CN108596346A - A kind of Gas Regulator O&M method - Google Patents

A kind of Gas Regulator O&M method Download PDF

Info

Publication number
CN108596346A
CN108596346A CN201810210710.5A CN201810210710A CN108596346A CN 108596346 A CN108596346 A CN 108596346A CN 201810210710 A CN201810210710 A CN 201810210710A CN 108596346 A CN108596346 A CN 108596346A
Authority
CN
China
Prior art keywords
gas
gas regulator
equipment
maintenance
maintenance record
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810210710.5A
Other languages
Chinese (zh)
Other versions
CN108596346B (en
Inventor
徐宜桢
夏琼玉
张星星
任建杰
雷蒙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU ZHENGRAN PRESSURE CONTROL TECHNOLOGY Co Ltd
Original Assignee
ZHENGZHOU ZHENGRAN PRESSURE CONTROL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU ZHENGRAN PRESSURE CONTROL TECHNOLOGY Co Ltd filed Critical ZHENGZHOU ZHENGRAN PRESSURE CONTROL TECHNOLOGY Co Ltd
Priority to CN201810210710.5A priority Critical patent/CN108596346B/en
Publication of CN108596346A publication Critical patent/CN108596346A/en
Application granted granted Critical
Publication of CN108596346B publication Critical patent/CN108596346B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of Gas Regulator O&M methods, Quick Response Code is provided on Gas Regulator, equipment O&M information page is checked in barcode scanning, for the equipment O&M information page for storing maintenance record, the maintenance record includes failure-description and/or reason and corresponding troubleshooting process;The more new interface of the web page interlinkage is connected with the server of O&M side;The maintenance record includes O&M side after completing Gas Regulator repair, in the increased maintenance record of O&M information page of corresponding equipment.This programme pass through scene Gas Regulator on identification information can network inquire corresponding equipment failure-description and corresponding repair solution process record, facilitate and be conducive to gas user and voluntarily investigates and participate in the safe operation of gas-fired equipment and the processing of simple fault, so that combustion gas user is participated in the Maintenance and Repair of gas-fired equipment, improves the safety and reliability of gas-fired equipment.

Description

A kind of Gas Regulator O&M method
Technical field
The present invention relates to a kind of Gas Regulator O&M methods, belong to gas pressure regulating technical field.
Background technology
The O&M of Gas Regulator has ensured the normal operation of gas-fired equipment, the guarantee even more kept the safety in production, therefore, combustion The daily O&M of gas voltage adjusting device is with regard to particularly important.And the maintenance of gas-fired equipment at present only relies on relevant gas company, uses The users such as factory, enterprise of the combustion gas as the energy, due to lacking the energy of the understanding to related Gas Regulator and troubleshooting Power, and daily O&M can not be participated in.Some security risks or problem, user's None- identified judges, simple for some Common failure, user can not voluntarily exclude to still need to ask for help to combustion gas O&M side due to a lack of relevant information, same because of letter The shortage of breath, user are also difficult to clearly describe problem to combustion gas O&M side.
Invention content
The object of the present invention is to provide a kind of Gas Regulator O&M methods, to solve gas user due to a lack of combustion gas Device-dependent message and the problem of be difficult to carry out maintenance and the failure-description on gas-fired equipment basis.
To achieve the above object, the solution of the present invention includes:
A kind of Gas Regulator O&M method of the present invention, is provided with Quick Response Code, in barcode scanning on Gas Regulator Shi Suoshu Quick Response Codes can be identified as linking, and the corresponding network address of the link includes equipment O&M information page, described to set For received shipment dimension information page for storing maintenance record, the maintenance record includes failure-description and/or reason and corresponding failure Exclusion process;
The maintenance record includes O&M side after completing Gas Regulator repair, in the O&M information of corresponding equipment The increased corresponding maintenance record of the page.
By scene Gas Regulator on identification information can network inquire corresponding equipment failure-description and Corresponding repair solves process record, it is convenient and be conducive to gas user voluntarily investigate and participates in the safe operation of gas-fired equipment with The processing of simple fault enables combustion gas user to participate in the Maintenance and Repair of gas-fired equipment, improves gas-fired equipment Safety and reliability.Using Quick Response Code as identification information, technology maturation is reliable, and convenient and easy.
Further, the corresponding network address of the link includes with manufacturer, the manufacture day for corresponding to Gas Regulator Phase, the date of inspection, repair responsible person, points for attention and contact method the page.
Corresponding identification information also facilitates inquiry and tracks source and the production information of gas-fired equipment, while can also be easy to use The points for attention such as square query safe.
Further, the O&M information page further includes inspection record and safeguards that record, the inspection record include inspection Come to an end fruit and corresponding suggestion, and the maintenance record includes maintenance reasons and corresponding attended operation process;
The inspection record includes O&M side after completing Gas Regulator and checking, in the O&M information of corresponding equipment The increased inspection record of the page;
Maintenance record includes O&M side after completing Gas Regulator and safeguarding, in the O&M information of correspondence equipment The increased maintenance record of the page.
Examination and maintenance record is inquired by identification information, allows user that can effectively organize oneself safety inspection and day It often safeguards, while by the Webpage in identification information, so that combustion gas O&M side and user's foundation is understood and reliably linking up, side Just O&M suggests effectively conveying and consulting.
Further, corresponding Gas Regulator corresponds to the inspection note of Gas Regulator before after integral replacing, being replaced The O&M information page that Gas Regulator is corresponded to after record and maintenance record filling are replaced is safeguarded in record.
After corresponding equipment is replaced, the record of equipment and information are still retained before.
Further, the Gas Regulator includes pressure regulator, flowmeter and pressure gauge.
Description of the drawings
Fig. 1 is gas pressure regulating cabinet babinet;
Fig. 2 is 500m3Gas pressure regulating cabinet main body;
Fig. 3 is 3000m3Gas pressure regulating cabinet main body.
Wherein 1 is babinet, and 2 be filter, and 3 be pressure gauge, and 4 be pressure regulator, and 5 be desorption tube, and 6 be diversity tracheae, and 7 be valve Door, 8 be flowmeter.
Specific implementation mode
The present invention will be further described in detail below in conjunction with the accompanying drawings.
For the defects in the prior art, this programme provides a kind of Gas Regulator O&M method, wherein about combustion gas The design of voltage adjusting device is the principle based on BIM and VR, as follows using theory:
BIM Building Information Model is using the every relevant information data produced with the design of gas pressure regulating cabinet as model Basis carries out the foundation of gas pressure regulating cabinet model, by real information possessed by digital information analogue simulation gas pressure regulating cabinet, VR virtual realities generate the virtual world of a gas pressure regulating cabinet three dimensions, as shown in Figure 1, Figure 2 and Fig. 3 institutes using computer simulation Show, the simulation of the sense organs such as vision, the sense of hearing, tactile be provided to designer, producers and user, allow user immersively Observation designs gas pressure regulating cabinet and proposes Optimizing Suggestions, and then realize and plan as a whole rule from the different angle for designing, producing and using It draws, resource consolidation and be embodied contact.By the foundation of VR models, for disparity items, designer can be according to actual gas Source position, place size, maintenance requirement, technological requirement etc. change design scheme in time, adjust between valve size and position, pipeline Away from, diffuse height etc..Simultaneously by this completely new sales mode of VR technologies, user can see finally in a short time to be given birth to The gas pressure regulating cabinet achievement that output is come is convenient for direct measurement distance, carries out construction work ahead of time.
Design about Gas Regulator includes the following steps:
1) Functional Design:Primary demand information of the user to gas pressure regulating cabinet is obtained, the personalized customization for responding user is wanted It asks and function foundation is carried out to gas pressure regulating cabinet.According to the gas flow and inlet and outlet pressure of user demand, gas pipeline is determined Specification, the specification of flowmeter and valve type, specific valve type include butterfly valve or ball valve etc.;According to customer requirement or demand Select the gas circuits forms such as gas circuit form, such as single gas circuit, single gas circuit+bypass gas circuit, double gas circuits, double gas circuits+bypass gas circuit;According to Range of regulation determines pressure regulator specification.And the user individual gas pressure regulating cabinet based on BIM is generated according to above-mentioned selection, and setting Visualization effect is realized during meter.And all components are carried out with the construction in component race library, including three grades:First Grade, including filter race, pressure regulator race, flowmeter race, valve race, diversity tracheae etc. parameterize race's file;Second grade, packet Include gas pressure regulating cabinet main body race and babinet race file;The tertiary gradient, including 300m3Gas pressure regulating cabinet, 500m3Gas pressure regulating cabinet, 1000m3Gas pressure regulating cabinet and 3000m3Gas pressure regulating cabinet race file.In preliminary Functional Design, complete to adjust on design software Depressor, flowmeter and valve will meet the function design scheme of user demand, on software according to the connection of corresponding gas circuit traveling It is intuitive three-dimensional in a manner of threedimensional model to show, it is for reference.
After the completion of Functional Design, if user demand changes, such as the gas flow of bigger, the gas outlet pressure of bigger are needed Power is adjusted the variation range of outlet gas pressure, then need to only adjust pipeline specifications, uses different thicknesses, different tube walls instead The pipeline of thickness, and from the component for choosing user demand after adaptation changes in counterpart member race library, only Functional Design is repaiied Change.
2) process optimization:For disparity items actual conditions, suitable gas pressure regulating cabinet babinet is selected, to personalized combustion gas Surge tank model optimizes type selecting.Designer utilizes virtual reality technology, intuitively finds out whether putting for each component conflicts, is The no operability for meeting construction and installation, whether maintenance spacing is sufficient and whether meets O&M operability etc., to send out in time Existing problem, and actual air source position, place size and maintenance, technique etc. is combined to require optimizing design scheme, including according to tune Press cabinet erecting bed to the distance of combustion gas supervisor's net and the type (industrial user or domestic consumer) of gas user, selection includes The type (indirect pressure regulation is chiefly used in industrial user, and direct pressure regulation is chiefly used in domestic consumer) and tool of combustion gas component including pressure regulator Build number;Valve size and position are adjusted, the action of the operable component such as valve is made not conflict with other components, and is had enough Space for staff operate;Ensure rational pipeline spacing, makes have enough space for maintenances between pipeline, meet daily fortune The needs of component are dismantled and replaced in dimension;And height etc. is diffused according to on-site actual situations determination.It is final to determine design scheme, And according to the gas pressure regulating cabinet babinet of final design Scheme Choice occupied space minimum.Select gas pressure regulating cabinet babinet after, also into The layout design of row support element, support element select channel steel, and the channel steel arrangement as support element should meet gas pressure regulating cabinet babinet and hang On the basis of reload request, has construction operability and do not influence the O&M operability of gas pressure regulating cabinet.Complete optimized Selection Design.
This step is in order to realize, in actual items, on the basis of the gas pressure regulating cabinet preliminary project of corresponding size On, the inlet and outlet direction of the Position Design gas pressure regulating cabinet according to gas source pipe is needed, due to the ruler of each component under different tube diameters Very little also different, so also to adjust the length and spacing of pipeline according to the component sizes of actual selection, searching, which both can guarantee, to be reached Design requirement meets repair spacing, and the rational preferred plan of space layout again.Intuitively found out using virtual reality technology simultaneously Gas pressure regulating cabinet appearance after molding, simulation maintenance situation, improves unreasonable place, to optimizing design scheme.
After determining final scheme, auto-building model bill of materials detail list, procurement staff is according to each unit type quantity It is orderly stocked up, construction personnel carries out the production of gas pressure regulating cabinet according to technological process, is intuitively completed in conjunction with threedimensional model each Installation, babinet lifting and the assembling of gas pressure regulating cabinet of component, reduce the possibility done over again, improve production efficiency.
Cost is analyzed with quantities:By the model of foundation by the unit price of procurement of each component of gas pressure regulating cabinet, required engineering The data such as amount and cost of labor import, by carrying out intelligence to raw material supply ability, workshop working ability and device memory It can analyze, to carry out cost analysis and the quantities control that entire gas pressure regulating cabinet produces each stage.
Include following scheme about Gas Regulator O&M:
Sticked on the Gas Regulators such as pressure regulator, flowmeter, pressure gauge and babinet or its nameplate on stamp comprising setting The Quick Response Code of standby information, Quick Response Code can direct into a webpage in the form of a link, and webpage includes project name and each equipment Design, production, transit information, specially correspond to the manufacturer of Gas Regulator, the date of production, the date of inspection, repair Responsible person, points for attention and contact method etc., the project convenient for the later stage join and check.
In addition, the webpage in connection further includes the O&M information of corresponding equipment, O&M information includes inspection record, safeguards note Record and maintenance record.Inspection record is the gas-fired equipment O&M side in the case that customary or other check gas-fired equipment Record, including the project of inspection, conclusion, such as airtight situation, if having the whether accurate nothing of gas leakage, pressure meter flow-meter Accidentally, situations such as whether pressure regulator range of regulation is accurate, equipment whether there is aging or equipment operation are good;There is provided phase simultaneously The suggestion for combustion gas user answered, for example, moisture-proof antirust, far from corrosives, pay attention to giving out of gas safety, intermittent oiling valve Door action component etc..It safeguards that record includes the project safeguarded, reason and specific operation, such as gas-fired equipment or pipeline is removed Rust, mend brush Amber Alerts paint or antirust paint, lubrication valve etc. execute the action component of equipment, fastening support channel steel bolt, Replace gasket etc..Maintenance record includes repair or the project replaced or component, failure-description, repair reason and specific behaviour Make, such as replace or repair the related components of pressure regulator, ensures that range of regulation is accurate, replaces or repair the valve etc. of gas leakage.
The more new interface of the web page interlinkage is connected with the server of O&M side, and above-mentioned O&M information is by corresponding to O&M side more Newly in the webpage, each O&M side once check, safeguards or repair, and just the information in corresponding webpage carries out once more Newly, by concrete condition and and the corresponding webpage of repair content input in;If one equipment of integral replacing, will change pair of equipment The webpage for answering O&M information update to the new equipment changed is total.User scans corresponding equipment using terminals such as mobile phones Quick Response Code can check the information in browsing corresponding page.
In addition to Quick Response Code, directly the network address of link can also be affixed on corresponding equipment or equipment nameplate, the present embodiment The form of identification information is not limited.
After project handing-over, the project model of gas pressure regulating cabinet and foundation is given to user together, once it goes wrong, user The all information of equipment can be directly viewable by scanning the two-dimensional code, such as manufacturer, the date of production, the date of inspection, repair duty It lets people, points for attention and telephone number etc..Every time after repair, accident situation and repair content can be inputted Quick Response Code, it is convenient Inquiry later helps to improve O&M efficiency, reduces accident potential.
Compared with prior art, the advantageous effect that the present invention obtains is:
Operation maintenance is information-based, and side easy to use checks the maintenance for understanding basic gas-fired equipment and Knowledge of Maintenance and inspection Method, while convenient for understanding the O&M suggestion that maintenance side proposes, while enabling the more clear effective description equipment of user Failure problems;Valuable history O&M data is provided for maintenance side simultaneously;And this programme is convenient for the collection of data and information, is consulted And classification, the exchange and conmmunication of O&M side and user about safety gas are strengthened, user and O&M side is allowed to be involved in The O&M of gas-fired equipment helps to improve O&M efficiency, reduces gas accidents hidden danger.

Claims (5)

1. a kind of Gas Regulator O&M method, which is characterized in that Quick Response Code is provided on Gas Regulator, in barcode scanning Shi Suoshu Quick Response Codes can be identified as linking, and the corresponding network address of the link includes equipment O&M information page, described to set For received shipment dimension information page for storing maintenance record, the maintenance record includes failure-description and/or reason and corresponding failure Exclusion process;
The maintenance record includes O&M side after completing Gas Regulator repair, in the O&M information page of corresponding equipment Increased corresponding maintenance record.
2. a kind of Gas Regulator O&M method according to claim 1, which is characterized in that described to link corresponding net Location include manufacturer with corresponding Gas Regulator, the date of production, the date of inspection, repair responsible person, points for attention and The page of contact method.
3. a kind of Gas Regulator O&M method according to claim 1, which is characterized in that the O&M information page Further include that inspection record and maintenance record, the inspection record includes inspection result and corresponding suggestion, and the maintenance record includes Maintenance reasons and corresponding attended operation process;
The inspection record includes O&M side after completing Gas Regulator and checking, in the O&M information page of corresponding equipment Increased inspection record;
Maintenance record includes O&M side after completing Gas Regulator and safeguarding, in the O&M information page of correspondence equipment Increased maintenance record.
4. a kind of Gas Regulator O&M method according to claim 3, which is characterized in that corresponding Gas Regulator After integral replacing, the inspection record of corresponding Gas Regulator, maintenance record and maintenance record filling are right after replacing before replacing Answer the O&M information page of Gas Regulator.
5. a kind of Gas Regulator O&M method according to claim 1,2,3 or 4, which is characterized in that the combustion gas Voltage adjusting device includes pressure regulator, flowmeter and pressure gauge.
CN201810210710.5A 2018-03-14 2018-03-14 Operation and maintenance method of gas pressure regulating equipment Active CN108596346B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810210710.5A CN108596346B (en) 2018-03-14 2018-03-14 Operation and maintenance method of gas pressure regulating equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810210710.5A CN108596346B (en) 2018-03-14 2018-03-14 Operation and maintenance method of gas pressure regulating equipment

Publications (2)

Publication Number Publication Date
CN108596346A true CN108596346A (en) 2018-09-28
CN108596346B CN108596346B (en) 2022-05-20

Family

ID=63626239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810210710.5A Active CN108596346B (en) 2018-03-14 2018-03-14 Operation and maintenance method of gas pressure regulating equipment

Country Status (1)

Country Link
CN (1) CN108596346B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111199391A (en) * 2020-01-03 2020-05-26 广州燃气集团有限公司 Maintenance information processing method, system and device for gas pressure regulating equipment and storage medium
CN111241861A (en) * 2020-01-20 2020-06-05 广州燃气集团有限公司 Method and system for processing management data of buried gas valve and storage medium
CN112527875A (en) * 2020-12-07 2021-03-19 广州燃气集团有限公司 Maintenance data recording and statistical analysis method and system for pressure regulating equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103646312A (en) * 2013-12-09 2014-03-19 浙江工业大学 Public bicycle information reading method based on two-dimension code
US20150066782A1 (en) * 2013-08-28 2015-03-05 PragmaTech Ltd. Computer monitoring, servicing, and management of remote equipment and assets
CN105069565A (en) * 2015-08-03 2015-11-18 南京云追溯网络科技有限公司 Monitoring equipment life-cycle management system based on two dimension codes
CN105894395A (en) * 2016-04-05 2016-08-24 国家电网公司 Substation equipment state overhaul, operation and maintenance management system based on two-dimensional code mobile Internet technology
CN106250638A (en) * 2016-08-04 2016-12-21 中建三局第建设工程有限责任公司 A kind of backform comprehensive Design based on BIM and application process
CN107273980A (en) * 2017-06-02 2017-10-20 合肥同佑电子科技有限公司 The maintaining-managing system and maintenance management method of a kind of electronic equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150066782A1 (en) * 2013-08-28 2015-03-05 PragmaTech Ltd. Computer monitoring, servicing, and management of remote equipment and assets
CN103646312A (en) * 2013-12-09 2014-03-19 浙江工业大学 Public bicycle information reading method based on two-dimension code
CN105069565A (en) * 2015-08-03 2015-11-18 南京云追溯网络科技有限公司 Monitoring equipment life-cycle management system based on two dimension codes
CN105894395A (en) * 2016-04-05 2016-08-24 国家电网公司 Substation equipment state overhaul, operation and maintenance management system based on two-dimensional code mobile Internet technology
CN106250638A (en) * 2016-08-04 2016-12-21 中建三局第建设工程有限责任公司 A kind of backform comprehensive Design based on BIM and application process
CN107273980A (en) * 2017-06-02 2017-10-20 合肥同佑电子科技有限公司 The maintaining-managing system and maintenance management method of a kind of electronic equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111199391A (en) * 2020-01-03 2020-05-26 广州燃气集团有限公司 Maintenance information processing method, system and device for gas pressure regulating equipment and storage medium
CN111199391B (en) * 2020-01-03 2023-05-02 广州燃气集团有限公司 Maintenance information processing method, system and device for gas pressure regulating equipment and storage medium
CN111241861A (en) * 2020-01-20 2020-06-05 广州燃气集团有限公司 Method and system for processing management data of buried gas valve and storage medium
CN112527875A (en) * 2020-12-07 2021-03-19 广州燃气集团有限公司 Maintenance data recording and statistical analysis method and system for pressure regulating equipment

Also Published As

Publication number Publication date
CN108596346B (en) 2022-05-20

Similar Documents

Publication Publication Date Title
CN114139264B (en) Building water system informatization wisdom fortune maintenance system based on BIM+GIS technique
CN109298685B (en) Digital factory implementation method, digital factory implementation system and digital factory
CN110046718A (en) A kind of intelligent operation platform based on BIM and RFID
CN108596346A (en) A kind of Gas Regulator O&M method
CN103970887A (en) Information stream display system and method based on GIS distribution network graphs
CN111223178B (en) Three-dimensional model application method and system for nuclear power engineering modularization construction
Ranta et al. Economics and success factors of flexible manufacturing systems: the conventional explanation revisited
KR101406885B1 (en) Using a computer system and method for architectural design
CN113822547A (en) Refined demand side management comprehensive information platform system and management method
CN109636156A (en) A kind of digital management system and method for multi-code unification
CN113642920A (en) Rapid construction method for digital application in industrial manufacturing field
CN111666619A (en) BIM technology-based substation engineering implementation field digital management system
JP6917627B2 (en) Management support device and management support method
CN108386722B (en) Model selection method of gas pressure regulating cabinet
Heinzl Methods for hybrid modeling and simulation-based optimization in energy-aware production planning
CN112003369A (en) Cloud platform based power grid automation equipment operation monitoring and statistical analysis method
Grevet et al. Development of an Object-Oriented Framework to Automate Subsea Pipeline Design
Karaz et al. Waste management using lean construction and building infrmoation modelling: systematic literature review
KR102668849B1 (en) Automatic calculation system for quantity and construction cost of railway facility based on building information modelling (bim)
Zebzeev Designing of complex information and control system of the deposit" Urubcheno-Tohomskoe"
Palos State-of-the-art analysis of product data definitions usage in BIM
Adegun Implementation of ISO19650 based framework for asset management in logistics centres for a major food retailer
Monticelli MEP modelling of a subway station to an executive level of design with clash detection verification Case study: Collegno Centro subway station
Van Rensburg A generic software platform for performance monitoring of deep-level mine systems
Schoeman Structuring data to capture energy reticulation knowledge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 450001 No. 150 Lamei Road, Zhengzhou High-tech Zone, Henan Province

Applicant after: Runzhi Technology Co., Ltd.

Address before: 450001 No. 150 Lamei Road, Zhengzhou High-tech Industrial Development Zone, Henan Province

Applicant before: Zhengzhou Zhengran Pressure Control Technology Co., Ltd.

CB02 Change of applicant information
CB02 Change of applicant information

Address after: 528400 cards 1, 2, 3, 11, 12, 20 / F, international financial center, no.16-3, Zhongshan Third Road, East District, Zhongshan City, Guangdong Province

Applicant after: Runzhi Technology Co., Ltd.

Address before: 450001 No. 150 Lamei Road, Zhengzhou High-tech Zone, Henan Province

Applicant before: Runzhi Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant