CN108583779A - A kind of packaging technology of ship - Google Patents

A kind of packaging technology of ship Download PDF

Info

Publication number
CN108583779A
CN108583779A CN201810393005.3A CN201810393005A CN108583779A CN 108583779 A CN108583779 A CN 108583779A CN 201810393005 A CN201810393005 A CN 201810393005A CN 108583779 A CN108583779 A CN 108583779A
Authority
CN
China
Prior art keywords
pump room
segmentation
siding
canopy
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810393005.3A
Other languages
Chinese (zh)
Inventor
胡少军
刘亚东
吕岩
熊飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Shipyard International Co Ltd
Original Assignee
Guangzhou Shipyard International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Shipyard International Co Ltd filed Critical Guangzhou Shipyard International Co Ltd
Priority to CN201810393005.3A priority Critical patent/CN108583779A/en
Publication of CN108583779A publication Critical patent/CN108583779A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The invention discloses a kind of packaging technologies of ship, belong to shipbuilding technical field.The technique includes:In ground the segmentation of the bottom of superstructure is protruded towards stem on build part siding and be segmented as individual pump room canopy, this division methods is not destroyed on original and builds antetheca, does not interfere with the intensity for building block, is not required to additional reinforcer reinforcement.By on pump room canopy segmental hoisting to pump room siding segmentation, in the segmentation of pump room siding and installation cargo oil pipe and related iron Xi parts between outskirt, pump room block is constituted;After the completion of pump room general assembly, it is transported to building berth over-assemble into hull, then case is freighted oil pump.The technique make fitting-out operation in advance and total group on the ground, realize process Forward, shorten assembling cycle, saved resource and cost, improve worker's operating environment.

Description

A kind of packaging technology of ship
Technical field
The present invention relates to shipbuilding technical field more particularly to a kind of packaging technologies of ship.
Background technology
Traditional shipbuilding mode pump room canopy (Cargo Oil Pump) is to make the islands a Ge Shangjianqian block with the islands Shang Jianqian, and block is in undocking It lifts within first 15 days or so, the associated constructions such as machine, first, electricity unit carries out the related work in this region again after lifting.Due to above building Preceding island block lifting opportunity is later, related fitting-out professional work such as cargo oil pipe (spy the applies pipe) system in this region, cable manifold, goods Grease cabin, inert gas system, compressed air system, pumping system, foaming system, fire-fighting system etc. are difficult to realize to report in the dock stage It tests completely, these were all in dock operation and to apply for checking and examination in the past, because of the various aspects limitation of the device resource and its environment of harbour, in Xi It is narrow to pretend in industry that there are assembling spaces, needs high-altitude cross-operation, and very long etc. various problems duty cycle.
Invention content
The purpose of the present invention is to provide a kind of packaging technologies of ship, to solve fitting-out operation week of the existing technology The problem of phase is very long, assembling space is narrow and high-altitude cross-operation.
To achieve the above object, following technical scheme is provided,
The packaging technology of ship provided by the invention, the processing step include:In ground, by the bottom of superstructure point Part siding is built on Duan Chaoxiang stems protrusion to be segmented as individual pump room canopy, by the pump room canopy segmental hoisting to pump room wall In plate segmentation, in pump room siding segmentation and installation cargo oil pipe and related iron Xi parts between outskirt, pump room block is constituted;
After the completion of the pump room general assembly, the pump room block is integrally transported on building berth, with other blocks into Row assembling constitutes hull, then Cargo Oil Pump is lifted in the pump room canopy siding segmentation.
Further, the pump room siding segmentation includes being arranged in the bulkhead of ship pump room surrounding and under the bulkhead The deck of side;The lower section setting structure crossbeam on the deck, is equipped with pipe and cable, the deck in the structural beams Centre is provided with Cargo Oil Pump mounting hole.
Further, fire-proof and water-proof material is filled inside the structural beams.
Further, when assembling the pump room siding segmentation, first antetheca is placed on platform, in the surrounding of the antetheca Remaining three bulkheads of welding and the deck, use bearing diagonal to remaining three bulkheads and institute in the welding process Deck is stated to be supported.
Further, the bearing diagonal is had to after the pump room canopy segmentation group installs after being more than or equal to 4 hours It removes again.
Further, the bearing diagonal is removed again after the pump room block and other general assemblies are at hull.
Further, pump room canopy segmentation is laterally lifted on the hatch of the pump room siding segmentation.
Further, location adjusting device is installed in advance to be positioned on the deck, then lifts the pump room again Canopy is segmented.
Further, the predetermined bit positions of pump room canopy segmentation are calculated first, in accordance with the design drawing of ship, and The pre-installed position that corresponding location adjusting device is drawn in the pump room canopy siding segmentation, pacifies on the pre-installed position The location adjusting device is filled, the pump room canopy segmentation is then lifted.
Further, before the Cargo Oil Pump is installed, intermediate support is installed on institute by support element tool locating It states on the bulkhead in pump room block, to position.
Compared with prior art, the present invention by the segmentation of the bottom of superstructure towards stem protrude on build part siding work It is segmented for individual pump room canopy, and the other parts reservation of the bottom of superstructure segmentation is constant, this division methods does not destroy original Antetheca is built on coming, therefore does not interfere with the overall construction intensity for building block, then is not required to additional reinforcer reinforcement.On ground On face by the segmentation of pump room canopy with the segmentation of pump room siding is logical assembles, can complete to assemble to fast accurate, and in pump room canopy and The outfititems such as cargo oil pipe and related iron Xi parts are installed between outskirt, constitute pump room block.Then pump room block it is whole and other General assembly constitutes hull.The technique makes the former fitting-out operation that need to be carried out in harbour be advanced to ground and always organize the stage, realizes Process moves forward, and related fitting-out operation can be completed for about 4 months in advance.And assembling space can also be avoided narrow, high in this way The problems such as empty cross-operation, makes three-dimensional operation planarize, and improves worker's operating environment, improves operating efficiency, and it is hidden to reduce safety Suffer from, because not needing special hardware aid, so comparing the construction before its optimization, input, which has no, to be obviously increased.It is greatly saved The resources such as artificial kinetic energy equipment have reached the cost efficiency purpose of shipbuilding industry promotion.
Description of the drawings
Fig. 1 is the structural schematic diagram one of the ship in the embodiment of the present invention;
Fig. 2 is the structural schematic diagram two of the ship in the embodiment of the present invention.
Reference numeral:1- pump room canopies are segmented;2- pump room sidings are segmented.
Specific implementation mode
Technical solution to further illustrate the present invention below with reference to the accompanying drawings and specific embodiments.
For make present invention solves the technical problem that, the technical solution that uses and the technique effect that reaches it is clearer, below The technical solution of the embodiment of the present invention will be described in further detail in conjunction with attached drawing, it is clear that described embodiment is only It is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those skilled in the art exist The every other embodiment obtained under the premise of creative work is not made, shall fall within the protection scope of the present invention.
The building of ship is first to mark off each segmentation, and each segmentation is assembled, later by assembled each segmentation It is lifted, constitutes complete ship.The present embodiment optimizes division to pump room canopy segmentation 1 and pump room siding segmentation 2 so that Manufacturing cycle shortens.Pump room siding segmentation 2 includes being arranged in the bulkhead of ship pump room surrounding and under bulkhead in the present embodiment The deck of side.The lower section setting structure crossbeam on deck is equipped with pipe and cable in structural beams, and setting is in stockit is available among deck Oil pump mounting hole.It is damaged to prevent pipe and cable etc. from meeting fire burning or being soaked in water, filling is anti-inside structural beams Fiery waterproof material.Specifically, structural beams are the proximate matter being welded below deck, and it is small that multiple structures are extended downwardly in structural beams Beam is connected with mounting groove on structure girder, and independent wall is connected in mounting groove, and the top of independent wall, which passes through, connects hull Structure girder avoids the structural beams of upper deck bottom, and closely coupled with structure girder, be effectively ensured cabin leakproofness, Soundproof effect, air-conditioning effect.Wherein, structure girder is L-type structure, and the lower end of L-type structure is mutually welded with mounting groove, both alleviated The weight and volume of pump room separation wall construction, and play the purpose for reinforcing independent wall.Mounting groove is U-type groove, independent wall It is connected in U-type groove.Further, multiple mounting holes are further opened on structure girder, be equipped in mounting hole wiring pipe and Cable.So that cable and wiring pipe are fixed in the same direction on structure girder, it is not only not take up floor space, but also succinct Beauty, simultaneously as special mounting hole installation so that the maintenance and maintenance of circuit are more simple and convenient.
The packaging technology of ship provided in this embodiment, as depicted in figs. 1 and 2, which includes:
Step S100:On the ground, using the bottom of superstructure be segmented towards stem protrude on build part siding as Individually pump room canopy segmentation 1 divides improve regularity in this way, can reduce and build segmentation and the welding of pump room general assembly on follow-up Difficulty, be conducive to assembly operation;
Step S200:Pump room siding segmentation 2 is assembled, first antetheca is placed on platform, is welded in the surrounding of antetheca remaining Three bulkheads and deck are in the welding process supported remaining three bulkheads and deck using bearing diagonal, each bulkhead And deck is at least spaced two bearing diagonals of setting;
Step S300:Analysis calculating is carried out to ship overall design drawing using finite element method, obtains pump room canopy point The predetermined bit positions of section 1, and the pre-installed position that corresponding location adjusting device is marked on 2 is segmented in pump room siding, and it is right The pre-installed position is supported power calculating, selects satisfactory location adjusting device, and be mounted on above-mentioned pre-installed position;
Step S400:Pump room canopy segmentation 1 is lifted into pump room siding segmentation 2 under the positioning of above-mentioned location adjusting device On hatch;
Step S400:Above-mentioned specific location adjusting device is removed, and is torn open after 4 hours have been welded in pump room canopy segmentation 1 Except bearing diagonal.
Step S500:Cargo oil pipe and the related iron Xi parts in this region are installed between pump room canopy and outskirt, it is total to constitute pump room Section.
Step S600:Pump room block is integrally transported on building berth, and is assembled hull on other blocks, then will Cargo Oil Pump is lifted in the segmentation of pump room canopy siding.
By using finite element analysis ship entirety drawing, the predetermined bit positions of pump room canopy segmentation 1 can be accurately found out, Good data support is provided for the installation of follow-up location adjusting device.
In another embodiment, bearing diagonal is removed again after pump room block and other general assemblies are at hull.Exist in this way There is additional effective support construction to support during assembling pump room siding segmentation 2 and lifting pump room block, has It prevents to effect the pump room canopy segmentation 1 after assembled formation to occur to sink and deform, ensure that the horizontal accuracy of pump room canopy segmentation 1, The construction precision for improving the bottom segmentation of the superstructure in later stage, reduces the workload reprocessed and corrected, improves processing Speed.
Specifically, above-mentioned specific location adjusting device includes pedestal, and multiple universal wheels, pedestal are provided with below pedestal Top be provided with jack, be provided on jack and the fore-set that moves up and down driven by jack, withstand it is outer be cased with sleeve, push up The surface of column indicates scale, and fixed plate is provided between fore-set and sleeve, handle is provided on sleeve.In use, fixed by two Position regulating device is respectively placed in the lower section of pump room canopy segmentation 1 and pump room siding segmentation 2, can be conveniently adjusted by lifting jack The upper and lower position of above-mentioned two segmentation.Since pedestal has multiple universal wheels, thus it need to only apply smaller power in segmentation and draw The horizontal position of the segmentation can be adjusted by dragging the segmentation or corresponding location adjusting device, to easily realize two segmentations The accurate positionin in direction all around.It, can when adjusting the height of jack raising and lowering since fore-set surface indicates scale It is adjusted according to scale, thus adjusts and more distinguish, precisely.Again due to being provided with fixed plate, thus fore-set between fore-set and sleeve It will not swing in its gap between sleeve, thus position more firm, reliable again.In addition, sleeve is equipped with handle, adjustment is fixed The position of position regulating device is more convenient.In order to reinforce the intensity of sleeve, can polylith sleeve be set between sleeve and pedestal and is added Strong plate.One top panel is installed at the top of fore-set, the contact area between location adjusting device and segmentation can be increased, will be pushed up Concentrated force suffered by column is converted into the even distributed force suffered by top panel, and part is generated to avoid being segmented due to the effect of concentrated force Deformation.In order to reinforce the intensity of top panel, polylith top panel reinforcing plate can be set between fore-set and top panel.
Further, before Cargo Oil Pump is installed, intermediate support is installed on pump room wall by support element tool locating On bulkhead in plate segmentation 2, to position.Specifically, support element tooling includes being fixed on bulkhead and adjustable for height bracket, With the supporting plate being installed on bracket, the sliding slot mutually slided is equipped between bracket and supporting plate, and the positioning that the two is fixed to each other Part, and sliding slot direction is perpendicular to bulkhead;It is also moveably secured on supporting plate and one end can be pushed against in two on bulkhead Lever arm, two lever arms are symmetrically disposed on the both sides of supporting plate along sliding slot, and the both sides of supporting plate are provided with measurement lever arm The graduation mark of extension elongation.When work, the general height needed for intermediate support is determined, bracket is fixed on to selected bulkhead position It sets, then adjusts the position of supporting plate, the distance between itself and bulkhead is made to meet the requirements.In this process, while ensuring that supporting plate fills There is the levelness of the both sides of lever arm so that two lever arms are located at same level height.Then the lever arm of supporting plate both sides is drawn So that its end is connected on bulkhead, while observing graduation mark, to ensure the length of two lever arms pull-out.Finally, holder for regulating The height of frame, it is the eye plate installation site of intermediate support to make the height of the contact position of lever arm and bulkhead, after eye plate installation i.e. Remaining intermediate support and Cargo Oil Pump can be installed.
Note that above are only presently preferred embodiments of the present invention and institute's application technology principle.It will be appreciated by those skilled in the art that The present invention is not limited to specific embodiments described here, can carry out for a person skilled in the art it is various it is apparent variation, It readjusts and substitutes without departing from protection scope of the present invention.Therefore, although being carried out to the present invention by above example It is described in further detail, but the present invention is not limited only to above example, without departing from the inventive concept, also May include other more equivalent embodiments, and the scope of the present invention is determined by scope of the appended claims.

Claims (10)

1. a kind of packaging technology of ship, which is characterized in that the step of technique includes:In ground, by the bottom of superstructure Layer segmentation towards stem protrude on build part siding and be segmented (1) as individual pump room canopy, the pump room canopy, which is segmented (1), to be hung It is attached in pump room siding segmentation (2), cargo oil pipe and related iron Xi parts is installed between outskirt in pump room siding segmentation (2), Constitute pump room block;
After the completion of the pump room general assembly, the pump room block is integrally transported on building berth, group is carried out with other blocks Dress constitutes hull, then Cargo Oil Pump is lifted in the pump room canopy siding segmentation.
2. the packaging technology of ship according to claim 1, which is characterized in that the pump room siding segmentation (2) includes setting Set the bulkhead in ship pump room surrounding and the deck below the bulkhead;The lower section setting structure crossbeam on the deck, It is equipped with pipe and cable in the structural beams, Cargo Oil Pump mounting hole is provided among the deck.
3. the packaging technology of ship according to claim 2, which is characterized in that fill fire prevention inside the structural beams Waterproof material.
4. the packaging technology of ship according to claim 2, which is characterized in that when assembling the pump room siding segmentation (2), First antetheca is placed on platform, on remaining three bulkheads of surrounding welding of the antetheca and the deck, was being welded Remaining three bulkheads and the deck are supported using bearing diagonal in journey.
5. the packaging technology of ship according to claim 4, which is characterized in that the bearing diagonal is segmented in the pump room canopy (1) it is removed again after being more than or equal to 4 hours after assembling.
6. the packaging technology of ship according to claim 4, which is characterized in that the bearing diagonal the pump room block with Other general assemblies are removed again at after hull.
7. the packaging technology of ship according to claim 2, which is characterized in that laterally hang pump room canopy segmentation (1) It is attached on the hatch of the pump room siding segmentation (2).
8. the packaging technology of ship according to claim 7, which is characterized in that installation positioning is adjusted on the deck in advance Regulating device is positioned, and then lifts the pump room canopy segmentation (1) again.
9. the packaging technology of ship according to claim 8, which is characterized in that calculated first, in accordance with the design drawing of ship Go out the predetermined bit positions of the pump room canopy segmentation (1), and draws corresponding positioning in pump room canopy siding segmentation (2) and adjust The pre-installed position of regulating device, installs the location adjusting device on the pre-installed position, then lifts the pump room canopy It is segmented (1).
10. according to the packaging technology of claim 2-9 any one of them ships, which is characterized in that installing the Cargo Oil Pump Before, intermediate support is installed on by support element tool locating on the bulkhead in the pump room block, to position.
CN201810393005.3A 2018-04-27 2018-04-27 A kind of packaging technology of ship Pending CN108583779A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810393005.3A CN108583779A (en) 2018-04-27 2018-04-27 A kind of packaging technology of ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810393005.3A CN108583779A (en) 2018-04-27 2018-04-27 A kind of packaging technology of ship

Publications (1)

Publication Number Publication Date
CN108583779A true CN108583779A (en) 2018-09-28

Family

ID=63610319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810393005.3A Pending CN108583779A (en) 2018-04-27 2018-04-27 A kind of packaging technology of ship

Country Status (1)

Country Link
CN (1) CN108583779A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109466712A (en) * 2018-10-31 2019-03-15 广船国际有限公司 A kind of stabilizer component, ship and mounting process
CN109823467A (en) * 2019-02-22 2019-05-31 中船澄西船舶修造有限公司 Orange juice shipload storehouse deck block hoisting
CN111422321A (en) * 2020-04-17 2020-07-17 上海外高桥造船有限公司 General assembling method for bow total section of bulk carrier
CN114368460A (en) * 2021-12-29 2022-04-19 中船澄西扬州船舶有限公司 Method for mounting middle support of liquid cargo pump pipe column
CN114771766A (en) * 2022-05-31 2022-07-22 中船黄埔文冲船舶有限公司 Method for building front mast and wave board in sections and ship
CN115158586A (en) * 2022-08-11 2022-10-11 上海外高桥造船有限公司 Method for mounting platform and ship

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1792711A (en) * 2005-12-23 2006-06-28 上海外高桥造船有限公司 Tech. for carrying super building on oil ship
JP2013056621A (en) * 2011-09-08 2013-03-28 Ihi Amtec Co Ltd Installation structure and installation method of ballast water treatment device in container ship
KR20130090514A (en) * 2012-02-06 2013-08-14 현대중공업 주식회사 Watering apparatus for cargo tanks of liquefied petroleum gas carriers
CN103910030A (en) * 2014-04-15 2014-07-09 南通长航船舶配件有限公司 Construction method for pump room area of self-propelled trailing suction hopper dredger
CN205801438U (en) * 2016-06-08 2016-12-14 江苏省船舶设计研究所有限公司 A kind of 30m level inland river multipurpose dan boat
CN107651104A (en) * 2017-09-22 2018-02-02 南通如港船舶配套机械有限公司 A kind of outfitting construction method of boats and ships

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1792711A (en) * 2005-12-23 2006-06-28 上海外高桥造船有限公司 Tech. for carrying super building on oil ship
JP2013056621A (en) * 2011-09-08 2013-03-28 Ihi Amtec Co Ltd Installation structure and installation method of ballast water treatment device in container ship
KR20130090514A (en) * 2012-02-06 2013-08-14 현대중공업 주식회사 Watering apparatus for cargo tanks of liquefied petroleum gas carriers
CN103910030A (en) * 2014-04-15 2014-07-09 南通长航船舶配件有限公司 Construction method for pump room area of self-propelled trailing suction hopper dredger
CN205801438U (en) * 2016-06-08 2016-12-14 江苏省船舶设计研究所有限公司 A kind of 30m level inland river multipurpose dan boat
CN107651104A (en) * 2017-09-22 2018-02-02 南通如港船舶配套机械有限公司 A kind of outfitting construction method of boats and ships

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109466712A (en) * 2018-10-31 2019-03-15 广船国际有限公司 A kind of stabilizer component, ship and mounting process
CN109823467A (en) * 2019-02-22 2019-05-31 中船澄西船舶修造有限公司 Orange juice shipload storehouse deck block hoisting
CN111422321A (en) * 2020-04-17 2020-07-17 上海外高桥造船有限公司 General assembling method for bow total section of bulk carrier
CN111422321B (en) * 2020-04-17 2021-06-25 上海外高桥造船有限公司 General assembling method for bow total section of bulk carrier
CN114368460A (en) * 2021-12-29 2022-04-19 中船澄西扬州船舶有限公司 Method for mounting middle support of liquid cargo pump pipe column
CN114368460B (en) * 2021-12-29 2024-08-16 中船澄西扬州船舶有限公司 Liquid cargo pump pipe column middle support installation method
CN114771766A (en) * 2022-05-31 2022-07-22 中船黄埔文冲船舶有限公司 Method for building front mast and wave board in sections and ship
CN114771766B (en) * 2022-05-31 2023-06-23 中船黄埔文冲船舶有限公司 Sectional construction method of front mast and breakwater and ship
CN115158586A (en) * 2022-08-11 2022-10-11 上海外高桥造船有限公司 Method for mounting platform and ship
CN115158586B (en) * 2022-08-11 2023-08-08 上海外高桥造船有限公司 Mounting method of carrying platform and ship

Similar Documents

Publication Publication Date Title
CN108583779A (en) A kind of packaging technology of ship
CN109850066B (en) Ship assembly carrying method
CN108468430A (en) The not contour bearing steel truss structure hoisting slide construction of large span
CN101885368B (en) Method for manufacturing and installing guide rail in container ship cargo hold
CN103318768B (en) Assembling method of quayside with low posture
US20100000955A1 (en) Girder block lifting method and jack-up stage used therefor
US20220213705A1 (en) Method for entire removal of space truss and assistive support mechanism
CN101306717A (en) Optical alignment method for shipbuilding central axis
CN109895945A (en) A kind of pre-assembled method of bulkhead in length and breadth of ore in sand form board block
CN105019665A (en) Method for mounting long-span structure beam based on total station
CN107323610A (en) Main engine bed, the installation method in gear block block stage
CN109159852A (en) The installation method of modularization accommodation
CN108033367A (en) A kind of steel column drum rack alternating brace type steel platform and tower crane synchronous hoisting device and its method for improving
CN110528678A (en) A kind of multilayer steel frame vestibule installation method between staggered floor high building
ITBO20080352A1 (en) SUPPORT PLATFORM FOR OPERATORS PERFORMING MAINTENANCE AND CONSTRUCTION OF TRANSPORTATION MEANS.
CN106544959B (en) The construction method of king-tower lifting segment and bridge main tower saddle containing saddle
CN107499453A (en) A kind of equipment On The Offshore Platform installation system
CN105155418B (en) A kind of construction method of bridge translation
CN105501391B (en) A kind of all-direction propeller is installed to the installation method of bottom of ship from building berth
CN111976916A (en) Full-rotation telescopic push mounting process for engineering ship
CN104060838B (en) A kind of vestibule divides into groups aerial group to Method for Installation
CN217028152U (en) Large-span factory building roofing modularization installation device
CN106968371B (en) A kind of construction method of the high wing articulated structure drifted by wind of curtain wall construction
CN105834272A (en) Method for mounting large aluminum plate drawing mill equipment in confined space
WO2019024290A1 (en) Method for building scaffold device in hyperboloidal linear cabin

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180928

RJ01 Rejection of invention patent application after publication