CN108588868A - A kind of chemical fibre processing ring blowing spinning equipment - Google Patents
A kind of chemical fibre processing ring blowing spinning equipment Download PDFInfo
- Publication number
- CN108588868A CN108588868A CN201810796428.XA CN201810796428A CN108588868A CN 108588868 A CN108588868 A CN 108588868A CN 201810796428 A CN201810796428 A CN 201810796428A CN 108588868 A CN108588868 A CN 108588868A
- Authority
- CN
- China
- Prior art keywords
- air
- several
- cooling
- pipe
- air cavity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01D—MECHANICAL METHODS OR APPARATUS IN THE MANUFACTURE OF ARTIFICIAL FILAMENTS, THREADS, FIBRES, BRISTLES OR RIBBONS
- D01D5/00—Formation of filaments, threads, or the like
- D01D5/08—Melt spinning methods
- D01D5/088—Cooling filaments, threads or the like, leaving the spinnerettes
- D01D5/092—Cooling filaments, threads or the like, leaving the spinnerettes in shafts or chimneys
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Textile Engineering (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
The invention discloses a kind of chemical fibre processing ring blowing spinning equipment,Including ring blower,The inside of the ring blower offers endoporus and air cavity,The air cavity is located at the side of endoporus,And the inside of air cavity is equipped with several partition boards and cooling water pipe,Several described cooling water pipes run through partition board,Several described partition boards will be divided into several cooling chambers inside air cavity,The present invention is provided with cooling chamber,First air valve,Partition board and cooling water pipe,During being blowed cooling,It is directed respectively into circulating condensing water and air in cooling water pipe from blast pipe to ring blower and air cavity first by water inlet pipe and,Condensed water is entered by water inlet pipe in penstock,Then several cooling water pipes are uniformly flowed to,Simultaneously,Air enters air cavity by blast pipe,And several partition boards are sequentially passed through by check valve,And in the process,The circulating direction of air is opposite with the circulating direction of condensed water.
Description
Technical field
The invention belongs to chemical fiber wire processing technique fields, and in particular to a kind of chemical fibre processing ring blowing spinning equipment.
Background technology
Chemical fiber wire processing refers to and needs high-molecular compound being heated into solution in process of production, by extruder by solution
Or melt is extruded from the pore of spinning head, the high temperature fiber silk then sprayed is dried by the ring being arranged below spinning head and is filled
Set cooling and shaping.
In the Chinese patent of Patent No. CN206970748U, it is proposed that a kind of experimental branch line ring blowing device leads to
Crossing the flowing of cooling flow in set water circulating pipe will be taken away by the heat of high-temperature fusant and equipment generation so that wind turbine
The wind-warm syndrome of blowout is efficiently molded convenient for high temperature chemical fiber wire, and by controlling to adjust flow valve switch size, controls cooling flow stream
Speed keeps filametntary cooling velocity different, and the filament to obtain different elasticity, toughness still in above equipment, passes through
Flow valve realizes the control to cooling velocity, and it is quick to realize that the keying of flow valve be easy to cause flow valve for a long time in control process
Aging causes control effect to decline, and influences the output effect of cold air, and ring blower itself can not ensure sky be discharged
Whether temperature degree is stablized, and the in addition keying of flow valve needs multiple electrical equipments mutually to assist that integrated operation could be completed, if certain
One component wear or open circuit then cause entire temperature control device that can not use, and influence the molding effect of chemical fiber wire.
Invention content
The purpose of the present invention is to provide a kind of chemical fibre processing ring blowing spinning equipment, to solve existing ring blower
It itself can not ensure whether air themperature be discharged is stablized to ask with what electrical equipment damage be easy to cause that flow valve can not use
Topic.
To achieve the above object, the present invention provides the following technical solutions:A kind of chemical fibre processing ring blowing spinning equipment, packet
Including ring blower, the inside of the ring blower offers endoporus and air cavity, and the air cavity is located at the side of endoporus, and air cavity
Inside is equipped with several partition boards and cooling water pipe, several described cooling water pipes run through partition board, several described partition boards will
It is divided into several cooling chambers inside air cavity, the first air valve is respectively connected between several described cooling chambers and endoporus, it is described cold
But the both ends of water pipe are connected separately with penstock and water output duct, and the penstock and water output duct are respectively positioned on one of them
The inside of cooling chamber.
Preferably, the inside of first air valve offers valve opening, and the inside of the valve opening is equipped with sealing ring and installation
Plate, the mounting plate are located at the side of sealing ring, and pressure bladder and the second gas are separately installed on the both sides outer wall of mounting plate
Valve, the pressure bladder are located at the inside of sealing ring.
Preferably, the inside of the mounting plate offers venthole and mounting groove, and the venthole is located at the two of mounting groove
The inside of side, the mounting groove is equipped with balance air bag and sealing plate, and the sealing plate is fixed on the both sides of balance air bag.
Preferably, the inside of the pressure bladder is equipped with capsula interna, and balance is connected between the capsula interna and balance air bag
Tracheae.
Preferably, the inside of several partition boards is mounted on check valve, the both ends of the check valve respectively with two
Adjacent cooling chamber connection.
Preferably, water inlet pipe, outlet pipe and blast pipe, the blast pipe are installed on the side outer wall of the ring blower
Between water inlet pipe and outlet pipe, the water inlet pipe and outlet pipe are connect with penstock and water output duct respectively.
Compared with prior art, the present invention having the advantages that:
(1) present invention is provided with cooling chamber, the first air valve, partition board and cooling water pipe, during being blowed cooling,
It is directed respectively into circulating condensing water and air in cooling water pipe from blast pipe to ring blower and air cavity first by water inlet pipe and,
Condensed water is entered by water inlet pipe in penstock, several cooling water pipes are then uniformly flowed to, meanwhile, air by blast pipe into
Enter air cavity, and several partition boards are sequentially passed through by check valve, and in the process, the circulating direction of air and the stream of condensed water
Logical direction is on the contrary, air gradually generates the heat effect of changing with condensed water in several cooling chambers so that ventilating air in air cavity
Temperature continuously decreases, and when the air themperature in a certain cooling chamber makes the first air valve show the state of balance contraction, air is then
It is expelled to endoporus from the cooling chamber, to the chemical fiber wire fast cooling shaping for making spinning head be sprayed, in integrally cooling discharge
In the process, air is changed with the gradual heat of condensed water, and the temperature of air shows the phenomenon that gradually declining, and with the of cooling chamber side
One air valve interacts, to realize the discharge of air, in the case where the first air valve structure remains unchanged so that it was opened
Condition also remains unchanged, thus in cooling procedure, no matter air is discharged from which cooling chamber, can guarantee discharge air
Temperature is identical so that ring blower plays the role of constant temperature air draft, in the case where not changing condensate flow size, realizes
The exhaust effect that ring blower is stablized, so that the cooling procedure of chemical fiber wire is more uniform.
(2) present invention is provided with cooling chamber and the first air valve, and for air during being cooled down, pressure bladder is in cold sky
It is gradually tapered up under the action of gas, until pressure bladder is contracted to when being detached from sealing state with sealing ring, the first air valve is opened, empty
Gas is then discharged by the cooling chamber corresponding to first air valve, and in addition the first air valve has the function of low-temperature protection, in pressure bladder
When suffered too low air temperature, pressure bladder generates moment and shrinks, and squeezes internal capsula interna, and interior intracapsular gas is squeezed
Go out, be imported into balance air bag by balance tracheae, balance air bag generates expansion at this time so that the sealing plate of both sides is to mounting groove
Both ends are moved, and are formed sealing between sealing plate and mounting groove, have been blocked the connection between the venthole of mounting groove both sides, made mounting plate
Sealing structure is formed, avoids the first air valve at this from being opened, overall structure is mutual with gas by expanding with heat and contract with cold for gas
The keying of the first air valve is realized in conducting, realizes that the automatic constant-temperature of valve itself is opened under not by the support of any control element
It opens, the constant temperature discharge for remaining to effectively realize air in the state that unregulated power is connected in ring blower is effectively ensured, and if need to change
The exhaust temperature of changing air then changes the gas content inside pressure bladder.
Description of the drawings
Fig. 1 is the front view of the present invention;
Fig. 2 is the vertical view of the present invention;
Fig. 3 is the structural schematic diagram of the first air valve of the invention;
Fig. 4 is the structural schematic diagram of mounting plate of the present invention;
In figure:1- rings blower, 2- endoporus, 3- air cavitys, 31- cooling chambers, the first air valves of 32-, 33- valve openings, 34- sealings
Ring, 35- mounting plates, 351- ventholes, 352- mounting grooves, 353- balance air bags, 354- sealing plates, 36- pressure bladders, in 361-
Capsule, the second air valves of 37-, 4- partition boards, 41- check valves, 5- cooling water pipes, 51- penstocks, 52- water output ducts, 6- water inlet pipes,
7- outlet pipes, 8- blast pipes.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
It please refers to Fig.1 shown in-Fig. 4, the present invention provides the following technical solutions:A kind of chemical fibre processing is set with ring blowing spinning
It is standby, including ring blower 1, the inside of ring blower 1 offers endoporus 2 and air cavity 3, air cavity 3 is located at the side of endoporus 2, and gas
The inside of chamber 3 is equipped with several partition boards 4 and cooling water pipe 5, several cooling water pipes 5 run through partition board 4, several partition boards 4
It will be divided into several cooling chambers 31 inside air cavity 3, the first air valve 32 is respectively connected between several cooling chambers 31 and endoporus 2,
The both ends of cooling water pipe 5 are connected separately with penstock 51 and water output duct 52, and penstock 51 and water output duct 52 are respectively positioned on
Recirculated water in cooling water pipe 5 is carried out heat with the air in cooling chamber 31 and changed, to drop by the inside of one of cooling chamber 31
Lower air temperatures, and multiple cooling chambers 31 realize multiple cooling, improve the cooling effect of air, and leading by the first air valve 32
Logical to export cold air, the first air valve 32 realizes autobalance outlet, ensures that the air themperature in endoporus 2 is constant.
Further, the inside of the first air valve 32 offers valve opening 33, and the inside of valve opening 33 is equipped with sealing ring 34 and peace
Loading board 35, mounting plate 35 are located at the side of sealing ring 34, and pressure bladder 36 is separately installed on the both sides outer wall of mounting plate 35
With the second air valve 37, pressure bladder 36 positioned at the inside of sealing ring 34, the first air valve is realized in the contraction for passing through pressure bladder 36
32 conducting.
Further, the inside of mounting plate 35 offers venthole 351 and mounting groove 352, and venthole 351 is located at installation
The inside of the both sides of slot 352, mounting groove 352 is equipped with balance air bag 353 and sealing plate 354, and sealing plate 354 is fixed on Balance Air
The keying of venthole 351 is realized in the both sides of capsule 353, the position by changing sealing plate 354.
Specifically, the inside of pressure bladder 36 is equipped with capsula interna 361, is connected between capsula interna 361 and balance air bag 353 flat
Weigh tracheae, capsula interna 361 is squeezed when 36 transition of pressure bladder is shunk, to make capsula interna 361 and 353 disequilibrium shape of balance air bag
State.
It is worth noting that the inside of several partition boards 4 is mounted on check valve 41, the both ends of check valve 41 are respectively with two
A adjacent cooling chamber 31 connects, and the one-way flow of gas is realized by the conducting of check valve 41.
Preferably, water inlet pipe 6, outlet pipe 7 and blast pipe 8, blast pipe 8 are installed on the side outer wall of ring blower 1
Between water inlet pipe 6 and outlet pipe 7, water inlet pipe 6 and outlet pipe 7 are connect with penstock 51 and water output duct 52 respectively, are passed through
Water inlet pipe 6 and outlet pipe 7 realize respectively recirculated water lead into export.
The operation principle and process for using of the present invention:During being blowed cooling, first by water inlet pipe 6 and into
Air hose 8 is directed respectively into circulating condensing water and air in the cooling water pipe 5 and air cavity 3 into ring blower 1, and condensed water passes through water inlet
Pipe 6 enters in penstock 51, then uniformly flows to several cooling water pipes 5, meanwhile, air enters air cavity 3 by blast pipe 8,
And several partition boards 4 are sequentially passed through by check valve 41, and in the process, the circulation side of the circulating direction and condensed water of air
To on the contrary, air gradually generates the heat effect of changing with condensed water in several cooling chambers 31 so that the temperature of ventilating air in air cavity 3
Degree continuously decreases, and during temperature reduces, pressure bladder 36 gradually tapers up under the action of cold air, until blanket gas
When capsule 36 is contracted to the disengaging sealing state of sealing ring 34, the first air valve 32 is opened, and air is corresponding to first air valve 32
Cooling chamber 31 be discharged, cold air after discharge passes through the endoporus 2 of ring blower 1 to blow to spinning head, to make the chemical fibre of ejection
Silk fast cooling shaping, in addition during progress heat is changed, the first air valve 32 also has the function of low-temperature protection, in blanket gas
When too low air temperature suffered by capsule 36, pressure bladder 36 generates moment and shrinks, and squeezes internal capsula interna 361, in capsula interna 361
Gas be extruded, be imported into balance air bag 353 by balance tracheae, at this time balance air bag 353 generate expansion so that both sides
Sealing plate 354 to 352 both ends of mounting groove move, between sealing plate 354 and mounting groove 352 formed sealing, blocked mounting groove
Connection between 352 both sides ventholes 351 makes mounting plate 35 form sealing structure, the first air valve 32 at this is avoided to be opened,
The balance open state of the first air valve 32 is effectively ensured by the structure of two way seal so that the air themperature in cooling chamber 31
It only can be just discharged when forming balance with the first air valve 32, the air for effectively preventing overheating or being subcooled is discharged, and ensure that
The temperature of air is discharged, realizes constant temperature discharge so that the cooling procedure of chemical fiber wire is more uniform.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of chemical fibre processing ring blowing spinning equipment, including ring blower (1), it is characterised in that:The ring blower (1)
Inside offer endoporus (2) and air cavity (3), the air cavity (3) is located at the side of endoporus (2), and the inside installation of air cavity (3)
Have several partition boards (4) and cooling water pipe (5), several described cooling water pipes (5) run through partition board (4), several it is described every
Plate (4) will be divided into several cooling chambers (31) inside air cavity (3), between several described cooling chambers (31) and endoporus (2)
It is connected with the first air valve (32), the both ends of the cooling water pipe (5) are connected separately with penstock (51) and water output duct (52),
The penstock (51) and water output duct (52) are respectively positioned on the inside of one of cooling chamber (31).
2. a kind of chemical fibre processing ring blowing spinning equipment according to claim 1, it is characterised in that:First air valve
(32) inside offers valve opening (33), and the inside of the valve opening (33) is equipped with sealing ring (34) and mounting plate (35), described
Mounting plate (35) is located at the side of sealing ring (34), and pressure bladder (36) is separately installed on the both sides outer wall of mounting plate (35)
With the second air valve (37), the pressure bladder (36) is located at the inside of sealing ring (34).
3. a kind of chemical fibre processing ring blowing spinning equipment according to claim 2, it is characterised in that:The mounting plate
(35) inside offers venthole (351) and mounting groove (352), and the venthole (351) is located at the two of mounting groove (352)
The inside of side, the mounting groove (352) is equipped with balance air bag (353) and sealing plate (354), and the sealing plate (354) is fixed
Both sides in balance air bag (353).
4. a kind of chemical fibre processing ring blowing spinning equipment according to claim 2, it is characterised in that:The pressure bladder
(36) inside is equipped with capsula interna (361), and balance tracheae is connected between the capsula interna (361) and balance air bag (353).
5. a kind of chemical fibre processing ring blowing spinning equipment according to claim 1, it is characterised in that:Several it is described every
The inside of plate (4) is mounted on check valve (41), and adjacent cooling chamber (31) connects with two respectively at the both ends of the check valve (41)
It connects.
6. a kind of chemical fibre processing ring blowing spinning equipment according to claim 1, it is characterised in that:The ring blower
(1) water inlet pipe (6), outlet pipe (7) and blast pipe (8) are installed, the blast pipe (8) is located at water inlet pipe on side outer wall
(6) between outlet pipe (7), the water inlet pipe (6) and outlet pipe (7) connect with penstock (51) and water output duct (52) respectively
It connects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810796428.XA CN108588868A (en) | 2018-07-19 | 2018-07-19 | A kind of chemical fibre processing ring blowing spinning equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810796428.XA CN108588868A (en) | 2018-07-19 | 2018-07-19 | A kind of chemical fibre processing ring blowing spinning equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108588868A true CN108588868A (en) | 2018-09-28 |
Family
ID=63618696
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810796428.XA Withdrawn CN108588868A (en) | 2018-07-19 | 2018-07-19 | A kind of chemical fibre processing ring blowing spinning equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108588868A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109594138A (en) * | 2019-01-16 | 2019-04-09 | 湖北天运消音防振新材料有限公司 | A kind of hollow terylene production line cooling back installation |
CN110359102A (en) * | 2019-06-28 | 2019-10-22 | 张家港江苏科技大学产业技术研究院 | A kind of ring blower cooling device |
CN111534870A (en) * | 2020-04-25 | 2020-08-14 | 浙江恒百华化纤有限公司 | POY silk cooling device |
CN115434025A (en) * | 2022-08-04 | 2022-12-06 | 南通文凯化纤有限公司 | Forming device for graphene filament fibers |
-
2018
- 2018-07-19 CN CN201810796428.XA patent/CN108588868A/en not_active Withdrawn
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109594138A (en) * | 2019-01-16 | 2019-04-09 | 湖北天运消音防振新材料有限公司 | A kind of hollow terylene production line cooling back installation |
CN110359102A (en) * | 2019-06-28 | 2019-10-22 | 张家港江苏科技大学产业技术研究院 | A kind of ring blower cooling device |
CN111534870A (en) * | 2020-04-25 | 2020-08-14 | 浙江恒百华化纤有限公司 | POY silk cooling device |
CN111534870B (en) * | 2020-04-25 | 2021-07-06 | 浙江恒百华化纤有限公司 | POY silk cooling device |
CN115434025A (en) * | 2022-08-04 | 2022-12-06 | 南通文凯化纤有限公司 | Forming device for graphene filament fibers |
CN115434025B (en) * | 2022-08-04 | 2023-10-20 | 南通文凯化纤有限公司 | Forming device for graphene filament fibers |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108588868A (en) | A kind of chemical fibre processing ring blowing spinning equipment | |
CN208791823U (en) | A kind of chemical fibre processing circular blow wind spinning equipment | |
CN204768175U (en) | Circulation desicator | |
CN201721121U (en) | Residual heat recovering device for drying oven of intaglio press | |
CN108344293A (en) | Temperature and pressure control system and control method for dryer | |
CN109109233B (en) | Quick switching pipeline for die temperature control waterway and control method thereof | |
CN208296562U (en) | Temperature and pressure control system for dryer | |
CN115807873A (en) | Ultra-high temperature quick valve group with heat exchange function | |
CN205517158U (en) | Hydrogen purification drying device | |
CN201129905Y (en) | Hot pipe waste heat recovery type dryer | |
CN204730611U (en) | A kind of woven fabric energy-saving dryer | |
CN100552355C (en) | A kind of heat pipe residual heat recovery type drying machine | |
CN204678857U (en) | A kind of woven fabric energy-saving dryer | |
CN202247404U (en) | Heating device of washing machine | |
CN212124132U (en) | A weather machine for extruder production line | |
CN109811418B (en) | Primary three-dimensional single-component fiber production line and production process | |
CN208805081U (en) | A kind of heat exchanger of Space Rotating equipment water-cooling | |
CN209273737U (en) | A kind of cooling device for plastic master batch preparation | |
CN208717480U (en) | A kind of polyester filament beam production circular blow wind apparatus | |
CN206347806U (en) | A kind of circulating air drying device of high-module high-strength polyethylene fibre heated drying casing | |
CN208133374U (en) | A kind of cooling bucket of the whirlwind being granulated for EVA | |
CN205593185U (en) | Paddle heating device | |
CN110164657A (en) | A kind of intelligent temperature control super heat-conductive pipe air cooling heat exchanger | |
CN220163190U (en) | Cooling device at tail end of plastic extruder | |
CN216347682U (en) | Efficient closed-loop dehumidification heat pump dryer with forward and reverse rotating fans |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180928 |
|
WW01 | Invention patent application withdrawn after publication |