CN108599010A - A kind of double thread-moving devices - Google Patents

A kind of double thread-moving devices Download PDF

Info

Publication number
CN108599010A
CN108599010A CN201810673070.1A CN201810673070A CN108599010A CN 108599010 A CN108599010 A CN 108599010A CN 201810673070 A CN201810673070 A CN 201810673070A CN 108599010 A CN108599010 A CN 108599010A
Authority
CN
China
Prior art keywords
column
hinge seat
hinge
shift fork
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810673070.1A
Other languages
Chinese (zh)
Inventor
杨厚昌
刘旭
朱良凯
王江
杜华伟
余曦
李发敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gemac Engineering Machinery Co Ltd
Original Assignee
Gemac Engineering Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gemac Engineering Machinery Co Ltd filed Critical Gemac Engineering Machinery Co Ltd
Priority to CN201810673070.1A priority Critical patent/CN108599010A/en
Publication of CN108599010A publication Critical patent/CN108599010A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • H02G1/04Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching

Landscapes

  • Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)

Abstract

A kind of double thread-moving devices, it is characterized in that:Second column is inserted into the centre bore of the first column, first hinge seat, second hinge seat and third hinge seat are respectively welded on support base;With the first axis pin and the second axis pin by first incline pendulum hydraulic cylinder and second incline pendulum hydraulic cylinder upper and lower side hinge on first hinge seat, second hinge seat, the 4th hinge seat and the 5th hinge seat;The lower end hinge of the first column is mounted on third hinge seat with third axis pin;Second column is housed in the first column central tube, one end of shift fork arm is fixed on the upper top of the second column, and the other end of shift fork arm is mounted with guiding thread-moving device respectively;The upper end of lifting cylinder is mounted in the hoist cylinder seat in the first column outer circle, the piston rod upper end hinge of lifting cylinder is mounted on the hinge seat of the second column top with the 6th axis pin, forms a kind of double thread-moving devices.

Description

A kind of double thread-moving devices
Technical field
The present invention relates to a kind of thread-moving device of electric railway, specifically a kind of double thread-moving devices.
Background technology
What thread-moving device was mounted in a kind of making contact net constant tension stringing vehicle industry device.Contact net constant tension stringing Vehicle is mainly used for the electric railway contact wire and erection of carrier cable, update and recycling;And thread-moving device is then used for the anchor that rises and falls When or operation process in, the height and lateral shift value of conducting wire or carrier cable are adjusted, to improve the operating efficiency for the anchor that rises and falls.
With the development of railway, contact net constant tension stringing vehicle generally uses in construction, and common thread-moving device is in stringing In the process, can only once adjust contact wire or carrier cable one of which, and China Railway pressure is big, the duration, skylight point Time anomaly is nervous, and common thread-moving device has the disadvantages such as labor intensity is big, working efficiency is low, can not expire in the construction process The demand of the fast-developing electric railway of foot;To do this, it is necessary to design a kind of double thread-moving devices.
Invention content
The purpose of the present invention is to overcome the deficiencies of existing technologies, provide a kind of double thread-moving devices.Double thread-moving devices exist During stringing, the height and lateral shift value of conducting wire and carrier cable can be adjusted simultaneously, solve that labor intensity is big, work effect The low problem of rate.
The technical scheme is that:A kind of double thread-moving devices, including support base, incline pendulum hydraulic cylinder, the first column, the Two columns are oriented to shifting fork device, lifting cylinder and axis pin.
A kind of double thread-moving devices, by the second column(Metal tube)It is inserted into the first column(Metal tube)Centre bore Interior, first hinge seat, second hinge seat and third hinge seat are respectively welded on support base;It will with the first axis pin and the second axis pin First incline pendulum hydraulic cylinder and second incline pendulum hydraulic cylinder lower end hinge mounted in first hinge seat, on second hinge seat;With Three axis pins are by the first column(Metal tube)Lower end hinge on the third hinge seat;First is inclined with four axis pins and the 5th axis pin Pendulum hydraulic cylinder and second incline pendulum hydraulic cylinder fourth hinge seat of the piston rod upper end difference hinge in the middle part of the column and the On five hinge seats;In the first column(Metal tube)Second column is housed in central tube(Metal tube), one end installation of shift fork arm is admittedly It is scheduled on the second column(Metal tube)Upper top, the other end of shift fork arm is mounted with guiding shifting fork device respectively;
The upper end of lifting cylinder is mounted in the hoist cylinder seat in the first column outer circle, with the 6th axis pin by lifting cylinder Piston rod upper end hinge forms a kind of double thread-moving devices on the hinge seat of the second column top.
First longitudinal direction support arm and second longitudinal direction support arm top are respectively equipped with the first transverse arm and the second transverse arm;At shift fork bottom It is respectively equipped with the first axis hole and the second axis hole on seat, the first transverse arm and the second transverse arm are respectively equipped with third axis hole and the 4th axis hole, The both ends of first shift fork axle are attached separately in the first axis hole and third axis hole in the first shift fork set the first shift fork axle of suit, second group The both ends of fork shaft are attached separately in the second axis hole and the 4th axis hole, and the second shift fork set is sleeved in the second shift fork axle, and composition is oriented to Shifting fork device.
Described first incline pendulum hydraulic cylinder and second incline pendulum hydraulic cylinder driving after, the first column can be made around third hinge Seat swings.
The telescopic post, when electric railway contact wire and carrier cable apart from it is high when, can be in the second column (Metal tube)Third column is inserted in pore, and shift fork arm is mounted on to the upper end of third column;And it is vertical in the second column and third 4th hydraulic cylinder is installed, to meet the height and lateral shift value of adjustment electric railway contact wire and carrier cable on column.
The invention has the advantages that this double thread-moving device is mounted on contact net constant tension stringing vehicle, alternative original The thread-laying mechanism come, for the electric railway contact wire and erection of carrier cable, update and recycling.Double thread-moving devices are in stringing The height and lateral shift value that conducting wire or carrier cable can be adjusted simultaneously in the process, greatly improve work efficiency, alleviate worker Labor intensity.
Description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the working state schematic representation of the present invention.
Specific implementation mode
In the embodiment of Fig. 1, Fig. 2 that the present invention provides, by the second column(Metal tube)12 are inserted into the first column (Metal tube)In 6 centre bore;First hinge seat 2, second hinge seat 2' and third hinge seat 5 are respectively welded on support base 1; With the first axis pin 3 and the second axis pin 3' respectively by first incline pendulum hydraulic cylinder 7 and second incline pendulum hydraulic cylinder 7' lower end hinge On first hinge seat 2, second hinge seat 2';With third axis pin 4 by the first column(Metal tube)6 lower end hinge is mounted in the On three hinge seats 5;With four axis pins 8 and the 5th axis pin 8' by first incline pendulum hydraulic cylinder 7 and second incline pendulum hydraulic cylinder 7' work Hinge is distinguished on the 4th hinge seat 9 and the 5th hinge seat 9' at 6 middle part of column in stopper rod upper end;In the first column(Metal tube) Second column is housed in 6 central tubes(Metal tube)12, one end of shift fork arm 14 is fixed on the second column(Metal tube)12 Upper top, the other end of shift fork arm 14 is mounted with respectively is oriented to shifting fork device a.
The upper end of lifting cylinder 10 is mounted in the hoist cylinder seat 11 in 6 outer circle of the first column, it will with the 6th axis pin The piston rod upper end hinge of lifting cylinder 10 is on the 6th hinge seat 13 of 12 top upper end of the second column.
The guiding shifting fork device, by shift fork pedestal 15, first longitudinal direction support arm 16, the first shift fork axle 18, first groups 20 composition of fork set 17 and second longitudinal direction support arm 21, the second fork shaft 19 and the second shift fork set.
First longitudinal direction support arm 16 and 21 top of second longitudinal direction support arm are respectively equipped with the first transverse arm b and the second transverse arm c; Be respectively equipped with the first axis hole and the second axis hole on shift fork pedestal 15, the first transverse arm b and the second transverse arm c be respectively equipped with third axis hole and The both ends of 4th axis hole, the first shift fork axle 18 are attached separately in the first axis hole and third axis hole, 17 suit first of the first shift fork set In shift fork axle 18;The both ends of second shift fork axle 19 are attached separately in the second axis hole and the 4th axis hole, and the second shift fork set 20 is sleeved on In second shift fork axle 19, composition is oriented to shifting fork device a.
The column is telescopic structure, when electric railway contact wire and carrier cable apart from it is remote when, can be second Column(Metal tube)Third column is inserted in 12 pores, and shift fork arm 14 is mounted on to the upper end of third column;And in the second column 12 and third column on support base upper hinge the 4th hydraulic cylinder is installed, electric railway contact wire and held with meeting adjustment The height and lateral shift value of power rope.
In the embodiment shown in fig. 3, hinge in first hinge seat 2 and the 4th hinge seat 9 first incline pendulum hydraulic oil Cylinder 7, second on second hinge seat 2' and the 5th hinge seat 9' incline after pendulum hydraulic cylinder 7' driving, column can be made around third Hinge seat 5 swings.
Operation principle:The present invention is mounted on contact net constant tension stringing vehicle, in operation process, is oriented to shifting fork device a Contact wire and carrier cable are clamped, by starting lifting cylinder 10, the first pendulum hydraulic cylinder 7 and second that inclines inclines pendulum hydraulic cylinder 7' Work adjusts the height and lateral shift value of conducting wire and carrier cable, to improve the operating efficiency for the anchor that rises and falls.

Claims (2)

1. a kind of double thread-moving devices, including support base, the pendulum hydraulic cylinder that inclines, the first column, the second column, be oriented to shifting fork device, Lifting cylinder and axis pin;It is characterized in that:Second column is inserted into the centre bore of the first column, first hinge seat, the second hinge Chain seat and third hinge seat are respectively welded on support base;First is inclined pendulum hydraulic cylinder and the with the first axis pin and the second axis pin Two, which incline, puts the lower end hinges of hydraulic cylinder on first hinge seat, second hinge seat;It will be under the first column with third axis pin Hold hinge on third hinge seat;The first pendulum hydraulic cylinder and second that inclines is inclined pendulum hydraulic cylinder with four axis pins and the 5th axis pin Piston rod upper end difference hinge on the 4th hinge seat and the 5th hinge seat in the middle part of the column;In the first column central tube Equipped with the second column, one end of shift fork arm is fixed on the upper top of the second column, and the other end of shift fork arm is installed admittedly respectively Surely there is guiding thread-moving device;The upper end of lifting cylinder is mounted in the hoist cylinder seat in the first column outer circle, with the 6th pin The piston rod upper end hinge of lifting cylinder on the hinge seat of the second column top, is formed a kind of double thread-moving devices by axis.
2. a kind of double thread-moving devices according to claim 1, it is characterized in that:First longitudinal direction support arm and second longitudinal direction support Arm top is respectively equipped with the first transverse arm and the second transverse arm;It is respectively equipped with the first axis hole and the second axis hole on shift fork pedestal, first Transverse arm and the second transverse arm are respectively equipped with third axis hole and the 4th axis hole, and the both ends of the first shift fork axle are attached separately to the first axis hole and In Triaxial hole in the first shift fork set the first shift fork axle of suit, the both ends of the second shift fork axle are attached separately to the second axis hole and the 4th axis hole Interior, the second shift fork set is sleeved in the second shift fork axle, and composition is oriented to shifting fork device.
CN201810673070.1A 2018-06-26 2018-06-26 A kind of double thread-moving devices Pending CN108599010A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810673070.1A CN108599010A (en) 2018-06-26 2018-06-26 A kind of double thread-moving devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810673070.1A CN108599010A (en) 2018-06-26 2018-06-26 A kind of double thread-moving devices

Publications (1)

Publication Number Publication Date
CN108599010A true CN108599010A (en) 2018-09-28

Family

ID=63634585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810673070.1A Pending CN108599010A (en) 2018-06-26 2018-06-26 A kind of double thread-moving devices

Country Status (1)

Country Link
CN (1) CN108599010A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201784480U (en) * 2010-07-21 2011-04-06 中铁四局集团电气化工程有限公司 Wire raising and pulling device for construction of electrified railway contact networks
CN202806435U (en) * 2012-08-28 2013-03-20 宝鸡南车时代工程机械有限公司 Electrified railway overhead contact system mechanical arm operation device
CN204488535U (en) * 2015-02-28 2015-07-22 徐州徐工随车起重机有限公司 A kind of pedestal can the wire thread-moving device of left and right translation
CN208299335U (en) * 2018-06-26 2018-12-28 金鹰重型工程机械有限公司 A kind of double thread-moving devices

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201784480U (en) * 2010-07-21 2011-04-06 中铁四局集团电气化工程有限公司 Wire raising and pulling device for construction of electrified railway contact networks
CN202806435U (en) * 2012-08-28 2013-03-20 宝鸡南车时代工程机械有限公司 Electrified railway overhead contact system mechanical arm operation device
CN204488535U (en) * 2015-02-28 2015-07-22 徐州徐工随车起重机有限公司 A kind of pedestal can the wire thread-moving device of left and right translation
CN208299335U (en) * 2018-06-26 2018-12-28 金鹰重型工程机械有限公司 A kind of double thread-moving devices

Similar Documents

Publication Publication Date Title
CN105002908B (en) Comprehensive piling machine
CN102674136A (en) Lifting method for large-scale tower equipment
CN206345591U (en) A kind of building tower crane with safety hanging cradle
CN208299335U (en) A kind of double thread-moving devices
CN102303821A (en) Luffing tower crane with balanced type suspension arm based on traction luffing of steel rope
CN202296907U (en) Suspension arm balanced movable arm tower crane capable of luffing based on steel rope traction
CN108599010A (en) A kind of double thread-moving devices
CN105201426B (en) A kind of tube rod conveyer with high conveying stroke
CN206467579U (en) A kind of support meanss of bridge coping
CN105401532B (en) Device for replacing traction friction type anchoring hanger rod and method for replacing steel tube arch bridge hanger rod by using device
CN107893419A (en) A kind of clip pile device of municipal road construction vibratory piling machine
CN205382442U (en) Multilayer puts that traffic awl of cone is automatic to receive and release system with grabbing awl device in storehouse
CN202175488U (en) Lifter for building construction
CN207537885U (en) Anchoring mechanism for stay cable tension stage
CN208234444U (en) A kind of wind power tower drum single-unit cylinder transfer device
CN105089052A (en) Frame horizontal moving mechanism for comprehensive pile driver
CN201443310U (en) Lifting rope device for racking platform
CN201619942U (en) Special hoisting tool for hoisting super large block of steel box girder
CN107953048A (en) A kind of adjustable suspension hanging apparatus and its hanging method
CN211034970U (en) Down-the-hole drill jack-up hoist and mount auxiliary device
CN208586320U (en) A kind of tap holes of electric furnace rapid tool change
CN203889946U (en) Cantilever crane
CN209176717U (en) A kind of auxiliary fixing device of railway signal
CN206345616U (en) A kind of building tower crane of stable safety
CN205583516U (en) Over -and -under type cable support bracket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination