CN108642985A - A kind of quick environment protection pavement based on regenerated plastics - Google Patents
A kind of quick environment protection pavement based on regenerated plastics Download PDFInfo
- Publication number
- CN108642985A CN108642985A CN201810494976.7A CN201810494976A CN108642985A CN 108642985 A CN108642985 A CN 108642985A CN 201810494976 A CN201810494976 A CN 201810494976A CN 108642985 A CN108642985 A CN 108642985A
- Authority
- CN
- China
- Prior art keywords
- san
- hole
- regenerated
- plastic boards
- regenerated plastics
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/006—Foundations for pavings made of prefabricated single units
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/06—Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a kind of quick environment protection pavement based on regenerated plastics, each SAN regenerated plastic boards are located between roadbed and cement concrete road face layer, each SAN regenerated plastic boards are sequentially distributed, and are connected by SAN regenerated plastics plate jointing apparatus between adjacent two pieces of SAN regenerated plastic boards;On each SAN regenerated plastic boards, it is both provided with first through hole on each SAN regenerated plastics plate jointing apparatus and at SAN regenerated plastic boards and the link position of SAN regenerated plastics plate jointing apparatus, several second through-holes are provided on roadbed, wherein, one first through hole corresponds to second through-hole and an interlayer securing device, wherein, corresponding second through-hole of each first through hole face, the upper end of interlayer securing device is connected with cement concrete road face layer, the lower end of interlayer securing device passes through corresponding first through hole to be inserted in corresponding second through-hole, the road surface can realize the recycling of SAN foamed plastics.
Description
Technical field
The present invention relates to a kind of quick environment protection pavement bases, and in particular to a kind of quick environment-friendlyroad road based on regenerated plastics
Face.
Background technology
Cement concrete road mainly builds base, generally existing material using the material with higher elasticity modulus at present
Procurement cost is high, transport difficulty is big, and operational procedure is complicated, occupies the problems such as long in time limit.Simultaneously because different regions roadbed dry and wet
The difference of type and highway loading situation, base material and structure design do not have strict standard.Usually require engineering staff according to
Construction State calculate and verify repeatedly, the unstable of roadbase quality is objectively resulted in, to influence road
Ability.
Cement concrete pavement high, stability and the good road surface types of durability as a kind of intensity, in all kinds of road works
Extensive use is received in journey, is to build up one of maximum road surface types of area at present.But since cement concrete pavement is to row
The specific requirement of the environmental factors such as water condition, foundation base intension, monolithic stability degree generally requires to build in advance below top course
Base, for preventing the road diseases such as purt mud, frost, Water Damage, while reduce roadbed top surface compression, improve pavement structure hold
Loading capability provides conveniently for surface construction.
In constructing at this stage, lean concrete, bituminous concrete, cement stabilized macadam, lime-flyash stabilization are mainly used
The traditional building materials such as rubble build base.Lean concrete is formulated by thick, fine aggregate and certain cement and water
A kind of material, intensity are more than semi-rigid sub-base material;Bituminous concrete refers to the mineral aggregate for having certain gradation composition, rubble etc.
With a certain proportion of bitumen for road use material, the mixture made of mixing under stringent control condition, strength of materials height, globality
It is good;Cement stabilized macadam is to make aggregate with graded broken stone, simultaneously using the gap of cementitious material and enough grey slurry filler aggregates
It paves compacting by embedded squeezing principle, there is ideal intensity, impermeability and frost resistance;Pulverized limestone.Flyash stabilization gravel be by lime,
Flyash is with other incorporation materials (soil gathers materials) by proper proportion, optimum moisture content, reasonable process (mix, compacting and maintenance)
Manufactured mixture.
At this stage cement concrete pavement base layer construction mainly use lean concrete, bituminous concrete, cement stabilized macadam,
The materials such as lime-flyash stabilization rubble, there is material cost height, transport difficulties to varying degrees greatly, structure design
Difficult, the problems such as construction standardization degree is low, resources circulation is poor.Specifically, lean concrete base due to its cementitious matter content is few,
Porosity is larger, and water resistance is poor, cannot obstruct road table and be seeped into base and partition underground capillary water rising under water;Pitch coagulation
Soil material higher price, complicated construction technique are mainly used for advanced road construction;Cement stabilized macadam needs time health,
It is unsatisfactory for the rapid construction requirement of road;Lime-flyash stabilization crushed stone material derives from a wealth of sources, but mechanical property is general, Zhi Nengman
Sufficient inferior grade roadbase requirement.
Thermosetting property SAN foamed plastics is a kind of heat cured foamed plastics, and material of main part is that styrene-propene is cured total
Polymers (Styrene Aery lonitrile Copolymer, SAN).SAN can be used for various resin systems, be suitable for various knots
Composition type and technique;Hole-closing structure does not absorb water;Low Resin Absorbent amount;Density is between other cystosepiments and plank;
In forming process thermal stability it is fabulous up to after 150 DEG C without swelling;Warm nature is thermoformable up to 127 DEG C;High temperature resistant, tool
There is high chemical constituent stability;There is higher toughness and high abrasion capacity compared with the cystosepiment and plank of crosslinking formula;
Splendid anti-fatigue performance and creep-resistant property;Splendid chemical stability;High compression-strength and compression mould are dizzy;Shock resistance
It is good.SAN mainly as a kind of large-scale high performance structures sandwich foamed material, is widely used in the necks such as wind energy, transport, shipping at present
The large-scale high performance structures in domain are built.But it will produce a large amount of SAN foams wastes, needle in the preparation process such as processing, cutting
High added value, the recycling method of high usage are lacked to the waste.
SAN foamed plastics belongs to the leftover bits and pieces in process of manufacture, average thin for the powder that bulk material is cut down
Spend 40 mesh.Waste plastic regeneration, which utilizes, at present mainly chemistry or heat chemistry, energy regenerating method, physiochemical mutagens method etc..Chemistry or
Although heat chemistry recycling can make waste plastics be decomposed into industrial chemicals, liquid fuel or obtain having changing for other application performance
Property material, but industrialize in general more difficult, need more harsh reaction condition, and production cost high to equipment requirement
It is high.Simultaneously SAN as a kind of density small, bulky foamed plastics, to solvent and other reactant demands in reaction process
It is excessive, greatly improve regeneration cost;Although energy regenerating method can by burn technics of reclaim of plastic waste part energy, by
Contain a large amount of additives and fire retardant in SAN foamed plastics itself, easily causes secondary pollution in combustion.Physiochemical mutagens
Method process is simpler, and the requirement to equipment is relatively low, is the most recovery method of economy and operability under the conditions of the prior art.
But without the finished product application of the high additional output value, meagre commercial profit constrains to be replanted current SAN foamed plastics physiochemical mutagens methods
The development and application of method, therefore a kind of environment protection pavement base based on SAN foamed plastics can be developed, to realize SAN foams
The recycling of plastics, avoids existing for cement concrete pavement base at this stage that material cost is high, transport difficulty is big, structure design
Difficult, the problems such as construction standardization degree is low, resource circulation utilization is poor.
Invention content
It is an object of the invention to overcome the above-mentioned prior art, a kind of quick ring based on regenerated plastics is provided
Road surface is protected, which can realize the recycling of SAN foamed plastics, while have that the cost of material is low, convenient transportation, structure design
Simply, the feature that construction standardization degree is high, resource circulation utilization is preferable.
In order to achieve the above objectives, the quick environment protection pavement of the present invention based on regenerated plastics includes that roadbed, cement are mixed
Solidifying dirt road supercrust, several SAN regenerated plastic boards and several interlayer securing devices, wherein each SAN regenerated plastic boards are located at
Between roadbed and cement concrete road face layer, each SAN regenerated plastic boards are sequentially distributed, and adjacent two blocks of SAN regenerated plastics
It is connected by SAN regenerated plastics plate jointing apparatus between plank;
On each SAN regenerated plastic boards, on each SAN regenerated plastics plate jointing apparatus and SAN regenerated plastic boards and SAN
It is both provided with first through hole at the link position of regenerated plastics plate jointing apparatus, several second through-holes are provided on roadbed, wherein
One first through hole corresponds to second through-hole and an interlayer securing device, wherein each first through hole face corresponding second
The upper end of through-hole, interlayer securing device is connected with cement concrete road face layer, and the lower end of interlayer securing device, which passes through, to be corresponded to
First through hole is inserted in corresponding second through-hole.
Adjacent S AN regenerated plastic boards are connected with SAN regenerated plastics plate jointing apparatus by embossed card crack structure.
On the inner wall of first through hole, on the inner wall of the second through-hole, roadbed and SAN regenerated plastics plate jointing apparatus and SAN again
It is both provided with interlaminar bonding between raw plastic plate and between SAN regenerated plastics plate jointing apparatus and SAN regenerated plastic boards
Waterproof layer.
The material of interlaminar bonding waterproof layer is epoxy resin adhesive.
The material of interlayer securing device is cement concrete.
In each first through hole on SAN regenerated plastic boards, connect positioned at SAN regenerated plastic boards and SAN regenerated plastics plates
The spacing stitched between the first through hole adjacent thereto of the first through hole at device link position is 25cm, other adjacent first through hole
The distance between be 2m;
In each first through hole on SAN regenerated plastics plate jointing apparatus, it is located at SAN regenerated plastic boards and is regenerated with SAN
The spacing between first through hole and first through hole adjacent thereto at plastic plate jointing apparatus link position is 25cm, other phases
Spacing between adjacent first through hole is 4m.
The invention has the advantages that:
Quick environment protection pavement of the present invention based on regenerated plastics is when specific operation, in roadbed and cement concrete
SAN regenerated plastic boards and SAN regenerated plastics plate jointing apparatus are set between road deck, by SAN regenerated plastic boards and
SAN regenerated plastics plate jointing apparatus is as base, to realize the recycling of SAN foamed plastics, reduce the integral construction of road at
This.In addition, SAN regenerated plastic boards and SAN regenerated plastics plates jointing apparatus can carry out prefabricated in the factory, then transport
Construction site carries out installation, and standardization level is higher, and pavement construction material scene is not present and is asked with what is when mixed and stirred
Topic, difficulty of construction is small, more convenient, short construction period of constructing, while can be to avoid transport base former material during traditional construction
The big problem of the next transport difficulty of material strip.It is mixed through base, roadbed and cement in addition, the present invention is formed by interlayer securing device
The force transferring structure of solidifying dirt road supercrust 1, ensures the globality of road structure.
Further, on the inner wall of first through hole, on the inner wall of the second through-hole, roadbed and SAN regenerated plastics plate jointing apparatus
And it is both provided with layer between SAN regenerated plastic boards and between SAN regenerated plastics plate jointing apparatus and SAN regenerated plastic boards
Between bond capacity, can be to avoid oozing on leakage or underground water under surface water and destroy road surface.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram of SAN regenerated plastic boards 2 in the present invention.
Wherein, 1 it is cement concrete road face layer, 2 be SAN regenerated plastic boards, 3 be interlayer securing device, 4 is interlayer
Bond capacity, 5 be SAN regenerated plastics plates jointing apparatus, 6 be roadbed.
Specific implementation mode
The present invention is described in further detail below in conjunction with the accompanying drawings:
With reference to figure 1 and Fig. 2, the quick environment protection pavement based on regenerated plastics described in this includes roadbed 6, cement concrete road
Supercrust 1, several SAN regenerated plastic boards 2 and several interlayer securing devices 3, wherein each SAN regenerated plastic boards 2 are located at road
Between base 6 and cement concrete road face layer 1, each SAN regenerated plastic boards 2 are sequentially distributed, and adjacent two blocks of SAN regenerated plastics
It is connected by SAN regenerated plastics plates jointing apparatus 5 between plank 2;On each SAN regenerated plastic boards 2, each SAN regenerated plastics
It is both provided on plate jointing apparatus 5 and at the link position of SAN regenerated plastic boards 2 and SAN regenerated plastics plates jointing apparatus 5
First through hole is provided with several second through-holes on roadbed 6, wherein a first through hole corresponds to second through-hole and a layer
Between securing device 3, wherein corresponding second through-hole of each first through hole face, the upper end of interlayer securing device 3 and cement concrete
Road deck 1 is connected, and the lower end of interlayer securing device 3 passes through corresponding first through hole to be inserted in corresponding second through-hole, wherein
Adjacent S AN regenerated plastic boards 2 are connected with SAN regenerated plastics plates jointing apparatus 5 by embossed card crack structure.
On the inner wall of first through hole, on the inner wall of the second through-hole, roadbed 6 and SAN regenerated plastics plates jointing apparatus 5 and SAN
It is both provided with interlayer between regenerated plastic board 2 and between SAN regenerated plastics plates jointing apparatus 5 and SAN regenerated plastic boards 2
Bond capacity 4;The material of interlaminar bonding waterproof layer 4 is epoxy resin adhesive;The material of interlayer securing device 3 is mixed for cement
Solidifying soil.
In each first through hole on SAN regenerated plastic boards 2, it is located at SAN regenerated plastic boards 2 and SAN regenerated plastics plates
Spacing between first through hole at 5 link position of jointing apparatus first through hole adjacent thereto is 25cm, other adjacent first
The distance between through-hole is 2m;In each first through hole on SAN regenerated plastics plates jointing apparatus 5, it is located at SAN regenerated plastics plates
The spacing between first through hole and first through hole adjacent thereto at 5 link position of material 2 and SAN regenerated plastics plates jointing apparatus
For 25cm, the spacing between other adjacent first through hole is 4m.
When preparing SAN regenerated plastic boards 2 and SAN regenerated plastics plate jointing apparatus 5, first waste thermosetting SAN is steeped
SAN foamed plastics powder is made in foam plastic crushing, cleaning, drying and second-time breakage, reheats pressurization and is moulded into SAN regenerated plastics plates
Material 2 and SAN regenerated plastics plates jointing apparatus 5, then cool to room temperature, and are answered in physiochemical mutagens furnished equipments ripe at present
In, the regrown material compression strength produced by SAN waste plastic foams is far above generally in 30MPa or more《Highway pavement base
Layer construction technique normalizing》(two level and two level are with the 2.5- that gets down the highway for the requirement of (JTJ 034-2000) to base's compression strength
3MPa, super highway and Class I highway 3-5MPa), while shock strength, generally in 3.5MPa or more, bending strength can reach
23MPa, therefore be ideal 6 layer material of Road Base of mechanical property.
In Specific construction, SAN regenerated plastic boards 2 and SAN regenerated plastics plates jointing apparatus 5 are first carried out in the factory
It is prefabricated, it then transports to construction site, then spud in the second through-hole in roadbed 6, then regenerates SAN regenerated plastic boards 2 and SAN
The splicing of plastic plate jointing apparatus 5 is placed on roadbed 6, further according to《Highway cement concrete pavement construction technique normalizing》(JTG
F30-2003) desired cement concrete is required according to job specfication, and the coagulating cement completed is built using cast in situs technique
The construction of dirt road supercrust 1.Particularly, in casting process, concrete can flow into first through hole and the second through-hole, wait for cement
After the completion of concrete road road surface layer 1 pours, interlayer securing device 3 also pouring molding therewith, and with being poured on road deck
Cement concrete hardens health, forms the force transferring structure through face layer, base and roadbed 6, ensures the globality of road structure.
Claims (6)
1. a kind of quick environment protection pavement based on regenerated plastics, which is characterized in that including roadbed (6), cement concrete road face
Layer (1), several SAN regenerated plastic boards (2) and several interlayer securing devices (3), wherein each SAN regenerated plastic boards (2) position
Between roadbed (6) and cement concrete road face layer (1), each SAN regenerated plastic boards (2) are sequentially distributed, and adjacent two pieces
It is connected by SAN regenerated plastics plate jointing apparatus (5) between SAN regenerated plastic boards (2);
On each SAN regenerated plastic boards (2), on each SAN regenerated plastics plate jointing apparatus (5) and SAN regenerated plastic boards (2)
It is both provided with first through hole at the link position of SAN regenerated plastics plate jointing apparatus (5), several are provided on roadbed (6)
Two through-holes a, wherein first through hole corresponds to second through-hole and an interlayer securing device (3), wherein each first through hole
The upper end of corresponding second through-hole of face, interlayer securing device (3) is connected with cement concrete road face layer (1), and interlayer is steady
The lower end for setting (3) is fixedly mounted with to be inserted in corresponding second through-hole across first through hole is corresponded to.
2. the quick environment protection pavement according to claim 1 based on regenerated plastics, which is characterized in that adjacent S AN regeneration modelings
Flitch material (2) is connected with SAN regenerated plastics plate jointing apparatus (5) by embossed card crack structure.
3. the quick environment protection pavement according to claim 1 based on regenerated plastics, which is characterized in that the inner wall of first through hole
On upper, the second through-hole inner wall, between roadbed (6) and SAN regenerated plastics plate jointing apparatus (5) and SAN regenerated plastic boards (2)
And it is both provided with interlaminar bonding waterproof layer between SAN regenerated plastics plate jointing apparatus (5) and SAN regenerated plastic boards (2)
(4)。
4. the quick environment protection pavement according to claim 3 based on regenerated plastics, which is characterized in that interlaminar bonding waterproof layer
(4) material is epoxy resin adhesive.
5. the quick environment protection pavement according to claim 1 based on regenerated plastics, which is characterized in that interlayer securing device
(3) material is cement concrete.
6. the quick environment protection pavement according to claim 1 based on regenerated plastics, which is characterized in that SAN regenerated plastics plates
In each first through hole on material (2), it is located at SAN regenerated plastic boards (2) and SAN regenerated plastics plate jointing apparatus (5) connection position
The spacing set between the first through hole first through hole adjacent thereto at place is 25cm, and the distance between other adjacent first through hole are
2m;
In each first through hole on SAN regenerated plastics plate jointing apparatus (5), it is located at SAN regenerated plastic boards (2) and SAN again
The spacing between first through hole and first through hole adjacent thereto at raw plastic plate jointing apparatus (5) link position is 25cm,
Spacing between other adjacent first through hole is 4m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810494976.7A CN108642985B (en) | 2018-05-22 | 2018-05-22 | Rapid environment-friendly pavement based on recycled plastic |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810494976.7A CN108642985B (en) | 2018-05-22 | 2018-05-22 | Rapid environment-friendly pavement based on recycled plastic |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108642985A true CN108642985A (en) | 2018-10-12 |
CN108642985B CN108642985B (en) | 2020-09-18 |
Family
ID=63757625
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810494976.7A Active CN108642985B (en) | 2018-05-22 | 2018-05-22 | Rapid environment-friendly pavement based on recycled plastic |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108642985B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110105784A (en) * | 2019-04-30 | 2019-08-09 | 长安大学 | A kind of regenerated engineering assembled road surface and its laying method |
CN110438862A (en) * | 2019-08-22 | 2019-11-12 | 长安大学 | A kind of assembled Plastic Base Asphalt Pavement structure and its construction technology |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2008126956A1 (en) * | 2007-04-12 | 2008-10-23 | Heung Sik Yu | Block having a load divergence function and manufacturing and road constructing method for the same |
CN203625916U (en) * | 2013-10-16 | 2014-06-04 | 西安科技大学 | Highway soft soil layer composite pile foundation |
CN104179105A (en) * | 2014-08-27 | 2014-12-03 | 中国地质大学(武汉) | Top-down rigid pile compound foundation construction method |
CN206245155U (en) * | 2016-12-08 | 2017-06-13 | 浙江长兴市政建设有限公司 | A kind of firm road structure of embankment |
CN107620243A (en) * | 2017-11-10 | 2018-01-23 | 山东大学 | The permeable roadbed of plate pin-connected panel made using waste plastic |
US10119228B2 (en) * | 2007-01-19 | 2018-11-06 | Jsp International Llc | Structural underlayment support system and panel for use with paving and flooring elements |
-
2018
- 2018-05-22 CN CN201810494976.7A patent/CN108642985B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10119228B2 (en) * | 2007-01-19 | 2018-11-06 | Jsp International Llc | Structural underlayment support system and panel for use with paving and flooring elements |
WO2008126956A1 (en) * | 2007-04-12 | 2008-10-23 | Heung Sik Yu | Block having a load divergence function and manufacturing and road constructing method for the same |
CN203625916U (en) * | 2013-10-16 | 2014-06-04 | 西安科技大学 | Highway soft soil layer composite pile foundation |
CN104179105A (en) * | 2014-08-27 | 2014-12-03 | 中国地质大学(武汉) | Top-down rigid pile compound foundation construction method |
CN206245155U (en) * | 2016-12-08 | 2017-06-13 | 浙江长兴市政建设有限公司 | A kind of firm road structure of embankment |
CN107620243A (en) * | 2017-11-10 | 2018-01-23 | 山东大学 | The permeable roadbed of plate pin-connected panel made using waste plastic |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110105784A (en) * | 2019-04-30 | 2019-08-09 | 长安大学 | A kind of regenerated engineering assembled road surface and its laying method |
CN110105784B (en) * | 2019-04-30 | 2022-03-29 | 长安大学 | Recycled engineering plastic assembled pavement and paving method thereof |
CN110438862A (en) * | 2019-08-22 | 2019-11-12 | 长安大学 | A kind of assembled Plastic Base Asphalt Pavement structure and its construction technology |
CN110438862B (en) * | 2019-08-22 | 2024-03-15 | 长安大学 | Assembled plastic base asphalt pavement structure and construction process thereof |
Also Published As
Publication number | Publication date |
---|---|
CN108642985B (en) | 2020-09-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4225359A (en) | Acidic earthen cemented compositions for building materials and process | |
CN104402339B (en) | The constructional method of pervious concrete | |
CN103342520B (en) | A kind of polymer modification rubberized mortar for building screed-coat and constructional method thereof | |
CN105672080A (en) | Anti-track road surface structure and paving method thereof | |
CN103774537B (en) | A kind of asphalt pavement regeneration method | |
CN109133800B (en) | Semi-flexible composite pavement precast block and manufacturing method thereof, pavement prepared by adopting precast block and manufacturing method thereof | |
CN109440571A (en) | The construction method for building road is faced in a kind of laying of prefabricated board | |
US20090314186A1 (en) | Retentive concrete material | |
CN209620361U (en) | The board-like floating build floor of precast concrete with heat insulating and sound insulating function | |
CN108642985A (en) | A kind of quick environment protection pavement based on regenerated plastics | |
CN105272001A (en) | Ceramsite concrete and preparation method thereof | |
CN111118999A (en) | Road structure of urban intersection, bus station and bus lane | |
CN105818395A (en) | Method for making water-permeable bricks from waste plastics and paving method of water-permeable bricks | |
CN108863201A (en) | A kind of the construction anti-resurgence concrete modular of heat preservation and its construction method | |
CN205917559U (en) | Anti type road surface structure of splitting suitable for semi rigid base course | |
CN1445193A (en) | Cement emulsion asphalt mortar and its preparing method as well as application in rilroad and in ballastless track of city light rail | |
CN110714389A (en) | Ultrathin high-performance composite semi-flexible surface layer pavement structure and construction method thereof | |
CN212000441U (en) | Novel road surface structure of urban heavy-load traffic | |
CN103388296A (en) | Environment-friendly reclaimed bituminous pavement structure and construction process thereof | |
CN101475350B (en) | Dry material for vertical connected plate type unballasted track cement emulsified bitumen mortar | |
CN104844100A (en) | Pre-mixed dry material for cold-in-place recycling, cold-in-place recycling mixture and preparation therefor | |
CN102775111A (en) | Roofing rigid waterproof layer construction material and construction method | |
CN104692719B (en) | Pouring type cold-mixed pavement material | |
CN107663927B (en) | A kind of regeneration concrete steel structural upright column and its construction technology | |
CN114086585A (en) | Waterproof internal and external corner prefabricating construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |