CN108589756A - building foundation structure - Google Patents

building foundation structure Download PDF

Info

Publication number
CN108589756A
CN108589756A CN201810678844.XA CN201810678844A CN108589756A CN 108589756 A CN108589756 A CN 108589756A CN 201810678844 A CN201810678844 A CN 201810678844A CN 108589756 A CN108589756 A CN 108589756A
Authority
CN
China
Prior art keywords
concrete
ladder
layer
pile
raft plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810678844.XA
Other languages
Chinese (zh)
Inventor
戴雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan No6 Engineering Co Ltd
Original Assignee
Hunan No6 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan No6 Engineering Co Ltd filed Critical Hunan No6 Engineering Co Ltd
Priority to CN201810678844.XA priority Critical patent/CN108589756A/en
Publication of CN108589756A publication Critical patent/CN108589756A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

Building foundation structure, including concrete raft plate, armored concrete king pile, sole plate, concrete upper layer and concrete layer, sole plate is set to the over top of concrete raft plate, sole plate is connected with concrete raft plate, concrete upper layer is set to the over top of sole plate, concrete upper layer is connected with sole plate, armored concrete king pile and concrete layer are set to the bottom part down of concrete raft plate, concrete raft plate is connected with armored concrete king pile, and armored concrete king pile is connected with concrete layer.The configuration of the present invention is simple, it is at low cost, take it is short, anti-pressure ability is strong, stability is good, reliable operation.

Description

Building foundation structure
Technical field
The present invention relates to building lot technical field, specially a kind of building foundation structure.
Background technology
Foundation is an important component of building, and consolidating for foundation just can enable building above make It is even earlier, because of some reasons such as foundation and the own wt of top building, pressure, meeting are generated to subsoil A series of influences for destroying building stabilization, such as settlement of foundation, settlement of foundation are caused to be inevitable, the sedimentation of a ground Degree, a big chunk reason depend on foundation anti-pressure ability and stability and foundation to the pressure of subsoil It forces powerful small.In the foundation structure design of building, if the anti-pressure ability of ground is not strong, stability is inadequate, it will cause The settling amount of ground is excessive, not only influences the use of building, more threatens the safety of structure.
Currently, deep pile foundation structure is costly, longer, maintenance complexity is taken, meanwhile, although traditional plane raft foundation The influence that differential settlement brings building can be mitigated, but steady under horizontal force (seismic force and wind-force) effect to building There is no very good effects for the raising of solidity, such as all very high using deep pile foundation cost, and use common strip footing list One raft foundation etc. is even tilted because its anti-pressure ability can not cause by force largely to sink, and causes very big economic loss, and common Toft foundation structure, as ground, needs a large amount of concrete, waste serious using very thick concrete layer.
So how to design a kind of building foundation structure, becoming us will currently solve the problems, such as.
Invention content
The technical problem to be solved by the present invention is to overcome drawbacks described above of the existing technology, provide a kind of anti-pressure ability By force, stability is good, building foundation structure of reliable operation.
The technical solution adopted by the present invention to solve the technical problems is:
Building foundation structure, including concrete raft plate, armored concrete king pile, sole plate, concrete upper layer and coagulation Native lower layer, sole plate are set to the over top of concrete raft plate, and sole plate is connected with concrete raft plate, and concrete upper layer is set In the over top of sole plate, concrete upper layer is connected with sole plate, and armored concrete king pile and concrete layer are set to The bottom part down of concrete raft plate, concrete raft plate are connected with armored concrete king pile, under armored concrete king pile and concrete Layer is connected.
Further, concrete layer includes that flight, the first support column and stone layer, flight are partly wrapped in stone layer On, the first support column is set in stone layer, and the first support column is fitted closely with stone layer, the top surface of the first support column and flight Inner surface be connected, the bottom surface of the first support column is concordant with the bottom surface of stone layer.
Further, concrete upper layer includes support platform, and the upper surface of support platform is provided with U-type groove.
Further, the quantity of first support column is two or more.
Further, the flight includes the first ladder, two the second ladders and two third ladders, two the second ladders The first ladder both sides are symmetrically arranged in, two third ladders are also symmetrically arranged in the first ladder both sides, the upper surface of the first ladder For horizontal plane, the bottom surface of the first ladder and the upper surface of the second ladder are connected, and the upper surface of the second ladder is also horizontal plane, and second The bottom surface of ladder is connected with the upper surface of third ladder, and the upper surface of third ladder is also horizontal plane.The bottom surface of third ladder with The bottom surface of stone layer is concordant.
Further, the upper surface of the first ladder of the bottom surface of armored concrete king pile and concrete layer is connected, and reinforcing bar is mixed The top surface and the bottom surface of concrete raft plate of solidifying soil king pile are connected.
Further, the first support column is linear type, and the length of the first support column and the length of the upper surface of the first ladder are suitable It is identical.
Further, building foundation structure further includes two the first reinforced concrete piles, two the second armored concrete Stake and two third reinforced concrete piles, two the first reinforced concrete piles are symmetrically set in the upper horizontal surface two of the first ladder End, the top surface of the first reinforced concrete pile are connected with the bottom surface of concrete raft plate, the bottom surface of the first reinforced concrete pile and first The upper horizontal surface of ladder is connected;Two the second reinforced concrete piles are respectively arranged on the upper horizontal surface of two the second ladders, the The top surface of two reinforced concrete piles is connected with the bottom surface of concrete raft plate, the water of the second ladder of bottom surface of the second reinforced concrete pile Flat upper surface is connected;Two third reinforced concrete piles are respectively arranged on the upper horizontal surface of two third ladders, and third reinforcing bar is mixed The top surface of solidifying soil stake is also connected with the bottom surface of concrete raft plate, on the bottom surface of third reinforced concrete pile and the level of third ladder Surface is connected.
All of above connected mode can be embedded connection.
Further, concrete layer further includes Concrete Filled layer, and Concrete Filled layer is set to armored concrete king pile Side, the side of the first reinforced concrete pile, the bottom surface of concrete raft plate and the first ladder the space that surrounds of upper horizontal surface It is interior.The upper surface of Concrete Filled layer is connected with the bottom surface of concrete raft plate, the bottom surface of Concrete Filled layer and the first ladder Upper horizontal surface is connected, the two sides of Concrete Filled layer respectively with the side of the first reinforced concrete pile and armored concrete master The side of stake is connected.The quantity of Concrete Filled layer is two.
Further, the bottom of the first support column is equipped with the second support column, and the second support column and the first support column are connected.
Further, concrete raft plate is made of armored concrete, and concrete raft plate helps to reduce the pressure of ground, makes ground Base is more firm.To the side of armored concrete king pile, the side of the first reinforced concrete pile, the bottom surface of concrete raft plate and When concrete perfusion forms Concrete Filled layer in the space that the upper horizontal surface of one ladder surrounds, the presence of concrete raft plate, On the one hand construction organization can be allowed to form complete Toft foundation structure after concrete perfusion, on the other hand can realizes resistance to compression, has The pressure for helping reduce ground keeps ground more firm;Simultaneously in the first reinforced concrete pile, the second reinforced concrete pile and the Under the action of three reinforced concrete piles, it can effectively increase the load intensity of concrete raft plate, in favor of in perfusion mixed mud process In effectively avoid the deformation of concrete raft plate.
Armored concrete king pile is connected between concrete raft plate and the first ladder, can make concrete raft plate and the first rank Ladder is more firm, has the function of supporting superstructure, the case where preventing ground to be collapsed, effectively avoid being crushed by building Occur.
Using the present invention building foundation structure when, construction organization can in U-type groove construction wall, under wall End is placed in U-type groove.U-type groove can undertake wall to its pressure, and on the one hand U-type groove has the function of bracing reinforcement, another Aspect construction organization can be conducive to shorten working hours along U-type groove masonry panel, improve working efficiency.
Building is transferred on concrete raft plate the pressure of U-type groove by support platform, sole plate, concrete raft plate Building to the pressure transmission of its own to armored concrete king pile, the first reinforced concrete pile, the second reinforced concrete pile With third reinforced concrete pile, armored concrete king pile, the first reinforced concrete pile are the pressure transmission suffered by its own to On one ladder, the second reinforced concrete pile is in the pressure transmission to the second ladder suffered by its own, third reinforced concrete pile In the pressure transmission to third ladder suffered by its own, the first ladder transmits pressure to stone layer and the second ladder again, and Two ladders transmit pressure to stone layer and third ladder, and third ladder transmits pressure to stone layer and ground, in favor of subtracting Pressure of few building to ground.The presence of first ladder, the second ladder and third ladder helps to transmit pressure, increases ground The anti-pressure ability of base.Pressure suffered by its own is also passed to ground by final stone layer, to be further reduced building pair The pressure of ground increases the anti-pressure ability of ground.Meanwhile stone layer also has supporting role, supports the first ladder, second-order Ladder and third ladder, prevent it from collapsing downwards, stone layer helps to disperse pressure, improves the stability of ground.
And first support column be linear type, concrete raft plate is transmitted to building by the first ladder to its pressure First support column is conducive to share the pressure on concrete raft plate, and to improve the anti-pressure ability of ground, the first support column helps In transmitting building to the pressure of concrete raft plate, prevent building concrete raft plate be collapsed.
The configuration of the present invention is simple, it is at low cost, take it is short, anti-pressure ability is strong, stability is good, reliable operation.
Description of the drawings
Fig. 1 is the overall structure diagram of the present invention.
Fig. 2 is the stereogram on the concrete upper layer of the present invention.
Fig. 3 is the sectional view of the concrete layer of the present invention.
In figure:1, concrete layer, 101, Concrete Filled layer, the 102, first ladder, the 103, second ladder, 104, third Ladder, the 105, first support column, the 106, second support column, 107, stone layer, 2, concrete raft plate, 3, armored concrete king pile, 4, sole plate, 5, concrete upper layer, 501, support platform, 502, U-type groove, the 6, first reinforced concrete pile, the 7, second reinforcing bar Concrete-pile, 8, third reinforced concrete pile.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig.1, building foundation structure, including it is concrete raft plate 2, armored concrete king pile 3, sole plate 4, mixed Solidifying soil upper layer 5 and concrete layer 1, sole plate 4 are set to the over top of concrete raft plate 2, sole plate 4 and concrete raft Plate 2 is connected, and concrete upper layer 5 is set to the over top of sole plate 4, and concrete upper layer 5 is connected with sole plate 4, and reinforcing bar is mixed Solidifying soil king pile 3 and concrete layer 1 are set to the bottom part down of concrete raft plate 2, concrete raft plate 2 and armored concrete king pile 3 It is connected, armored concrete king pile 3 is connected with concrete layer 1.
Concrete layer 1 includes flight, the first support column 105 and stone layer 107, and flight is partly wrapped in stone layer On 107, the first support column 105 is set in stone layer 107, and the first support column 105 is fitted closely with stone layer 107, the first support The top surface of column 105 and the inner surface of flight are connected, and the bottom surface of the first support column 105 is concordant with the bottom surface of stone layer 107.
In the present embodiment, the quantity of the first support column 105 is two.
The flight includes 102, two the second ladders 103 of the first ladder and two third ladders 104, two second-orders Ladder 103 is symmetrically arranged in 102 both sides of the first ladder, and two third ladders 104 are also symmetrically arranged in 102 both sides of the first ladder, the The upper surface of one ladder 102 is horizontal plane, and the bottom surface of the first ladder 102 and the upper surface of the second ladder 103 are connected, the second ladder 103 upper surface is also horizontal plane, and the bottom surface of the second ladder 103 is connected with the upper surface of third ladder 104, third ladder 104 Upper surface also be horizontal plane.The bottom surface of third ladder 104 is concordant with the bottom surface of stone layer 107.
The bottom surface of armored concrete king pile 3 and the upper surface of the first ladder 102 of concrete layer 1 are connected, reinforced concrete The top surface of native king pile 3 is connected with the bottom surface of concrete raft plate 2.
First support column 105 is linear type, the length of the length of the first support column 105 and the upper surface of the first ladder 102 It is identical.
Building foundation structure further includes two the first reinforced concrete piles, 6, two the second reinforced concrete piles 7 and two A third reinforced concrete pile 8, two the first reinforced concrete piles 6 are symmetrically set in the upper horizontal surface both ends of the first ladder 102, The top surface of first reinforced concrete pile 6 is connected with the bottom surface of concrete raft plate 2, the bottom surface and first of the first reinforced concrete pile 6 The upper horizontal surface of ladder 102 is connected;Two the second reinforced concrete piles 7 are respectively arranged in the level of two the second ladders 103 Surface, the top surface of the second reinforced concrete pile 7 and the bottom surface of concrete raft plate 2 are connected, the bottom surface of the second reinforced concrete pile 7 the The upper horizontal surface of two ladders 103 is connected;Two third reinforced concrete piles 8 are respectively arranged on the level of two third ladders 104 The top surface of upper surface, third reinforced concrete pile 8 is also connected with the bottom surface of concrete raft plate 2, the bottom of third reinforced concrete pile 8 Face and the upper horizontal surface of third ladder 104 are connected.
All of above connected mode can be embedded connection.
Concrete layer 1 further includes Concrete Filled layer 101, and Concrete Filled layer 101 is set to armored concrete king pile 3 Side, the side of the first reinforced concrete pile 6, the bottom surface of concrete raft plate 2 and the first ladder 102 upper horizontal surface surround In space.The upper surface of Concrete Filled layer 101 and the bottom surface of concrete raft plate 2 are connected, the bottom surface of Concrete Filled layer 101 with The upper horizontal surface of first ladder 102 is connected, the two sides of Concrete Filled layer 101 respectively with the first reinforced concrete pile 6 Side and the side of armored concrete king pile 3 are connected.The quantity of Concrete Filled layer 101 is two.
The bottom of first support column 105 is equipped with the second support column 106, and the second support column 106 and the first support column 105 are solid Even.
Concrete upper layer 5 includes support platform 501, and the upper surface of support platform 501 is provided with U-type groove 502.
Concrete raft plate 2 is made of armored concrete, and concrete raft plate helps to reduce the pressure of ground, makes ground more It is firm.To the side of armored concrete king pile 3, the side of the first reinforced concrete pile 6, concrete raft plate 2 bottom surface and first When concrete perfusion forms Concrete Filled layer 101 in the space that the upper horizontal surface of ladder 102 surrounds, concrete raft plate 2 In the presence of construction organization on the one hand can be allowed to form complete Toft foundation structure after concrete perfusion, on the other hand can realize and resist Pressure contributes to the pressure for reducing ground, keeps ground more firm;Simultaneously in the first reinforced concrete pile 6, the second armored concrete Under the action of stake 7 and third reinforced concrete pile 8, it can effectively increase the load intensity of concrete raft plate 2, in favor of mixed in perfusion The deformation of concrete raft plate 2 is effectively avoided during soil.
Armored concrete king pile 3 is connected between concrete raft plate 2 and the first ladder 102, can make 2 He of concrete raft plate First ladder 102 is more firm, has the function of supporting superstructure, prevents ground to be collapsed, effectively avoid by building The case where crushing.
Using the present invention building foundation structure when, construction organization can in U-type groove 502 construction wall, wall Lower end be placed in U-type groove 502.U-type groove 502 can undertake wall to its pressure, and there is 502 one side of U-type groove support to add Solid effect, another aspect construction organization can be conducive to shorten working hours along 502 masonry panel of U-type groove, improve work Efficiency.
Building is transferred on concrete raft plate 2 pressure of U-type groove 502 by support platform 501, sole plate 4, mixes Solidifying soil raft plate 2 is building to the pressure transmission of its own to armored concrete king pile 3, the first reinforced concrete pile 6, the second steel Rib concrete pile 7 and third reinforced concrete pile 8, armored concrete king pile 3, the first reinforced concrete pile 6 are suffered by its own Pressure transmission to the first ladder 102 on, the second reinforced concrete pile 7 is the pressure transmission suffered by its own to the second ladder On 103, third reinforced concrete pile 8 in the pressure transmission to third ladder 104 suffered by its own, the first ladder 102 again For pressure transmission to stone layer 107 and the second ladder 103, the second ladder 103 transmits pressure to stone layer 107 and third ladder 104, third ladder 104 transmits pressure to stone layer 107 and ground, in favor of reducing pressure of the building to ground.First The presence of ladder 102, the second ladder 103 and third ladder 104 helps to transmit pressure, increases the anti-pressure ability of ground.Finally Pressure suffered by its own is also passed to ground by stone layer 107, to be further reduced pressure of the building to ground, is increased The anti-pressure ability of ground.Meanwhile stone layer 107 also has supporting role, supports the first ladder 102, the second ladder 103 and the Three ladders 104, prevent it from collapsing downwards, and stone layer 107 helps to disperse pressure, improve the stability of ground.
And first support column 105 be linear type, building passes through the first ladder 102 by concrete raft plate 2 to its pressure It is transmitted to the first support column 105, is conducive to share the pressure on concrete raft plate 2, to improve the anti-pressure ability of ground, first Support column 105 helps to transmit building to the pressure of concrete raft plate 2, prevents building 2 be collapsed of concrete raft plate.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (9)

1. building foundation structure, which is characterized in that including concrete raft plate, armored concrete king pile, sole plate, coagulation Native upper layer and concrete layer, sole plate are set to the over top of concrete raft plate, and sole plate is connected with concrete raft plate, Concrete upper layer is set to the over top of sole plate, and concrete upper layer and sole plate are connected, armored concrete king pile and mixed Ning Tu lower layers are set to the bottom part down of concrete raft plate, and concrete raft plate is connected with armored concrete king pile, armored concrete master Stake is connected with concrete layer.
2. building foundation structure according to claim 1, which is characterized in that concrete layer includes flight, One support column and stone layer, flight are partly wrapped on stone layer, and the first support column is set in stone layer, the first support column and stone The bed of material fits closely, and the top surface of the first support column and the inner surface of flight are connected, the bottom surface of the first support column and stone layer Bottom surface is concordant.
3. building foundation structure according to claim 2, which is characterized in that concrete upper layer includes support platform, The upper surface of support platform is provided with U-type groove.
4. building foundation structure according to claim 2 or 3, which is characterized in that the flight includes the first rank Ladder, two the second ladders and two third ladders, two the second ladders are symmetrically arranged in the first ladder both sides, two third ladders Also the first ladder both sides are symmetrically arranged in, the upper surface of the first ladder is horizontal plane, the bottom surface of the first ladder and the second ladder Upper surface is connected, and the upper surface of the second ladder is also horizontal plane, and the bottom surface of the second ladder is connected with the upper surface of third ladder, the The upper surface of three ladders is also horizontal plane;The bottom surface of third ladder is concordant with the bottom surface of stone layer.
5. building foundation structure according to claim 4, which is characterized in that building foundation structure further includes two A first reinforced concrete pile, two the second reinforced concrete piles and two third reinforced concrete piles, two the first reinforcing bars are mixed Solidifying soil stake is symmetrically set in the upper horizontal surface both ends of the first ladder, the bottom of the top surface and concrete raft plate of the first reinforced concrete pile Face is connected, and the bottom surface of the first reinforced concrete pile and the upper horizontal surface of the first ladder are connected;Two the second reinforced concrete piles It is respectively arranged on the upper horizontal surface of two the second ladders, the top surface of the second reinforced concrete pile is solid with the bottom surface of concrete raft plate Even, the upper horizontal surface of the second ladder of bottom surface of the second reinforced concrete pile is connected;Two third reinforced concrete piles are set respectively It is also connected with the bottom surface of concrete raft plate in the top surface of the upper horizontal surface of two third ladders, third reinforced concrete pile, the The bottom surface of three reinforced concrete piles is connected with the upper horizontal surface of third ladder.
6. building foundation structure according to claim 5, which is characterized in that concrete layer further includes that concrete is filled out Fill layer, Concrete Filled layer is set to the side of armored concrete king pile, the side of the first reinforced concrete pile, concrete raft plate In the space that the upper horizontal surface of bottom surface and the first ladder surrounds;The bottom surface of the upper surface and concrete raft plate of Concrete Filled layer Be connected, the upper horizontal surface of the bottom surface of Concrete Filled layer and the first ladder is connected, the two sides of Concrete Filled layer respectively with The side of first reinforced concrete pile and the side of armored concrete king pile are connected.
7. building foundation structure according to claim 2 or 3, which is characterized in that the bottom of the first support column is equipped with Second support column, the second support column and the first support column are connected.
8. building foundation structure according to claim 1 or 2 or 3, which is characterized in that the number of first support column Amount is two or more.
9. building foundation structure according to claim 1 or 2 or 3, which is characterized in that concrete raft plate is mixed by reinforcing bar Solidifying soil is made.
CN201810678844.XA 2018-06-27 2018-06-27 building foundation structure Pending CN108589756A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810678844.XA CN108589756A (en) 2018-06-27 2018-06-27 building foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810678844.XA CN108589756A (en) 2018-06-27 2018-06-27 building foundation structure

Publications (1)

Publication Number Publication Date
CN108589756A true CN108589756A (en) 2018-09-28

Family

ID=63634049

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810678844.XA Pending CN108589756A (en) 2018-06-27 2018-06-27 building foundation structure

Country Status (1)

Country Link
CN (1) CN108589756A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576487A (en) * 2020-06-01 2020-08-25 许庆仁 Underground engineering foundation bottom plate structure and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1158105A2 (en) * 2000-05-25 2001-11-28 Willibald Fischer Shuttering
JP3465026B2 (en) * 1999-02-03 2003-11-10 ジェイ建築システム株式会社 Forming method of pressure plate type foundation
CN202440827U (en) * 2012-02-07 2012-09-19 万华节能建材股份有限公司 U-shaped groove foundation of prefabricated building
CN204491648U (en) * 2015-03-25 2015-07-22 浙江华东工程建设管理有限公司 A kind of Toft foundation structure
CN107119704A (en) * 2017-06-20 2017-09-01 南京长江都市建筑设计股份有限公司 The precast concrete groove profile foundation structure and construction method of a kind of concrete earthen wall
CN107338803A (en) * 2017-07-13 2017-11-10 浙江永联建设工程股份有限公司 A kind of assembly type building U-type groove basis and its construction method
CN208685646U (en) * 2018-06-27 2019-04-02 湖南省第六工程有限公司 A kind of building foundation structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3465026B2 (en) * 1999-02-03 2003-11-10 ジェイ建築システム株式会社 Forming method of pressure plate type foundation
EP1158105A2 (en) * 2000-05-25 2001-11-28 Willibald Fischer Shuttering
CN202440827U (en) * 2012-02-07 2012-09-19 万华节能建材股份有限公司 U-shaped groove foundation of prefabricated building
CN204491648U (en) * 2015-03-25 2015-07-22 浙江华东工程建设管理有限公司 A kind of Toft foundation structure
CN107119704A (en) * 2017-06-20 2017-09-01 南京长江都市建筑设计股份有限公司 The precast concrete groove profile foundation structure and construction method of a kind of concrete earthen wall
CN107338803A (en) * 2017-07-13 2017-11-10 浙江永联建设工程股份有限公司 A kind of assembly type building U-type groove basis and its construction method
CN208685646U (en) * 2018-06-27 2019-04-02 湖南省第六工程有限公司 A kind of building foundation structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
丁兆锋等: "U型槽结构设计与分析 ", 《铁道工程学报》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576487A (en) * 2020-06-01 2020-08-25 许庆仁 Underground engineering foundation bottom plate structure and construction method thereof
CN111576487B (en) * 2020-06-01 2021-02-09 广东佰业泰建设工程有限公司 Underground engineering foundation bottom plate structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN203174619U (en) Reverse raft concrete terrace
CN102926400A (en) Combined earth retaining wall structure and construction method thereof
CN201770942U (en) Support for soft soil foundation cast-in-place concrete continuous beam bridge
CN207933826U (en) The fore-telling shaped pile anchor structure of guardrail reinforcing integrated with roadbed
CN102864796A (en) Construction spreading foundation adaptive to filled ground settlement and construction method
CN202730796U (en) Existing retaining wall rib plate type unloading reinforcing structure
CN208685646U (en) A kind of building foundation structure
CN108589756A (en) building foundation structure
CN211665773U (en) Unloading plate type supporting structure
CN216891816U (en) A high stability road bed filling structure for road engineering
CN202430682U (en) Permeable jetty
CN111005389A (en) Construction method of unloading plate type supporting structure
CN110295573A (en) Adapt to the channel revetment project post-evaluation structure of construction time severe hydrometeorological condition
CN212223764U (en) Dam prevention of seepage structure for hydraulic engineering
CN211973356U (en) Soft soil foundation dyke structure
CN211523243U (en) Reinforcement type highway bank protection
CN211057845U (en) Retaining wall structure for water conservancy project diversion canal
CN203256771U (en) Semi-gravity type column and board combined retaining wall structure
CN208803305U (en) Prefabricated GFRP pipe concrete stake and concrete slab overhead type roadbed pile slab structure
CN221167885U (en) Soft soil foundation anti-sedimentation drainage structure
CN102383417B (en) Combined framework pile
CN111501662A (en) Soft soil foundation dyke structure
CN210216052U (en) Composite structure for treating high-fill foundation containing soft soil layer
CN211872952U (en) Soil layer structure for enhancing stability
CN210216179U (en) Buttress type truss reinforcing structure of bridge abutment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180928