1. the angle beta of the angle of taper α and anchor slab small end taper hole of wedge-shaped rubber tapered sleeve 42 can be adjusted(Fig. 3, Fig. 5), to adjust The radial normal pressure that rubber ring applies PE sheaths when section locking, it is easy to operate.
It is finished 2. sealing anchor slab component can be assembled before construction, only needs to lock after lashing(Or it compresses)Pressure plate, you can complete Easy to operate at sealed connection, construction efficiency is high.
3. for this kind of elongated vertical structure of wind tower cylinder, single presstressed reinforcing steel lashing can be carried out, can also be used more Beam is reeved, easy to operate, and occupancy operating space is small, and operability is good.
3, small to the damage of structure, convenient for safeguarding when the later stage carry out changing rope or anchoring temporarily:
1. duct is smaller, small to the damage of structure;
2. presstressed reinforcing steel is protected it is not necessary that slurry is perfused in duct, therefore when presstressed reinforcing steel occurs abnormal, can carry out pre- Stress rib replacement operation;The later stage carries out changing rope or anchoring temporarily when convenient for safeguarding.
3. according to the preferable anti-corrosion medium of mobility, since the structure is in the connection of protection shade assembly 1 and anchor plate 5 Rubber has been carried out at place, the junction of sealing anchor slab component 4 and anchor plate 5, rubber tapered sleeve 42 and PE sheaths, anchor slab lower end taper hole Glue crush seal, therefore the structure can observe by the naked eye anti-corrosion medium residue content in protection shade assembly and judge seal assembly Whether fail.
4, the anti-corrosion medium amount of structural reduction, perfusion is less, and perfusion anti-corrosion medium need to only cover anchor head, you can reach anti-corrosion Effect, it is cost-effective.
With reference to the accompanying drawings and examples to the present invention's《It a kind of prestressed group anchorage system of internal single beam sealing and its applies Work method》Technical characteristic be described further.
Description of the drawings
Fig. 1 is a kind of prestressed group anchorage system overall structure diagram of internal single beam sealing of the present invention;
Fig. 2 is that a kind of assembled state structure of the sealing anchor slab component of the prestressed group anchorage system of internal single beam sealing of the present invention is shown It is intended to;
Fig. 3, Fig. 4 are the combining structure schematic diagrams of the rubber tapered sleeve and plastics stop collar that seal anchor slab component;
Fig. 3 is front sectional view, and Fig. 4 is the left view of Fig. 3;
Fig. 5 is the work anchor plate structure schematic diagram for sealing anchor slab component;
Fig. 6 is the plastics stop collar structural schematic diagram for sealing anchor slab component;
Fig. 7 is the sealing anchor slab component structure diagram before presstressed reinforcing steel lashing;
Fig. 8 is locking after presstressed reinforcing steel lashing, the sealing anchor slab component structure diagram after sealing;
Fig. 9 is the portions the A enlarged drawing of Fig. 7;
Figure 10 is the existing single sealing anchor device structure schematic diagram with the independent sealed structure of multilayer.
In Fig. 1-Fig. 9:
1- protection shade assemblies, 2- anti-corrosion media, 3- work clip sheets,
4- anchors seal anchor slab component, 41- work anchor slabs, 42- rubber tapered sleeves, 43- plastics stop collars, 44- pressure plates, 45- hexagonals Bolt, 46- nuts;
411- taper holes I, 412- straight holes, 413- taper holes II, 414- grooves,
5- anchor plates, 6- unbonded prestressing tendons, the pre-buried ducts 7-, 8-O shape sealing rings.
Gap between JX1- PE sheaths and rubber tapered sleeve, the gap between JX2- plastics stop collar and work anchor slab,
YJMF- compresses sealing.
In Figure 10:
1a- protects shade assembly, 2a- bolts, 3a- work clip sheets, 4a- anchor slabs, 5a- sealing drums, the hardenable slurries of 6a-, 7a- isolation Set, 8a- sealing devices II, 9a-sealing plate, 10a-compression ring, 11a- unbonded prestressing tendons.
Specific implementation mode
Embodiment one
A kind of prestressed group anchorage system of internal single beam sealing:
As shown in Figure 1, the prestressed group anchorage system of internal single beam sealing includes protection shade assembly 1, work clip sheet 3, anchor slab, anchor Backing plate 5, m roots unbonded prestressing tendon 6, pre-buried duct 7;
The unbonded prestressing tendon 6 is the presstressed reinforcing steel of single beam sealing, and the anchor slab is sealing anchor slab component 4, such as Fig. 2 Shown, which includes work anchor slab 41, rubber tapered sleeve 42, plastics stop collar 43 and pressure plate 44, and work anchor slab 41 one end is provided with the taper hole I 411 for installing intermediate plate, and the other end of work anchor slab 41 is provided with groove 414, pressure plate 44 is located at In the groove 414, there is taper hole II 413 in 412 tail portion of straight hole in the anchor slab that works(Referring to Fig. 5);
The rubber tapered sleeve 42 is multiple-piece wedge-shaped rubber coil structures, and plastics stop collar 43 is not isometrical hollow circular shaft with the level It covers, every wedge shape rubber block on rubber tapered sleeve 42 can only carry out radial displacement by respective card slot limitation on plastics stop collar 43 (Referring to Fig. 3-Fig. 4);
Every presstressed reinforcing steel is each passed through pressure plate 44, plastics stop collar 43, the rubber tapered sleeve 42 in taper hole II 413 and work Make the taper hole I 411 of anchor slab 41, work clip sheet clamps presstressed reinforcing steel, and PE sheaths withstand work anchor slab lower face taper hole II 413, Hex bolts and nut check work anchor slab 41 and pressure plate 44, rubber tapered sleeve 42 and work anchor slab taper hole II 413 form wedging Cooperation, rubber tapered sleeve 42 and anchor slab taper hole II 413, rubber tapered sleeve 42 and presstressed reinforcing steel PE the sheaths squeezed tight between the two that works Cooperation;Luminal perfusion has flowable anti-corrosion to be situated between in gap between protection shade assembly 1 and the work anchor slab for sealing anchor slab component 4 Matter 2;The value range of above-mentioned m is:M is the integer more than or equal to 2.
The angle of taper α of the rubber tapered sleeve 42 and the angle beta of anchor slab small end taper hole are corresponding, value range be 10~ 30°(Referring to Fig. 3, Fig. 5), the angle beta of angle of taper α and anchor slab small end taper hole by adjusting rubber tapered sleeve 42, to adjust The radial normal pressure that rubber ring applies PE sheaths when locking.
As a kind of transformation of the embodiment of the present invention, an O-ring seals 8 can also be put on plastics stop collar 43(Ginseng See Fig. 6), to enhance sealing effect.
Embodiment two
A kind of construction method of the prestressed group anchorage system of internal single beam sealing, it includes the following steps:
A, prepare before construction:It is prefabricated in the factory and seals each component of anchor slab component 4, including work anchor slab 41, rubber tapered sleeve 42, modeling Expect stop collar 43 and pressure plate 44(Referring to Fig. 3-Fig. 6);
B, positioning and anchor plate 5 and pre-buried duct 7 are installed(Bellows or withdrawing pipe)Afterwards, casting concrete;
C, after concrete reaches demand intensity, presstressed reinforcing steel is passed through into duct, divests presstressed reinforcing steel end sections PE sheaths;
D, installation sealing anchor slab component 4:
Sealing anchor slab component 4 is mounted on anchor plate 5, and promotes certain altitude, so as to lashing;
E, lashing:
Every presstressed reinforcing steel is each passed through pressure plate 44, positioning sleeve 43, rubber tapered sleeve 42 and work anchor slab 41, allows PE sheaths top It firmly works after 41 lower face taper hole of anchor slab, installment work intermediate plate 3 clamps presstressed reinforcing steel end, makes it can not be because conducting oneself with dignity or knocking Touch generation displacement(Referring to Fig. 7);
F:Locking, sealing:
After completing all presstressed reinforcing steel lashings, by hex bolts and nut check pressure plate 44, squeezed using rubber tapered sleeve wedge shape The PE sheaths and anchor slab lower end taper hole for pressing presstressed reinforcing steel, to reach sealing effect, plastics stop collar 43 is preferable using plasticity Material can generate small plastic deformation to a certain extent, reach sealing effect after being squeezed(Referring to Fig. 8);
G:Other end anchorage uses same structure type(Referring to Fig. 1), steel strand wires are cut off on demand and divest PE sheaths, are repeated Step D~F completes the installation of a whole set of anchorage;
H:One end is selected to carry out presstressed reinforcing steel preload and integral tension;
I:After completing tensioning, at both ends, anchor head is respectively mounted protection shade assembly 1, and is situated between to the flowable anti-corrosion of protective cover luminal perfusion Matter.
In F:In locking, sealing step, the angle beta phase of the angle of taper α and anchor slab small end taper hole of the rubber tapered sleeve 42 Corresponding, value range is 10~30 °(Referring to Fig. 3, Fig. 5), by the angle of taper α and anchor slab small end that adjust rubber tapered sleeve 42 The angle beta of taper hole, the radial normal pressure that rubber ring applies PE sheaths when to adjust locking.
As a kind of transformation of the embodiment of the present invention, an O-ring seals 8 can also be put on plastics stop collar 43, with Enhance sealing effect.

Claims (5)

1. a kind of prestressed group anchorage system of internal single beam sealing, including protection shade assembly(1), work clip sheet(3), anchor slab, anchor Backing plate(5), m root unbonded prestressing tendons(6), pre-buried duct(7), it is characterised in that:The unbonded prestressing tendon(6)It is The presstressed reinforcing steel of single beam sealing, the anchor slab are sealing anchor slab component(4), the sealing anchor slab component(4)Including the anchor slab that works (41), rubber tapered sleeve(42), plastics stop collar(43)And pressure plate(44), work anchor slab(41)One end be provided with for installation folder The taper hole I of piece(411), work anchor slab(41)The other end be provided with groove(414), pressure plate(44)Positioned at the groove(414)It is interior, There is taper hole II in straight hole tail portion in work anchor slab(413);
The rubber tapered sleeve(42)For multiple-piece wedge-shaped rubber coil structures, plastics stop collar(43)It is with the level not isometrical hollow Round sleeve, rubber tapered sleeve(42)On every wedge shape rubber block by plastics stop collar(43)Upper respective card slot limitation can only carry out Radial displacement;
Under installation condition, every presstressed reinforcing steel is each passed through pressure plate(44), plastics stop collar(43), be located at taper hole II(413) Interior rubber tapered sleeve(42)With work anchor slab(41)Taper hole I(411), work clip sheet clamps presstressed reinforcing steel, and PE sheaths are withstood Work anchor slab lower face taper hole II(413), hex bolts and nut check work anchor slab(41)And pressure plate(44), rubber tapered sleeve (42)With work anchor slab taper hole II(413)Form wedging cooperation, rubber tapered sleeve(42)With work anchor slab taper hole II(413)Between, Rubber tapered sleeve(42)Squeezed tight coordinates between presstressed reinforcing steel PE sheaths;Protect shade assembly(1)With sealing anchor slab component(4)'s Luminal perfusion has flowable anti-corrosion medium in gap between work anchor slab(2);The value range of above-mentioned m is:M be more than etc. In 2 integer.
2. a kind of prestressed group anchorage system of internal single beam sealing according to claim 1, it is characterised in that:The rubber Tapered sleeve(42)Angle of taper α and anchor slab small end taper hole angle beta it is corresponding, value range be 10~30 °.
3. a kind of prestressed group anchorage system of internal single beam sealing according to claim 1 or 2, it is characterised in that:It is moulding Expect stop collar(43)Upper storing has an O-ring seals(8).
4. a kind of construction method of the prestressed group anchorage system of internal single beam sealing, it is characterised in that:It includes the following steps:
A, prepare before construction:Be prefabricated in the factory sealing anchor slab component(4)Each component, including work anchor slab(41), rubber tapered sleeve (42), plastics stop collar(43)And pressure plate(44);
B, positioning and anchor plate is installed(5)With pre-buried duct(7)(Bellows or withdrawing pipe)Afterwards, casting concrete;
C, after concrete reaches demand intensity, presstressed reinforcing steel is passed through into duct, divests presstressed reinforcing steel end sections PE sheaths;
D, installation sealing anchor slab component(4):
Anchor slab component will be sealed(4)Mounted on anchor plate(5)On, and certain altitude is promoted, so as to lashing;
E, lashing:
Every presstressed reinforcing steel is each passed through pressure plate(44), positioning sleeve(43), rubber tapered sleeve(42)With work anchor slab(41), allow PE sheaths withstand work anchor slab(41)After the taper hole of lower face, installment work intermediate plate(3), presstressed reinforcing steel end is clamped, its nothing is made Method generates displacement because conducting oneself with dignity or colliding with;
F:Locking, sealing:
After completing all presstressed reinforcing steel lashings, pass through hex bolts and nut check pressure plate(44), utilize rubber tapered sleeve wedge shape The PE sheaths and anchor slab lower end taper hole for squeezing presstressed reinforcing steel, to reach sealing effect;
G:Other end anchorage uses same structure type, cuts off steel strand wires on demand and divests PE sheaths, repeats step D~F, Complete the installation of a whole set of anchorage;
H:One end is selected to carry out presstressed reinforcing steel preload and integral tension;
I:After completing tensioning, at both ends, anchor head is respectively mounted protection shade assembly(1), and to the flowable anti-corrosion of protective cover luminal perfusion Medium.
5. a kind of construction method of the prestressed group anchorage system of internal single beam sealing according to claim 4, feature exist In:In F:Locking, sealing step, in plastics stop collar(43)Upper storing has an O-ring seals(8).
CN201810785628.5A 2018-07-17 2018-07-17 In-vivo single-beam sealed prestress group anchor system and construction method thereof Active CN108643454B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810785628.5A CN108643454B (en) 2018-07-17 2018-07-17 In-vivo single-beam sealed prestress group anchor system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810785628.5A CN108643454B (en) 2018-07-17 2018-07-17 In-vivo single-beam sealed prestress group anchor system and construction method thereof

Publications (2)

Publication Number Publication Date
CN108643454A true CN108643454A (en) 2018-10-12
CN108643454B CN108643454B (en) 2023-07-25

Family

ID=63751437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810785628.5A Active CN108643454B (en) 2018-07-17 2018-07-17 In-vivo single-beam sealed prestress group anchor system and construction method thereof

Country Status (1)

Country Link
CN (1) CN108643454B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258928A (en) * 2019-06-26 2019-09-20 中国长江三峡集团有限公司 A kind of installation method of Nut column deformed bar device
CN110359634A (en) * 2019-07-25 2019-10-22 威胜利工程有限公司 Stretching end anchorage
CN113027138A (en) * 2021-03-19 2021-06-25 云南省建设投资控股集团有限公司 Steel strand penetrating and guiding device
CN118029693A (en) * 2024-02-27 2024-05-14 中国核工业华兴建设有限公司 Prestressed construction method of grouting and tensioning

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3339125A1 (en) * 1983-10-28 1985-05-15 Philipp Holzmann Ag, 6000 Frankfurt Two-part wedge anchorage for tendons and an apparatus with a hydraulic press for installing a fixed anchor comprising such a wedge anchorage
US20050066595A1 (en) * 2002-04-03 2005-03-31 Dywidag-Systems International Gmbh Anchoring device for a corrosion-resistant tension member, particularly an inclined cable for a cable-stayed bridge
CN201003241Y (en) * 2007-01-24 2008-01-09 柳州欧维姆机械股份有限公司 Anchorage device with seal structure
CN103850181A (en) * 2014-01-28 2014-06-11 柳州欧维姆机械股份有限公司 Separable sealing structure of dragline anchor and method for realizing sealing of anchor
CN206109979U (en) * 2016-07-29 2017-04-19 安徽金星预应力工程技术有限公司 Multiple sealed anticorrosive ground tackle
CN106638309A (en) * 2016-12-28 2017-05-10 柳州欧维姆机械股份有限公司 Inhaul cable anchorage device adopting single sealing
CN106835985A (en) * 2016-12-30 2017-06-13 柳州欧维姆机械股份有限公司 One kind electric isolution prestress anchorage system and its construction installation method
KR20180068707A (en) * 2016-12-14 2018-06-22 퓨처엔지니어링 주식회사 Apparatus and method for anchoring unbonded type tension member
CN208899750U (en) * 2018-07-17 2019-05-24 柳州欧维姆机械股份有限公司 A kind of prestressed group anchorage system of internal single beam sealing

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3339125A1 (en) * 1983-10-28 1985-05-15 Philipp Holzmann Ag, 6000 Frankfurt Two-part wedge anchorage for tendons and an apparatus with a hydraulic press for installing a fixed anchor comprising such a wedge anchorage
US20050066595A1 (en) * 2002-04-03 2005-03-31 Dywidag-Systems International Gmbh Anchoring device for a corrosion-resistant tension member, particularly an inclined cable for a cable-stayed bridge
CN201003241Y (en) * 2007-01-24 2008-01-09 柳州欧维姆机械股份有限公司 Anchorage device with seal structure
CN103850181A (en) * 2014-01-28 2014-06-11 柳州欧维姆机械股份有限公司 Separable sealing structure of dragline anchor and method for realizing sealing of anchor
CN206109979U (en) * 2016-07-29 2017-04-19 安徽金星预应力工程技术有限公司 Multiple sealed anticorrosive ground tackle
KR20180068707A (en) * 2016-12-14 2018-06-22 퓨처엔지니어링 주식회사 Apparatus and method for anchoring unbonded type tension member
CN106638309A (en) * 2016-12-28 2017-05-10 柳州欧维姆机械股份有限公司 Inhaul cable anchorage device adopting single sealing
CN106835985A (en) * 2016-12-30 2017-06-13 柳州欧维姆机械股份有限公司 One kind electric isolution prestress anchorage system and its construction installation method
CN208899750U (en) * 2018-07-17 2019-05-24 柳州欧维姆机械股份有限公司 A kind of prestressed group anchorage system of internal single beam sealing

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258928A (en) * 2019-06-26 2019-09-20 中国长江三峡集团有限公司 A kind of installation method of Nut column deformed bar device
CN110359634A (en) * 2019-07-25 2019-10-22 威胜利工程有限公司 Stretching end anchorage
CN113027138A (en) * 2021-03-19 2021-06-25 云南省建设投资控股集团有限公司 Steel strand penetrating and guiding device
CN118029693A (en) * 2024-02-27 2024-05-14 中国核工业华兴建设有限公司 Prestressed construction method of grouting and tensioning

Also Published As

Publication number Publication date
CN108643454B (en) 2023-07-25

Similar Documents

Publication Publication Date Title
CN108643454A (en) A kind of the prestressed group anchorage system and its construction method of internal single beam sealing
US10544581B2 (en) Prestressed tube section structure and construction method thereof
EP2718520B1 (en) Joint for concrete tower sections
US4878327A (en) Corrosion protected tension member for use in prestressed concrete and method of installing same
CN107575257B (en) The anchoring process of anchor tool system for fibre-reinforced high molecular material bar
US10077538B2 (en) Axial reinforcement system for restorative shell
CN100570067C (en) Prestressed method of suspension bridge anchoring changeable formula and device
US4640068A (en) Anchoring and coupling device for tendons in prestressed concrete
CN109184737A (en) The tunnel prestressing force constraint of pressure energy-absorbing can be allowed to fill liner supporting system and technique
CN104372738A (en) Single-cable-replaceable type anchorage pre-stressed anchor device and installation and cable replacement methods thereof
CN111188335A (en) Supporting body anchor rod and supporting body anchor rod with bag
CN103074851A (en) Composite strand tapered anchoring steel strand finished product cable and manufacture method thereof
CN208899750U (en) A kind of prestressed group anchorage system of internal single beam sealing
CN105780652A (en) Sealing device, cable saddle sealing connecting structure using sealing device and construction method of cable saddle sealing connecting structure
CN112901232B (en) Multistage pressure stock that lets of compensation prestressing force loss
CN214530646U (en) Recoverable anchorage device for prestressed steel strand
CN201144393Y (en) Replaceable prestressed device for suspension bridge anchor
CN212316913U (en) Supporting body anchor rod and supporting body anchor rod with bag
CN109723915B (en) PCCP (prestressed concrete cylinder pipe) prestress reinforcing structure and reinforcing method
CN107165059A (en) A kind of construction method of the anti-bend reinforced device of bridge prestress high-strength steel cord
CN208293398U (en) A kind of attachment device of segmented prestress wire
CN101086162A (en) Section bar pull out technology by gradual destruction of gripping power of section bar concrete composite member
CN210510737U (en) PCCP pipeline maintenance device
CN205304104U (en) A anchor clamps for cable laying
CN211396284U (en) Connecting structure of flat anchor assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant