CN108635942A - A kind of plate of water route - Google Patents
A kind of plate of water route Download PDFInfo
- Publication number
- CN108635942A CN108635942A CN201810586056.8A CN201810586056A CN108635942A CN 108635942 A CN108635942 A CN 108635942A CN 201810586056 A CN201810586056 A CN 201810586056A CN 108635942 A CN108635942 A CN 108635942A
- Authority
- CN
- China
- Prior art keywords
- water
- pipe
- water pipe
- mainboard
- inlet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 471
- 239000002351 wastewater Substances 0.000 claims abstract description 20
- 238000001746 injection moulding Methods 0.000 claims abstract description 12
- 238000000746 purification Methods 0.000 abstract description 30
- 238000005516 engineering process Methods 0.000 abstract description 6
- 238000012423 maintenance Methods 0.000 abstract description 5
- 238000009434 installation Methods 0.000 abstract description 4
- 238000001223 reverse osmosis Methods 0.000 description 7
- 239000004698 Polyethylene Substances 0.000 description 5
- 239000004743 Polypropylene Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 239000012528 membrane Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 241000894006 Bacteria Species 0.000 description 2
- 241000700605 Viruses Species 0.000 description 2
- 239000002360 explosive Substances 0.000 description 2
- -1 polyethylene Polymers 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- BHPQYMZQTOCNFJ-UHFFFAOYSA-N Calcium cation Chemical compound [Ca+2] BHPQYMZQTOCNFJ-UHFFFAOYSA-N 0.000 description 1
- JLVVSXFLKOJNIY-UHFFFAOYSA-N Magnesium ion Chemical compound [Mg+2] JLVVSXFLKOJNIY-UHFFFAOYSA-N 0.000 description 1
- 229910001424 calcium ion Inorganic materials 0.000 description 1
- 239000003651 drinking water Substances 0.000 description 1
- 235000020188 drinking water Nutrition 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- JEGUKCSWCFPDGT-UHFFFAOYSA-N h2o hydrate Chemical compound O.O JEGUKCSWCFPDGT-UHFFFAOYSA-N 0.000 description 1
- 229910001425 magnesium ion Inorganic materials 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003204 osmotic effect Effects 0.000 description 1
- 239000002957 persistent organic pollutant Substances 0.000 description 1
- 229920000573 polyethylene Polymers 0.000 description 1
- 229920001155 polypropylene Polymers 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000008213 purified water Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D35/00—Filtering devices having features not specifically covered by groups B01D24/00 - B01D33/00, or for applications not specifically covered by groups B01D24/00 - B01D33/00; Auxiliary devices for filtration; Filter housing constructions
Abstract
The invention discloses a kind of plate of water route, water inlet pipe, condensed water outlet pipe, the first water pipe, the second water pipe, third water pipe, the 4th water pipe, the 5th water pipe, the 6th water pipe and the 7th water pipe with mainboard integrated injection molding.When installation, low tension switch is plugged in mainboard by the first water pipe, inlet valve is plugged in mainboard by the second water pipe and third water pipe, booster pump is plugged in mainboard by third water pipe and the 4th water pipe, element kit is plugged in mainboard by the 4th water pipe, the 5th water pipe and the 6th water pipe, and wastewater valve is plugged in mainboard by the 6th water pipe and the 7th water pipe.The low tension switch of water purification machine, inlet valve, booster pump, element kit and wastewater valve are plugged in the correspondence pipeline of mainboard in this programme, in compared with the existing technology in such a way that PE connectors are connected with quick connector, reduce the connector quantity in water purification machine, to reduce the risk of water purification machine leak, it is convenient for the later maintenance of water purification machine.
Description
Technical field
The present invention relates to water-purifying technique field, more particularly to a kind of plate of water route.
Background technology
As the improvement of people's living standards, requirement of the people to drinking water quality is also higher and higher.Many families all fill
Improve water quality with RO (Reverse Osmosis, reverse osmosis) film for the domestic water purifying machine of filter core.
Reverse osmosis is to apply the pressure than naturally osmotic pressure bigger in raw water side, makes hydrone by a highly concentrated side
Reverse osmosis is to the low side of concentration.Since the aperture of reverse osmosis membrane is far smaller than virus and bacterium, therefore various viruses, bacterium, again
Metal, solid dissolvable object, Organic Pollutants and calcium ions and magnesium ions etc. at all can not be by reverse osmosis membranes, to reach purification of water quality
Purpose.
The water purification machine of the prior art is mostly level Four (PP+C+PP+RO) or the above filter element filtering device of level Four, wherein filter
PE (polyethylene) pipes and quick connector are used between core and filter core and between filter core and booster pump, solenoid valve and high and low voltage switch
Connection, this kind of connection type cause water purification machine center tap excessive, increases the risk of water purification machine leak in use, unfavorable
In the later maintenance of water purification machine.
Therefore, the connector quantity in water purification machine how is reduced, the leak risk of water purification machine in use is reduced, becomes
Those skilled in the art's technical problem urgently to be resolved hurrily.
Invention content
In view of this, the present invention provides a kind of plate of water route, to reduce the connector quantity in water purification machine, reduces water purification machine and exist
Leak risk during use.
To achieve the above object, the present invention provides the following technical solutions:
A kind of plate of water route, the plate of water route include:
Mainboard;
Water inlet pipe;
Condensed water outlet pipe;
The first water pipe being connected to the water inlet pipe is provided with low tension switch on first water pipe;
The water inlet end of second water pipe, second water pipe is connected to the water inlet pipe, the water outlet of second water pipe with
The water inlet of inlet valve is connected to;
The water inlet end of third water pipe, the third water pipe is connected to the water outlet of the inlet valve, the third water pipe
Water outlet is connected to the water inlet of booster pump;
The water inlet end of 4th water pipe, the 4th water pipe is connected to the water outlet of the booster pump, the 4th water pipe
Water outlet is connected to element kit;
The water inlet end of 5th water pipe, the 5th water pipe is connected to the element kit, the water outlet of the 5th water pipe
It is connected to clear water tanks;
The water inlet end of 6th water pipe, the 6th water pipe is connected to the element kit, the water outlet of the 6th water pipe
It is connected to the water inlet of wastewater valve;
The water inlet end of 7th water pipe, the 7th water pipe is connected to the water outlet of the wastewater valve, the 7th water pipe
Water outlet is connected to condensed water outlet pipe;
The water inlet pipe, the condensed water outlet pipe, first water pipe, second water pipe, the third water pipe, institute
State the 4th water pipe, the 5th water pipe, the 6th water pipe and the 7th water pipe with the mainboard integrated injection molding.
Preferably, in above-mentioned plate of water route, first water pipe is straight tube, and first water pipe hangs down with the water inlet pipe
Directly, and it is parallel with the mainboard;
Second water pipe is straight tube, and second straight tube is parallel with first water pipe.
Preferably, in above-mentioned plate of water route, the third water pipe be T-type pipe, the horizontal tube of the third water pipe with it is described
Second water pipe is parallel, and one end that the horizontal tube of the third water pipe is opposite with the inlet valve is blind end, the third water pipe
VERTICAL TUBE be connected to the tube wall of the horizontal tube of the third water pipe, the VERTICAL TUBE of the third water pipe is vertical with the mainboard,
The horizontal tube of the third water pipe and the water inlet grafting of the inlet valve, VERTICAL TUBE and the booster pump of the third water pipe
Water inlet grafting;
The horizontal tube of second water pipe and the third water pipe is close to arrange;
It is provided with the first column being arranged in parallel with second water pipe on the mainboard, is offered on first column
Threaded hole for installing the booster pump;
First column and the mainboard integrated injection molding.
Preferably, in above-mentioned plate of water route, the 4th water pipe includes being arranged in parallel with the VERTICAL TUBE of the third water pipe
The first branch pipe, along the setting of the surface of the mainboard and the second branch pipe for being connected to first branch pipe and along the table of the mainboard
The third branch pipe that face is arranged and is connected to second branch pipe.
Preferably, in above-mentioned plate of water route, second branch pipe is vertical with second water pipe, the third branch pipe and institute
It is vertical to state the second branch pipe.
Preferably, in above-mentioned plate of water route, the 5th water pipe is right-angle elbow pipe, the horizontal tube of the 5th water pipe and institute
State that the first water pipe is parallel, the VERTICAL TUBE of the 5th water pipe is vertical with the mainboard.
Preferably, in above-mentioned plate of water route, the 6th water pipe includes the 4th to be arranged in parallel with first water pipe
Pipe and with vertically arranged 5th branch pipe of the mainboard, the 4th branch pipe is connected to the tube wall of the 5th branch pipe.
Preferably, further include the second column arranged with the 5th arms parallel in above-mentioned plate of water route, described second
The threaded hole for installing the wastewater valve is offered on column;
Second column and the mainboard integrated injection molding;
Bolt hole corresponding with the position of mounting hole of the booster pump is offered on the mainboard.
Preferably, in above-mentioned plate of water route, the condensed water outlet pipe is parallel with the water inlet pipe.
Preferably, in above-mentioned plate of water route, the water inlet pipe, first water pipe, second water pipe and the third
Water pipe is respectively positioned on the side of the length direction of the mainboard, the condensed water outlet pipe, the 4th water pipe, the 5th water
Pipe, the 6th water pipe and the 7th water pipe are respectively positioned on the other side of the length direction of the mainboard.
It can be seen from the above technical proposal that plate of water route provided by the invention, water inlet pipe, condensed water outlet pipe, the first water
Pipe, the second water pipe, third water pipe, the 4th water pipe, the 5th water pipe, the 6th water pipe and the 7th water pipe with mainboard integrated injection molding at
Type.When installation, low tension switch is plugged in mainboard by the first water pipe, and inlet valve is plugged in master by the second water pipe and third water pipe
Plate, booster pump are plugged in mainboard by third water pipe and the 4th water pipe, and element kit passes through the 4th water pipe, the 5th water pipe and the 6th
Water pipe is plugged in mainboard, and wastewater valve is plugged in mainboard by the 6th water pipe and the 7th water pipe.The low pressure of water purification machine is opened in this programme
Pass, inlet valve, booster pump, element kit and wastewater valve are plugged in the correspondence pipeline of mainboard, compared with the existing technology in pass through PE
The mode that connector is connected with quick connector reduces the connector quantity in water purification machine, to reduce the risk of water purification machine leak,
Convenient for the later maintenance of water purification machine.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
Obtain other attached drawings according to these attached drawings.
Fig. 1 is the structural schematic diagram of plate of water route provided in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of plate of water route provided in an embodiment of the present invention;
Fig. 3 is the explosive view of plate of water route provided in an embodiment of the present invention and the cooperation of water purification machine original paper.
1, water inlet pipe, the 2, first water pipe, 3, low tension switch, the 4, second water pipe, 5, third water pipe, 6, inlet valve, 7, third
The VERTICAL TUBE of water pipe, the 8, the 4th water pipe, 9, booster pump, the 10, first gap bridge connecting tube, the 11, second gap bridge connecting tube, 12, second
Gap bridge connecting tube, the 13, the 5th water pipe, the 14, the 7th water pipe, the 15, wastewater valve, 16, condensed water outlet pipe, 17, mainboard, the 18, the 6th
Water pipe.
Specific implementation mode
The invention discloses a kind of plate of water route, to reduce the connector quantity in water purification machine, reduce water purification machine and are using process
In leak risk.
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
- Fig. 3 is please referred to Fig.1, Fig. 1 is the structural schematic diagram of plate of water route provided in an embodiment of the present invention;Fig. 2 is that the present invention is real
The structural schematic diagram of the plate of water route of example offer is provided;Fig. 3 is plate of water route provided in an embodiment of the present invention and the cooperation of water purification machine original paper
Explosive view.
The invention discloses a kind of plate of water route, plate of water route includes mainboard 17, water inlet pipe 1, condensed water outlet pipe 16, the first water
Pipe 2, the second water pipe 4, third water pipe 5, the 4th water pipe 8, the 5th water pipe 13, the 6th water pipe 18 and the 7th water pipe 14.
Wherein, water inlet pipe 1 is passed through water to be clean;
Condensed water is discharged in condensed water outlet pipe 16;
Mainboard 17 plays the role of each pipeline of connection;
First water pipe 2 is connected to water inlet pipe 1, is provided with low tension switch 3 on the first water pipe 2, low tension switch 3 for detect into
Whether the mouth of a river has water entrance, if fed without water, low tension switch 3 will cut off the water supply signal reaction to master control system machine, pure water
Machine is stopped;
The water of water inlet pipe 1 enters inlet valve 6 by the second water pipe 4, and the water inlet end of the second water pipe 4 is connected to water inlet pipe 1, the
The water outlet of two water pipes 4 is connected to the water inlet of inlet valve 6, and inlet valve 6 controls whether water enters water purification machine;
The water inlet end of third water pipe 5 is connected to the water outlet of inlet valve 6, the water outlet of third water pipe 5 and entering for booster pump 9
The mouth of a river is connected to, and booster pump 9, which pressurizes, makes water enter the purification that element kit realizes water;
The water inlet end of 4th water pipe 8 is connected to the water outlet of booster pump 9, and water outlet and the element kit of the 4th water pipe 8 connect
Logical, the 4th water pipe 8 is connected to by the first gap bridge connecting tube 10 with element kit, and the water after pressurization is entered by the 4th water pipe 8 to be filtered
Core assembly;
Purified moisture enters the 5th water pipe 13 all the way at two-way, and water inlet end and the element kit of the 5th water pipe 13 connect
Logical, the 5th water pipe 13 is connected to by the second gap bridge connecting tube 11 with element kit, and water outlet and the clear water tanks of the 5th water pipe 13 connect
Logical, clear water tanks store purified water;
Another way enters the 6th water pipe 18, and the water inlet end of the 6th water pipe 18 is connected to element kit, and the 6th water pipe 18 passes through
Third gap bridge connecting tube 12 is connected to element kit, and the water outlet of the 6th water pipe 18 is connected to the water inlet of wastewater valve 15, waste water
The intake pressure that valve 15 adjusts reverse osmosis membrane achievees the purpose that water processed, while being rinsed to RO films;
The water inlet end of 7th water pipe 14 is connected to the water outlet of wastewater valve 15, and the water outlet of the 7th water pipe 14 goes out with condensed water
Water pipe 16 is connected to, condensed water discharge.
Water inlet pipe 1, condensed water outlet pipe 16, the first water pipe 2, the second water pipe 4, third water pipe 5, the 4th water pipe in this programme
8, the 5th water pipe 13, the 6th water pipe 18 and the 7th water pipe 14 with 17 integrated injection molding of mainboard.When installation, low tension switch 3 is logical
It crosses the first water pipe 2 and is plugged in mainboard 17, inlet valve 6 is plugged in mainboard 17 by the second water pipe 4 and third water pipe 5, and booster pump 9 is logical
It crosses third water pipe 5 and the 4th water pipe 8 is plugged in mainboard 17, element kit passes through the 4th water pipe 8, the 5th water pipe 13 and the 6th water pipe
18 are plugged in mainboard 17, and wastewater valve 15 is plugged in mainboard 17 by the 6th water pipe 18 and the 7th water pipe 14.
The low tension switch 3 of water purification machine, inlet valve 6, booster pump 9, element kit and wastewater valve 15 are plugged in master in this programme
The correspondence pipeline of plate 17, compared with the existing technology in such a way that PE connectors are connected with quick connector, reduce in water purification machine
Connector quantity, to reduce the risk of water purification machine leak, be convenient for water purification machine later maintenance.
More further, mainboard 17 and water inlet pipe 1, condensed water outlet pipe 16, the first water pipe 2, the second water pipe 4, third water
Pipe 5, the 4th water pipe 8, the 5th water pipe 13, the 6th water pipe 18 and 14 integrated injection molding of the 7th water pipe, relative to ultrasonic bonding
Technique, it is at low cost, and quality is guaranteed, to further reduce the maintenance dynamics of water purification machine.
When water purification machine assembles, the step of cutting PE pipes is eliminated, reduces the hand labor intensity of water purification machine assembling.
The plate of water route that this programme provides is integral type integrating water route plate, low tension switch 3, inlet valve 6, booster pump 9, filter core group
Part and the pipeline plug connection corresponding in plate of water route of wastewater valve 15, piping connection simplicity.
This programme by low tension switch 3, inlet valve 6, booster pump 9, element kit and wastewater valve 15 be focused on mainboard 17 into
Row installation, reduces multiple original paper the space occupied to a certain extent, realizes the target of machine miniaturization.
In a specific embodiment of this programme, the first water pipe 2 is straight tube, and straight tube is vertical with water inlet pipe 1, and and mainboard
17 is parallel, i.e. the length extending direction of the first water pipe 2 is identical as the plane extending direction of mainboard 17;
Second water pipe 4 is straight tube, and the second straight tube is parallel with the first water pipe 2.
In a specific embodiment of this programme, third water pipe 5 is T-type pipe, the horizontal tube of third water pipe 5 and the second water
Pipe 4 is parallel.
The horizontal tube of third water pipe 5 one end opposite with inlet valve 6 is blind end, the horizontal tube of third water pipe 5 and water inlet
One end that valve 6 coordinates is open end.
The VERTICAL TUBE 7 of the 7 third water pipe of VERTICAL TUBE of third water pipe is connected to the tube wall of the horizontal tube of third water pipe 5, third
The VERTICAL TUBE 7 of the 7 third water pipe of VERTICAL TUBE of water pipe is vertical with mainboard 17, the water inlet of the horizontal tube and inlet valve 6 of third water pipe 5
Grafting, the water inlet grafting of the VERTICAL TUBE 7 and booster pump 9 of the 7 third water pipe of VERTICAL TUBE of third water pipe.
In order to reduce the difficulty of processing of the second water pipe 4 and third water pipe 5, it is preferred that the second water pipe 4 and third water pipe 5
The equal length of horizontal tube.
The horizontal tube of second water pipe 4 and third water pipe 5 is close to arrange, reduces the occupancy of the second water pipe 4 and third water pipe 5
Space reduces the length of mainboard 17 to a certain extent.
It is provided with the first column being arranged in parallel with the second water pipe 4 on mainboard 17, is offered on the first column for installing
The threaded hole of booster pump 9, that is to say, that booster pump 9 is installed on mainboard 17 by the first column.
Preferably, the number of the first column is two.
In order to ensure the bonding strength of the first column and mainboard 17, in a specific embodiment of this programme, first is vertical
Column and 17 integrated injection molding of mainboard.
4th water pipe 8 include the first branch pipe being arranged in parallel with the VERTICAL TUBE 7 of 7 third water pipe of the VERTICAL TUBE of third water pipe,
Be arranged along the setting of the surface of mainboard 17 and the second branch pipe for be connected to the first branch pipe and along the surface of mainboard 17 and with the second branch pipe
The third branch pipe of connection.4th water pipe 8 occupies vertically and horizontally two planes, this kind of structure can facilitate the 4th water pipe 8 with
The connection of element kit and booster pump 9.
Preferably, the second branch pipe is vertical with the second water pipe 4, and third branch pipe is vertical with the second branch pipe.
5th water pipe 13 is right-angle elbow pipe, and the horizontal tube of the 5th water pipe 13 is parallel with the first water pipe 2, and the 5th water pipe 13 erects
Straight tube is vertical with mainboard 17.The horizontal tube and VERTICAL TUBE of 5th water pipe 13 are coaxially arranged.
6th water pipe 18 includes the 4th branch pipe being arranged in parallel with the first water pipe 2 and vertically arranged 5th with mainboard 17
Pipe, the 4th branch pipe are connected to the tube wall of the 5th branch pipe.4th branch pipe and the 5th non-coaxial arrangement of branch pipe.
In order to advanced optimize above-mentioned technical proposal, the plate of water route that this programme provides further includes being arranged with the 5th arms parallel
The second column, the threaded hole for installing wastewater valve 15 is offered on the second column, wastewater valve 15 passes through the second column and installs
In mainboard 17.
In order to ensure the bonding strength of the second column and mainboard 17, while reducing the difficulty of processing of the second column, it is preferred that
Second column and 17 integrated injection molding of mainboard.
Bolt hole corresponding with the position of mounting hole of booster pump 9, i.e. booster pump 9 and 17 bolt of mainboard are offered on mainboard 17
Connection, reduces the cooperation difficulty of booster pump 9 and mainboard 17 to a certain extent.
Preferably, condensed water outlet pipe 16 is parallel with water inlet pipe 1.
In a specific embodiment of this programme, water inlet pipe 1,5 equal position of the first water pipe 2, the second water pipe 4 and third water pipe
In the side of the length direction of mainboard 17, condensed water outlet pipe 16, the 4th water pipe 8, the 5th water pipe 13, the 6th water pipe 18 and the 7th
Water pipe 14 is respectively positioned on the other side of the length direction of mainboard 17.
Herein it should be noted that water inlet pipe 1, condensed water outlet pipe 16, the first water pipe 2, the second water pipe 4, third water pipe
5, the outer diameter of the 4th water pipe 8, the 5th water pipe 13, the 6th water pipe 18 and the 7th water pipe 14 is designed according to matched original paper,
Pipeline outer diameter is not limited specifically herein, to ensure effective grafting of the pipeline with corresponding original paper.
Plate of water route is PP (polypropylene) plate of water route.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention.
Various modifications to these embodiments will be apparent to those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one
The widest range caused.
Claims (10)
1. a kind of plate of water route, which is characterized in that the plate of water route includes:
Mainboard (17);
Water inlet pipe (1);
Condensed water outlet pipe (16);
The first water pipe (2) being connected to the water inlet pipe (1) is provided with low tension switch (3) on first water pipe (2);
The water inlet end of second water pipe (4), second water pipe (4) is connected to the water inlet pipe (1), second water pipe (4)
Water outlet is connected to the water inlet of inlet valve (6);
The water inlet end of third water pipe (5), the third water pipe (5) is connected to the water outlet of the inlet valve (6), the third water
The water outlet of pipe (5) is connected to the water inlet of booster pump (9);
The water inlet end of 4th water pipe (8), the 4th water pipe (8) is connected to the water outlet of the booster pump (9), the 4th water
The water outlet of pipe (8) is connected to element kit;
The water inlet end of 5th water pipe (13), the 5th water pipe (13) is connected to the element kit, the 5th water pipe (13)
Water outlet be connected to clear water tanks;
The water inlet end of 6th water pipe (18), the 6th water pipe (18) is connected to the element kit, the 6th water pipe (18)
Water outlet be connected to the water inlet of wastewater valve (15);
The water inlet end of 7th water pipe (14), the 7th water pipe (14) is connected to the water outlet of the wastewater valve (15), and described
The water outlet of seven water pipes (14) is connected to condensed water outlet pipe (16);
The water inlet pipe (1), the condensed water outlet pipe (16), first water pipe (2), second water pipe (4), described
Three water pipes (5), the 4th water pipe (8), the 5th water pipe (13), the 6th water pipe (18) and the 7th water pipe (14)
With the mainboard (17) integrated injection molding.
2. plate of water route according to claim 1, which is characterized in that
First water pipe (2) be straight tube, first water pipe (2) is vertical with the water inlet pipe (1), and with the mainboard (17)
It is parallel;
Second water pipe (4) is straight tube, and second straight tube is parallel with the first water pipe (2).
3. plate of water route according to claim 2, which is characterized in that the third water pipe (5) is T-type pipe, the third water
The horizontal tube for managing (5) is parallel with the second water pipe (4), and the horizontal tube of the third water pipe (5) is opposite with the inlet valve (6)
One end be blind end, the VERTICAL TUBE (7) of VERTICAL TUBE (7) third water pipe of the third water pipe and the third water pipe (5)
The tube wall of horizontal tube is connected to, and the VERTICAL TUBE (7) and the mainboard (17) of VERTICAL TUBE (7) third water pipe of the third water pipe hang down
Directly, the water inlet grafting of the horizontal tube and the inlet valve (6) of the third water pipe (5), the VERTICAL TUBE (7) of the third water pipe
The water inlet grafting of the VERTICAL TUBE (7) and the booster pump (9) of third water pipe;
The horizontal tube of second water pipe (4) and the third water pipe (5) is close to arrange;
It is provided with the first column being arranged in parallel with second water pipe (4) on the mainboard (17), is opened on first column
Equipped with the threaded hole for installing the booster pump (9);
First column and the mainboard (17) integrated injection molding.
4. plate of water route according to claim 3, which is characterized in that the 4th water pipe (8) includes and the third water pipe
VERTICAL TUBE (7) third water pipe VERTICAL TUBE (7) parallel arrangement the first branch pipe, along the mainboard (17) surface setting and with
Second branch pipe of first branch pipe connection and be connected to along the setting of the surface of the mainboard (17) and with second branch pipe the
Three branch pipes.
5. plate of water route according to claim 4, which is characterized in that second branch pipe is vertical with the second water pipe (4),
The third branch pipe is vertical with second branch pipe.
6. plate of water route according to claim 1, which is characterized in that the 5th water pipe (13) is right-angle elbow pipe, described the
The horizontal tube of five water pipes (13) is parallel with the first water pipe (2), VERTICAL TUBE and the mainboard of the 5th water pipe (13)
(17) vertical.
7. plate of water route according to claim 1, which is characterized in that the 6th water pipe (18) includes and first water pipe
(2) the 4th branch pipe that is arranged in parallel and with vertically arranged 5th branch pipe of the mainboard (17), the 4th branch pipe and described the
The tube wall of five branch pipes is connected to.
8. plate of water route according to claim 7, which is characterized in that further include second arranged with the 5th arms parallel
Column offers the threaded hole for installing the wastewater valve (15) on second column;
Second column and the mainboard (17) integrated injection molding;
Bolt hole corresponding with the position of mounting hole of the booster pump (9) is offered on the mainboard (17).
9. plate of water route according to claim 1, which is characterized in that the condensed water outlet pipe (16) and the water inlet pipe
(1) parallel.
10. plate of water route according to claim 1, which is characterized in that the water inlet pipe (1), first water pipe (2), institute
State the second water pipe (4) and the third water pipe (5) be respectively positioned on the mainboard (17) length direction side, the condensed water goes out
Water pipe (16), the 4th water pipe (8), the 5th water pipe (13), the 6th water pipe (18) and the 7th water pipe (14)
It is respectively positioned on the other side of the length direction of the mainboard (17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810586056.8A CN108635942A (en) | 2018-06-08 | 2018-06-08 | A kind of plate of water route |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810586056.8A CN108635942A (en) | 2018-06-08 | 2018-06-08 | A kind of plate of water route |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108635942A true CN108635942A (en) | 2018-10-12 |
Family
ID=63751903
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810586056.8A Pending CN108635942A (en) | 2018-06-08 | 2018-06-08 | A kind of plate of water route |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108635942A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114011142A (en) * | 2021-11-30 | 2022-02-08 | 绍兴摩纳净水科技有限公司 | Filter element seat |
CN114031134A (en) * | 2021-11-30 | 2022-02-11 | 绍兴摩纳净水科技有限公司 | Water purifier |
CN114031134B (en) * | 2021-11-30 | 2024-05-10 | 绍兴摩纳净水科技有限公司 | Water purifier |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205019819U (en) * | 2015-08-13 | 2016-02-10 | 深圳安吉尔饮水产业集团有限公司 | Parallel waterway structure and parallel purifier |
WO2017161858A1 (en) * | 2016-03-25 | 2017-09-28 | 佛山市顺德区美的饮水机制造有限公司 | Water path adapter plate for water purifier and water purifier having same |
CN206676093U (en) * | 2017-03-03 | 2017-11-28 | 江西书源科技有限公司 | A kind of horizontal water purifier water route installing plate |
CN107902707A (en) * | 2017-11-20 | 2018-04-13 | 佛山市顺德区美的饮水机制造有限公司 | Integrating water route plate and water purifier |
CN107915332A (en) * | 2017-08-09 | 2018-04-17 | 佛山市顺德区美的饮水机制造有限公司 | Integrating water route component and water purifier |
CN207375850U (en) * | 2017-10-19 | 2018-05-18 | 广东长虹日电科技有限公司 | A kind of staged is molded integrating water route plate |
CN208770972U (en) * | 2018-06-08 | 2019-04-23 | 浙江朗诗德健康饮水设备股份有限公司 | A kind of plate of water route |
-
2018
- 2018-06-08 CN CN201810586056.8A patent/CN108635942A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205019819U (en) * | 2015-08-13 | 2016-02-10 | 深圳安吉尔饮水产业集团有限公司 | Parallel waterway structure and parallel purifier |
WO2017161858A1 (en) * | 2016-03-25 | 2017-09-28 | 佛山市顺德区美的饮水机制造有限公司 | Water path adapter plate for water purifier and water purifier having same |
CN206676093U (en) * | 2017-03-03 | 2017-11-28 | 江西书源科技有限公司 | A kind of horizontal water purifier water route installing plate |
CN107915332A (en) * | 2017-08-09 | 2018-04-17 | 佛山市顺德区美的饮水机制造有限公司 | Integrating water route component and water purifier |
CN207375850U (en) * | 2017-10-19 | 2018-05-18 | 广东长虹日电科技有限公司 | A kind of staged is molded integrating water route plate |
CN107902707A (en) * | 2017-11-20 | 2018-04-13 | 佛山市顺德区美的饮水机制造有限公司 | Integrating water route plate and water purifier |
CN208770972U (en) * | 2018-06-08 | 2019-04-23 | 浙江朗诗德健康饮水设备股份有限公司 | A kind of plate of water route |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114011142A (en) * | 2021-11-30 | 2022-02-08 | 绍兴摩纳净水科技有限公司 | Filter element seat |
CN114031134A (en) * | 2021-11-30 | 2022-02-11 | 绍兴摩纳净水科技有限公司 | Water purifier |
CN114031134B (en) * | 2021-11-30 | 2024-05-10 | 绍兴摩纳净水科技有限公司 | Water purifier |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105668706B (en) | Automatic positive backwash ultra filtering reverse osmosis water cleaning systems with water storage diaphragm pressure tank | |
CN203700063U (en) | Household water purification machine with concentrated water backflow function | |
JP2009525846A (en) | Modular reverse osmosis water treatment system | |
CN2830380Y (en) | Super-filtering, hyperfiltration integral home water purifier | |
CN105502579A (en) | Ultrafiltration cartridge self-flushing system for domestic water purifier, self-flushing method and domestic water purifier | |
CN208770972U (en) | A kind of plate of water route | |
CN108635942A (en) | A kind of plate of water route | |
US20050087492A1 (en) | Reverse osmosis water filtering system | |
CN108715475A (en) | A kind of water cleaning systems with pure water rinsing | |
CN209226704U (en) | A kind of water purification machine | |
CN209123686U (en) | A kind of pure water automatic reverse flushing water purifier of detectable filter element life | |
CN207286832U (en) | A kind of bottled water water production system | |
RU2199377C1 (en) | Membrane plant for separation of solutions | |
CN2837286Y (en) | Use synchronously water-purifying machine more | |
CN207498149U (en) | Circulating Wastewater-free water purifier | |
CN209940633U (en) | Backwashing water purifier | |
US20080128355A1 (en) | Filtration apparatus and method | |
CN106315901A (en) | Water-saving type water purifier | |
CN208135971U (en) | A kind of filter structure with water quality sensor | |
RU22434U1 (en) | SOLUTION SEPARATION INSTALLATION | |
CN205740584U (en) | Blockage resisting ultrafiltration water cleaning systems | |
CN111204843A (en) | Energy-saving water filtering system combining reverse osmosis membrane and nanofiltration membrane | |
CN108483703A (en) | A kind of water purification machine | |
CN113490646A (en) | Liquid purification system | |
CN208869430U (en) | Multifunctional and composite type liquid level sensor and water purifier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |