CN108625587A - A kind of scaffold self-locking card section for building - Google Patents

A kind of scaffold self-locking card section for building Download PDF

Info

Publication number
CN108625587A
CN108625587A CN201810561370.0A CN201810561370A CN108625587A CN 108625587 A CN108625587 A CN 108625587A CN 201810561370 A CN201810561370 A CN 201810561370A CN 108625587 A CN108625587 A CN 108625587A
Authority
CN
China
Prior art keywords
rack
cross bar
button
gauge
engaging lug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810561370.0A
Other languages
Chinese (zh)
Other versions
CN108625587B (en
Inventor
王小艳
陈建辉
印宝权
杨也容
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou City Construction College
Original Assignee
Guangzhou City Construction College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou City Construction College filed Critical Guangzhou City Construction College
Priority to CN201810561370.0A priority Critical patent/CN108625587B/en
Publication of CN108625587A publication Critical patent/CN108625587A/en
Application granted granted Critical
Publication of CN108625587B publication Critical patent/CN108625587B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/06Stiff scaffolding clamps for connecting scaffold members of common shape
    • E04G7/12Clamps or clips for crossing members

Abstract

The invention discloses a kind of scaffold self-locking card sections for building, it includes upright bar chuck, upright bar clip is provided in the interstitial hole of upright bar chuck, it is respectively arranged with cross bar folder in the outer surface of four side of upright bar chuck, cross bar folder includes surge bunker and cross bar clip, cross bar clip is locked by self-locking structure, the first rack and the second rack of gear-linked are provided in surge bunker, first rack is pierced by cross bar clip, second rack is pierced by the side positioned at the hinged end of cross bar clip, ejector sleeve is housed in that end cap of the second rack being pierced by, ejector sleeve is for pushing cross bar clip auto lock, the present invention is easy to use.

Description

A kind of scaffold self-locking card section for building
Technical field
The present invention relates to construction engineering technical fields, more particularly to a kind of scaffold self-locking card section for building.
Background technology
In construction industry, construction with scaffold is assembled by assembly for scaffold.Existing assembly for scaffold usually wraps Cross bar, upright bar and connection card section are included, is fixedly connected with cross bar with upright bar using connection card section, to be overlapped to form construction scaffolding, But existing connection card section is attached to cross bar and upright bar by bolt, causes the work for building scaffold very numerous Trivial and operation difficulty is big.
Invention content
The technical problems to be solved by the invention are just to provide a kind of scaffold self-locking card for building easy to use Section.
Above-mentioned technical problem is solved, the technical solution adopted by the present invention is as follows:
A kind of scaffold self-locking card section for building, it is characterised in that:Including upright bar chuck, upright bar chuck is equipped with vertical Interstitial hole is provided with the upright bar clip of the upright bar for fastening scaffold, the outer surface in four side of upright bar chuck in interstitial hole It is respectively arranged with cross bar folder, cross bar folder includes surge bunker, and surge bunker correspondence is fixed on the outer surface of upright bar chuck, surge bunker Wherein it is provided with the cross bar clip of one end of the cross bar for fastening scaffold on the outer surface of one side wall, cross bar clip includes the One button and the second button, the first button correspondence are fixed on the outer surface of surge bunker, one end of the second button and the first button One end it is hinged, the other end of the second button is connect with the other end of the first button by self-locking structure, surge bunker with fixation The inside for another side wall for having the side wall of cross bar clip opposite is equipped with the first rack tube and the second rack tube, lives in the first rack tube It is dynamic inserted with the first rack, in the first rack tube also compression be provided with ejector spring, ejector spring for the first rack provide to Outer thrust, the side wall for being fixed with cross bar clip that surge bunker is sequentially passed through from that end that the first rack tube stretches out of the first rack With the first button, and it is prominent be located in cross bar clip, in the second rack tube activity inserted with the second rack, the second rack from the That end that two rack tubes stretch out passes through the side wall for being fixed with cross bar clip of surge bunker, and positioned at the side of the hinged end of cross bar clip Face is adjusted at that end of the second rack being pierced by and is set with ejector sleeve, passes through rotation axis between the first rack and the second rack Gear is installed, gear is engaged with the first rack and the second rack respectively.
Further, self-locking structure includes extension bar, upper snap-gauge and lower snap-gauge, the first button and the second button pass through from That end of lock construction connection is respectively equipped with the first engaging lug and the second engaging lug, and perforation is provided on the first engaging lug, extension bar One end is fixed on the second engaging lug, and the other end is corresponded to across perforation, one end of upper snap-gauge and lower snap-gauge be articulated with extension bar from The other end of that end being pierced by, upper snap-gauge and lower snap-gauge is tilted towards the first engaging lug, is compressed between upper snap-gauge and extension bar It is provided with the first jack-up spring, lower compression between snap-gauge and extension bar is provided with the second jack-up spring, and extension bar is pierced by from perforation That end be additionally provided with the fixed upper and lower limit block for being tilted towards the first engaging lug, upper and lower limit block is corresponding respectively to be located at upper card The outside of plate and lower snap-gauge.
Further, that end for being set with ejector sleeve of the second rack offers at least two along the length side of the second rack To the first threaded hole of arrangement, ejector sleeve activity is placed on the end of the second rack, and corresponding threaded hole offers the second threaded hole, It is screwed with clamping screw in the second threaded hole.
Further, one end of the first button is equipped with link block, and one end of the second button and link block are hinged, ejector sleeve pair The side of link block should be located at.
Further, that end that the protrusion of the first rack is located in cross bar clip is fixed with rubber protective layer.
Further, the medial surface of the first rack tube and the second rack tube is equipped with lubricant layer.
Further, upright bar clip includes clip body, and two connecting pins of clip body are respectively arranged with third engaging lug and One end of four engaging lugs, third engaging lug and the 4th engaging lug extends respectively to the top of interstitial hole, and third engaging lug and That end outstanding of four engaging lugs is bolted by connection.
Further, upright bar chuck is vertically square pipe-shaped.
Compared with prior art, the invention has the advantages that:
It is the configuration of the present invention is simple, ingenious, it is easy to use.The in surge bunker can be pushed while cross bar is put into cross bar folder One rack drives the second rack to move out so that and ejector sleeve pushes the second button to rotate, self-locking structure auto lock, to Complete the self-locking to cross bar, it is seen then that the present invention can reduce the operation difficulty of operator, while improve working efficiency.
Description of the drawings
Fig. 1 is the front view of the present invention;
Fig. 2 is the vertical view of the present invention;
Fig. 3 is the sectional view of the cross bar folder of the present invention;
Fig. 4 is the enlarged diagram at A in Fig. 3.
Specific implementation mode
The present invention is further described with reference to embodiment.
A kind of scaffold self-locking card section for building as depicted in figs. 1 and 2, the self-locking card section 1 include upright bar chuck 101, upright bar chuck 101 is vertically square pipe-shaped, and middle part is interstitial hole 107, is distinguished in the outer surface of 101 4 side of upright bar chuck It is provided with cross bar folder 2, i.e., there are four cross bars to press from both sides 2 altogether, and the structure of four cross bar folders 2 is identical.
The upright bar clip of the upright bar for fastening scaffold is provided in interstitial hole 107, upright bar clip includes clip body 103, clip body 103 is fixedly connected by link block 102 with the left side hole wall of interstitial hole 107, two connecting pins point of clip body 103 It is not provided with third engaging lug 104 and the 4th engaging lug 106, one end of third engaging lug 104 and the 4th engaging lug 106 is prolonged respectively Extend to the top of interstitial hole 107, the prominent top for being located at upright bar chuck 101, and third engaging lug 104 and the 4th engaging lug 106 That end outstanding offer threaded hole respectively, and pass through and connect bolt 105 and connect.
As shown in figure 3, cross bar folder 2 includes surge bunker 201, the correspondence of surge bunker 201 is fixed on 101 respective side of upright bar chuck On outer surface, surge bunker 201 is tetragonal body shape, and inside is the cavity for installing parts.Outside the right side wall of surge bunker 201 The cross bar clip of one end of the cross bar for fastening scaffold is provided on surface.
Cross bar clip includes the first button 202 and the second button 204, and the first button 202 correspondence is fixed on surge bunker 201 On the outer surface of right side, the lower end of the first button 202 is equipped with fixed link block 203, and the lower end of the second button 24 is articulated with connection On block 203, the upper end of the second button is connect with the upper end of the first button by self-locking structure.
As shown in Figure 3 and Figure 4, the concrete structure of self-locking structure is:The self-locking structure includes extension bar 208, upper snap-gauge 2026 and lower snap-gauge 2010, the upper end of the first button 202 and the second button 204 is respectively equipped with the first engaging lug 206 and second company Lug 205 is provided with perforation 207 on first engaging lug 206, and one end of extension bar 208 is fixed on the second engaging lug 205, another End is corresponding across perforation 207, and the left end of upper snap-gauge 2026 and lower snap-gauge 2010 is articulated with the left end of extension bar 208, upper snap-gauge 2026 and the other end of lower snap-gauge 2010 be inclined to the first engaging lug 206, and peak on the left side of the first engaging lug 206, upper card Compression is provided with the first jack-up spring 2025 between plate 2026 and extension bar 208, is compressed between lower snap-gauge 2010 and extension bar 208 Be provided with the second jack-up spring 2011, the left end of extension bar 208 be additionally provided with it is fixed be tilted towards the first engaging lug 206 it is upper, Lower position block 209,210, upper and lower limit block 209,210 are corresponding positioned at the outside of upper snap-gauge 2026 and lower snap-gauge 2010 respectively.On The state when state for stating description is self-locking structure locking when needing to release self-locking, only need to press snap-gauge 2026 and lower snap-gauge 2010, allow extension bar 208 to be moved right across perforation 207, at this time cross bar card with upper snap-gauge 2026 and lower snap-gauge 2010 Hoop is in an open state.
As shown in figure 3, the inside of the left side wall of surge bunker 201 is equipped with lateral the first rack tube 2012 and the second rack tube 2016, the right side wall of the first rack tube 2012 and the second rack tube 2016 opposite direction surge bunker 201, the second rack tube 2016 is located at The lower section of first rack tube 2012.Activity is inserted with the first rack 2014 in first rack tube 2012, the first rack 2014 with Compression is provided with ejector spring 2013 between the bottom plate of first rack tube, and ejector spring 2013 is that the first rack 2014 provides to the right Thrust, the right end of the first rack 2014 sequentially passes through the right side wall and the first button of surge bunker 201, and prominent is located at cross bar card In hoop, the first rack 2014 can control activity.The right end of first rack 2014 is fixed with rubber protective layer 2023, can prevent first The right end of rack 2014 scratches cross bar.Activity is inserted with the second rack 2017 in second rack tube 2016, the second rack 2017 Right end passes through the right side wall of surge bunker 201, and below the cross bar clip, and the second rack 2017 can also control activity, the The right end of two racks 2017 is equipped with ejector sleeve 2019, and ejector sleeve 2019 is to transport below link block 203 in side-to-side movement Dynamic.It is equipped with lubricant layer 2022 in the medial surface of the first rack tube 2012 and the second rack tube 2016, which is It is applied on the medial surface of rack tube and is formed by lubricating oil.The mounting structure of ejector sleeve 2019 is:On the right side of the second rack 2017 The lower surface at end is opened up there are two the first transversely arranged threaded hole 2018, and 2019 activity of ejector sleeve is placed on the second rack 2017 Right end, and corresponding threaded hole 2018 offers the second threaded hole 2020, and clamping screw 2024 is screwed in the second threaded hole 2020, To which ejector sleeve 2019 to be adjusted to the right end for being set in the second rack 2017.
Gear 2015, gear 2015 are equipped with by rotation axis 2027 between the first rack 2014 and the second rack 2017 It is engaged respectively with the first rack 2014 and the second rack 2017.
Operation principle:First by upright bar hoop sleeve on the outside of scaffold upright rod, connection bolt 105 is tightened, it is vertical to complete Fixation of the bar clip to scaffold upright rod, at this moment, self-locking structure is unlocked, and cross bar clip is in an open state, the second button 204 Naturally it rotates down, the first rack 2014 projects under the effect of ejector spring 2013 in cross bar clip.Then cross bar is put into In cross bar clip, cross bar will press the first rack 2014, and the first rack 2014 compresses ejector spring 2013, along the first rack tube 2012 are moved to the left, and the first rack 2014 is rotated with moving gear 2015, and gear 2015 drives the second rack 2017 along the second tooth Item set 2016 moves right, and the second rack 2017 drives ejector sleeve 2019 to move right, and ejector sleeve 2019 jacks up the second button 204, so that the second button 204 is flipped up, last extension bar 208 passes through perforation 207 with upper snap-gauge 2026 and lower snap-gauge 2010, After passing through, the first jack-up spring 2025 and second jacks up spring 2011 and struts snap-gauge 2026 and lower snap-gauge 2010 again, makes snap-gauge Right end withstand on the left side of the first button 206, self-locking is completed, and completes the locking to cross bar.When needing dismounting, back-out first Clamping screw 2024 is moved to the left ejector sleeve 2019, then squeezes upper snap-gauge 2026 and lower snap-gauge 2010, makes 2026 He of snap-gauge Lower snap-gauge 2010 enters fixed hole 207, and cross bar clip can be opened by then overturning the second button 204, takes out cross bar, then pine It opens connection bolt 105 and takes out upright bar.
The above embodiment of the present invention is not limiting the scope of the present invention, and embodiments of the present invention are not limited to This, all this kind the above according to the present invention is not departing from this according to the ordinary technical knowledge and customary means of this field Under the premise of inventing above-mentioned basic fundamental thought, modification, replacement or change to other diversified forms that above structure of the present invention is made More, it should all fall within the scope and spirit of the invention.

Claims (8)

1. a kind of scaffold self-locking card section for building, it is characterised in that:Including upright bar chuck, the upright bar chuck is equipped with vertical Interstitial hole, the upright bar clip of the upright bar for fastening scaffold is provided in the interstitial hole, in the upright bar chuck four The outer surface of side is respectively arranged with cross bar folder, and the cross bar folder includes surge bunker, and the surge bunker correspondence is fixed on the upright bar On the outer surface of chuck, one of the cross bar for fastening scaffold is provided on the outer surface of the wherein one side wall of the surge bunker The cross bar clip at end, the cross bar clip include the first button and the second button, and the first button correspondence is fixed on the tune On the outer surface for saving storehouse, one end of one end of second button and first button is hinged, second button it is another End is connect with the other end of first button by self-locking structure, the surge bunker with the side that is fixed with the cross bar clip The inside of the opposite another side wall of wall is equipped with the first rack tube and the second rack tube, and activity is inserted with the in first rack tube One rack, also compression is provided with ejector spring in first rack tube, and the ejector spring provides for first rack Outside thrust, first rack sequentially pass through being fixed with for the surge bunker from that end that first rack tube stretches out The side wall of the cross bar clip and first button, and it is prominent in the cross bar clip, it is living in second rack tube It moves inserted with the second rack, the fixation for passing through the surge bunker from that end that second rack tube stretches out of second rack There is a side wall of the cross bar clip, and positioned at the side of the hinged end of the cross bar clip, in being pierced by for second rack That end is adjustable to be set with ejector sleeve, is equipped with gear by rotation axis between first rack and second rack, institute Gear is stated to engage with first rack and second rack respectively.
2. scaffold self-locking card section for building according to claim 1, it is characterised in that:The self-locking structure includes stretching Rod, upper snap-gauge and lower snap-gauge, first button and the second button are set respectively by that end that the self-locking structure connects There are the first engaging lug and the second engaging lug, be provided with perforation on first engaging lug, one end of the extension bar is fixed on described On second engaging lug, the other end is corresponded to across the perforation, and one end of the upper snap-gauge and lower snap-gauge is articulated with the extension bar From described that end being pierced by, the other end of the upper snap-gauge and lower snap-gauge is tilted towards first engaging lug, the upper card Compression is provided with the first jack-up spring between plate and the extension bar, compresses and is provided between the lower snap-gauge and the extension bar Second jacks up spring, and the extension bar is additionally provided with from described that end being pierced by and fixed is tilted towards first engaging lug Upper and lower limit block, the upper and lower limit block is corresponding positioned at the outside of the upper snap-gauge and lower snap-gauge respectively.
3. scaffold self-locking card section for building according to claim 1, it is characterised in that:The suit of second rack There is that end of the ejector sleeve to offer at least two the first threaded holes arranged along the length direction of second rack, it is described Ejector sleeve activity is placed on the end of second rack, and the corresponding threaded hole offers the second threaded hole, described second Clamping screw is screwed in threaded hole.
4. scaffold self-locking card section for building according to claim 1, it is characterised in that:One end of first button Equipped with link block, one end of second button is hinged with the link block, and the ejector sleeve is corresponded to positioned at the link block Side.
5. scaffold self-locking card section for building according to claim 1, it is characterised in that:The protrusion of first rack That end in the cross bar clip is fixed with rubber protective layer.
6. scaffold self-locking card section for building according to claim 1, it is characterised in that:First rack tube and The medial surface of two rack tubes is equipped with lubricant layer.
7. scaffold self-locking card section for building according to claim 1, it is characterised in that:The upright bar clip includes card Two connecting pins of hoop body, the clip body are respectively arranged with third engaging lug and the 4th engaging lug, the third engaging lug and One end of four engaging lugs extends respectively to the top of the interstitial hole, and the third engaging lug and the 4th engaging lug is outstanding That end is bolted by connection.
8. scaffold self-locking card section for building according to claim 1, it is characterised in that:The upright bar chuck is vertical It is square pipe-shaped.
CN201810561370.0A 2018-06-01 2018-06-01 Self-locking clamping joint of scaffold for building Active CN108625587B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810561370.0A CN108625587B (en) 2018-06-01 2018-06-01 Self-locking clamping joint of scaffold for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810561370.0A CN108625587B (en) 2018-06-01 2018-06-01 Self-locking clamping joint of scaffold for building

Publications (2)

Publication Number Publication Date
CN108625587A true CN108625587A (en) 2018-10-09
CN108625587B CN108625587B (en) 2020-07-17

Family

ID=63691188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810561370.0A Active CN108625587B (en) 2018-06-01 2018-06-01 Self-locking clamping joint of scaffold for building

Country Status (1)

Country Link
CN (1) CN108625587B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734120A (en) * 2020-08-03 2020-10-02 烟台虹月电子商务有限公司 Connecting piece for scaffold and using method thereof
CN112575684A (en) * 2020-12-05 2021-03-30 陈雪美 Pipe support fastening device with self-locking structure for bridge construction
CN113137041A (en) * 2021-05-26 2021-07-20 谢斯斯 High self-locking scaffold fixing device of security

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001032536A (en) * 1999-07-19 2001-02-06 Tadahiko Fujishiro Member coupling device for timbering
CN201314118Y (en) * 2008-12-25 2009-09-23 大连金广建设集团有限公司 Self-locking fixing and connecting piece used for building
CN201722918U (en) * 2009-11-05 2011-01-26 戴红妹 Connecting piece of scaffold
CN106499169A (en) * 2016-12-02 2017-03-15 枣庄度秘信息科技有限公司 A kind of hydraulic engineering means for fastening scaffolding
CN207032840U (en) * 2017-07-24 2018-02-23 常州市君成机械有限公司 A kind of scaf folding fittings pipe sleeve

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001032536A (en) * 1999-07-19 2001-02-06 Tadahiko Fujishiro Member coupling device for timbering
CN201314118Y (en) * 2008-12-25 2009-09-23 大连金广建设集团有限公司 Self-locking fixing and connecting piece used for building
CN201722918U (en) * 2009-11-05 2011-01-26 戴红妹 Connecting piece of scaffold
CN106499169A (en) * 2016-12-02 2017-03-15 枣庄度秘信息科技有限公司 A kind of hydraulic engineering means for fastening scaffolding
CN207032840U (en) * 2017-07-24 2018-02-23 常州市君成机械有限公司 A kind of scaf folding fittings pipe sleeve

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734120A (en) * 2020-08-03 2020-10-02 烟台虹月电子商务有限公司 Connecting piece for scaffold and using method thereof
CN112575684A (en) * 2020-12-05 2021-03-30 陈雪美 Pipe support fastening device with self-locking structure for bridge construction
CN113137041A (en) * 2021-05-26 2021-07-20 谢斯斯 High self-locking scaffold fixing device of security

Also Published As

Publication number Publication date
CN108625587B (en) 2020-07-17

Similar Documents

Publication Publication Date Title
CN108625587A (en) A kind of scaffold self-locking card section for building
CN110254465A (en) A kind of anti roll device of cargo train
CN207260546U (en) A kind of scaffold easy to use
CN206680132U (en) A kind of auto repair tilting crane
CN2799740Y (en) Assembling bis-adjustable multifunctional early-demolishment device
CN103624541B (en) A kind of railway vehicle tumbler formula axle box guidance joint assembling device
CN109183621A (en) The anti-tilter of gate-type and its method for installing prefabricated components
CN208103178U (en) It goes up a hill track supporting roller mechanism
CN206903396U (en) A kind of electronic lock being easily installed
CN108750505A (en) Refuse compaction equipment lockable mechanism and refuse compaction equipment
DE102007061357B3 (en) Landing leveler for ladders and scaffolding has traverse movable in longitudinal direction and with two turning feet fixed between spars
CN208828549U (en) Refuse compaction equipment lockable mechanism and refuse compaction equipment
CN208304242U (en) A kind of detachable welding fixture
CN106049224B (en) A kind of hydraulic spreader in large displacement expansion joint gap
CN206319843U (en) A kind of constitutionally stable pneumatic frame column type driller supporting mechanism
CN200939593Y (en) Flange extender
CN207326277U (en) A kind of open side type hydraulic device
CN208900966U (en) A kind of oil recovery machine base bracing means
CN203229110U (en) Novel container door multi-point locking mechanism of garbage compression container
CN212387015U (en) Coal container roll-over stand
CN214829103U (en) Support firm sewage treatment case for sewage treatment
CN211666985U (en) Anti-drop fixing device
CN208217725U (en) A kind of trolley safe locking device
CN211313338U (en) Mobile scaffold placing box
CN204232637U (en) Compact shelving, bookshelf

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant