CN108590194A - Coupling beam method for binding reinforcing steel bars between a kind of assembled superimposed sheet - Google Patents

Coupling beam method for binding reinforcing steel bars between a kind of assembled superimposed sheet Download PDF

Info

Publication number
CN108590194A
CN108590194A CN201810236941.3A CN201810236941A CN108590194A CN 108590194 A CN108590194 A CN 108590194A CN 201810236941 A CN201810236941 A CN 201810236941A CN 108590194 A CN108590194 A CN 108590194A
Authority
CN
China
Prior art keywords
muscle
binding
superimposed sheet
steel bars
reinforcing steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810236941.3A
Other languages
Chinese (zh)
Other versions
CN108590194B (en
Inventor
邓凯
缪昌华
吴碧桥
周起太
刘成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huajian Construction Co Ltd
Original Assignee
Jiangsu Huajian Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huajian Construction Co Ltd filed Critical Jiangsu Huajian Construction Co Ltd
Priority to CN201810236941.3A priority Critical patent/CN108590194B/en
Publication of CN108590194A publication Critical patent/CN108590194A/en
Application granted granted Critical
Publication of CN108590194B publication Critical patent/CN108590194B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • E04G21/122Machines for joining reinforcing bars
    • E04G21/123Wire twisting tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses coupling beam method for binding reinforcing steel bars between a kind of assembled superimposed sheet, belong to building heat preserving technical field.The method is:First interim binding operating platform is installed on superimposed sheet bridge side;Then on beam slab horizontal shuttering, scene installs reinforcing bar beam binding frame body;Then beam bottom muscle, stirrup, beam side waist muscle are first bound on reinforcing bar beam binding frame body, and consider that beam mutually laminates order in length and breadth and beam muscle enters the anchoring of wall, column, using being fixed temporarily tool muscle on the outside of beam framework, is removed again after superimposed sheet is in place, beam gluten is in place and be fixed temporarily tool muscle.The present invention solves the problems, such as to connect beam steel bar colligation difficulty between superimposed sheet, can guiding construction.

Description

Coupling beam method for binding reinforcing steel bars between a kind of assembled superimposed sheet
Technical field
Present invention relates particularly to coupling beam method for binding reinforcing steel bars between a kind of assembled superimposed sheet, belong to construction techniques technology Field.
Background technology
With the quickening of building industrialization process, assembled architecture is rised sheer from level ground like the mushrooms after rain.In assembled architecture In work progress, superimposed sheet support system uses more, which eliminates the shuttering supporting of horizontal direction, but superimposed sheet Between connect that beam steel bar colligation is more bothersome than common plank sheathing very much, should because the reinforcing bar being inserted into beam has been reserved in the both sides of superimposed sheet Reserved joint bar must be stretched into all in beam, therefore first can only complete stirrup and the binding of bottom muscle to hang in beam form when beam steel bar colligation In plate, then bind the gluten of beam framework.
Invention content
Therefore, the present invention is directed to the above problem of the prior art, designs a kind of coupling beam method for binding reinforcing steel bars.
Specifically, coupling beam method for binding reinforcing steel bars, the method are between assembled superimposed sheet:
First interim binding operating platform is installed on superimposed sheet bridge side;
Then on beam slab horizontal shuttering, scene installs reinforcing bar beam binding frame body;
Then beam bottom muscle, stirrup, beam side waist muscle are first bound on reinforcing bar beam binding frame body, and considers that beam mutually laminates order in length and breadth And beam muscle enters the anchoring of wall, column, using being fixed temporarily tool muscle on the outside of beam framework, after superimposed sheet is in place, beam gluten is in place It removes again and is fixed temporarily tool muscle.
Further, the setting of stirrup opening is staggered in beam bottom side, left and right in the method.
Further, coupling beam upper longitudinal bar is shelved on by the vertically and transversely cross-linking sequence that stacks on beam bottom muscle temporarily in the method Or interim several points binding, it is fixed on the downward 20mm of beam side mouth, every upper longitudinal bar uses tied silk to be bound with the short muscle of top handle Securely.
The beneficial effects of the present invention are:Coupling beam method for binding reinforcing steel bars and the prior art between the assembled superimposed sheet of the present invention It compares, solves the problems, such as to connect beam steel bar colligation difficulty between superimposed sheet, it can guiding construction.
Description of the drawings
Fig. 1 coupling beam method for binding reinforcing steel bars work progress schematic diagrames between assembled superimposed sheet of the present invention.
Fig. 2 is the floor map of temporary operating platform.
Fig. 3 is the fixed installation diagram of coupling beam upper longitudinal bar.
Specific implementation mode
Description of specific embodiments of the present invention below in conjunction with the accompanying drawings:
As shown in Figure 1, Fig. 1 includes interim binding operating platform 1, beam bottom muscle 2, a long thick piece of timber shaped like a square pillar 3, is fixed temporarily tool muscle 4, upper hand Carry short muscle 5, muscle 8 is indulged on tied silk 6, stirrup 7, beam upper layer.Beam bottom muscle 2 is tied with stirrup 7, and a long thick piece of timber shaped like a square pillar 3 is 50*100, spacing 800.
Coupling beam method for binding reinforcing steel bars work progress is specially between assembled superimposed sheet of the present invention:
Interim binding operating platform 1 is installed on superimposed sheet bridge side first, as shown in Figure 2.
Then on beam slab horizontal shuttering, scene installs reinforcing bar beam binding frame body.
Then beam bottom muscle 2, stirrup 7, beam side waist muscle are first bound on frame body, and consider that beam mutually laminates order and beam in length and breadth Muscle enters the anchoring etc. of wall, column.To form beam framework, it can be used on the outside of beam framework and be fixed temporarily tool muscle 4, it is in place in superimposed sheet Afterwards, it is removed again after beam gluten is in place and is fixed temporarily tool muscle 4.
Difficulty is bound to reduce gluten, without exception in beam bottom side, left and right is staggered stirrup opening.
As shown in figure 3, coupling beam upper longitudinal bar is shelved on by the vertically and transversely cross-linking sequence that stacks on beam bottom muscle temporarily, or it is interim several Point binding, is fixed on the downward 20mm of beam side mouth.Every upper longitudinal bar is bound securely with tied silk 6 and the short muscle of top handle 5, side Continue beam upper longitudinal bar binding after an action of the bowels.
The above is the preferred embodiment of the present invention, it is noted that for those skilled in the art For, without departing from the principles of the present invention, it can also make several improvements and retouch, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (3)

1. coupling beam method for binding reinforcing steel bars between a kind of assembled superimposed sheet, which is characterized in that the method is:
First interim binding operating platform is installed on superimposed sheet bridge side;
Then on beam slab horizontal shuttering, scene installs reinforcing bar beam binding frame body;
Then beam bottom muscle, stirrup, beam side waist muscle are first bound on reinforcing bar beam binding frame body, and considers that beam mutually laminates order in length and breadth And beam muscle enters the anchoring of wall, column, using being fixed temporarily tool muscle on the outside of beam framework, after superimposed sheet is in place, beam gluten is in place It removes again and is fixed temporarily tool muscle.
2. coupling beam method for binding reinforcing steel bars between assembled superimposed sheet as described in claim 1, which is characterized in that bound round in the method The setting of muscle opening is staggered in beam bottom side, left and right.
3. coupling beam method for binding reinforcing steel bars between assembled superimposed sheet as described in claim 1, which is characterized in that connect in the method Beam upper longitudinal bar is shelved on beam bottom muscle or interim several points binding temporarily by the vertically and transversely cross-linking sequence that stacks, and is fixed on beam side mouth Downward 20mm, every upper longitudinal bar use tied silk and the short muscle binding of top handle secured.
CN201810236941.3A 2018-03-21 2018-03-21 Method for binding connecting beam reinforcing steel bars between assembled laminated plates Active CN108590194B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810236941.3A CN108590194B (en) 2018-03-21 2018-03-21 Method for binding connecting beam reinforcing steel bars between assembled laminated plates

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810236941.3A CN108590194B (en) 2018-03-21 2018-03-21 Method for binding connecting beam reinforcing steel bars between assembled laminated plates

Publications (2)

Publication Number Publication Date
CN108590194A true CN108590194A (en) 2018-09-28
CN108590194B CN108590194B (en) 2020-04-28

Family

ID=63627161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810236941.3A Active CN108590194B (en) 2018-03-21 2018-03-21 Method for binding connecting beam reinforcing steel bars between assembled laminated plates

Country Status (1)

Country Link
CN (1) CN108590194B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115288446A (en) * 2022-07-08 2022-11-04 中国建筑第二工程局有限公司 Construction method for prefabricated half cage beam steel bars of floor of assembly structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05171807A (en) * 1991-12-24 1993-07-09 Taisei Corp Assembling method of underground-girder reinforcement
CN102587554A (en) * 2012-02-29 2012-07-18 黑龙江宇辉新型建筑材料有限公司 Laminated concrete slab connected by bending reinforcing steel bars by 180 degrees within span and connection method
CN103046746A (en) * 2012-12-03 2013-04-17 成军 Construction method of conversion beam reinforcing bars for tall building structure
CN206737440U (en) * 2017-05-10 2017-12-12 江苏省华建建设股份有限公司 A kind of crossbeam assembling reinforcement structure
CN207032674U (en) * 2017-06-28 2018-02-23 华南理工大学 A kind of butt welding stirrup for improving ductility of sheer wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05171807A (en) * 1991-12-24 1993-07-09 Taisei Corp Assembling method of underground-girder reinforcement
CN102587554A (en) * 2012-02-29 2012-07-18 黑龙江宇辉新型建筑材料有限公司 Laminated concrete slab connected by bending reinforcing steel bars by 180 degrees within span and connection method
CN103046746A (en) * 2012-12-03 2013-04-17 成军 Construction method of conversion beam reinforcing bars for tall building structure
CN206737440U (en) * 2017-05-10 2017-12-12 江苏省华建建设股份有限公司 A kind of crossbeam assembling reinforcement structure
CN207032674U (en) * 2017-06-28 2018-02-23 华南理工大学 A kind of butt welding stirrup for improving ductility of sheer wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115288446A (en) * 2022-07-08 2022-11-04 中国建筑第二工程局有限公司 Construction method for prefabricated half cage beam steel bars of floor of assembly structure
CN115288446B (en) * 2022-07-08 2024-01-26 中国建筑第二工程局有限公司 Construction method for prefabricated half-cage beam steel bars of building surface with assembly structure

Also Published As

Publication number Publication date
CN108590194B (en) 2020-04-28

Similar Documents

Publication Publication Date Title
CN104060825B (en) Adjustable general stair template
CN204983391U (en) Exempt from to tear open precast concrete beam mold board
CN105863253B (en) Integral formwork support is asynchronous to pour staircase wall column formwork system and construction method
CN207484964U (en) Side form structure at post-cast strip in concrete pouring construction
CN201738575U (en) Beam-slab supporting system with post-cast strip
CN105257009B (en) Device for anti-falling partition in elevator shaft
CN105544873B (en) A kind of construction method of the hollow roofing of waveform
CN206562761U (en) Floor post-cast strip boatswain chair mould
CN108590194A (en) Coupling beam method for binding reinforcing steel bars between a kind of assembled superimposed sheet
CN205012665U (en) Temporary fixing device of concrete wall joint bar
CN108005370B (en) Scaffold board for scaffold and construction method
CN208056469U (en) Coupling beam framework of steel reinforcement fixing device between a kind of assembled superimposed sheet
CN208363666U (en) It is a kind of for build face side construction safety protection frame
CN110499857A (en) A kind of precast concrete superimposed sheet vertically goes out the installation method of muscle and readjustment
CN204826403U (en) Exempt from to tear open precast concrete roof beam heat preservation template
CN204370653U (en) A kind of hollow devices basis being applicable to roof, roof
CN208379874U (en) A kind of concrete folding plate
CN106193456A (en) A kind of high-layer shear force wall reinforcing steel bar Exact Location Method and truss strength fixing device
CN108867854A (en) Reinforced concrete frame and its construction method
CN203977864U (en) Can repeat the stair template that turnover is used
CN211714007U (en) Construction elevator foundation structure
CN106836641A (en) Side sticking steel plate formula Combined concrete coupling beam
DK1563728T3 (en) Process for making shelves for livestock flooring for cattle or the like
CN208456117U (en) A kind of post-cast strip overhanging end independent support device
CN204326488U (en) The building operations overhanging unloading platform that a kind of safety is high

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 225001 No. 468 middle Wenchang Road, Jiangsu, Yangzhou

Patentee after: JIANGSU HUAJIAN CONSTRUCTION Co.,Ltd.

Address before: 225001 No. 468 Wenchang Middle Road, Suzhou, Jiangsu

Patentee before: JIANGSU HUAJIAN CONSTRUCTION Co.,Ltd.

CP02 Change in the address of a patent holder