CN108625281A - 一种先简支后连续桥梁湿接缝连接方法 - Google Patents

一种先简支后连续桥梁湿接缝连接方法 Download PDF

Info

Publication number
CN108625281A
CN108625281A CN201810326694.6A CN201810326694A CN108625281A CN 108625281 A CN108625281 A CN 108625281A CN 201810326694 A CN201810326694 A CN 201810326694A CN 108625281 A CN108625281 A CN 108625281A
Authority
CN
China
Prior art keywords
wet seam
structural system
system changing
exposed reinforcement
wet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810326694.6A
Other languages
English (en)
Inventor
水龙飞
江东赟
从海虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201810326694.6A priority Critical patent/CN108625281A/zh
Publication of CN108625281A publication Critical patent/CN108625281A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • E01D19/067Flat continuous joints cast in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

本发明公开了一种先简支后连续桥梁湿接缝连接方法,包括:将套筒左端的内螺纹连接所述螺纹钢筋右端的外螺纹,套筒右端的内螺纹连接湿接缝右侧预制简支梁裸露钢筋端部的外螺纹;将活接云头左端的内螺纹连接湿接缝左侧预制简支梁裸露钢筋端部的外螺纹,活接云头右端的内螺纹连接所述螺纹钢筋左端的外螺纹,转动活接云头的调整螺母,拉紧湿接缝左、右两侧预制简支梁裸露钢筋,使其受力;按照上述步骤将湿接缝左、右两侧的预制简支梁裸露钢筋的端部一一对应连接;本发明采用机械连接的方式连接湿接缝两侧的预制简支梁的裸露钢筋,增加了连接强度,且操作方便,提高了工作效率,降低了劳动强度。

Description

一种先简支后连续桥梁湿接缝连接方法
技术领域
本发明属于桥梁建筑领域,尤其涉及一种先简支后连续桥梁湿接缝连接方法。
背景技术
随着桥梁建筑技术的发展,预制架构的梁式桥越来越多的采用了先简支后连续结构,简支梁具有施工工艺简单,便于工厂化作业、质量好、工效高、预制安装方便等优点,而连续梁具有桥梁线性好、行车平稳,结构体系完整,梁体受力较好的优点,将这两种优点相结合就形成了先简支后连续结构体系。
梁跨体系转换后,梁的最大弯矩转移到两梁连接的现浇段即湿接缝处,同时现浇段的剪力比原设计简支梁梁端所受剪力还大,现浇段承受着弯矩及剪力,为连续梁的危险截面,因此湿接缝钢筋的连接质量至关重要。现有先简支后连续结构体系桥梁两跨简支梁间湿接缝钢筋的连接均是通过绑扎、搭接焊或帮条焊的方式,然而由于上述现有连接方式均为偏心连接,其接头强度并不高,特别的,当相邻两跨简支梁端伸出的钢筋连接长度不足,此时搭接焊的连接方式将无法采用。若采用帮条焊,在湿接缝钢筋密布的环境中,无法保证钢筋受力及最小间距要求,其焊接受施工条件及施工水平限制,影响现浇段湿接缝混凝土的成形效果及体系转换后连续梁的整体受力特性。
发明内容
为了解决上述存在的问题,本发明提出一种先简支后连续桥梁湿接缝连接方法,该方法采用机械连接的方式连接湿接缝两侧的预制简支梁的裸露钢筋,增加了连接强度,且操作方便,提高了工作效率,降低了劳动强度。
为了实现上述目的,本发明采用以下方法:
将湿接缝两侧的预制简支梁吊装就位在临时支座上,并在永久支座上安装湿接缝底模;
将预应力管道由湿接缝左侧的预制简支梁的底部穿入,跨越湿接缝后由湿接缝右侧的预制简支梁的底部穿出,所述预应力管道内集束放置若干预应力钢筋,所述预应力钢筋的端部伸出预制简支梁的底部;
对湿接缝左、右两侧预制简支梁若干裸露钢筋进行预处理;
测量湿接缝左侧预制简支梁裸露钢筋的端部与湿接缝右侧预制简支梁相对应裸露钢筋的端部之间的间距,取长度略小于所述间距其直径等同裸露钢筋直径的螺纹钢筋,并将所述螺纹钢筋两端滚丝;
将套筒左端的内螺纹连接所述螺纹钢筋右端的外螺纹,套筒右端的内螺纹连接湿接缝右侧预制简支梁裸露钢筋端部的外螺纹;
将活接云头左端的内螺纹连接湿接缝左侧预制简支梁裸露钢筋端部的外螺纹,活接云头右端的内螺纹连接所述螺纹钢筋左端的外螺纹,转动活接云头的调整螺母,拉紧湿接缝左、右两侧的预制简支梁裸露钢筋,使其受力;
按照上述第四、第五、第六步骤将湿接缝左、右两侧的预制简支梁裸露钢筋的端部一一对应连接;
安装湿接缝前、后两侧的侧模,用混凝土浇注湿接缝;
张拉预应力管道内的预应力钢筋,并将预应力钢筋的两端分别锚固在湿接缝左、右两侧的预制简支梁的底部;
待湿接缝混凝土的保养期结束,拆除临时支座。
所述对湿接缝左、右两侧预制简支梁裸露钢筋进行预处理,是将湿接缝左、右两侧预制简支梁裸露的钢筋拉直、除锈,并将其端部滚丝。
本发明采用机械连接的方式连接湿接缝两侧的预制简支梁的裸露钢筋,增加了连接强度,且操作方便,提高了工作效率,降低了劳动强度。
附图说明
图1是本发明实施例剖视主视示意图。
图2是图1的俯视示意图。
具体实施方式
下面结合附图对本发明作进一步的详细说明,以利于本领域技术人员能够更加清楚的理解,如图1、图2所示,本发明采用以下方法,包括:
将湿接缝1两侧的预制简支梁2吊装就位在临时支座3上,并在永久支座4上安装湿接缝底模5;
将预应力管道6由湿接缝1左侧的预制简支梁2的底部穿入,跨越湿接缝1后由湿接缝1右侧的预制简支梁2的底部穿出,所述预应力管道6内集束放置若干预应力钢筋,所述预应力钢筋的端部伸出预制简支梁2的底部;
对湿接缝1左、右两侧预制简支梁2若干裸露钢筋进行预处理;
测量湿接缝1左侧预制简支梁2裸露钢筋的端部与湿接缝1右侧预制简支梁2相对应裸露钢筋的端部之间的间距,取长度略小于所述间距其直径等同裸露钢筋直径的螺纹钢筋7,并将所述螺纹钢筋7两端滚丝;
将套筒8左端的内螺纹连接所述螺纹钢筋7右端的外螺纹,套筒8右端的内螺纹连接湿接缝1右侧预制简支梁2裸露钢筋端部的外螺纹;
将活接云头9左端的内螺纹连接湿接缝1左侧预制简支梁2裸露钢筋端部的外螺纹,活接云头9右端的内螺纹连接所述螺纹钢筋7左端的外螺纹,转动活接云头9的调整螺母,拉紧湿接缝1左、右两侧的预制简支梁2裸露钢筋,使其受力;
按照上述第四、第五、第六步骤将湿接缝1左、右两侧的预制简支梁2裸露钢筋的端部一一对应连接;
安装湿接缝1前、后两侧的侧模,用混凝土浇注湿接缝1;
张拉预应力管道6内的预应力钢筋,并将预应力钢筋的两端分别锚固在湿接缝1左、右两侧的预制简支梁2的底部;
待湿接缝1混凝土的保养期结束,拆除临时支座3。
所述对湿接缝1左、右两侧的预制简支梁2裸露钢筋进行预处理,是将湿接缝1左、右两侧的预制简支梁2裸露的钢筋拉直、除锈,并将其端部滚丝。
本发明采用机械连接的方式连接湿接缝两侧的预制简支梁的裸露钢筋,增加了连接强度,且操作方便,提高了工作效率,降低了劳动强度。

Claims (2)

1.一种先简支后连续桥梁湿接缝连接方法,其特征在于,所述方法包括以下步骤:
将湿接缝(1)两侧的预制简支梁(2)吊装就位在临时支座(3)上,并在永久支座(4)上安装湿接缝底模(5);
将预应力管道(6)由湿接缝(1)左侧的预制简支梁(2)的底部穿入,跨越湿接缝(1)后由湿接缝(1)右侧的预制简支梁(2)的底部穿出,所述预应力管道(6)内集束放置若干预应力钢筋,所述预应力钢筋的端部伸出预制简支梁(2)的底部;
对湿接缝(1)左、右两侧预制简支梁(2)若干裸露钢筋进行预处理;
测量湿接缝(1)左侧预制简支梁(2)裸露钢筋的端部与湿接缝(1)右侧预制简支梁(2)相对应裸露钢筋的端部之间的间距,取长度略小于所述间距其直径等同裸露钢筋直径的螺纹钢筋(7),并将所述螺纹钢筋(7)两端滚丝;
将套筒(8)左端的内螺纹连接所述螺纹钢筋(7)右端的外螺纹,套筒(8)右端的内螺纹连接湿接缝(1)右侧预制简支梁(2)裸露钢筋端部的外螺纹;
将活接云头(9)左端的内螺纹连接湿接缝(1)左侧预制简支梁(2)裸露钢筋端部的外螺纹,活接云头(9)右端的内螺纹连接所述螺纹钢筋(7)左端的外螺纹,转动活接云头(9)的调整螺母,拉紧湿接缝(1)左、右两侧的预制简支梁(2)裸露钢筋,使其受力;
按照上述第四、第五、第六步骤将湿接缝(1)左、右两侧的预制简支梁(2)裸露钢筋的端部一一对应连接;
安装湿接缝(1)前、后两侧的侧模,用混凝土浇注湿接缝(1);
张拉预应力管道(6)内的预应力钢筋,并将预应力钢筋的两端分别锚固在湿接缝(1)左、右两侧的预制简支梁(2)的底部;
待湿接缝(1)混凝土的保养期结束,拆除临时支座(3)。
2.根据权利要求1所述连接方法,其特征在于:所述对湿接缝(1)左、右两侧的预制简支梁(2)裸露钢筋进行预处理,是将湿接缝(1)左、右两侧的预制简支梁(2)裸露的钢筋拉直、除锈,并将其端部滚丝。
CN201810326694.6A 2018-04-12 2018-04-12 一种先简支后连续桥梁湿接缝连接方法 Pending CN108625281A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810326694.6A CN108625281A (zh) 2018-04-12 2018-04-12 一种先简支后连续桥梁湿接缝连接方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810326694.6A CN108625281A (zh) 2018-04-12 2018-04-12 一种先简支后连续桥梁湿接缝连接方法

Publications (1)

Publication Number Publication Date
CN108625281A true CN108625281A (zh) 2018-10-09

Family

ID=63705255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810326694.6A Pending CN108625281A (zh) 2018-04-12 2018-04-12 一种先简支后连续桥梁湿接缝连接方法

Country Status (1)

Country Link
CN (1) CN108625281A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440662A (zh) * 2018-12-04 2019-03-08 中铁大桥局集团有限公司 一种主塔锚固区钢筋恢复连接的方法
CN109736146A (zh) * 2019-02-26 2019-05-10 中铁第四勘察设计院集团有限公司 一种用于跨座式单轨轨道梁简支变连续的后浇带结构
CN110106788A (zh) * 2019-04-18 2019-08-09 中国建筑第八工程局有限公司 轨道梁对接处的后浇段施工方法
CN115679812A (zh) * 2022-11-03 2023-02-03 中铁大桥勘测设计院集团有限公司 一种主塔竖向钢筋分段式补强结构及其施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007239301A (ja) * 2006-03-08 2007-09-20 Ps Mitsubishi Construction Co Ltd 間詰めコンクリートを介在させたプレキャストコンクリート部材間一体化方法
CN102086630A (zh) * 2010-10-14 2011-06-08 东南大学 一种连续u形梁施工方法
CN102817325A (zh) * 2012-09-13 2012-12-12 永升建设集团有限公司 负弯矩束预应力预制箱梁先简支后连续转换体系施工方法
CN103938546A (zh) * 2013-01-23 2014-07-23 上海市城市建设设计研究总院 简支变连续施工方法及其结构
CN105863046A (zh) * 2016-05-05 2016-08-17 四川省第四建筑工程公司 一种预制装配式梁柱节点连接工艺

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007239301A (ja) * 2006-03-08 2007-09-20 Ps Mitsubishi Construction Co Ltd 間詰めコンクリートを介在させたプレキャストコンクリート部材間一体化方法
CN102086630A (zh) * 2010-10-14 2011-06-08 东南大学 一种连续u形梁施工方法
CN102817325A (zh) * 2012-09-13 2012-12-12 永升建设集团有限公司 负弯矩束预应力预制箱梁先简支后连续转换体系施工方法
CN103938546A (zh) * 2013-01-23 2014-07-23 上海市城市建设设计研究总院 简支变连续施工方法及其结构
CN105863046A (zh) * 2016-05-05 2016-08-17 四川省第四建筑工程公司 一种预制装配式梁柱节点连接工艺

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440662A (zh) * 2018-12-04 2019-03-08 中铁大桥局集团有限公司 一种主塔锚固区钢筋恢复连接的方法
CN109440662B (zh) * 2018-12-04 2021-04-20 中铁大桥局集团有限公司 一种主塔锚固区钢筋恢复连接的方法
CN109736146A (zh) * 2019-02-26 2019-05-10 中铁第四勘察设计院集团有限公司 一种用于跨座式单轨轨道梁简支变连续的后浇带结构
CN110106788A (zh) * 2019-04-18 2019-08-09 中国建筑第八工程局有限公司 轨道梁对接处的后浇段施工方法
CN115679812A (zh) * 2022-11-03 2023-02-03 中铁大桥勘测设计院集团有限公司 一种主塔竖向钢筋分段式补强结构及其施工方法

Similar Documents

Publication Publication Date Title
CN108625281A (zh) 一种先简支后连续桥梁湿接缝连接方法
CN203097017U (zh) 一种预制填充墙与预制柱或预制剪力墙的连接结构
CN105714673B (zh) 一种自复位frp‑钢‑混凝土组合结构墩柱及施工方法
CN104120647A (zh) 适合快速施工的节段拼装混凝土框架桥墩系统及施工方法
CN105369729A (zh) 一种体外预应力波形钢腹板t梁及施工方法
CN108104567A (zh) 混凝土塔筒纵缝连接结构、方法、片体的预制方法及混凝土塔筒
CN108560544A (zh) 一种套筒连接装配式桩基及其施工方法
CN107984610B (zh) 一种预应力小箱梁制作方法
CN204940102U (zh) 一种拱桥连接结构
CN105155868A (zh) 一种无粘结钢绞线预应力拔柱方法
CN110453778A (zh) 一种预制预应力梁柱节点抗扭构造及安装方法
CN110700082A (zh) 一种sma-ecc自复位圆钢管约束钢筋混凝土桥墩的柱脚节点
CN108729544A (zh) 干湿式复合连接拼装式构建物
CN115772848A (zh) 内置金属波纹管的单层配筋空心预制桥墩
CN203755302U (zh) 先张法预应力混凝土桩
CN217027756U (zh) 钢绞线定位装置及其现浇钢混结合段
CN108678164A (zh) 连接梁式拼装建筑结构
CN202644398U (zh) 预制桥面板精轧螺纹钢筋弧形连接构造
CN103850253B (zh) 先张法预应力混凝土桩、生产方法及桩与承台的连接方法
CN112502160A (zh) 一种后张法预制混凝土支撑构件、内支撑系统及施工方法
CN111962381A (zh) 双空竹形钢-混组合墩梁连接结构及其施工方法
CN207331424U (zh) 钢骨架预应力混凝土梁
CN105673354A (zh) 混凝土塔筒和钢塔筒之间的连接结构
CN202492837U (zh) 抗弯、抗剪增强型管桩
CN109016127A (zh) 一种桥梁拱箱预制生产及其横向连接方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181009