CN108597753A - 一种变压器整体转运时套管加固装置及方法 - Google Patents
一种变压器整体转运时套管加固装置及方法 Download PDFInfo
- Publication number
- CN108597753A CN108597753A CN201810528563.6A CN201810528563A CN108597753A CN 108597753 A CN108597753 A CN 108597753A CN 201810528563 A CN201810528563 A CN 201810528563A CN 108597753 A CN108597753 A CN 108597753A
- Authority
- CN
- China
- Prior art keywords
- fixing bracket
- transformer
- end fixing
- seat
- casing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 230000002787 reinforcement Effects 0.000 title claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 21
- 239000010959 steel Substances 0.000 claims abstract description 21
- 230000001133 acceleration Effects 0.000 claims abstract description 7
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 3
- 241001633942 Dais Species 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000002828 fuel tank Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01F—MAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
- H01F27/00—Details of transformers or inductances, in general
- H01F27/02—Casings
- H01F27/04—Leading of conductors or axles through casings, e.g. for tap-changing arrangements
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01F—MAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
- H01F27/00—Details of transformers or inductances, in general
- H01F27/002—Arrangements provided on the transformer facilitating its transport
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01F—MAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
- H01F27/00—Details of transformers or inductances, in general
- H01F27/40—Structural association with built-in electric component, e.g. fuse
- H01F27/402—Association of measuring or protective means
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Housings And Mounting Of Transformers (AREA)
Abstract
本发明涉及一种变压器整体转运时套管加固装置及方法,属于变压器制造设备技术领域。技术方案是:套管上端固定支架(1)安装在套管上端,套管下端固定支架(4)为两个,对称安装在升高座壁上端;钢丝绳锁具(2)上端通过卸扣(7)与套管上端固定支架(1)连接,下端通过花篮螺丝(3)与套管下端固定支架(4)连接;升高座固定支架(5)安装在升高座壁下端与变压器油箱之间;三维冲击记录仪(6)有三个,分别安装在变压器本体、套管升高座、套管上端部。本发明的有益效果是:增加了套管固定强度,有效防止套管在变压器整体转运过程中由于冲击加速度造成套管损坏,提高了安全性,方便操作。
Description
技术领域
本发明涉及一种变压器整体转运时套管加固装置及方法,属于变压器制造设备技术领域。
背景技术
变压器设备出现故障时,为了快速切换备用相和故障相变压器,需要变压器本体带套管整体转运。由于套管质量大,重心高,并且只有套管下部安装法兰一处固定位置。在变压器整体转运过程中,如果产生的冲击加速度过大,会导致套管局部受力过大从而造成套管损坏。
发明内容
本发明目的是提供一种变压器整体转运时套管加固装置及方法,在变压器升高座和套管的适当位置增加固定支架,有效地解决了背景技术中存在的上述问题。
本发明的技术方案是:一种变压器整体转运时套管加固装置,包含套管上端固定支架、钢丝绳锁具、花篮螺丝、套管下端固定支架、升高座固定支架、三维冲击记录仪和卸扣,所述套管上端固定支架安装在套管上端,套管下端固定支架为两个,对称安装在升高座壁上端;钢丝绳锁具上端通过卸扣与套管上端固定支架连接,下端通过花篮螺丝与套管下端固定支架连接;升高座固定支架安装在升高座壁下端与变压器油箱之间;三维冲击记录仪有三个,分别安装在变压器本体、套管升高座、套管上端部。
所述套管上端固定支架、套管下端固定支架、升高座固定支架均为可拆卸式结构,通过紧固件分别安装在相应位置的预留底板或安装孔上。
所述套管上端固定支架、套管下端固定支架以套管轴心为中心均匀布置。
所述套管上端固定支架上设有三维冲击记录仪的安装孔。
一种变压器整体转运时套管加固方法,采用上述加固装置,步骤如下:
在变压器套管上端安装套管上端固定支架,两个套管下端固定支架对称安装在升高座壁的上端,通过钢丝绳锁具将套管上端固定支架和套管下端固定支架连接,钢丝绳锁具上端通过卸扣与套管上端固定支架连接,钢丝绳锁具下端与套管下端固定支架通过花篮螺丝连接,并通过花篮螺丝调节钢丝绳锁具的拉紧力;通过升高座固定支架将升高座与变压器油箱连接在一起;分别在变压器本体、套管升高座、套管上端部各安装一件三维冲击记录仪,用于记录变压器整体转运过程中的加速度。
本发明的有益效果是:增加了套管固定强度,有效防止套管在变压器整体转运过程中由于冲击加速度造成套管损坏,提高了安全性,可通过三维冲击记录仪实时记录变压器整体转运过程中加速度数据,固定支架采用可拆卸结构,钢丝绳锁具拉紧力可调节,方便操作。
附图说明
图1是本发明的结构示意图;
图中:套管上端固定支架1、钢丝绳锁具2、花篮螺丝3、套管下端固定支架4、升高座固定支架5、三维冲击记录仪6、卸扣7。
具体实施方式
以下结合附图,通过实施例对本发明作进一步说明。
一种变压器整体转运时套管加固装置,包含套管上端固定支架1、钢丝绳锁具2、花篮螺丝3、套管下端固定支架4、升高座固定支架5、三维冲击记录仪6和卸扣7,所述套管上端固定支架1安装在套管上端,套管下端固定支架4为两个,对称安装在升高座壁上端;钢丝绳锁具2上端通过卸扣7与套管上端固定支架1连接,下端通过花篮螺丝3与套管下端固定支架4连接;升高座固定支架5安装在升高座壁下端与变压器油箱之间;三维冲击记录仪6有三个,分别安装在变压器本体、套管升高座、套管上端部。
所述套管上端固定支架1、套管下端固定支架4、升高座固定支架5均为可拆卸式结构,通过紧固件分别安装在相应位置的预留底板或安装孔上。
所述套管上端固定支架1、套管下端固定支架4以套管轴心为中心均匀布置。
所述套管上端固定支架1上设有三维冲击记录仪6的安装孔。
一种变压器整体转运时套管加固方法,采用上述加固装置,步骤如下:
在变压器套管上端安装套管上端固定支架1,两个套管下端固定支架4对称安装在升高座壁的上端,通过钢丝绳锁具2将套管上端固定支架1和套管下端固定支架4连接,钢丝绳锁具2上端通过卸扣7与套管上端固定支架1连接,钢丝绳锁具2下端与套管下端固定支架4通过花篮螺丝3连接,并通过花篮螺丝3调节钢丝绳锁具的拉紧力;通过升高座固定支架5将升高座与变压器油箱连接在一起;分别在变压器本体、套管升高座、套管上端部各安装一件三维冲击记录仪6,用于记录变压器整体转运过程中的加速度。
Claims (5)
1.一种变压器整体转运时套管加固装置,其特征在于:包含套管上端固定支架(1)、钢丝绳锁具(2)、花篮螺丝(3)、套管下端固定支架(4)、升高座固定支架(5)、三维冲击记录仪(6)和卸扣(7),所述套管上端固定支架(1)安装在套管上端,套管下端固定支架(4)为两个,对称安装在升高座壁上端;钢丝绳锁具(2)上端通过卸扣(7)与套管上端固定支架(1)连接,下端通过花篮螺丝(3)与套管下端固定支架(4)连接;升高座固定支架(5)安装在升高座壁下端与变压器油箱之间;三维冲击记录仪(6)有三个,分别安装在变压器本体、套管升高座、套管上端部。
2.根据权利要求1所述的一种变压器整体转运时套管加固装置,其特征在于:所述套管上端固定支架(1)、套管下端固定支架(4)、升高座固定支架(5)均为可拆卸式结构,通过紧固件分别安装在相应位置的预留底板或安装孔上。
3.根据权利要求1所述的一种变压器整体转运时套管加固装置,其特征在于:所述套管上端固定支架(1)、套管下端固定支架(4)以套管轴心为中心均匀布置。
4.根据权利要求1所述的一种变压器整体转运时套管加固装置,其特征在于:所述套管上端固定支架(1)上设有三维冲击记录仪(6)的安装孔。
5.一种变压器整体转运时套管加固方法,采用权利要求1-4所述的任意一项加固装置,其特征在于如下步骤:在变压器套管上端安装套管上端固定支架(1),两个套管下端固定支架(4)对称安装在升高座壁的上端,通过钢丝绳锁具(2)将套管上端固定支架(1)和套管下端固定支架(4)连接,钢丝绳锁具(2)上端通过卸扣(7)与套管上端固定支架(1)连接,钢丝绳锁具(2)下端与套管下端固定支架(4)通过花篮螺丝(3)连接,并通过花篮螺丝(3)调节钢丝绳锁具的拉紧力;通过升高座固定支架(5)将升高座与变压器油箱连接在一起;分别在变压器本体、套管升高座、套管上端部各安装一件三维冲击记录仪(6),用于记录变压器整体转运过程中的加速度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810528563.6A CN108597753A (zh) | 2018-05-29 | 2018-05-29 | 一种变压器整体转运时套管加固装置及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810528563.6A CN108597753A (zh) | 2018-05-29 | 2018-05-29 | 一种变压器整体转运时套管加固装置及方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108597753A true CN108597753A (zh) | 2018-09-28 |
Family
ID=63629965
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810528563.6A Pending CN108597753A (zh) | 2018-05-29 | 2018-05-29 | 一种变压器整体转运时套管加固装置及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108597753A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110202698A (zh) * | 2019-07-02 | 2019-09-06 | 广西路桥工程集团有限公司 | 骨料供给装置 |
CN111243839A (zh) * | 2019-11-27 | 2020-06-05 | 山东电力设备有限公司 | 一种换流变压器升高座拆分套件及拆分方法 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002029309A (ja) * | 2000-07-13 | 2002-01-29 | Fuji Electric Co Ltd | 輸送方法および変圧器 |
CN201187172Y (zh) * | 2008-04-16 | 2009-01-28 | 广西大学 | 双向速调单臂索道支架 |
CN203158194U (zh) * | 2013-03-27 | 2013-08-28 | 国家电网公司 | 一种水运变压器时的捆扎装置 |
CN204009562U (zh) * | 2014-08-27 | 2014-12-10 | 山东电力设备有限公司 | 变压器本体运输状态在线监测系统 |
CN206163970U (zh) * | 2016-11-29 | 2017-05-10 | 特变电工南京智能电气有限公司 | 一种110kV电压等级、主变容量50MVA的移动变电站 |
CN106706120A (zh) * | 2016-12-20 | 2017-05-24 | 国家电网公司 | 一种变压器振动测试系统及方法 |
CN106898461A (zh) * | 2017-03-14 | 2017-06-27 | 国网福建省电力有限公司 | 变压器套管试验专用支架 |
CN206432101U (zh) * | 2016-12-22 | 2017-08-22 | 中国西电电气股份有限公司 | 一种用于电抗器和变压器整装运输的套管保护结构 |
CN108020683A (zh) * | 2016-11-02 | 2018-05-11 | 成都宇卓时代科技有限公司 | 一种变压器运输监测装置 |
CN208157206U (zh) * | 2018-05-29 | 2018-11-27 | 保定天威保变电气股份有限公司 | 一种变压器整体转运时套管加固装置 |
-
2018
- 2018-05-29 CN CN201810528563.6A patent/CN108597753A/zh active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002029309A (ja) * | 2000-07-13 | 2002-01-29 | Fuji Electric Co Ltd | 輸送方法および変圧器 |
CN201187172Y (zh) * | 2008-04-16 | 2009-01-28 | 广西大学 | 双向速调单臂索道支架 |
CN203158194U (zh) * | 2013-03-27 | 2013-08-28 | 国家电网公司 | 一种水运变压器时的捆扎装置 |
CN204009562U (zh) * | 2014-08-27 | 2014-12-10 | 山东电力设备有限公司 | 变压器本体运输状态在线监测系统 |
CN108020683A (zh) * | 2016-11-02 | 2018-05-11 | 成都宇卓时代科技有限公司 | 一种变压器运输监测装置 |
CN206163970U (zh) * | 2016-11-29 | 2017-05-10 | 特变电工南京智能电气有限公司 | 一种110kV电压等级、主变容量50MVA的移动变电站 |
CN106706120A (zh) * | 2016-12-20 | 2017-05-24 | 国家电网公司 | 一种变压器振动测试系统及方法 |
CN206432101U (zh) * | 2016-12-22 | 2017-08-22 | 中国西电电气股份有限公司 | 一种用于电抗器和变压器整装运输的套管保护结构 |
CN106898461A (zh) * | 2017-03-14 | 2017-06-27 | 国网福建省电力有限公司 | 变压器套管试验专用支架 |
CN208157206U (zh) * | 2018-05-29 | 2018-11-27 | 保定天威保变电气股份有限公司 | 一种变压器整体转运时套管加固装置 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110202698A (zh) * | 2019-07-02 | 2019-09-06 | 广西路桥工程集团有限公司 | 骨料供给装置 |
CN111243839A (zh) * | 2019-11-27 | 2020-06-05 | 山东电力设备有限公司 | 一种换流变压器升高座拆分套件及拆分方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108597753A (zh) | 一种变压器整体转运时套管加固装置及方法 | |
CN208157206U (zh) | 一种变压器整体转运时套管加固装置 | |
CN106882698B (zh) | 一种一体式舵桨吊装方法 | |
CN203568666U (zh) | 一种变电站gis电流互感器吊装工具 | |
CN207725446U (zh) | 一种开关柜下置转运车 | |
CN206705582U (zh) | 一种提升装置 | |
CN215213508U (zh) | 一种移动式盾构机稳定器 | |
CN209191961U (zh) | 一种轨道车辆及其起吊组件 | |
CN216812023U (zh) | 一种高强度风力发电塔筒 | |
CN207283050U (zh) | 一种通讯光缆的架线机构 | |
CN206242998U (zh) | 一种用于货车装卸货物的车载起重装置 | |
CN204871485U (zh) | 一种海工绞车作业设备的安装固定装置 | |
CN204434129U (zh) | 塔式起重机的下支座结构 | |
CN208485512U (zh) | 一种弹簧式起重量起升高度限制器 | |
CN210478447U (zh) | 一种电气化铁路接触网承力索放线装置 | |
CN210949205U (zh) | 便于安装的变压器风机 | |
CN209592922U (zh) | 一种塔架用电缆固定装置 | |
CN210003219U (zh) | 一种免吊装自升式海洋石油试井设备 | |
CN208898404U (zh) | 一种单元制动机车载安装拆卸机构 | |
CN209306866U (zh) | 一种适用于特殊地形的变压器吊装装置 | |
CN206654662U (zh) | 一种钢丝绳定位装置 | |
CN107994501B (zh) | 一种输电线路耐张塔更换横担主材用受力装置及使用方法 | |
CN206827990U (zh) | 一种塔机变幅钢丝绳自动紧绳装置 | |
CN206599390U (zh) | 一种起重机自动收钩机构 | |
CN206903180U (zh) | 上吊点支架结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180928 |