CN108638410A - A kind of production method of reconstructed amber - Google Patents

A kind of production method of reconstructed amber Download PDF

Info

Publication number
CN108638410A
CN108638410A CN201810400483.2A CN201810400483A CN108638410A CN 108638410 A CN108638410 A CN 108638410A CN 201810400483 A CN201810400483 A CN 201810400483A CN 108638410 A CN108638410 A CN 108638410A
Authority
CN
China
Prior art keywords
amber
reconstructed
pressure
time
hours
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810400483.2A
Other languages
Chinese (zh)
Other versions
CN108638410B (en
Inventor
代荔莉
施光海
熊珍喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Geosciences Beijing
Original Assignee
China University of Geosciences Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Geosciences Beijing filed Critical China University of Geosciences Beijing
Priority to CN201810400483.2A priority Critical patent/CN108638410B/en
Publication of CN108638410A publication Critical patent/CN108638410A/en
Application granted granted Critical
Publication of CN108638410B publication Critical patent/CN108638410B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/02Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor of articles of definite length, i.e. discrete articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • B29C43/56Compression moulding under special conditions, e.g. vacuum
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • B29C43/58Measuring, controlling or regulating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C71/00After-treatment of articles without altering their shape; Apparatus therefor
    • B29C71/02Thermal after-treatment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • B29C43/56Compression moulding under special conditions, e.g. vacuum
    • B29C2043/566Compression moulding under special conditions, e.g. vacuum in a specific gas atmosphere, with or without pressure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • B29C43/58Measuring, controlling or regulating
    • B29C2043/5808Measuring, controlling or regulating pressure or compressing force
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • B29C43/58Measuring, controlling or regulating
    • B29C2043/5816Measuring, controlling or regulating temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C71/00After-treatment of articles without altering their shape; Apparatus therefor
    • B29C71/02Thermal after-treatment
    • B29C2071/022Annealing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2031/00Other particular articles
    • B29L2031/743Jewellery
    • B29L2031/7432Gems

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Casting Or Compression Moulding Of Plastics Or The Like (AREA)

Abstract

A kind of production method of reconstructed amber, includes the following steps:Using segmentation pressuring method, heating compacting is carried out to raw material;Under protective gas and pressurized environment, pressed amber is made annealing treatment.The present invention is realized is pressed into different types of reconstructed amber by amber waste material, such as reproduces golden amber, reproduces beeswax, reproduces the brown amber of gold.The reconstructed amber of production has the characteristics that:First, obtained reconstructed amber size and weight are larger, the following process requirement of jewellery or craftwork can be met;Second is that reconstructed amber color is uniformly vivid, solve the problems, such as that different its shade of amber waste material, tone differ well, the reconstructed amber craftwork of color beauty by consumer favorable comment;Third, reconstructed amber finished product cleanliness is high, is split without tuft, close structure, durability is good, solves the problems, such as have a large amount of dark impurity and part tuft to split in amber waste material, improves the degree of purity and durability of reconstructed amber craftwork.

Description

A kind of production method of reconstructed amber
Technical field
The invention belongs to jewelry production technical fields, are related to a kind of method producing reconstructed amber using amber particle.
Background technology
Amber is a kind of rare organic gemstone, has high ornamental values and the economic values.Amber is used as one kind certainly Right resource has the characteristics that yield is rare, non-renewable.Natural amber original stone often do not advise by cranny development, irregular colour, size Then, cleanliness is bad, its practical efficiency is only 65% or so according to statistics, rest part be mostly have it is miscellaneous split, dark-coloured inclusion enclave or size Too small unserviceable amber waste material, these waste materials are difficult to be machined directly to jewellery or craftwork, usual feelings as natural amber Direct discard processing under condition.Meanwhile amber jewellery or craftwork are in process, generally also will produce a large amount of leftover pieces and broken Bits, these leftover pieces and clast generally also can not be recycled directly, and there are the serious wastings of resources.
In the prior art, by the way that resin binder is added in amber waste material, leftover pieces or clast, and amber is pressed System processing, can produce reconstructed amber.However the technology has the following disadvantages:First, the presence of adhesive, leads to reconstructed amber Component difference between natural amber is very big, seriously affects product quality and price;Second is that the adhesive being added is easy always Change, amber particle easily along bonding place fragmentation, influences the beauty and durability of reconstructed amber;Third, the pressing time is long, under room temperature Need about 15 day time could compression moulding, expend a large amount of manpower and materials;Fourth, the particle contact surface of finished product amber is apparent, particle Between particle, powder and agitation itself can all form a large amount of intensive bubbles, be distributed in particle junction and near border, The polishing for influencing amber craft product, makes aesthetics reduce;Fifth, the cleanliness of compacting amber is not improved, wherein impurity or dark Color inclusion enclave is apparent, seriously affects the quality of amber jewellery or craftwork.
In real work, also have tried to directly press amber using pressure stove in the case where being not added with adhesive System, but the recrystallization state after clinkering is rendered as outside pressed finished product, but combined not between internal feed particles closely, There are clear gap or bubbles between naked eyes visible particle, it is difficult to realize higher artistic value and economic value.
Invention content
It is an object of the invention to overcome the deficiencies of existing technologies, provide that a kind of operating procedure is succinct, short time consumption is short, raw The controllable reconstructed amber production method of at low cost, prosthetic additive, finished product type is produced, the reconstructed amber prepared using this method Color is good with cleanliness, close structure, and ingredient is completely the same with natural amber.
To achieve the above object, present invention employs following technical solutions:
A kind of production method of reconstructed amber, includes the following steps:(a)Using segmentation pressuring method, heating pressure is carried out to raw material System;(b)Under protective gas and pressurized environment, pressed amber is made annealing treatment." annealing " described herein is used for reference Term in intermetallic composite coating, using method similar with " annealing " link in metal working processes, its object is to further Optimize pressed amber internal structure.
Further, the step(a)Include the following steps:(a1)Pretreatment of raw material, including clean and crush, impurity elimination; (a2)Raw material is placed in mold, first pressure is applied to raw material;(a3)Segmentation pressurization, heating compacting are carried out to raw material;Wherein, The process of segmentation pressurization is often to pass through first time interval to increase fixation pressure, until reaching second pressure;The process of heating is In the first time interior temperature by raw material by room temperature to first object temperature, and kept for the second time of the constant temperature; (a4)Natural cooling and demoulding.Step(a3)In, amber particle clinkering at high temperature, inside joint surface between particle and amber Bubble discharge, the stacking volume of amber raw material becomes smaller, it is therefore desirable to increase certain pressure at regular intervals;That is, By using segmentation pressuring method, bubble discharge can be advantageously promoted, and further increase the tight ness rating of raw material, make to produce Reconstructed amber structure more uniformly, it is fine and close.Meanwhile it in such a way that segmentation is pressurizeed, can also avoid directly increasing pressure The problem of being worth the raw material fragmentation caused by maximum value, this is because with the raising of temperature, amber raw material is gradually melted and is generated After deformation or flowing, then it is stepped up pressure and would not causes fragmentation.Step(a3)In, the second pressure is preferably 50-100 Ton, the first object temperature are preferably between 120-190 DEG C;By adjusting the value of second pressure and first object temperature, The clinkering degree and compactness between each particle of amber raw material can be adjusted, to realize the life of different type reconstructed amber Production, such as golden amber, beeswax or the brown amber of gold etc..
Further, the step(b)Include the following steps:(b1)By step(a)The amber of compression moulding is placed in closed loop Border is forced into the first air pressure;(b2)Heating;The process of heating is by the temperature of amber within the third time by room temperature to the Two target temperatures, and kept for the 4th time of the constant temperature;(b3)Natural cooling.The purpose of annealing is to amber structure Advanced optimize.Second target temperature uses high temperature to shorten processing time, and preferred scope is 140-210 DEG C;Due to Amber is in closed environment, by using the mode slowly to heat up, the air pressure in closed environment can be stepped up, to realize As temperature increases the pressure being stepped up to amber, and then realize that amber internal structure is more uniform, fine and close.
Further, the step(b1)The method of middle pressurization is:Protective gas is repeatedly filled with and is discharged into closed environment, It is finally pressurized to the first air pressure.By multiple inflation/deflation, oxygen, moisture etc. in closed environment can quickly, thoroughly be discharged Substance avoids the substances such as oxygen in annealing process, moisture and amber from generating chemical reaction.
Further, step(b1)Described in the first air pressure pressure that amber is generated be more than step(a2)In raw material is applied Add first pressure.In annealing process, the pressure that air pressure generates amber raw material in closed environment is greater than in pressing process Pressue device applies first pressure to amber raw material(It is compared with the pressure that the round pressure surface of dies cavity generates), mesh Be further micronized particles, stable dimensions, adjustment structure, as a kind of preferred value be 35MPa.
Further, step(b1)Described in protective gas be nitrogen or inert gas.Purpose is, avoids high pressure gas Chemical reaction is generated with amber.
Further, the inner cavity of the mold is cylinder, a diameter of 25-30cm of round pressure surface of dies cavity, mold The height of inner cavity is 6-10cm.If increaseing or decreasing pressure surface area, pressing pressure can be scaled up or reduced;If increase or Reduce cavity heights, can be appropriately extended or shorten the pressing time, can get technique effect identical with the technical program.
Further, step(a)Size after Central Plains feed powder is broken is 3mm, and the first pressure is 50 tons, the first time Interval 1 hour, the fixation pressure be 5 tons, the second pressure be 70 tons, the first time be 1.5 hours, described first Target temperature is 190 DEG C, and second time is 2.5 hours;Step(b)Described in the first air pressure be 35MPa, when the third Between be 2.5 hours, second target temperature be 210 DEG C, the 4th time be 4.5 hours;The reconstructed amber of acquisition is gold Amber.Amber raw material is in high pressure(The pressure rather than air pressure that physically longitudinal direction applies)Under the conditions of, become since 140 DEG C or so It is soft, and clinkering is shaped under the action of high pressure.In order to shorten the production time, and compacting amber finished product type is controlled, this Place makes closely to merge between amber raw material, final production goes out golden amber finished product using 190 DEG C of high temperature;Simultaneously in order to avoid amber Raw material aoxidizes blackening, should suitably shorten heating time when being suppressed using 190 DEG C of high temperature.
Further, step(a)Size after Central Plains feed powder is broken is 1mm, and the first pressure is 60 tons, the first time Interval 0.5 hour, the fixation pressure be 3 tons, the second pressure be 96 tons, the first time be 3 hours, described first Target temperature is 120 DEG C, and second time is 3 hours;Step(b)Described in the first air pressure be 35MPa, the third time It it is 1.5 hours, second target temperature is 140 DEG C, and the 4th time is 8.5 hours;The reconstructed amber of acquisition is beeswax.
Further, step(a)Size after Central Plains feed powder is broken is 200 mesh, and the first pressure is 50 tons, when described first Between be spaced 1 hour, the fixation pressure is 5 tons, and the second pressure is 70 tons, and the first time is 1.5 hours, described the One target temperature is 190 DEG C, and second time is 2.5 hours;Step(b)Described in the first air pressure be 35MPA, the third Time is 2.5 hours, and second target temperature is 210 DEG C, and the 4th time is 4.5 hours;The reconstructed amber of acquisition is Golden palm fibre amber.By under identical pressing conditions, increasing the height of amber raw material, may be controlled to product reconstructed amber is gold palm fibre Amber.
A kind of production method of reconstructed amber of the present invention realizes in such a way that high temperature, high pressure are suppressed and are made annealing treatment Amber waste material is pressed into different types of reconstructed amber, golden amber is such as reproduced, reproduces beeswax, reproduces brown amber of gold etc..The present invention's Innovation is, first, using by the way of being segmented and being stepped up, can not only advantageously promote between feed particles in air and raw material The discharge of portion's bubble also can avoid directly will be increased to raw material fragmentation problem caused by maximum;Two are utilized in open space(I.e. Under atmospheric environment)It is suppressed, is suppressed compared in pressure stove, the sky being more advantageous between quickly discharge feed particles Gas;The reason is that being suppressed amber raw material under conditions of high temperature, high pressure using pressure stove, although high voltage protective gas Body can apply the pressure of bigger to amber raw material, but high voltage protective gas can be full of the gap between feed particles simultaneously, Its pressure formed is only capable of independent action in each feed particles, and but adjacent feed particles can not press together, because And also just the amber raw material of dispersion can not be compacted be an entirety;And this method can make the gas between particle gap be pressurized To be discharged into air.Reconstructed amber produced by the invention has the characteristics that:When obtained reconstructed amber size and Weight is larger, can meet the following process requirement of jewellery or craftwork;Second is that reconstructed amber color is uniformly vivid, solve well It has determined different its shade of amber waste material, tone the problem of differing, the reconstructed amber craftwork of color beauty is by consumer Favorable comment;Third, reconstructed amber finished product cleanliness is high, is split without tuft, close structure, durability is good, and solve has largely in amber waste material The problem of dark impurity and part tuft are split improves the degree of purity and durability of reconstructed amber craftwork.
Description of the drawings
Fig. 1 is a kind of overall flow schematic diagram of the production method of reconstructed amber in embodiment 1;
Fig. 2 is the overall structure diagram of reconstructed amber cooked flake wrapping machine in embodiment 2;
Fig. 3 is the overall structure diagram of the mold of reconstructed amber cooked flake wrapping machine in embodiment 2;
Fig. 4 is the electrical connection schematic diagram of reconstructed amber cooked flake wrapping machine in embodiment 2.
Specific implementation mode
Below in conjunction with attached drawing 1 to 4, a kind of specific embodiment party of the production method of reconstructed amber is further illustrated the present invention Formula.A kind of production method of reconstructed amber of the present invention is not limited to the following description.
Embodiment 1:
The present embodiment provides a kind of production method of reconstructed amber, as shown in Figure 1, including the following steps:(a)It is pressurizeed using segmentation Mode carries out heating compacting to raw material;(b)Under protective gas and pressurized environment, pressed amber is made annealing treatment.
Wherein, the step(a)It is carried out, is included the following steps using the reconstructed amber cooked flake wrapping machine described in embodiment 2:(a1) Pretreatment of raw material, including clean and crush;Specifically, after being cleaned the amber particle of size unevenness, rejecting impurity, it is placed on food It is particle to be beaten in grade pulverizer(Powder), it is that should be able to get size be particles of the 5mm to 200 mesh to meet demand pulverizer Or powder.(a2)Raw material is placed in the mold of reconstructed amber cooked flake wrapping machine, first pressure is applied to raw material;Die size is diameter It is highly the cylinder of 6-10cm for 25-30cm.(a3)Raw material is segmented by the pressue device of reconstructed amber cooked flake wrapping machine Pressurization, heating compacting;Wherein, the process for being segmented pressurization is often to pass through first time interval to increase fixation pressure, until reaching the Two pressure;The process of heating is by the temperature of raw material within first time by room temperature to first object temperature, and keeping should Second time of constant temperature;In pressure process, with the clinkering of feed particles, the air between particle is gradually squeezed out amber Simultaneously mold is discharged in cake, and the gap between particle is gradually reduced up to disappearing, and is combined closely between particle.(a4)It naturally cools to Room temperature is removed from the molds the amber of compression moulding to complete to demould.Step(a)Described in " pressure " refer in particular to cooked flake wrapping machine to raw material The physical pressure of application, direction are vertical direction.
It is as follows to the pressing parameter of 3 pieces of samples:
The step(b)The pressure stove model Kapex AB/3/KAP of use, by pressurized tank, tank interior room, pressure fittings, automatic Control and protection system, protection accessory composition.The pressurized tank is furnished with the cylindrical tank of tank cervical approach orchid and flat cover, cover It is fixed with 8 column cap screws;The tank interior room includes the electric heater being fixed on tank shell;The pressure fittings include liquid nitrogen The shut-off valve and pressure gauge of gas tank, for pressurizeing for tank interior room;It is described automatically control with protection system, for pressure and temperature Automatically adjust control;The protection accessory includes security header or safety valve.The step(b)Include the following steps:(b1) By step(a)3 pieces of amber samples of compression moulding cut into the fritter of 5cm long x5cm wide x3cm thickness, and loading filling basket is simultaneously whole Body is placed in the pressurized tank interior room of pressure stove, and closing covers pressurized tank sealing cover to form closed environment;By the outlet of nitrogen bucket Pipe is connect with the air inlet pipe of pressure stove, the gas outlet of confining pressure stove.It is inflated to after air pressure reaches 5MPa and closes into pressurized tank Air inlet, the gas outlet for then opening pressure stove discharge gas.It is after being filled and deflated by 3 times repeatedly, the air of pressurized tank interior room is complete It drains entirely, confining pressure stove gas outlet;By air inlet, into pressurized tank, inflated with nitrogen to air pressure conditions reach the first air pressure.(b2) Heating;Its method is that heating time and maximum temperature are arranged on automatic controlled box, and after reaching heating time, pressure stove is from dynamic circuit breaker Electricity;Specific heating process is by the temperature of amber within the third time by room temperature to the second target temperature, and keeping should The 4th time of constant temperature;Period, the air pressure of pressurized tank interior room are affected by temperature and can further increase.(b3)Natural cooling;Pressure After power furnace power-off, 12h is slowly cooled to room temperature, nitrogen in pressurized tank is discharged by gas outlet, open pressurized tank sealing Lid takes out amber sample.Step(b)Described in " pressure " refer in particular to the air pressure in pressure stove.
It is as follows to the annealing parameter of 3 pieces of samples:
Number Atmosphere Temperature Heating time Temperature fall time Product
1 Nitrogen, initial pressure 35MPa 210℃ 7 hours (28 DEG C at the uniform velocity rise to 210 DEG C and need 2.5 hours, 210 DEG C of constant temperature 4.5 hours) Natural cooling, slow cooling 12 hours The golden amber of reconstruction
2 Nitrogen, initial pressure 35MPa 140℃ 10 hours (28 DEG C at the uniform velocity rise to 140 DEG C and need 1.5 hours, 140 DEG C of constant temperature 8.5 hours) Natural cooling, slow cooling 12 hours Reproduce beeswax
3 Nitrogen, initial pressure 35MPa 210℃ 7 hours (28 DEG C at the uniform velocity rise to 210 DEG C and need 2.5 hours, 210 DEG C of constant temperature 4.5 hours) Natural cooling, slow cooling 12 hours The brown amber of reconstruction gold
Embodiment 2:
The present embodiment provides a kind of concrete structure of reconstructed amber cooked flake wrapping machine used by embodiment 1, as shown in Fig. 2, including setting Set mold 2 and pressue device 3 in frame 1.The frame 1 is cube structure, including the flat seat of honour 11 and pedestal 12, it is detachably connected by the realization of multiple vertical beams 14 between the seat of honour 11 and pedestal 12;1 interior central of frame is coaxially arranged with Mold 2 and pressue device 3.Fixation is detachably connected using screw between the vertical beam 14 and the seat of honour 11 of the frame 1.
As shown in figure 3, the mold 2 is cylindrical structure, including steel cylinder 22 and the upper top that is used cooperatively with steel cylinder 22 Plate 25 and lower roof plate 26;The steel cylinder 22, upper plate 25 and lower roof plate 26 are enclosed dies cavity 21.22 outside of the steel cylinder It is equipped with heating device 23 and attemperator 24 successively, for being heated to the object being set in dies cavity 21.It is described to add Thermal 23 is resistance wire or heating board, and being equipped with temperature between 23 inside of the heating device or heating device 23 and steel cylinder 22 passes Sensor automatically controls for realizing to temperature in dies cavity 21.
The pressue device 3 is the electric control hydraulic press or electric control screw block of integrated pressure sensor, in order to defeated to pressure Go out value to measure and automatically control.The pressure output end 32 of the pressue device 3 presses towards mold 2, realizes to mould The amber raw material having in 2 inner cavities 21 is suppressed.Specifically, the ontology 31 of the pressue device 3 is arranged upward in frame 1 between two parties On pedestal 12, mold 2 is vertically arranged in the top of pressue device 3;Under the 32 face mold 2 of pressure output end of pressue device 3 Top plate 26.
Preferably, the frame 1 further includes the positioning plate 13 for being fixed to mold 2, is suppressed with improving The stability of mold 2 and detachability energy in journey;25 lower section of the upper plate is additionally provided with cylindrical fore-set 15, the fore-set 15 The upper plate 25 of downside face mold 2, effect is the upper plate 25 downwardly against mold 2, to coordinate the pressure of pressue device 3 Power output end 32 is realized and is suppressed the object being set in dies cavity 21 jointly.In pressing process, in dies cavity Air can be discharged by the gap between the steel cylinder 22 and upper plate 25, lower roof plate 26.
The reconstructed amber cooked flake wrapping machine further includes the controller 4 for being carried out automatically controlling to pressing process.Such as Fig. 4 institutes Show, is the electrical connection schematic diagram of reconstructed amber cooked flake wrapping machine in the present embodiment.The heating device of the controller 4 and mold 2 23, the pressue device control interface of temperature sensor and pressue device 3, pressure sensor electrical connection, pass through temperature sensing Device, pressure sensor and the temperature value in acquisition dies cavity 21 and pressure value, and by the way of negative-feedback, pass through and heat dress Set 23 and pressue device control interface the temperature and pressure in dies cavity 21 is controlled, so that it is in expected shape always State.Preferably, the controller 4 further includes for being arranged and showing that compacting setting and the input and output of pressing process parameters fill It sets, the parameter includes at least pressure value, temperature value and time;The input/output unit is keyboard and display, Huo Zhewei Integrated touch screen.
A kind of reconstructed amber cooked flake wrapping machine of the present embodiment is convenient for the installation of amber raw material using dismountable tower structure Arrangement and reverse mould processing;Pressue device and heating device are controlled by controller in pressing process, realizes and suppressed The automatic business processing of journey saves human cost;Meanwhile using the feedback controling mode of pressure and temperature, improves and compacting is pressed The adjusting control precision of power and temperature.
The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and it cannot be said that The specific implementation of the present invention is confined to these explanations.For those of ordinary skill in the art to which the present invention belongs, exist Under the premise of not departing from present inventive concept, a number of simple deductions or replacements can also be made, all shall be regarded as belonging to the present invention's Protection domain.

Claims (10)

1. a kind of production method of reconstructed amber, it is characterised in that:Include the following steps:
(a)Using segmentation pressuring method, heating compacting is carried out to raw material;
(b)Under protective gas and pressurized environment, pressed amber is made annealing treatment.
2. the production method of reconstructed amber according to claim 1, it is characterised in that:The step(a)Including following step Suddenly:
(a1)Pretreatment of raw material, including clean and crush;
(a2)Raw material is placed in mold, first pressure is applied to raw material;
(a3)Segmentation pressurization, heating compacting are carried out to raw material;Wherein, the process for being segmented pressurization is often to pass through first time interval to increase Constant-pressure is reinforced, until reaching second pressure;The process of heating be within first time by the temperature of raw material by room temperature extremely First object temperature, and kept for the second time of the constant temperature;
(a4)Natural cooling and demoulding.
3. the production method of reconstructed amber according to claim 2, it is characterised in that:The step(b)Including following step Suddenly:
(b1)By step(a)The amber of compression moulding is placed in closed environment, is forced into the first air pressure;
(b2)Heating;The process of heating be within the third time by the temperature of amber by room temperature to the second target temperature, and Kept for the 4th time of the constant temperature;
(b3)Natural cooling.
4. the production method of reconstructed amber according to claim 3, it is characterised in that:The step(b1)The side of middle pressurization Method is:Protective gas is repeatedly filled with and be discharged into closed environment, is finally pressurized to the first air pressure.
5. the production method of reconstructed amber according to claim 4, it is characterised in that:Step(b1)Described in the first air pressure Step is more than to the pressure that amber generates(a2)In to raw material apply first pressure.
6. the production method of reconstructed amber according to claim 5, it is characterised in that:Step(b1)Described in protective gas For nitrogen or inert gas.
7. the production method of reconstructed amber according to claim 6, it is characterised in that:The inner cavity of the mold is cylinder The height of shape, a diameter of 25-30cm of round pressure surface of dies cavity, dies cavity is 6-10cm.
8. the production method of reconstructed amber according to claim 7, it is characterised in that:Step(a)After Central Plains feed powder is broken Size is 3mm, the first pressure be 50 tons, the first time interval 1 hour, the fixation pressure be 5 tons, described second Pressure is 70 tons, and the first time is 1.5 hours, and the first object temperature is 190 DEG C, and second time is 2.5 small When;Step(b)Described in the first air pressure be 35MPa, the third time be 2.5 hours, second target temperature be 210 DEG C, the 4th time is 4.5 hours;The reconstructed amber of acquisition is golden amber.
9. the production method of reconstructed amber according to claim 7, it is characterised in that:Step(a)After Central Plains feed powder is broken Size is 1mm, and the first pressure is 60 tons, the first time interval 0.5 hour, and the fixation pressure is 3 tons, described the Two pressure are 96 tons, and the first time is 3 hours, and the first object temperature is 120 DEG C, and second time is 3 hours; Step(b)Described in the first air pressure be 35MPa, the third time be 1.5 hours, second target temperature be 140 DEG C, institute It is 8.5 hours to state for the 4th time;The reconstructed amber of acquisition is beeswax.
10. the production method of reconstructed amber according to claim 7, it is characterised in that:Step(a)After Central Plains feed powder is broken Size is 200 mesh, and the first pressure is 50 tons, the first time interval 1 hour, and the fixation pressure is 5 tons, described the Two pressure are 70 tons, and the first time is 1.5 hours, and the first object temperature is 190 DEG C, and second time is 2.5 Hour;Step(b)Described in the first air pressure be 35MPa, the third time be 2.5 hours, second target temperature be 210 DEG C, the 4th time is 4.5 hours;The reconstructed amber of acquisition is the brown amber of gold.
CN201810400483.2A 2018-04-28 2018-04-28 Production method of reconstructed amber Active CN108638410B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810400483.2A CN108638410B (en) 2018-04-28 2018-04-28 Production method of reconstructed amber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810400483.2A CN108638410B (en) 2018-04-28 2018-04-28 Production method of reconstructed amber

Publications (2)

Publication Number Publication Date
CN108638410A true CN108638410A (en) 2018-10-12
CN108638410B CN108638410B (en) 2020-05-01

Family

ID=63748712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810400483.2A Active CN108638410B (en) 2018-04-28 2018-04-28 Production method of reconstructed amber

Country Status (1)

Country Link
CN (1) CN108638410B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85106328A (en) * 1985-08-13 1986-11-19 抚顺市雕刻厂琥珀制品分厂 Fusing-junction method for amber
CN105415560A (en) * 2015-12-02 2016-03-23 琚轶臻 Manufacturing method of amber ore tea set
CN105835285A (en) * 2016-04-05 2016-08-10 昆明理工大学 Preparation method for reconstructed amber
CN105946158A (en) * 2016-05-19 2016-09-21 中国工程物理研究院化工材料研究所 High polymer material temperature isostatic pressing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85106328A (en) * 1985-08-13 1986-11-19 抚顺市雕刻厂琥珀制品分厂 Fusing-junction method for amber
CN105415560A (en) * 2015-12-02 2016-03-23 琚轶臻 Manufacturing method of amber ore tea set
CN105835285A (en) * 2016-04-05 2016-08-10 昆明理工大学 Preparation method for reconstructed amber
CN105946158A (en) * 2016-05-19 2016-09-21 中国工程物理研究院化工材料研究所 High polymer material temperature isostatic pressing method

Also Published As

Publication number Publication date
CN108638410B (en) 2020-05-01

Similar Documents

Publication Publication Date Title
CN105543621B (en) Raw nano ceramics enhancing high-entropy alloy composite and preparation method in a kind of
CN107760897A (en) To hydrogenate method of the titanium sponge as raw material manufacture titanium and titanium alloy and its parts
CN101480810B (en) Method for preparing artificial quartz
ATE441478T1 (en) WEAR PART DESIGNED FOR A CRUSHER AND PRODUCTION PROCESS THEREOF
CN104498754B (en) A kind of preparation method of magnesium alloy base neutron shield composite
CN107142388A (en) A kind of preparation method of Ti 13Nb 13Zr alloys
CN101444802B (en) A method of producing particle reinforced aluminum-base compound material continuously by using extrusion-upsetting and device thereof
CN108638410A (en) A kind of production method of reconstructed amber
CN106032323A (en) Method for preparing Ti2AlC ceramic powder from TiAl powder
CN105494708B (en) Brick tea compacting die
CN105835285A (en) Preparation method for reconstructed amber
CN110085338B (en) UO 2 Preparation method and preparation device of/Cr composite fuel pellet
CN208179986U (en) A kind of reconstructed amber cooked flake wrapping machine
CN109824358B (en) Processing method of high-toughness cover plate for 5G mobile phone
CN107630161A (en) A kind of motor for cell phone mass preparation method and its manufacturing system
CN104128128B (en) A kind of diamond synthesizing split stem stem and preparation method thereof
CN107138730B (en) A method of manufacture fixed weight dumbbell plate
CN107892559A (en) A kind of preparation method of simple efficient lower thermal conductivity MgO CoO solid solution transmission media
CN206217014U (en) A kind of artificial quartz stone plate solidification equipment
CN104175574A (en) SMC material molding process
CN105058835B (en) A kind of use stalk material manufactures the technique and its mould of furniture shaped component
CN201030609Y (en) Compacting tool set improving evenness of pyrophyllite block density
CN109203183B (en) Isostatic pressing method and mould for ceramic pot liner
CN204111852U (en) A kind of device by the coated amorphous alloy layer of pneumatic shaping
CN2058376U (en) Liquid metal bath type melting device for synthesizing amber

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant