CN108624730A - Waste material cleaning system and method for cleaning in a kind of large blast furnace overhaul stove - Google Patents

Waste material cleaning system and method for cleaning in a kind of large blast furnace overhaul stove Download PDF

Info

Publication number
CN108624730A
CN108624730A CN201810853244.2A CN201810853244A CN108624730A CN 108624730 A CN108624730 A CN 108624730A CN 201810853244 A CN201810853244 A CN 201810853244A CN 108624730 A CN108624730 A CN 108624730A
Authority
CN
China
Prior art keywords
waste
blast furnace
furnace
belt conveyor
excavator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810853244.2A
Other languages
Chinese (zh)
Inventor
张守喜
王长波
王运国
王世友
邹德胜
周江
刘庆涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bengang Steel Plates Co Ltd
Original Assignee
Bengang Steel Plates Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bengang Steel Plates Co Ltd filed Critical Bengang Steel Plates Co Ltd
Priority to CN201810853244.2A priority Critical patent/CN108624730A/en
Publication of CN108624730A publication Critical patent/CN108624730A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

本发明属于炼铁中高炉领域,尤其涉及一种大型高炉大修炉内废料清理系统及清理方法,包括挖掘机、滚筒皮带机、流嘴、渣罐。本发明将两台挖掘机从炉顶检修孔吊运至炉内;一台挖掘机安装液压锤负责破碎废料,另一台安装斗铲负责装运废料;高炉风口平台设置一台滚筒皮带机,首端从高炉送风口伸向炉内;高炉出铁场平台设置一台滚筒皮带机,首端通过流嘴与高炉风口平台滚筒皮带机末端相连,末端通过流嘴与地面渣罐相连;炉内废料通过挖掘机、滚筒皮带机和流嘴,从高炉送风口经过风口平台、出铁场平台最终运到地面渣罐,实现了由机械施工代替人工作业,大大提高了工作效率,有效缩短高炉大修炉内废料清理施工时间,节约施工成本,使高炉能够提前生产。

The invention belongs to the field of blast furnaces in ironmaking, and in particular relates to a waste cleaning system and cleaning method in a large-scale blast furnace overhaul furnace, including an excavator, a roller belt conveyor, a nozzle, and a slag tank. In the present invention, two excavators are hoisted from the inspection hole on the top of the furnace to the furnace; one excavator is equipped with a hydraulic hammer to crush the waste, and the other is equipped with a bucket shovel to transport the waste; the tuyere platform of the blast furnace is equipped with a roller belt conveyor. The end extends from the air supply port of the blast furnace to the furnace; a drum belt conveyor is installed on the casting house platform of the blast furnace. Through excavators, roller belt conveyors and flow nozzles, the air supply port of the blast furnace is transported to the ground slag tank through the tuyere platform, the casthouse platform and finally to the ground slag tank, which realizes the replacement of manual work by mechanical construction, greatly improves work efficiency, and effectively shortens blast furnace overhaul The construction time for waste cleaning in the furnace is reduced, the construction cost is saved, and the blast furnace can be produced in advance.

Description

一种大型高炉大修炉内废料清理系统及清理方法A system and method for cleaning waste in a large-scale blast furnace overhaul furnace

技术领域technical field

本发明涉及炼铁中高炉技术领域,特别提供了一种大型高炉大修炉内废料清理系统及清理方法。The invention relates to the technical field of blast furnaces in ironmaking, and in particular provides a waste cleaning system and cleaning method in a large-scale blast furnace overhaul furnace.

背景技术Background technique

目前,公知的大型高炉大修时,炉内废料清理有两种方法,一种是,通过气焊把炉壳局部割开,拆除部分冷却壁及炉内耐火砖,然后,借助机械设备将炉内残铁凝块与废料一并清理出炉,最后把炉壳恢复原状,安装上冷却壁、砌筑上耐火砖。此种方法废料清理的速度较快,但是,炉壳破损变形不能恢复原状,冷却壁连接水管易产生变形开裂漏水,耐火砖新老接茬处易产生缝隙渗铁,甚至造成炉缸烧穿事故。At present, when the known large-scale blast furnace is overhauled, there are two methods for cleaning the waste in the furnace. One is to partially cut the furnace shell by gas welding, remove part of the stave and refractory bricks in the furnace, and then remove the residual waste in the furnace by means of mechanical equipment. The iron clot and the waste are cleaned out of the furnace together, and finally the furnace shell is restored to its original shape, and the stave is installed and refractory bricks are built. This method can clean up waste faster, but the furnace shell cannot be restored to its original shape due to damage and deformation, the water pipes connected to the cooling wall are prone to deformation, cracking and water leakage, and iron seepage is likely to occur in gaps where new and old refractory bricks are connected, and even cause hearth burn-through accidents.

另一种是,不破坏炉壳,依靠搭设脚手架、人工通过风镐、大锤、钢钎等原始方法进行人工清理,最后从送风口、铁口将渣铁往外倒运。由于炉内铁垢异常结实,加上有大量残铁,清理起来非常困难,不但劳动强度大,而且费时,如果遇到炉内残铁量大时,清理时间长达数十天甚至时间更长。The other is not to damage the furnace shell, relying on scaffolding, manual cleaning by primitive methods such as pneumatic picks, sledgehammers, and steel drills, and finally transporting the slag and iron out from the air supply port and the iron port. Due to the extremely strong iron scale in the furnace and a large amount of residual iron, it is very difficult to clean up, not only labor-intensive, but also time-consuming. If there is a large amount of residual iron in the furnace, the cleaning time will be as long as dozens of days or even longer .

发明内容Contents of the invention

为了解决上述技术问题,本发明提供了一种大型高炉大修炉内废料清理系统及清理方法,通过对整个高炉的炉体结构进行分析和论证,采用将挖掘机吊运至高炉炉膛内,由机械施工代替人工作业的办法快速清理炉内废料,并增设电动滚筒皮带机倒运,以解决现有技术中,炉壳破损变形不能恢复原状,人工清理劳动强度大,清理时间长等问题。In order to solve the above technical problems, the present invention provides a large-scale blast furnace overhaul furnace waste cleaning system and cleaning method, through the analysis and demonstration of the furnace body structure of the entire blast furnace, the excavator is used to hoist the excavator into the blast furnace hearth, and the mechanical Construction replaces manual work to quickly clean up the waste in the furnace, and an electric drum belt conveyor is added to reverse the transportation, so as to solve the problems in the prior art that the furnace shell is damaged and deformed and cannot be restored to its original shape, manual cleaning is labor-intensive, and cleaning time is long.

本发明是这样实现的,一种大型高炉大修炉内废料清理系统,包括滚筒皮带机A、流嘴A、滚筒皮带机B、流嘴B和渣罐,滚筒皮带机A设在风口平台上,一端伸入高炉送风口,另一端的下面与流嘴A顶部接触连接,滚筒皮带机B设在出铁厂平台上,流嘴A下端与滚筒皮带机B一端的上面接触连接,滚筒皮带机B的另一端下面接触连接流嘴B,流嘴B正下方对准渣罐。The present invention is achieved in this way, a waste cleaning system in a large-scale blast furnace overhaul furnace, including a drum belt conveyor A, a nozzle A, a roller belt conveyor B, a nozzle B and a slag tank, and the drum belt conveyor A is arranged on the tuyere platform, One end extends into the air supply port of the blast furnace, and the bottom of the other end is in contact with the top of the nozzle A. The roller belt conveyor B is set on the platform of the cast iron factory. The lower end of the nozzle A is in contact with the top of the roller belt conveyor B. The roller belt conveyor B The bottom of the other end is in contact with nozzle B, and the bottom of nozzle B is aimed at the slag tank.

进一步地,在高炉内,设有挖掘机A和挖掘机B,挖掘机A的工作端为液压锤,挖掘机B的工作端为铲斗。Further, in the blast furnace, an excavator A and an excavator B are provided, the working end of the excavator A is a hydraulic hammer, and the working end of the excavator B is a bucket.

进一步地,所述渣罐设有多个,每个渣罐均设置在小车上,小车顺次连接,由车头牵引。Further, there are multiple slag tanks, and each slag tank is set on a trolley, and the trolleys are connected in sequence and pulled by the front of the vehicle.

进一步地,所述滚筒皮带机A和滚筒皮带机B的宽度为1.2m。Further, the width of the roller belt conveyor A and the roller belt conveyor B is 1.2m.

提供一种利用上述大型高炉大修炉内废料清理系统清理炉内废料的方法,包括如下步骤:A method for cleaning waste in the furnace by using the above-mentioned large-scale blast furnace overhaul furnace waste cleaning system is provided, including the following steps:

1)将炉内废料放置在滚筒皮带机A上,滚筒皮带机将废料运输至流嘴A,废料顺着流嘴A运输到滚筒皮带机B上;1) Put the waste in the furnace on the roller belt conveyor A, and the roller belt conveyor transports the waste to the nozzle A, and the waste is transported to the roller belt conveyor B along the nozzle A;

2)滚筒皮带机B将废料继续运输,到末端后从流嘴B上滑下,落入渣罐中。2) The roller belt conveyor B continues to transport the waste, and when it reaches the end, it slides off the nozzle B and falls into the slag tank.

进一步地,所述高炉中设有挖掘机A和挖掘机B,挖掘机A的工作端为液压锤,挖掘机B的工作端为铲斗,挖掘机A负责破碎废料,挖掘机B负责将废料运至所述滚筒皮带机A上。Further, the blast furnace is equipped with an excavator A and an excavator B, the working end of the excavator A is a hydraulic hammer, the working end of the excavator B is a bucket, the excavator A is responsible for crushing waste, and the excavator B is responsible for crushing the waste Ship to the roller belt conveyor A.

进一步地,将挖掘机A和挖掘机B在高炉外将操作室和机体分开,依次从检修孔吊运至高炉内,在高炉内重新组装。Further, the excavator A and the excavator B are separated from the operating room and the machine body outside the blast furnace, lifted from the inspection hole to the blast furnace in turn, and reassembled in the blast furnace.

进一步地,所述渣罐设有多个,每个渣罐均设置在小车上,小车顺次连接,由车头牵引,当第一个渣罐装满废料后,车头牵引小车向前,将第二个渣罐牵引至所述流嘴B正下方,依次将各个渣罐装满至废渣清理完毕。Further, there are multiple slag tanks, and each slag tank is set on a trolley, and the trolleys are connected in sequence and pulled by the front of the car. When the first slag tank is filled with waste, the front of the car pulls the trolley forward to move the first slag tank. The two slag tanks are pulled to directly below the nozzle B, and each slag tank is filled in turn until the waste slag is cleaned up.

与现有技术相比,本发明的优点在于:Compared with the prior art, the present invention has the advantages of:

1、在不破坏炉壳的前提下施工,避免了由于炉壳破损变形不能恢复原状,保证冷却壁连接水管不产生变形开裂漏水,不需要重新砌筑耐火砖。1. Construction under the premise of not destroying the furnace shell, avoiding the failure to restore the original shape due to the damage and deformation of the furnace shell, ensuring that the water pipes connected to the cooling wall will not be deformed, cracked and leaked, and there is no need to re-build refractory bricks.

2、采用特殊方案将挖掘机吊入炉内,机械清料,皮带运料,极大提高了炉内清料进度,安全、环保,国内领先。2. A special plan is adopted to hoist the excavator into the furnace, mechanically clean the material, and transport the material by belt, which greatly improves the progress of cleaning the furnace. It is safe and environmentally friendly, leading the country.

3、由机械施工代替人工作业,大大提高了工作效率,有效缩短高炉大修炉内废料清理施工时间,节约施工成本,缩短施工总工期,使高炉能够提前生产。3. Mechanical construction replaces manual work, which greatly improves work efficiency, effectively shortens the construction time for waste cleaning in blast furnace overhaul, saves construction costs, shortens the total construction period, and enables blast furnaces to be produced in advance.

4、避免了人工通过风镐、大锤、钢钎等原始方法进行人工清理,交叉作业,增加了高炉炉内施工过程的安全系数。4. It avoids manual cleaning by original methods such as jacks, sledgehammers, and steel drills, and cross-operation, which increases the safety factor of the construction process in the blast furnace.

5、本发明技术创新,得到全面推广和应用,取得了良好效果,产生巨大经济效益和社会效益。5. The technical innovation of the present invention has been comprehensively promoted and applied, achieved good results, and produced huge economic and social benefits.

附图说明Description of drawings

下面结合附图及实施方式对本发明作进一步详细的说明:Below in conjunction with accompanying drawing and embodiment the present invention is described in further detail:

图1为发明结构示意图。Fig. 1 is a schematic diagram of the structure of the invention.

具体实施方式Detailed ways

为了使本发明的目的、技术方案及优点更加清楚明白,下面结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用于解释本发明,并不用于限定本发明。In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

参考图1,本发明提供一种大型高炉大修炉内废料清理系统,包括滚筒皮带机A1、流嘴A2、滚筒皮带机B3、流嘴B4和渣罐5,滚筒皮带机A1设在风口平台6上,一端伸入高炉送风口7,另一端的下面与流嘴A2顶部接触连接,滚筒皮带机B3设在出铁厂平台上,流嘴A2下端与滚筒皮带机B3一端的上面接触连接,滚筒皮带机B3的另一端下面接触连接流嘴B4,流嘴B4正下方对准渣罐5。Referring to Fig. 1, the present invention provides a waste cleaning system in a large-scale blast furnace overhaul furnace, including a drum belt conveyor A1, a nozzle A2, a drum belt conveyor B3, a nozzle B4 and a slag tank 5, and the drum belt conveyor A1 is located on the tuyere platform 6 One end extends into blast furnace air outlet 7, and the bottom of the other end contacts and connects with the top of the nozzle A2. The drum belt conveyor B3 is set on the platform of the cast iron plant, and the lower end of the nozzle A2 contacts and connects with the top of the drum belt conveyor B3. The bottom of the other end of the belt conveyor B3 is in contact with the spout B4, and the bottom of the spout B4 is aligned with the slag pot 5.

利用上述大型高炉大修炉内废料清理系统清理炉内废料的方法,包括如下步骤:The method for cleaning the waste in the furnace by using the above-mentioned large-scale blast furnace overhaul furnace waste cleaning system includes the following steps:

1)将炉内废料放置在滚筒皮带机A1上,滚筒皮带机A1将废料运输至流嘴A2,废料顺着流嘴A2运输到滚筒皮带机B3上;1) Put the waste in the furnace on the roller belt conveyor A1, and the roller belt conveyor A1 transports the waste to the nozzle A2, and the waste is transported to the roller belt conveyor B3 along the nozzle A2;

2)滚筒皮带机B3将废料继续运输,到末端后从流嘴B4上滑下,落入渣罐5中。2) The roller belt conveyor B3 continues to transport the waste, and slides down from the nozzle B4 after reaching the end, and falls into the slag tank 5.

为了方便将炉内废料放至滚筒皮带机A1上,作为技术方案的改进,在高炉内,设有挖掘机A8和挖掘机B9,挖掘机A8的工作端为液压锤,挖掘机B9的工作端为铲斗。挖掘机A8负责破碎废料,挖掘机B9负责将废料运至所述滚筒皮带机A1上。In order to conveniently put the waste in the furnace on the roller belt conveyor A1, as an improvement of the technical scheme, there are excavator A8 and excavator B9 in the blast furnace, the working end of the excavator A8 is a hydraulic hammer, and the working end of the excavator B9 for the bucket. The excavator A8 is responsible for crushing waste, and the excavator B9 is responsible for transporting the waste to the roller belt conveyor A1.

因为挖掘机体积较大,无法将其直接整体送入高炉中,因此,将挖掘机A8和挖掘机B9在高炉外将操作室和机体分开,依次从检修孔吊运至高炉内,在高炉内重新组装。Due to the large size of the excavator, it is impossible to directly send it into the blast furnace as a whole. Therefore, the excavator A8 and excavator B9 are separated from the operation room and the machine body outside the blast furnace, and are hoisted from the inspection hole to the blast furnace in sequence. reassemble.

为了实现装废料的连续性,作为技术方案的改进,所述渣罐5设有多个,每个渣罐5均设置在小车上,小车顺次连接,由车头牵引。当第一个渣罐5装满废料后,车头牵引小车向前,将第二个渣罐5牵引至所述流嘴B4正下方,依次将各个渣罐5装满至废渣清理完毕。In order to realize the continuity of loading waste, as an improvement of the technical solution, there are multiple slag tanks 5, and each slag tank 5 is arranged on a trolley, and the trolleys are connected in sequence and pulled by the front of the vehicle. After the first slag tank 5 is filled with waste materials, the headstock pulls the trolley forward, and the second slag tank 5 is drawn to directly below the nozzle B4, and each slag tank 5 is filled in turn until the waste residue is cleaned up.

优选,所述滚筒皮带机A1和滚筒皮带机B3的宽度为1.2m。Preferably, the width of the roller belt conveyor A1 and the roller belt conveyor B3 is 1.2m.

Claims (8)

1.一种大型高炉大修炉内废料清理系统,其特征在于,包括滚筒皮带机A、流嘴A、滚筒皮带机B、流嘴B和渣罐,滚筒皮带机A设在风口平台上,一端伸入高炉送风口,另一端的下面与流嘴A顶部接触连接,滚筒皮带机B设在出铁厂平台上,流嘴A下端与滚筒皮带机B一端的上面接触连接,滚筒皮带机B的另一端下面接触连接流嘴B,流嘴B正下方对准渣罐。1. A waste material cleaning system in a large-scale blast furnace overhaul furnace is characterized in that it comprises a drum belt conveyor A, a nozzle A, a drum belt conveyor B, a nozzle B and a slag pot, and the drum belt conveyor A is arranged on the tuyere platform, and one end It extends into the air supply port of the blast furnace, and the bottom of the other end is in contact with the top of the nozzle A. The roller belt conveyor B is set on the platform of the cast iron factory. The lower end of the nozzle A is in contact with the top of the roller belt conveyor B. The bottom of the other end is connected to nozzle B, and the bottom of nozzle B is aimed at the slag tank. 2.按照权利要求1所述的大型高炉大修炉内废料清理系统,其特征在于,在高炉内,设有挖掘机A和挖掘机B,挖掘机A的工作端为液压锤,挖掘机B的工作端为铲斗。2. according to the waste cleaning system in the large-scale blast furnace overhaul furnace described in claim 1, it is characterized in that, in the blast furnace, be provided with excavator A and excavator B, the working end of excavator A is a hydraulic hammer, and the working end of excavator B is The working end is a bucket. 3.按照权利要求1所述的大型高炉大修炉内废料清理系统,其特征在于,所述渣罐设有多个,每个渣罐均设置在小车上,小车顺次连接,由车头牵引。3. The waste cleaning system in the large-scale blast furnace overhaul according to claim 1, characterized in that there are multiple slag tanks, and each slag tank is set on a trolley, and the trolleys are connected in sequence and pulled by the front of the vehicle. 4.按照权利要求1所述的大型高炉大修炉内废料清理系统,其特征在于,所述滚筒皮带机A和滚筒皮带机B的宽度为1.2m。4. The large-scale blast furnace overhaul furnace waste cleaning system according to claim 1, characterized in that the width of the roller belt conveyor A and the roller belt conveyor B is 1.2m. 5.利用如权利要求1所述的大型高炉大修炉内废料清理系统清理炉内废料的方法,其特征在于,包括如下步骤:5. Utilize the method for cleaning waste in the furnace of the large-scale blast furnace overhaul furnace waste cleaning system as claimed in claim 1, it is characterized in that, comprising the steps: 1)将炉内废料放置在滚筒皮带机A上,滚筒皮带机将废料运输至流嘴A,废料顺着流嘴A运输到滚筒皮带机B上;1) Put the waste in the furnace on the roller belt conveyor A, and the roller belt conveyor transports the waste to the nozzle A, and the waste is transported to the roller belt conveyor B along the nozzle A; 2)滚筒皮带机B将废料继续运输,到末端后从流嘴B上滑下,落入渣罐中。2) The roller belt conveyor B continues to transport the waste, and when it reaches the end, it slides off the nozzle B and falls into the slag tank. 6.如权利要求5所述的方法,其特征在于,所述高炉中设有挖掘机A和挖掘机B,挖掘机A的工作端为液压锤,挖掘机B的工作端为铲斗,挖掘机A负责破碎废料,挖掘机B负责将废料运至所述滚筒皮带机A上。6. The method according to claim 5, wherein an excavator A and an excavator B are arranged in the blast furnace, the working end of the excavator A is a hydraulic hammer, the working end of the excavator B is a bucket, and the excavator Machine A is responsible for crushing waste materials, and excavator B is responsible for transporting waste materials to the roller belt conveyor A. 7.如权利要求6所述的方法,其特征在于,将挖掘机A和挖掘机B在高炉外将操作室和机体分开,依次从检修孔吊运至高炉内,在高炉内重新组装。7. The method according to claim 6, characterized in that the excavator A and the excavator B are separated from the operating room and the machine body outside the blast furnace, lifted from the inspection hole to the blast furnace in turn, and reassembled in the blast furnace. 8.如权利要求5所述的方法,其特征在于,所述渣罐设有多个,每个渣罐均设置在小车上,小车顺次连接,由车头牵引,当第一个渣罐装满废料后,车头牵引小车向前,将第二个渣罐牵引至所述流嘴B正下方,依次将各个渣罐装满至废渣清理完毕。8. The method according to claim 5, characterized in that there are multiple slag tanks, and each slag tank is arranged on a trolley, and the trolleys are connected in sequence and pulled by the front of the car, when the first slag tank is loaded After the waste is full, the front of the car pulls the trolley forward, pulls the second slag tank directly below the nozzle B, and fills each slag tank in turn until the waste is cleaned up.
CN201810853244.2A 2018-07-30 2018-07-30 Waste material cleaning system and method for cleaning in a kind of large blast furnace overhaul stove Pending CN108624730A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810853244.2A CN108624730A (en) 2018-07-30 2018-07-30 Waste material cleaning system and method for cleaning in a kind of large blast furnace overhaul stove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810853244.2A CN108624730A (en) 2018-07-30 2018-07-30 Waste material cleaning system and method for cleaning in a kind of large blast furnace overhaul stove

Publications (1)

Publication Number Publication Date
CN108624730A true CN108624730A (en) 2018-10-09

Family

ID=63689081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810853244.2A Pending CN108624730A (en) 2018-07-30 2018-07-30 Waste material cleaning system and method for cleaning in a kind of large blast furnace overhaul stove

Country Status (1)

Country Link
CN (1) CN108624730A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113755660A (en) * 2021-07-30 2021-12-07 上海宝冶冶金工程有限公司 Mechanized cleaning device for blast furnace burden

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03291311A (en) * 1990-04-09 1991-12-20 Nippon Steel Corp Method for removing residual iron in blast furnace
CN102618677A (en) * 2012-03-21 2012-08-01 马钢(集团)控股有限公司 Method for cleaning materials in large-scale blast furnace in overhaul
CN202849453U (en) * 2012-09-18 2013-04-03 南京钢铁股份有限公司 Device for raking out coke in blast furnace quickly
CN104726625A (en) * 2015-02-26 2015-06-24 河北二十冶建设有限公司 Method for quickly eliminating waste materials and remaining iron in a furnace during blast furnace overhaul
CN206901170U (en) * 2017-06-27 2018-01-19 包安雷 A kind of rubber conveyer that cupola well is taken off suitable for 2500m3 blast furnaces
CN208594308U (en) * 2018-07-30 2019-03-12 本钢板材股份有限公司 A large blast furnace overhaul furnace waste cleaning system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03291311A (en) * 1990-04-09 1991-12-20 Nippon Steel Corp Method for removing residual iron in blast furnace
CN102618677A (en) * 2012-03-21 2012-08-01 马钢(集团)控股有限公司 Method for cleaning materials in large-scale blast furnace in overhaul
CN202849453U (en) * 2012-09-18 2013-04-03 南京钢铁股份有限公司 Device for raking out coke in blast furnace quickly
CN104726625A (en) * 2015-02-26 2015-06-24 河北二十冶建设有限公司 Method for quickly eliminating waste materials and remaining iron in a furnace during blast furnace overhaul
CN206901170U (en) * 2017-06-27 2018-01-19 包安雷 A kind of rubber conveyer that cupola well is taken off suitable for 2500m3 blast furnaces
CN208594308U (en) * 2018-07-30 2019-03-12 本钢板材股份有限公司 A large blast furnace overhaul furnace waste cleaning system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113755660A (en) * 2021-07-30 2021-12-07 上海宝冶冶金工程有限公司 Mechanized cleaning device for blast furnace burden
CN113755660B (en) * 2021-07-30 2023-02-21 上海宝冶冶金工程有限公司 Mechanized cleaning device for blast furnace burden

Similar Documents

Publication Publication Date Title
CN104726625B (en) Waste material and the method for quickly eliminating of residual ferrum in stove in a kind of blast furnace overhaul
JP2011006983A (en) Repair method for cross-section of concrete structure
CN105177202B (en) A kind of blast furnace overhaul method
CN102618677B (en) Method for cleaning materials in large-scale blast furnace in overhaul
WO2023231183A1 (en) Environment-friendly hot-splashed slag treatment system and use method thereof
CN108624730A (en) Waste material cleaning system and method for cleaning in a kind of large blast furnace overhaul stove
CN101781693A (en) Tap hole integral pouring mud sleeve for blast furnace and manufacturing method thereof
CN108342533B (en) blast furnace residual iron safe discharging opening control method
CN209243086U (en) The device of the quick handling cleaning cupola well of overhaul 2500m3 blast furnace
CN114993055A (en) Refractory material dismantling method in external combustion type hot blast stove online modification process
CN208594308U (en) A large blast furnace overhaul furnace waste cleaning system
CN108300495A (en) A coke transport system and coke transport method for CDQ production
CN100489410C (en) Technique for inner lining construction for unopened hot-blast stove furnace jacket
CN115647344A (en) Maintenance method for ladle lining
CN108642221A (en) A kind of super-huge blast furnace overhaul quickly takes off furnace system and method
CN109913601B (en) The method of prolonging the first-generation furnace age of blast furnace
CN208121027U (en) Coke transferring system for dry quenching production
CN201455242U (en) Movable spout of iron ladle
CN105605924A (en) Repair method of fixed anode copper metallurgical furnace bottom bricks
CN211546589U (en) Slag runner flow nozzle device capable of being replaced quickly for blast furnace
CN223129342U (en) Torpedo tank masonry structure and torpedo tank
CN207159259U (en) A kind of Ou Ye stoves cupola well residue transports device
CN222374681U (en) A device for online repairing the bottom of the main groove of the blast furnace iron mouth
CN215413131U (en) Novel movable hearth device
CN115198045B (en) Furnace burden and residual iron discharging method after blast furnace shutdown

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181009

RJ01 Rejection of invention patent application after publication