CN108625593A - A kind of wall spray coating constructing technique - Google Patents

A kind of wall spray coating constructing technique Download PDF

Info

Publication number
CN108625593A
CN108625593A CN201810547914.8A CN201810547914A CN108625593A CN 108625593 A CN108625593 A CN 108625593A CN 201810547914 A CN201810547914 A CN 201810547914A CN 108625593 A CN108625593 A CN 108625593A
Authority
CN
China
Prior art keywords
basal plane
wall
spray gun
boundary line
spray
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810547914.8A
Other languages
Chinese (zh)
Inventor
陈立新
王婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Yi New Fit Type New Building Materials Co Ltd
Original Assignee
Guizhou Yi New Fit Type New Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Yi New Fit Type New Building Materials Co Ltd filed Critical Guizhou Yi New Fit Type New Building Materials Co Ltd
Priority to CN201810547914.8A priority Critical patent/CN108625593A/en
Publication of CN108625593A publication Critical patent/CN108625593A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • E04F21/08Mechanical implements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The present invention provides a kind of wall spray coating constructing technique, include that the basal plane to be sprayed to wall side is handled, places flush coater, put into coating and water into flush coater and mix and stir and slurry is made, so that slurry is sprayed on basal plane by spray gun, and make spray gun along scheduled spraying profile according to uniform motion, form on basal plane layered coating layer with being sequentially overlapped, after, press polish processing levelling to dope layer, remove the impurity on the ground of construction site;Technical solution using the present invention, during spraying operation, spray gun is set to be moved along rational path, not only make operator operate more smoothly with it is convenient, also slurry is enable equably to be sprayed on surface to be sprayed, make the dope layer surface more smooth of acquisition, it is laborsaving to keep the processes such as levelling, the press polish processing of subsequent darby more time saving, improve construction efficiency, in addition, spraying operation has been disposed in time and has interrupted situation, be ensure that the operation that equipment safety is stablized, is extended the service life of construction equipment.

Description

A kind of wall spray coating constructing technique
Technical field
The invention belongs to build spraying application technical field more particularly to a kind of wall spray coating constructing technique.
Background technology
With the development of economy, various skyscrapers are rised sheer from level ground, and spraying application is carried out to the metope of these skyscrapers Operation is conducive to optimize the environment, and gives beautiful impression.But due in city the structure of various buildings, figure appearances it is different, Because causing some difficulties to spraying wall construction operation, most of middle parapet surface construction of existing outdoor still uses people Work mode is constructed, and using the form of construction work of hand spray, exterior surface of wall coating quality is difficult to control, and is formed by dope layer appearance The reason of easily there is surface irregularity, hollowing, fall off, crack, seeping water and phenomenon that heat performance is unstable, generating these phenomenons It is lack of standardization to be largely due to spraying application operating procedure, when spraying application, the distance between pistol-port and coating surface to be painted, Caused by the selection of the technological parameters such as spray gun movement speed is improper.
Invention content
In order to solve the above technical problems, the present invention provides a kind of wall spray coating constructing techniques.
The present invention is achieved by the following technical programs.
The present invention provides a kind of wall spray coating constructing technique, mainly includes the following steps that:
Step 1:Basal plane processing:The metope of wall side construction to be sprayed is chosen as basal plane, remove the basal plane and Impurity on the ceiling face adjacent with basal plane, ground;
Step 2:Preparing machine equipment:Flush coater is provided, mixing chamber and spray gun, the spray are provided on the flush coater Rifle is connected by conveying pipeline with the mixing chamber;
Step 3:Prepare slurry:Appropriate coating and water are put into mixing chamber described in step 2, make coating and water described It is evenly mixed in mixing chamber and slurry is made;
Step 4:Spray basal plane:So that pistol-port described in step 2 is vertically intended for the basal plane, open flush coater, So that spray gun is made linear uniform motion in the perpendicular parallel with basal plane, while making between the pistol-port and the basal plane Distance keep constant, so that slurry described in step 3 is attached on the basal plane by spray gun sprinkling, and on the basal plane A coating layer is formed, the spray gun movement paths traversed forms a spraying profile;
Step 5:After the dope layer condensation formed after spray treatment described in step 4, using its outer surface as new Basal plane, repeat that step 3 is multiple to step 4, new basal plane repeatedly sprayed, is formed with being sequentially overlapped on former base face Layered coating layer;
Step 6:Dope layer is levelling:The outer surface of last coating layer formed in step 5 is scraped using darby, then It is rubbed with the hands and is put down using wooden float, keep last coating layer outer surface levelling;
Step 7:Press polish is handled:Press polish processing is carried out to last coating layer outer surface after leveling, i.e., Last coating layer outer surface is smoothed out again, and to applying pressure appropriate within dope layer during floating is handled Power;
Step 8:Remove impurity:After the condensation of all dope layers, remove all miscellaneous on the ground adjacent with wall Matter.
Removed described in step 1 the impurity on the basal plane and the ceiling face adjacent with basal plane, ground further include with Lower step:
Step 1:Electric switch, terminal box and pipeline are installed on wall, and reserve door and window hole on wall;
Step 2:Electric switch, terminal box and exposed tube are blocked in the basal plane exterior portion using plastic cloth, it is right The door and window hole port reserved on wall is blocked using plastic cloth, the rubbish road junction on pair ground adjacent with the basal plane It is blocked using plastic cloth with floor drain port;
Step 3:To electric switch, terminal box, pipeline, door and window hole, the garbage chute blocked by plastic cloth described in step 2 Mouth and floor drain port are identified respectively.
Castor is also equipped on flush coater described in step 2, the wall spray coating constructing technique further includes carrying out step 4 Castor is locked before.
The distance between spray gun and basal plane described in the step 4 are 10cm to 15cm.
Thickness per coating layer is less than 2cm.
Spray treatment described in step 4 is further comprising the steps of:
Step 1:It is boundary line A to define boundary line between the basal plane and ground, define the basal plane and ceiling face it Between boundary line be boundary line B, the spray gun is moved to the left side of the boundary line A;
Step 2:So that the spray gun is parallel to boundary line A described in step 1 and make linear uniform motion, by the spray gun from boundary The left side of line A is moved to the right of boundary line A;
Step 3:Spray gun is set to raise suitable distance relative to ground along vertical direction;
Step 4:So that the spray gun is parallel to boundary line A described in step 1 and make linear uniform motion, by the spray gun from boundary The left side of boundary line A is moved on the right of line A;
Step 5:Step 2 is repeated to step 4, the spray gun is made to be moved to the left side or the right neighbouring with boundary line B.
The left side of the boundary line A refers to:The wall side and the building interior space built using the wall away from From close one side.
During preparing slurry described in step 3, wherein the volume for putting into water into the mixing chamber for the first time is 300mL to 350mL.
During spraying basal plane described in step 4, if there is job interruption of the duration more than 15min, in weight Before newly being sprayed to basal plane, conveying pipeline is rinsed using clear water.
The wall spray coating constructing technique further includes:After step 8, mixing chamber and conveying pipeline are carried out using clear water Cleaning, removes the slurry adhered on its inner wall.
The beneficial effects of the present invention are:Technical solution using the present invention makes pistol-port during spraying operation The spacing kept constant with surface to be sprayed, remain a constant speed translation in the perpendicular parallel with surface to be sprayed, and makes Spray gun is moved along rational path, not only make operator operate more smoothly with it is convenient, also enable slurry equal It is sprayed at evenly on surface to be sprayed, makes the dope layer surface more smooth of acquisition, make the works such as levelling, the press polish processing of subsequent darby It is laborsaving that sequence is more time saving, improves construction efficiency, in addition, to the job interruption situation occurred during spraying operation, in time into It has gone corresponding disposition, has protected the safety of construction equipment, safe operation that can be steady in a long-term extends construction equipment Service life.
Description of the drawings
Fig. 1 is the process flow chart of the present invention;
Fig. 2 is spray gun spraying track schematic diagram of the present invention.
In figure:1- boundary lines A, 2- boundary line B, 3- spraying profile.
Specific implementation mode
Be described further below technical scheme of the present invention, but claimed range be not limited to it is described.
As shown in Figure 1 and Figure 2, the present invention provides a kind of wall spray coating constructing technique, includes the following steps:
Step 1:Basal plane processing:The metope of wall side construction to be sprayed is chosen as basal plane, remove the basal plane and Impurity on the ceiling face adjacent with basal plane, ground;
Step 2:Preparing machine equipment:Flush coater is provided, mixing chamber and spray gun, the spray are provided on the flush coater Rifle is connected by conveying pipeline with the mixing chamber;Further, castor, the wall spraying are also equipped on the flush coater Construction technology further includes locking castor before carrying out step 4, in addition, the ground for placing flush coater is carrying out spraying operation Also need to carry out it smooth, compacting processing before construction, to ensure that spraying operation is smoothed out, the installation of conveying pipeline do not allow into Row bending and coiling.
Step 3:Prepare slurry:Appropriate coating and water are put into mixing chamber described in step 2, make coating and water described It is evenly mixed in mixing chamber and slurry is made;Further, during preparing slurry described in step 3, wherein for the first time to institute The volume for stating input water in mixing chamber is 300mL to 350mL, and second of volume that water is put into the mixing chamber is 300mL To 310mL.
Step 4:Spray basal plane:So that pistol-port described in step 2 is vertically intended for the basal plane, open flush coater, So that spray gun is made linear uniform motion in the perpendicular parallel with basal plane, while making between the pistol-port and the basal plane Distance keep constant, so that slurry described in step 3 is attached on the basal plane by spray gun sprinkling, and on the basal plane A coating layer is formed, the spray gun movement paths traversed forms a spraying profile;Further, the spray gun and base The distance between face is 10cm to 15cm.During spraying basal plane described in step 4, if the duration occur is more than 15min Job interruption, then before being sprayed again to basal plane, use clear water rinse conveying pipeline.
Step 5:After the dope layer condensation formed after spray treatment described in step 4, using its outer surface as new Basal plane, repeat that step 3 is multiple to step 4, new basal plane repeatedly sprayed, is formed with being sequentially overlapped on former base face Layered coating layer;Further, the thickness per coating layer is less than 2cm.
Step 6:Dope layer is levelling:The outer surface of last coating layer formed in step 5 is scraped using darby, then It is rubbed with the hands and is put down using wooden float, keep last coating layer outer surface levelling;
Step 7:Press polish is handled:Press polish processing is carried out to last coating layer outer surface after leveling, i.e., Last coating layer outer surface is smoothed out again, and to applying pressure appropriate within dope layer during floating is handled Power;
Step 8:Remove impurity:After the condensation of all dope layers, remove all miscellaneous on the ground adjacent with wall Matter.The wall spray coating constructing technique further includes:After step 8, mixing chamber and conveying pipeline are cleaned using clear water, Remove the slurry adhered on its inner wall.
Technical solution using the present invention makes pistol-port be kept constant with surface to be sprayed during spraying operation Spacing, remain a constant speed translation in the perpendicular parallel with surface to be sprayed, and make spray gun along rational path into Row movement, not only make operator operate more smoothly with it is convenient, so that slurry is equably sprayed at surface to be sprayed On, make the dope layer surface more smooth of acquisition, it is laborsaving, raising to keep the processes such as levelling, the press polish processing of subsequent darby more time saving Construction efficiency has carried out corresponding disposition, has protected in time in addition, to the job interruption situation occurred during spraying operation The safety of construction equipment, safe operation that can be steady in a long-term extend the service life of construction equipment.
Further, it is removed described in step 1 miscellaneous on the basal plane and the ceiling face adjacent with basal plane, ground Matter is further comprising the steps of:
Step 1:Electric switch, terminal box and pipeline are installed on wall, and reserve door and window hole on wall;
Step 2:Electric switch, terminal box and exposed tube are blocked in the basal plane exterior portion using plastic cloth, it is right The door and window hole port reserved on wall is blocked using plastic cloth, the rubbish road junction on pair ground adjacent with the basal plane It is blocked using plastic cloth with floor drain port;
Step 3:To electric switch, terminal box, pipeline, door and window hole, the garbage chute blocked by plastic cloth described in step 2 Mouth and floor drain port are identified respectively.
Further, as shown in Fig. 2, the spray treatment is further comprising the steps of:
Step 1:It is boundary line A to define boundary line between the basal plane and ground, define the basal plane and ceiling face it Between boundary line be boundary line B, the spray gun is moved to the left side of the boundary line A;The left side of the boundary line A refers to: The wall side is with the building interior space built using the wall apart from close one side.
Step 2:So that the spray gun is parallel to boundary line A described in step 1 and make linear uniform motion, by the spray gun from boundary The left side of line A is moved to the right of boundary line A;
Step 3:Spray gun is set to raise suitable distance relative to ground along vertical direction;
Step 4:So that the spray gun is parallel to boundary line A described in step 1 and make linear uniform motion, by the spray gun from boundary The left side of boundary line A is moved on the right of line A;
Step 5:Step 2 is repeated to step 4, the spray gun is made to be moved to the left side or the right neighbouring with boundary line B.Using Technical solution provided by the invention, spray gun motion track follow the principle of " from inside outwards, getting on, get off ", due to the area first sprayed Slurry in domain first condenses in time, and therefore, spray gun motion track according to the invention is sprayed, and slurry condensation sequence is " from inside outwards, getting on, get off ", although slurry part therein in non-condensing region can be towards in partial coagulation region The surface flow of dope layer, still, due to partial coagulation in dope layer, the decline of coating quality will not be caused, also not Spraying can be made non-uniform phenomenon occur.

Claims (10)

1. a kind of wall spray coating constructing technique, it is characterised in that:Include the following steps:
Step 1:Basal plane processing:The metope of wall side construction to be sprayed is chosen as basal plane, removes the basal plane and and base Impurity on the adjacent ceiling face in face, ground;
Step 2:Preparing machine equipment:Flush coater is provided, mixing chamber and spray gun are provided on the flush coater, the spray gun is logical Conveying pipeline is crossed with the mixing chamber to be connected;
Step 3:Prepare slurry:Appropriate coating and water are put into mixing chamber described in step 2, make coating and water in the stirring It is evenly mixed in storehouse and slurry is made;
Step 4:Spray basal plane:So that pistol-port described in step 2 is vertically intended for the basal plane, opens flush coater, make spray Rifle makees linear uniform motion in the perpendicular parallel with basal plane, at the same make between the pistol-port and the basal plane away from From keeping constant, slurry described in step 3 is set to be attached on the basal plane by spray gun sprinkling, and formed on the basal plane One coating layer, the spray gun movement paths traversed form a spraying profile;
Step 5:After the dope layer condensation formed after spray treatment described in step 4, using its outer surface as new base Face, repeats that step 3 is multiple to step 4, is repeatedly sprayed to new basal plane, multilayer is formed with being sequentially overlapped on former base face Dope layer;
Step 6:Dope layer is levelling:The outer surface of last coating layer formed in step 5 is scraped using darby, is reused Wooden float, which is rubbed with the hands, puts down, and keeps last coating layer outer surface levelling;
Step 7:Press polish is handled:Press polish processing is carried out to last coating layer outer surface after leveling, i.e., to most Later layer dope layer outer surface smoothes out again, and to applying pressure appropriate within dope layer during floating is handled;
Step 8:Remove impurity:After the condensation of all dope layers, remove and all impurity on the adjacent ground of wall.
2. wall spray coating constructing technique as described in claim 1, it is characterised in that:Removed described in step 1 the basal plane with And adjacent ceiling face, the impurity on ground are further comprising the steps of with basal plane:
Step 1:Electric switch, terminal box and pipeline are installed on wall, and reserve door and window hole on wall;
Step 2:Electric switch, terminal box and exposed tube are blocked in the basal plane exterior portion using plastic cloth, to wall On the door and window hole port that reserves blocked using plastic cloth, the rubbish road junction on pair ground adjacent with the basal plane and ground Drain terminal mouth is blocked using plastic cloth;
Step 3:To blocked by plastic cloth described in step 2 electric switch, terminal box, pipeline, door and window hole, rubbish road junction and Floor drain port is identified respectively.
3. wall spray coating constructing technique as described in claim 1, it is characterised in that:It is also equipped on flush coater described in step 2 Castor, the wall spray coating constructing technique further include locking castor before carrying out step 4.
4. wall spray coating constructing technique as described in claim 1, it is characterised in that:Spray gun and basal plane described in the step 4 The distance between be 10cm to 15cm.
5. wall spray coating constructing technique as described in claim 1, it is characterised in that:Thickness per coating layer is less than 2cm.
6. wall spray coating constructing technique as claimed in claim 3, it is characterised in that:Spray treatment described in step 4 further includes Following steps:
Step 1:The boundary line defined between the basal plane and ground is boundary line A, is defined between the basal plane and ceiling face Boundary line is boundary line B, and the spray gun is moved to the left side of the boundary line A;
Step 2:So that the spray gun is parallel to boundary line A described in step 1 and make linear uniform motion, by the spray gun from boundary line A The left side be moved to the right of boundary line A;
Step 3:Spray gun is set to raise suitable distance relative to ground along vertical direction;
Step 4:So that the spray gun is parallel to boundary line A described in step 1 and make linear uniform motion, by the spray gun from boundary line A The right be moved to the left side of boundary line A;
Step 5:Step 2 is repeated to step 4, the spray gun is made to be moved to the left side or the right neighbouring with boundary line B.
7. wall spray coating constructing technique as claimed in claim 6, it is characterised in that:The left side of the boundary line A refers to:The wall Body side is with the building interior space built using the wall apart from close one side.
8. wall spray coating constructing technique as described in claim 1, it is characterised in that:The process of slurry is prepared described in step 3 In, wherein the volume for putting into water into the mixing chamber for the first time is 300mL to 350mL.
9. wall spray coating constructing technique as described in claim 1, it is characterised in that:The process of basal plane is sprayed described in step 4 In, it is rinsed using clear water before being sprayed again to basal plane if there is job interruption of the duration more than 15min Conveying pipeline.
10. wall spray coating constructing technique as described in claim 1, it is characterised in that:The wall spray coating constructing technique also wraps It includes:After step 8, mixing chamber and conveying pipeline are cleaned using clear water, remove the slurry adhered on its inner wall.
CN201810547914.8A 2018-05-31 2018-05-31 A kind of wall spray coating constructing technique Pending CN108625593A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810547914.8A CN108625593A (en) 2018-05-31 2018-05-31 A kind of wall spray coating constructing technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810547914.8A CN108625593A (en) 2018-05-31 2018-05-31 A kind of wall spray coating constructing technique

Publications (1)

Publication Number Publication Date
CN108625593A true CN108625593A (en) 2018-10-09

Family

ID=63690852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810547914.8A Pending CN108625593A (en) 2018-05-31 2018-05-31 A kind of wall spray coating constructing technique

Country Status (1)

Country Link
CN (1) CN108625593A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111747720A (en) * 2020-07-27 2020-10-09 贵州中建建筑科研设计院有限公司 Phosphogypsum-based mixed mortar wall spraying process
CN111827523A (en) * 2020-07-27 2020-10-27 贵州中建建筑科研设计院有限公司 Phosphogypsum-based refractory partition wall construction process
CN111851798A (en) * 2020-07-27 2020-10-30 贵州中建建筑科研设计院有限公司 Construction method of assembled mortise and tenon structure fire-resistant partition wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223562A (en) * 2016-08-30 2016-12-14 唐健发 A kind of coating application method of body of wall
CN106988510A (en) * 2017-04-20 2017-07-28 中亿丰建设集团股份有限公司 A kind of method that use mortar spraying carries out white washed wall construction
CN107035085A (en) * 2017-05-22 2017-08-11 中城建设有限责任公司 A kind of indoor wall machine spray gypsum mortar is plastered one-time formed construction method
CN107780559A (en) * 2017-09-06 2018-03-09 贵州益新装配式新型建材有限公司 A kind of construction method of heat-insulation and heat-preservation gypsum partition wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223562A (en) * 2016-08-30 2016-12-14 唐健发 A kind of coating application method of body of wall
CN106988510A (en) * 2017-04-20 2017-07-28 中亿丰建设集团股份有限公司 A kind of method that use mortar spraying carries out white washed wall construction
CN107035085A (en) * 2017-05-22 2017-08-11 中城建设有限责任公司 A kind of indoor wall machine spray gypsum mortar is plastered one-time formed construction method
CN107780559A (en) * 2017-09-06 2018-03-09 贵州益新装配式新型建材有限公司 A kind of construction method of heat-insulation and heat-preservation gypsum partition wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111747720A (en) * 2020-07-27 2020-10-09 贵州中建建筑科研设计院有限公司 Phosphogypsum-based mixed mortar wall spraying process
CN111827523A (en) * 2020-07-27 2020-10-27 贵州中建建筑科研设计院有限公司 Phosphogypsum-based refractory partition wall construction process
CN111851798A (en) * 2020-07-27 2020-10-30 贵州中建建筑科研设计院有限公司 Construction method of assembled mortise and tenon structure fire-resistant partition wall

Similar Documents

Publication Publication Date Title
CN108625593A (en) A kind of wall spray coating constructing technique
CN107035085A (en) A kind of indoor wall machine spray gypsum mortar is plastered one-time formed construction method
CN107755163A (en) A kind of efficient steel plate paint-spraying device
CN106513209B (en) A kind of insulator on-line spray device and robot
CN204703468U (en) Automatic swabbing device
CN209227996U (en) A kind of construction wall plastering device
CN105525726A (en) Aerated brick wall plastering construction method
CN109853760A (en) The ultra-thin heat-insulation vacuum board exterior wall outer thermal insulation thin limed construction method of STP
CN204737890U (en) Automatic machine of glazing porcelain of pottery bathroom
CN204982373U (en) Dresser with spraying device and remove thick liquid device
CN203834943U (en) Mobile building wall and floorslab water atomizing and spraying device
CN207563193U (en) Environment-friendly type coats reflective heat-insulation paint wallboard continuous process system automatically
CN214183787U (en) Mechanical spraying device for interface agent
CN206346445U (en) A kind of ceramic brick used in bathroom with diversion function
CN108005321A (en) A kind of method that exterior wall bulk finish coat adds stone-like coating layer
CN206174427U (en) High altitude vertical wall surface whitewashing machine ware people
CN208215066U (en) A kind of color steel plate processing polishing cleaning device
CN210976491U (en) Building engineering spraying device
CN209631480U (en) A kind of electrostatic dusting room turnover panel clears up system
CN204690965U (en) A kind of flooring of steel building and the connected node of body of wall
CN112302308A (en) Spraying and trowelling device used in wall surface anhydrous type paste coating and plastering
CN207988543U (en) A kind of construction wall decorated glass curtain wall automatic cleaning machine
CN208122223U (en) A kind of construction wall automatic plastering device
CN106351342A (en) Exterior wall waterproof construction tool and construction method adopting same
CN207144414U (en) A kind of mechanical float for building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181009

RJ01 Rejection of invention patent application after publication