CN108612094A - The method that immersed tube plants stake - Google Patents

The method that immersed tube plants stake Download PDF

Info

Publication number
CN108612094A
CN108612094A CN201810392395.2A CN201810392395A CN108612094A CN 108612094 A CN108612094 A CN 108612094A CN 201810392395 A CN201810392395 A CN 201810392395A CN 108612094 A CN108612094 A CN 108612094A
Authority
CN
China
Prior art keywords
casing
steel pipe
pile
immersed tube
loose material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810392395.2A
Other languages
Chinese (zh)
Inventor
毕建东
毕建宏
陈晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810392395.2A priority Critical patent/CN108612094A/en
Publication of CN108612094A publication Critical patent/CN108612094A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The present invention provides the methods that three kinds of immersed tube plant stake, it is first sinking sleeve, it replants into prefabricated pile or steel pipe, concrete can be also filled in steel pipe forms steel tube concrete pile, pile quality is good, no spoir, without mud, thoroughly solves the problems, such as the various aspects such as quality existing for existing driven cast-in-place pile, the effect of hard supporting course is given full play to, bearing capacity of pile tip is far above existing plant stake method.

Description

The method that immersed tube plants stake
Technical field
The present invention relates to the methods that immersed tube plants stake, belong to piling Technology field.
Background technology
Existing plant piling method is mostly drilling pile or is inserted into the methods of prefabricated pile in soil cement, and pile is substantially all category In Piles for Friction Piles, bearing capacity of pile tip is relatively low, can not play the effect of hard supporting course.
The bearing capacity of pile tip of existing driven cast-in-place pile is higher, but undergauge, folder mud, broken pile and other issues are more.
Invention content
To solve the above problems, the present invention provides the methods that following three kinds of immersed tube plant stake.
Method one:
1.1 sinking sleeves stop immersed tube after reaching pre-provisioning request;
1.2 hang in prefabricated pile or steel pipe in casing;
1.3 into casing encapsulating ramming material or loose material, cementitious matter or loose material filling prefabricated pile or steel pipe and casing gap;
1.4 it is quiet pull out or casing of extricating oneself from a predicament and brace oneself up to action, the gap of cementitious matter or loose material filling prefabricated pile or steel pipe and native hole;
1.5 casings go out ground, terminate.
Method two:
2.1 sinking sleeves stop immersed tube after reaching pre-provisioning request;
2.2 hang in the steel pipe suitable for reading for having temporary enclosed in casing;
2.3 into casing encapsulating ramming material or loose material, cementitious matter or loose material filling steel pipe and casing gap;
2.4 it is quiet pull out or casing of extricating oneself from a predicament and brace oneself up to action, the gap of cementitious matter or loose material filling steel pipe and native hole;
2.5 open temporary enclosed, and concrete is filled into steel pipe, terminate.
Method three:
3.1 sinking sleeves stop immersed tube after reaching pre-provisioning request;
3.2 hang in the steel pipe of opening suitable for reading in casing;
3.3 fill concrete into steel pipe;
3.4 into casing encapsulating ramming material or loose material, cementitious matter or loose material filling steel pipe and casing gap;
3.5 it is quiet pull out or casing of extricating oneself from a predicament and brace oneself up to action, the gap of cementitious matter or loose material filling steel pipe and native hole;
3.6 casings go out ground, terminate.
Hammering, vibration, static pressure, rotation or the interior modes sinking sleeve such as hit can be used.
Pile top can be set or not set as needed.
The existing method for improving set tubing pile end or stake side bearing capacity, the method for reducing soil compaction effect,
It can be combined with plant piling method provided by the invention.
Cementitious matter can use materials, the loose materials such as cement mortar or mortar that can use the materials such as sand.
To improve filling effect, anti-plug can be carried out according to actual conditions.
For implantation steel pipe, hook can be set in pile top as needed or hooked with other methods, push down steel pipe, to prevent pulling out Steel pipe is taken up when casing.
For method three, cementitious matter can be the same as the concrete in steel pipe.
Prefabricated pile or the implantation of steel pipe extensible are with long stake of constructing.
Cementitious matter can also be pumped by the Grouting Pipe got off with casing.
Can be as needed, seat slurry is first descended after immersed tube, then hang in prefabricated pile or steel pipe.
Advantageous effect
Stake in embodiment, pile top diameter 436mm, native hole theoretical diameter 430mm, stake diameter 325mm, ultimate bearing capacity of pile tip 6600kN is mysterious for existing plant stake method;For existing driven cast-in-place pile, diameter 730, C30 concrete or diameter 630mm, C40 concrete are possible to reach this effect.
For implantation steel pipe, cementitious matter also plays antisepsis.
Method provided by the invention is first sinking sleeve, is replanted into prefabricated pile or steel pipe, and concrete shape can be also filled in steel pipe At steel tube concrete pile, pile quality is good, no spoir, without mud, thoroughly solves quality etc. existing for existing driven cast-in-place pile Various aspects problem, has given full play to the effect of hard supporting course, and bearing capacity of pile tip is far above existing plant stake method.
Specific implementation mode
The top-down soil layer situation of Site Soil:The silty of the miscellaneous fill of about 1m thickness, the thick soft modeling-plastic states of about 5m is viscous Soil, about 2m thickness is slightly close, in close state fine sand, middle sand, the completely decomposed mud stone of about 1m thickness, the intense weathering munstone of about 3m thickness, below For middle weathered mudstone.
Designing pile length 15m, ultimate bearing capacity 6600kN, stake end, stake side ultimate bearing capacity are respectively 5500kN, 1100kN, Totally 300 pile.
Stake is planted using method two, vibration interior sinks pipe.
Casing is D426*20 seamless steel pipes, Q345 materials;Pile top is that inner cased type steel-concrete combines pile top, outer diameter D436;Steel pipe is D325*6 helix tubes, Q345 materials;Cementitious matter is M10 upper flow regime mortars;Concrete is C40 self-compactions, micro- swollen Swollen concrete.
Using the hollow vibration hammers of 90kW, interior hammer weight 60kN, maximum is fallen away from 3m.
Construction procedure is as follows:
1. putting pile top;
2. vibration sinking tube, immersed tube depth about 9m;
Hit pile top, vibration sinking tube follow-up in 3., last 10 when hitting pile penetration no more than 30mm, stops immersed tube, practical stake is long 15.3m;
4. hanging in the steel pipe suitable for reading for having temporary enclosed;
5. filling 1m into casing3Mortar;
6. after casing of extricating oneself from a predicament and brace oneself up to action goes out ground, removing the lower pile of ram machine construction;
7. in three batches, 100 pile of every batch of opens temporary enclosed, concrete is filled into steel pipe, terminate.

Claims (3)

1. immersed tube plants piling method one:
(1.1) sinking sleeve stops immersed tube after reaching pre-provisioning request;
(1.2) prefabricated pile or steel pipe are hung in casing;
(1.3) encapsulating ramming material or loose material into casing, between cementitious matter or loose material filling prefabricated pile or steel pipe and casing Gap;
(1.4) quiet to pull out or casing of extricating oneself from a predicament and brace oneself up to action, the gap of cementitious matter or loose material filling prefabricated pile or steel pipe and native hole;
(1.5) casing goes out ground, terminates.
2. immersed tube plants piling method two:
(2.1) sinking sleeve stops immersed tube after reaching pre-provisioning request;
(2.2) steel pipe suitable for reading for having temporary enclosed is hung in casing;
(2.3) gap of encapsulating ramming material or loose material into casing, cementitious matter or loose material filling steel pipe and casing;
(2.4) quiet to pull out or casing of extricating oneself from a predicament and brace oneself up to action, the gap of cementitious matter or loose material filling steel pipe and native hole;
(2.5) temporary enclosed is opened, concrete is filled into steel pipe, is terminated.
3. immersed tube plants piling method three:
(3.1) sinking sleeve stops immersed tube after reaching pre-provisioning request;
(3.2) steel pipe of opening suitable for reading is hung in casing;
(3.3) concrete is filled into steel pipe;
(3.4) gap of encapsulating ramming material or loose material into casing, cementitious matter or loose material filling steel pipe and casing;
(3.5) quiet to pull out or casing of extricating oneself from a predicament and brace oneself up to action, the gap of cementitious matter or loose material filling steel pipe and native hole;
(3.6) casing goes out ground, terminates.
CN201810392395.2A 2018-04-27 2018-04-27 The method that immersed tube plants stake Pending CN108612094A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810392395.2A CN108612094A (en) 2018-04-27 2018-04-27 The method that immersed tube plants stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810392395.2A CN108612094A (en) 2018-04-27 2018-04-27 The method that immersed tube plants stake

Publications (1)

Publication Number Publication Date
CN108612094A true CN108612094A (en) 2018-10-02

Family

ID=63661253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810392395.2A Pending CN108612094A (en) 2018-04-27 2018-04-27 The method that immersed tube plants stake

Country Status (1)

Country Link
CN (1) CN108612094A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004162370A (en) * 2002-11-13 2004-06-10 Takenaka Komuten Co Ltd Steel pipe structural permanent column erection method
JP2005126945A (en) * 2003-10-22 2005-05-19 Geotop Corp Static press-in construction method for steel pipe pile
CN101343871A (en) * 2008-08-22 2009-01-14 北京航空航天大学 Composite pile with high permanent stability protection layer and its production and construction method
CN106480877A (en) * 2015-08-28 2017-03-08 毕建东 The pile making method of pipe sinking pressure grouting composite pile
CN107687168A (en) * 2016-08-06 2018-02-13 毕建东 Inside hit and plant stake method and its application

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004162370A (en) * 2002-11-13 2004-06-10 Takenaka Komuten Co Ltd Steel pipe structural permanent column erection method
JP2005126945A (en) * 2003-10-22 2005-05-19 Geotop Corp Static press-in construction method for steel pipe pile
CN101343871A (en) * 2008-08-22 2009-01-14 北京航空航天大学 Composite pile with high permanent stability protection layer and its production and construction method
CN106480877A (en) * 2015-08-28 2017-03-08 毕建东 The pile making method of pipe sinking pressure grouting composite pile
CN107687168A (en) * 2016-08-06 2018-02-13 毕建东 Inside hit and plant stake method and its application

Similar Documents

Publication Publication Date Title
WO2018210019A1 (en) Pile formation method for down-the-hole impact rotary jet composite piles
CN105604001B (en) Drilling tool is stirred in the stake of stiff-core cement soil cylinder and the rotation of construction method and tubular
KR100762991B1 (en) Precast piling method injected with high-strength mortar
CN110924383A (en) Construction method of pressurized cast-in-place pile based on reinforced fibers and metakaolin
CN111058443B (en) Precast pile composite foundation construction method for eliminating loess collapsibility
CN105672307A (en) Expanded-base combination end pile bearing foundation
CN106907157B (en) A kind of shield machine normal pressure opens the cabin operation construction method
CN103510510A (en) Reinforced long spiral drilling concrete grouting pile and construction method thereof
CN108643214B (en) Backfill mixed soil composite foundation structure and construction method thereof
US20190309494A1 (en) Methods and apparatuses for compacting soil and granular materials
CN104153357A (en) Construction method of composite pile
WO2022021469A1 (en) Method for constructing pipeline sinking rammed and expanded cast-in-situ pile in sand or gravel layer
RU118649U1 (en) PILE
US11773555B2 (en) Methods and apparatuses for compacting soil and granular materials
CN107687168A (en) Inside hit and plant stake method and its application
CN1548661A (en) Method of supporting foundation pit in soft layer with brad
CN108612094A (en) The method that immersed tube plants stake
CN205501998U (en) Expand end combination end -bearing pile basis
CN109056747A (en) A kind of efficient mini steel-pipe pile constructing structure, method
CN104294817B (en) The construction method of concrete-pile
CN208472721U (en) A kind of anchor pole constructed in loose media stratum using hand air drill
JP4425073B2 (en) Cast-in-place concrete construction method
CN206495202U (en) A kind of top expansion type cement-soil composite pile
CN108643179A (en) A kind of anchor pole and construction method using the construction of hand air drill in loose media stratum
CN215211008U (en) Pile foundation construction device for treating waste air-raid shelter and pile foundation thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181002