CN108611983A - A kind of Bridge Erector of bridging method and band special piling machine - Google Patents

A kind of Bridge Erector of bridging method and band special piling machine Download PDF

Info

Publication number
CN108611983A
CN108611983A CN201810628465.XA CN201810628465A CN108611983A CN 108611983 A CN108611983 A CN 108611983A CN 201810628465 A CN201810628465 A CN 201810628465A CN 108611983 A CN108611983 A CN 108611983A
Authority
CN
China
Prior art keywords
bridge
erector
bridge erector
precast segment
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810628465.XA
Other languages
Chinese (zh)
Inventor
沙焕焕
邓亚光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810628465.XA priority Critical patent/CN108611983A/en
Publication of CN108611983A publication Critical patent/CN108611983A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds

Abstract

The invention discloses a kind of bridging method and the Bridge Erectors of band special piling machine, are constructed using the Bridge Erector with piling machine;The Bridge Erector with piling machine, including Bridge Erector, before and after the Bridge Erector front end in telescopic arms setting can longitudinal extension, extend to the longitudinal bracing frame on ground, fill the traveling pile driver that can be moved forward and backward on Bridge Erector;The bridge pier precast segment downward putting device that setting can transfer combined type bridge pier precast segment on Bridge Erector.The present invention is easy for construction, quick, substantially increases construction efficiency, saves construction cost.

Description

A kind of Bridge Erector of bridging method and band special piling machine
Technical field
The present invention relates to a kind of bridging method and Bridge Erectors.
Background technology
In the roads such as high ferro, construction of railways, it is often necessary to it is built bridge using Bridge Erector, and existing Bridge Erector is built bridge Method is first to carry out all Bridge Pier Constructions, after the completion of Bridge Pier Construction, Bridge Erector is recycled to carry out Summarized Account of Bridge Erection Construction;The construction of bridge pier is still So sufficiently complex, difficulty of construction is big, engineering progress is slow.
Invention content
The purpose of the present invention is to provide a kind of easy for construction, the bridging method that work efficiency is high and band special piling machine Bridge Erector.
Technical solution of the invention is:
A kind of bridging method, it is characterized in that:It is constructed using the Bridge Erector with piling machine;The Bridge Erector with piling machine, Including Bridge Erector, before and after the Bridge Erector front end in telescopic arms setting can longitudinal extension, extend to the longitudinal bracing frame on ground, frame The traveling pile driver that can be moved forward and backward is filled on bridge machine;The bridge pier that setting can transfer combined type bridge pier precast segment on Bridge Erector Precast segment downward putting device;
Construction includes the following steps:
(1)First with Bridge Erector in the place for needing that bridge pier is arranged, lower section longitudinal bracing frame;
(2)Bridge floor is shelved on front support point and longitudinal bracing frame;
(3)Traveling pile driver is moved to stake position, carries out piling construction, and will combine by bridge pier precast segment downward putting device Formula bridge pier precast segment transfers to pier location and carries out bridge pier assembling;Bridge pier after assembling substitutes longitudinal bracing frame to step(2) The bridge floor is supported, and as the front support point of next bridge floor;
Repeat step(1)~(3), completed until building bridge.
A kind of Bridge Erector of the bridging method with piling machine, including Bridge Erector, it is characterized in that:In Bridge Erector front end Front and back telescopic arms on setting can longitudinal extension, extend to the longitudinal bracing frame on ground, fill the shifting that can be moved forward and backward on Bridge Erector Dynamic formula piling machine;The bridge pier precast segment downward putting device that setting can transfer combined type bridge pier precast segment on Bridge Erector.
The present invention is easy for construction, quick, substantially increases construction efficiency, saves construction cost.
Description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the structural schematic diagram of the Bridge Erector of the invention with piling machine.
Specific implementation mode
A kind of bridging method is constructed using the Bridge Erector with piling machine;The Bridge Erector with piling machine, including frame Bridge machine, before and after the Bridge Erector front end in telescopic arms setting can longitudinal extension, extend to the longitudinal bracing frame on ground, on Bridge Erector Fill the traveling pile driver that can be moved forward and backward;Prefabricated group of the bridge pier that setting can transfer combined type bridge pier precast segment on Bridge Erector Part downward putting device;
Construction includes the following steps:
(1)First with Bridge Erector in the place for needing that bridge pier is arranged, lower section longitudinal bracing frame;
(2)Bridge floor is shelved on front support point and longitudinal bracing frame;
(3)Traveling pile driver is moved to stake position, carries out piling construction, and will combine by bridge pier precast segment downward putting device Formula bridge pier precast segment transfers to pier location and carries out bridge pier assembling;Bridge pier after assembling substitutes longitudinal bracing frame to step(2) The bridge floor is supported, and as the front support point of next bridge floor;
Repeat step(1)~(3), completed until building bridge.
A kind of Bridge Erector of the bridging method with piling machine, including Bridge Erector 1, can before and after Bridge Erector front end On telescopic arm 2 setting can longitudinal extension, extend to the longitudinal bracing frame 3 on ground, filling the movable type that can be moved forward and backward on Bridge Erector beats Stake machine 4;The bridge pier precast segment downward putting device 5 that setting can transfer combined type bridge pier precast segment on Bridge Erector.

Claims (2)

1. a kind of bridging method, it is characterized in that:It is constructed using the Bridge Erector with piling machine;The bridge formation with piling machine Machine, including Bridge Erector, before and after the Bridge Erector front end in telescopic arms setting can longitudinal extension, extend to the longitudinal bracing on ground Frame fills the traveling pile driver that can be moved forward and backward on Bridge Erector;Setting can transfer combined type bridge pier precast segment on Bridge Erector Bridge pier precast segment downward putting device;
Construction includes the following steps:
(1)First with Bridge Erector in the place for needing that bridge pier is arranged, longitudinal bracing frame is transferred;
(2)Bridge floor is shelved on front support point and longitudinal bracing frame;
(3)Traveling pile driver is moved to stake position, carries out piling construction, and will combine by bridge pier precast segment downward putting device Formula bridge pier precast segment transfers to pier location and carries out bridge pier assembling;Bridge pier after assembling substitutes longitudinal bracing frame to step(2) The bridge floor is supported, and as the front support point of next bridge floor;
Repeat step(1)~(3), completed until building bridge.
2. a kind of Bridge Erector of the bridging method described in claim 1 with piling machine, including Bridge Erector, it is characterized in that:In frame In the front and back telescopic arms of bridge machine front end setting can longitudinal extension, extend to the longitudinal bracing frame on ground, dress can be front and back on Bridge Erector Mobile traveling pile driver;The bridge pier precast segment that setting can transfer combined type bridge pier precast segment on Bridge Erector transfers dress It sets.
CN201810628465.XA 2018-06-19 2018-06-19 A kind of Bridge Erector of bridging method and band special piling machine Withdrawn CN108611983A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810628465.XA CN108611983A (en) 2018-06-19 2018-06-19 A kind of Bridge Erector of bridging method and band special piling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810628465.XA CN108611983A (en) 2018-06-19 2018-06-19 A kind of Bridge Erector of bridging method and band special piling machine

Publications (1)

Publication Number Publication Date
CN108611983A true CN108611983A (en) 2018-10-02

Family

ID=63665350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810628465.XA Withdrawn CN108611983A (en) 2018-06-19 2018-06-19 A kind of Bridge Erector of bridging method and band special piling machine

Country Status (1)

Country Link
CN (1) CN108611983A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110775892A (en) * 2019-10-31 2020-02-11 三一海洋重工有限公司 Fork truck arm strutting arrangement and fork truck
CN111254837A (en) * 2020-03-04 2020-06-09 成都天府轨谷科技有限公司 Construction method for building bridge by bridge crane fishing method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2418156Y (en) * 2000-04-28 2001-02-07 秦皇岛市北戴河机械厂 Double guiding-beam bridge-laying machine
CN2507903Y (en) * 2001-08-20 2002-08-28 郭文学 Fore-and-aft self-extension nose girder bridging machine
KR20130003161A (en) * 2011-06-30 2013-01-09 주식회사 리노이엔지 Reclamaion frame construntion apparatus of concrete slab and reclamaion frame construntion method using the same
US9739019B1 (en) * 2014-06-13 2017-08-22 Gomaco Corporation Bridge paving device
CN107740350A (en) * 2017-09-21 2018-02-27 郑州新大方重工科技有限公司 The bridge pier column construction method and its passing method of full precast bridge Bridge Erector
CN207062949U (en) * 2017-07-05 2018-03-02 河南省高远公路养护技术有限公司 A kind of traveling pile driver

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2418156Y (en) * 2000-04-28 2001-02-07 秦皇岛市北戴河机械厂 Double guiding-beam bridge-laying machine
CN2507903Y (en) * 2001-08-20 2002-08-28 郭文学 Fore-and-aft self-extension nose girder bridging machine
KR20130003161A (en) * 2011-06-30 2013-01-09 주식회사 리노이엔지 Reclamaion frame construntion apparatus of concrete slab and reclamaion frame construntion method using the same
US9739019B1 (en) * 2014-06-13 2017-08-22 Gomaco Corporation Bridge paving device
CN207062949U (en) * 2017-07-05 2018-03-02 河南省高远公路养护技术有限公司 A kind of traveling pile driver
CN107740350A (en) * 2017-09-21 2018-02-27 郑州新大方重工科技有限公司 The bridge pier column construction method and its passing method of full precast bridge Bridge Erector

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110775892A (en) * 2019-10-31 2020-02-11 三一海洋重工有限公司 Fork truck arm strutting arrangement and fork truck
CN111254837A (en) * 2020-03-04 2020-06-09 成都天府轨谷科技有限公司 Construction method for building bridge by bridge crane fishing method
CN111254837B (en) * 2020-03-04 2021-06-22 成都天府轨谷科技有限公司 Construction method for building bridge by bridge crane fishing method

Similar Documents

Publication Publication Date Title
CN106337686B (en) Three layers of subway station canopy structure of rocky stratum tunneling and construction method
CN101864963B (en) Large-section loess tunnel construction method
CN201695321U (en) Multifunctional propelled tunnel inverted arch trestle
CN109989757B (en) Construction method conversion construction method of ultra-large span tunnel from V-level to IV-level surrounding rock section
CN103590337B (en) A kind of bridge girder erection machine system and transfer method thereof
CN204729099U (en) Rock quality layer tunneling three layers of subway station canopy structure
CN106193286B (en) The production method of assembling frame beam based on 3D printing
CN108611983A (en) A kind of Bridge Erector of bridging method and band special piling machine
CN106930321A (en) Underground structure novel construction method is built in a kind of pipe-jacking with large diameter combination hole stake
CN204552761U (en) Wall all-hydraulic self-walking formwork jumbo in combined type song
CN104564101A (en) Single-tube double-layer tunnel simultaneous construction method
CN203891087U (en) Gravity-type retaining wall reinforcement structure
CN103835728B (en) Method for pouring concrete into mid-board arch crown of multi-arch tunnel
CN205152983U (en) Stratum pre -reinforcing of underground space construction handles structure
CN204386615U (en) A kind of self-propelled tunnel invert construction trolley
CN204436407U (en) The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs
CN107740423A (en) A kind of precast splice type city tunnel construction method
CN206346751U (en) A kind of tunnel duct piece quick-assembling equipment
CN106758827A (en) Chevron shaped prestressed concrete pre-tensioned method Bridge Erector and application method
CN203821248U (en) Steel pipe arch main arch assembling supporting system
CN203684102U (en) Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge
CN203412585U (en) Initial reaction frame in shield hole
CN112343614B (en) U-shaped shield tunneling machine-based overlapped-spliced comprehensive pipe gallery construction method
CN104100279A (en) Tunnel floor supporting frame penetrating cave and construction method thereof
CN103981810A (en) Steel tube arch main arch splicing and supporting system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20181002