CN108609495A - Safety monitoring device for construction hanging scaffold in State of Blast Furnace - Google Patents

Safety monitoring device for construction hanging scaffold in State of Blast Furnace Download PDF

Info

Publication number
CN108609495A
CN108609495A CN201810615742.3A CN201810615742A CN108609495A CN 108609495 A CN108609495 A CN 108609495A CN 201810615742 A CN201810615742 A CN 201810615742A CN 108609495 A CN108609495 A CN 108609495A
Authority
CN
China
Prior art keywords
trigger switch
hanging scaffold
load transfer
transfer device
blast furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810615742.3A
Other languages
Chinese (zh)
Inventor
熊民辉
王亚丁
曾伟
汪成国
王兴康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201810615742.3A priority Critical patent/CN108609495A/en
Publication of CN108609495A publication Critical patent/CN108609495A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/16Applications of indicating, registering, or weighing devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C15/00Safety gear
    • B66C15/06Arrangements or use of warning devices
    • B66C15/065Arrangements or use of warning devices electrical

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The present invention relates to blast furnace construction field, specifically a kind of safety monitoring device for construction hanging scaffold in State of Blast Furnace;It is characterized in that:Including acousto-optic hint device, conducting wire, trigger switch, holder, load transfer device and steel wire rope;Wherein, acousto-optic hint device by conducting wire by connect with trigger switch, holder is arranged in trigger switch, load transfer device is threaded through by steel wire rope on holder, the load transfer device bottom is connect with trigger switch, when load transfer device is under pressure or when pulling force, trigger switch is excited, to make acousto-optic hint device work and send out alarm.In hanging scaffold validity period, the present apparatus is connected on lifting rope, load generates pulling force to lifting rope on hanging scaffold, deforms trigger switch by lifting rope and is transferred to acousto-optic hint device;To make hanging scaffold in blast furnace that there is monitoring lifting rope, the variation of hanging scaffold internal force and load assignment warning function in real time, guarantee construction safety in use, promotion, decline.

Description

Safety monitoring device for construction hanging scaffold in State of Blast Furnace
Technical field
The present invention relates to blast furnace construction field, specifically a kind of safety monitoring device for construction hanging scaffold in State of Blast Furnace.
Background technology
In blast furnace building course, the construction of furnace shell, the resistance to material of cooling wall and furnace wall carries out in stove under restricted clearance, And with the promotion of construction height, the job platform that stand, stack for personnel material and the resistance to material of lifting are built in stove is needed. Job platform builds mode, generally there is following methods, the platform of support is formed using full hall scaffold, in construction height It is safer when less than 20m, and blast furnace is larger, when operation height is higher, full hall scaffold not only sets up dismounting construction week Phase is long, overall security is poor, and excessively takes up space, and is unfavorable for cooling wall, the lifting construction of resistance to material;Therefore, in comparison, exist Liftable steel hanging scaffold is used in stove, is a kind of relatively inexpensive, applicable solution.
But hanging scaffold declines and during use being promoted in stove, due to wanted above installation hanging scaffold standing at work personnel and The materials such as storing tools, blender, material are also wanted, the electric hoisting equipment below annular hanging scaffold needs lift heavy object(Carbon brick)Along hanging scaffold The operating features such as annular operating, hanging scaffold mobile load is more and is unevenly distributed, and hanging scaffold itself dead load is larger in addition, therefore there are lotuses for hanging scaffold The significant risk factors such as uneven, overload, uneven, the tired, fracture of lifting rope tension are carried, lifting rope fracture easily occurs, hanging scaffold deformation, collapses It the great pernicious safety accident such as collapses, therefore, is badly in need of a kind of to monitor the variation of lifting rope internal force, hanging scaffold point area load distribution situation in real time Early warning, warning device, real-time monitoring tubular reason is carried out to hanging scaffold, pernicious safety accident is avoided to occur.
Invention content
The object of the present invention is to provide a kind of safety monitoring devices for construction hanging scaffold in State of Blast Furnace.
In order to achieve the above object, the invention is realized in this way:
A kind of safety monitoring device for construction hanging scaffold in State of Blast Furnace, including acousto-optic hint device, conducting wire, trigger switch, branch Frame, load transfer device and lifting rope;Wherein, acousto-optic hint device by conducting wire by connect with trigger switch, holder setting is triggering On switch, load transfer device is threaded through by lifting rope on holder, and the load transfer device bottom is connect with trigger switch, when power transmission fills It sets and is under pressure or when pulling force, trigger switch is excited, to make acousto-optic hint device work and send out alarm.
The safety monitoring device for construction hanging scaffold in State of Blast Furnace, load transfer device refers to transmission rod, trigger switch It refer to pressure sensor.
The present apparatus is connected on lifting rope using above-mentioned design in hanging scaffold validity period by the present apparatus, and load is to hanging on hanging scaffold Rope generates pulling force, is deformed by lifting rope, is converted into tension and is transferred to load transfer device, pulling force signal is transferred to triggering by load transfer device Switch, trigger switch calculates lifting rope internal force, and is transferred to acousto-optic hint device.To make in blast furnace hanging scaffold use, promotion, under When drop, there is monitoring lifting rope, the variation of hanging scaffold internal force and load assignment warning function in real time, ensure construction safety.
Description of the drawings
Fig. 1 is present apparatus structural schematic diagram.
Fig. 2 is present apparatus arrangement schematic diagram.
Specific implementation mode
It is further illustrated the present invention below by way of specific embodiment.
As shown in Figure 1, a kind of safety monitoring device for construction hanging scaffold in State of Blast Furnace, including acousto-optic hint device 1, lead Line 2, trigger switch 3, holder 4, load transfer device 5 and lifting rope 6;Wherein, acousto-optic hint device 1 by conducting wire 2 by open with triggering 3 connections are closed, holder 4 is arranged in trigger switch 3, and load transfer device 5 is threaded through by lifting rope 6 on holder 4, the load transfer device 5 bottoms are connect with trigger switch 3, when load transfer device 5 is under pressure or when pulling force, trigger switch 3 is excited, to make acousto-optic carry Showing device 1 works and sends out alarm.
The safety monitoring device for construction hanging scaffold in State of Blast Furnace, load transfer device 5 refers to transmission rod, trigger switch 3 refer to pressure sensor.
The present apparatus is connected on lifting rope using above-mentioned design as shown in Fig. 2, in hanging scaffold validity period by the present apparatus, hanging scaffold Upper load generates pulling force to lifting rope, is deformed by lifting rope, is converted into tension and is transferred to load transfer device, and load transfer device is by pulling force signal It is transferred to trigger switch, trigger switch calculates lifting rope internal force, and is transferred to acousto-optic hint device.To make hanging scaffold in blast furnace make With, promoted, decline when, have in real time monitoring lifting rope, hanging scaffold internal force variation and load assignment warning function, ensure construction safety.

Claims (2)

1. a kind of safety monitoring device for construction hanging scaffold in State of Blast Furnace, it is characterized in that:Including acousto-optic hint device, conducting wire, Trigger switch, holder, load transfer device and steel wire rope;Wherein, acousto-optic hint device by conducting wire by connect with trigger switch, prop up Frame is arranged in trigger switch, and load transfer device is threaded through by steel wire rope on holder, and the load transfer device bottom is opened with triggering Connection connects, when load transfer device is under pressure or when pulling force, trigger switch is excited, to make acousto-optic hint device work and send out Alarm.
2. the safety monitoring device according to claim 1 for construction hanging scaffold in State of Blast Furnace, it is characterized in that:Load transfer device Refer to transmission rod, trigger switch refers to pressure sensor.
CN201810615742.3A 2018-06-15 2018-06-15 Safety monitoring device for construction hanging scaffold in State of Blast Furnace Pending CN108609495A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810615742.3A CN108609495A (en) 2018-06-15 2018-06-15 Safety monitoring device for construction hanging scaffold in State of Blast Furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810615742.3A CN108609495A (en) 2018-06-15 2018-06-15 Safety monitoring device for construction hanging scaffold in State of Blast Furnace

Publications (1)

Publication Number Publication Date
CN108609495A true CN108609495A (en) 2018-10-02

Family

ID=63665182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810615742.3A Pending CN108609495A (en) 2018-06-15 2018-06-15 Safety monitoring device for construction hanging scaffold in State of Blast Furnace

Country Status (1)

Country Link
CN (1) CN108609495A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114084823A (en) * 2021-10-20 2022-02-25 广东洋艺建设有限公司 Building is material hoisting device for municipal construction with warning function

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3976851A (en) * 1974-07-31 1976-08-24 Unelec Load limiter
CN87204118U (en) * 1987-04-07 1987-12-31 航空部南方动力机械公司 Overloading limiter for lifting equipments
DE202006016043U1 (en) * 2006-10-17 2008-02-28 M. A. T. Malmedie Antriebstechnik Gmbh Overload protection of a hoist
CN201250070Y (en) * 2008-05-21 2009-06-03 长治清华机械厂 Overload warning device of lorry-mounted crane
CN201473214U (en) * 2009-05-27 2010-05-19 敖贵华 Lifting weight limiter
CN106115528A (en) * 2016-06-28 2016-11-16 重庆川九建设有限责任公司 Sinking winch steel wire rope overload breaking rope protecting system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3976851A (en) * 1974-07-31 1976-08-24 Unelec Load limiter
CN87204118U (en) * 1987-04-07 1987-12-31 航空部南方动力机械公司 Overloading limiter for lifting equipments
DE202006016043U1 (en) * 2006-10-17 2008-02-28 M. A. T. Malmedie Antriebstechnik Gmbh Overload protection of a hoist
CN201250070Y (en) * 2008-05-21 2009-06-03 长治清华机械厂 Overload warning device of lorry-mounted crane
CN201473214U (en) * 2009-05-27 2010-05-19 敖贵华 Lifting weight limiter
CN106115528A (en) * 2016-06-28 2016-11-16 重庆川九建设有限责任公司 Sinking winch steel wire rope overload breaking rope protecting system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114084823A (en) * 2021-10-20 2022-02-25 广东洋艺建设有限公司 Building is material hoisting device for municipal construction with warning function

Similar Documents

Publication Publication Date Title
CN202785258U (en) Hoisting device for air overturn of large-sized steel column
CN108609495A (en) Safety monitoring device for construction hanging scaffold in State of Blast Furnace
CN107502690A (en) A kind of point of device and replacing options with integral replacing last furnace shell
CN101692405A (en) Method for assembling and overturning main transformer body of locomotive
CN102409120B (en) Method for replacing bottom of blast furnace
CN211444835U (en) Tower body tile holding mounting and dismounting device of tower crane
CN104627877B (en) A kind of high pressure porcelain wall bushing installation method and transporting device
CN211647241U (en) Attached lifting scaffold early warning control system
CN201215028Y (en) Special hanger for hoisting upper casing of turbine set
CN211501178U (en) Hydraulic overload protection device
CN205990752U (en) Attachment type raise scaffold
CN203639956U (en) Combined high-strain test hammer
CN102120538A (en) Falling protector and dynamic operation monitoring system for cage guide rope
CN103882850A (en) Hydraulic automatic rammer releasing and hanging device
CN217686627U (en) Residual anode charging system
CN206721254U (en) Refining furnace electrode anti-dropout clamping device
CN201704035U (en) Lifting device of large-sized gas holder top
CN215667013U (en) Auxiliary device for installing gantry crane
CN204643580U (en) Cement pole lifting chuck device
CN219039858U (en) Climbing formwork overload alarm system
CN204510770U (en) A kind of lift-type elevator hoistway construction platform being applicable to varying cross-section
CN205419583U (en) 1000kV cluster is mended condenser and is changed special lifting device
CN109665361A (en) Foil delayed automatic control system is put in a kind of production of etched foil
CN219823427U (en) Special lifting appliance
CN212503634U (en) Cast steel pipe handling anchor clamps

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181002