CN108572568A - The cooperative control system and method for water equipment and water heater - Google Patents

The cooperative control system and method for water equipment and water heater Download PDF

Info

Publication number
CN108572568A
CN108572568A CN201710134750.1A CN201710134750A CN108572568A CN 108572568 A CN108572568 A CN 108572568A CN 201710134750 A CN201710134750 A CN 201710134750A CN 108572568 A CN108572568 A CN 108572568A
Authority
CN
China
Prior art keywords
water
equipment
flow
server
heater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710134750.1A
Other languages
Chinese (zh)
Other versions
CN108572568B (en
Inventor
王金凯
陈玉玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Haier Washing Electric Appliance Co ltd
Haier Smart Home Co Ltd
Original Assignee
Qingdao Haier Washing Machine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haier Washing Machine Co Ltd filed Critical Qingdao Haier Washing Machine Co Ltd
Priority to CN201710134750.1A priority Critical patent/CN108572568B/en
Publication of CN108572568A publication Critical patent/CN108572568A/en
Application granted granted Critical
Publication of CN108572568B publication Critical patent/CN108572568B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Control Of Washing Machine And Dryer (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The invention belongs to household electrical appliance technical fields, and in particular to a kind of cooperative control system and method for water equipment and water heater.Present invention seek to address that the problem that the control mode of existing water heater is relatively simple.For this purpose, the method for the present invention includes:During water equipment is intake, the flow of inlet water of the water equipment is obtained;During water equipment is intake, the water flow of the water heater is obtained;The water flow of the flow of inlet water and the water heater of the water equipment is compared, and controls the operation of the water equipment and/or the water heater according to comparing result.The present invention passes through the coordination control to water equipment and water heater, by comparing the size of water outlet of water heater flow and the flow of inlet water of water equipment, while meeting water equipment using hot water, avoids multiple water equipments and lead to the problem of conflict when using water heater.

Description

The cooperative control system and method for water equipment and water heater
Technical field
The invention belongs to household electrical appliance technical fields, and in particular to a kind of cooperative control system of water equipment and water heater And method.
Background technology
In daily life, when being especially in, user is also more and more to the use demand of hot water.Pot-type boiler conduct The main supply equipment of hot water needs to supply multiple spot use, such as washing machine, kitchen, toilet, bathroom.And different Under service condition, the water temperature demand that user supplies water heater is also different.
Currently, the control mode to water heater is relatively simple, typically temperature control water heater the output phase is answered according to demand The water of temperature.So, when there are multiple water equipments while using water heater, use is generated due to the difference of demand temperature The case where water conflicts.Such as while user's shower when operation washing machine, caused by taking a shower with set temperature difference of doing washing The temperature influence shower experience fluctuated/excessively high harm users of temperature does not wash clean the problems such as clothes/temperature excessively high damage clothes.
In order to solve the above-mentioned technical problem, special to propose the present invention.
Invention content
In order to solve the above problem in the prior art, in order to which the control mode for solving existing water heater is relatively simple Problem, the present invention provides the cooperative control systems and method of a kind of water equipment and water heater.The water equipment can be with The water heater connection, the cooperative control system further includes server, and the server can obtain the water equipment The water flow of flow of inlet water and the water heater, and during the water equipment is intake, the server compares institute State the water flow of the flow of inlet water and the water heater of water equipment, and according to comparing result control the water equipment and/ Or the operation of the water heater.
In the preferred embodiment of cooperative control system, the server can also obtain the demand of the water equipment Temperature set information, and before water equipment water inlet, the server is according to the demand temperature of the water equipment The water flow of set information and the water heater controls the operation of the water equipment and/or the water heater.
In the preferred embodiment of cooperative control system, before water equipment water inlet, if the water heater Water flow is more than zero:Then the server sends out prompt message, which is used to determine whether the water equipment It is switched to the state of delay water inlet, and when the water equipment is not switched to the state of delay water inlet or in preset time When not making selection whether switching, water equipment water inlet described in the server controls;And/or work as the water equipment When being switched to the state of delay water inlet, water equipment pause water inlet described in the server controls, and obtained according to predetermined interval The water flow of the water heater, until when to get the water flow of the water heater be zero, described in the server setting The leaving water temperature of water heater is the demand temperature, and controls the water equipment water inlet.
In the preferred embodiment of cooperative control system, before water equipment water inlet, if the water heater Water flow is equal to zero, then the server is proceeded as follows according to the demand temperature set information of the water equipment:When When not setting demand temperature, the water heater is arranged as not heated condition in the server, and controls the water equipment water inlet; And/or when having set demand temperature, the leaving water temperature that the water heater is arranged in the server is the demand temperature, And control the water equipment water inlet.
In the preferred embodiment of cooperative control system, during the water equipment is intake:When the water heater Water flow when being equal to the flow of inlet water of the water equipment, still maintain the current into water state of the water equipment; And/or when the water flow of the water heater is more than the flow of inlet water of the water equipment, the server, which is sent out, to be carried Show information, which is used to determine whether for the water equipment to be switched to the state of delay water inlet.
In the preferred embodiment of cooperative control system, when the water equipment be not switched to delay water inlet state or When person does not make selection whether switching in preset time, water equipment still maintains current described in the server controls Into water state;And/or when the water equipment is switched to the state of delay water inlet, water is used described in the server controls Equipment pause is intake, and the water flow of the water heater is obtained according to predetermined interval, until getting going out for the water heater When water flow is zero, the leaving water temperature that the water heater is arranged in the server is the demand temperature, and controls and described use water Equipment is intake.
In the preferred embodiment of cooperative control system, the cooperative control system further includes:First control module, It is set to the water equipment and/or operating terminal, the server is set by the way that first control module acquisition is described with water The flow of inlet water of standby demand temperature set information and the water equipment, and the control water equipment into water state; Second control module, is set to the water heater and/or operating terminal, and the server is obtained by second control module Take the water flow of the water heater, and the control water heater goes out water state.
In the preferred embodiment of cooperative control system, first control module is true by direct or indirect mode The demand temperature set information of the fixed water equipment.
In the preferred embodiment of cooperative control system, the cooperative control system further includes:First flow sensor, It is used to detect the flow of inlet water of the water equipment;Second flow sensor, be used to detect the water heater goes out flow Amount.
In the preferred embodiment of cooperative control system, the server is cloud server or physical server, institute It states physical server and is set to the water equipment, the water heater, backstage or operating terminal.
In the preferred embodiment of cooperative control system, the water equipment be washing machine or dish-washing machine, and/or The water heater is gas heater.
The present invention also provides the cooperative control method of a kind of water equipment and water heater, this method includes the following steps: During water equipment is intake, the flow of inlet water of the water equipment is obtained;During water equipment is intake, described in acquisition The water flow of water heater;The water flow of the flow of inlet water and the water heater of the water equipment is compared, and according to comparison The operation of water equipment described in output control and/or the water heater.
In the preferred embodiment of the cooperative control method of the present invention, this method further includes:It is intake in water equipment Before, obtain the demand temperature set information of the water equipment;Before water equipment water inlet, the water outlet of the water heater is obtained Flow;The water equipment is controlled according to the water flow of the demand temperature set information of the water equipment and the water heater And/or the operation of the water heater.
In the preferred embodiment of the cooperative control method of the present invention, before water equipment water inlet, described The water flow of water heater is more than in the case of zero:Prompt message is sent out, which is used to determine whether to use water by described Equipment is switched to the state of delay water inlet, and when the water equipment is not switched to the state of delay water inlet or when default When the interior selection that do not make whether switching, the water equipment water inlet is controlled;And/or when the water equipment is switched to When the state intake that is delayed, the water equipment pause water inlet is controlled, and obtains the water outlet of the water heater according to predetermined interval Flow, until when to get the water flow of the water heater be zero, the leaving water temperature that the water heater is arranged is the demand Temperature, and control the water equipment water inlet.
In the preferred embodiment of the cooperative control method of the present invention, before water equipment water inlet, described In the case of the water flow of water heater is equal to zero and does not set demand temperature, the water heater is set for not heated condition, and Control the water equipment water inlet;And/or it is equal to zero in the water flow of the water heater and has set demand temperature Under situation, the leaving water temperature that the water heater is arranged is the demand temperature, and controls the water equipment water inlet.
In the preferred embodiment of the cooperative control method of the present invention, during the water equipment is intake:Work as institute When stating the water flow of water heater and being equal to the flow of inlet water of the water equipment, keep the water equipment into water state;And And/or person sends out prompt message, the prompt when the water flow of the water heater is more than the flow of inlet water of the water equipment Information is used to determine whether for the water equipment to be switched to the state of delay water inlet.
In the preferred embodiment of the cooperative control method of the present invention, when the water equipment is not switched to delay water inlet State or do not made in preset time switching whether selection when, control the water equipment and keep into water state;And And/or person controls the water equipment pause water inlet, and according to pre- when the water equipment is switched to the state of delay water inlet If the operating status of water heater described in interval acquiring, until when to get the water flow of the water heater be zero, described in setting The leaving water temperature of water heater is the demand temperature, and controls the water equipment water inlet.
In the preferred embodiment of the cooperative control method of the present invention, the demand temperature set information of the water equipment It can be determined by direct or indirect mode.
The present invention cooperative control method preferred embodiment in, the water equipment be washing machine or dish-washing machine, And/or the water heater is gas heater.
The present invention is set by comparing water outlet of water heater flow with water by the coordination control to water equipment and water heater The size of standby flow of inlet water avoids multiple water equipments using hot water while meeting water equipment using hot water Conflict is led to the problem of when device.By taking washing machine as an example, by the coordination control to washing machine and water heater, wave is on the one hand avoided Wheel washer can not heat, roller washing machine heats slow problem, shorten washing time while so that clothing is cleaned.Another party It, according to the demand temperature information of the operating status of water heater and washing machine, is adopted when supplying use in washing machine water using water heater in face Above-mentioned control strategy is taken to adjust washing machine inflow, operation is washed while using water heater (as taken a shower) so as to avoid user When clothing machine, outlet water temperature of water heater is fluctuated caused by shower is different with washing of drum type washing machine temperature, and then influences to take a shower Experience (such as temperature excessively high also have scald risk) does not wash clean the problems such as clothes, temperature excessively high damage clothes.The technical side of the present invention Case greatly improves the usage experience of user.
The cooperative control system of scheme 1, a kind of water equipment and water heater, the water equipment can connect with the water heater It is logical, which is characterized in that the cooperative control system further includes server,
The server can obtain the water flow of the flow of inlet water and the water heater of the water equipment, and
During the water equipment is intake, the server compares the flow of inlet water of the water equipment and the water heater Water flow, and control according to comparing result the operation of the water equipment and/or the water heater.
Scheme 2, the cooperative control system according to scheme 1, which is characterized in that the server, which can also obtain, described uses water The demand temperature set information of equipment, and
Before water equipment water inlet, the server is according to the demand temperature set information of the water equipment and described The water flow of water heater controls the operation of the water equipment and/or the water heater.
Scheme 3, the cooperative control system according to scheme 2, which is characterized in that before water equipment water inlet, if institute The water flow for stating water heater is more than zero:
Then the server sends out prompt message, the prompt message be used to determine whether the water equipment being switched to be delayed into The state of water, and
The selection whether water equipment is not switched to the state of delay water inlet or does not make switching in preset time When, water equipment water inlet described in the server controls;And/or
When the water equipment is switched to the state of delay water inlet, water equipment pause water inlet described in the server controls, And the water flow of the water heater is obtained according to predetermined interval, until when to get the water flow of the water heater be zero, The leaving water temperature that the water heater is arranged in the server is the demand temperature, and controls the water equipment water inlet.
Scheme 4, the cooperative control system according to scheme 2, which is characterized in that before water equipment water inlet, if institute The water flow for stating water heater is equal to zero, then the server carries out such as according to the demand temperature set information of the water equipment Lower operation:
When not setting demand temperature, it is not heated condition that the water heater, which is arranged, in the server, and controls and described set with water Standby water inlet;And/or
When having set demand temperature, the leaving water temperature that the water heater is arranged in the server is the demand temperature, and is controlled Make the water equipment water inlet.
Scheme 5, the cooperative control system according to scheme 2, which is characterized in that during the water equipment is intake:
When the water flow of the water heater is equal to the flow of inlet water of the water equipment, the water equipment is still maintained It is current into water state;And/or
When the water flow of the water heater is more than the flow of inlet water of the water equipment, the server sends out prompt letter Breath, the prompt message are used to determine whether for the water equipment to be switched to the state of delay water inlet.
Scheme 6, the cooperative control system according to scheme 5, which is characterized in that when the water equipment be not switched to be delayed into When the state of water or selection whether do not make switching in preset time, water equipment described in the server controls is still Keep current into water state;And/or
When the water equipment is switched to the state of delay water inlet, water equipment pause water inlet described in the server controls, And the water flow of the water heater is obtained according to predetermined interval, until when to get the water flow of the water heater be zero, The leaving water temperature that the water heater is arranged in the server is the demand temperature, and controls the water equipment water inlet.
Scheme 7, the cooperative control system according to any one of scheme 1 to 6, which is characterized in that the cooperative control system Further include:
First control module, is set to the water equipment and/or operating terminal, and the server is controlled by described first Module obtains the flow of inlet water of the demand temperature set information and the water equipment of the water equipment, and the control use Wetting system into water state;
Second control module, is set to the water heater and/or operating terminal, and the server controls mould by described second Block obtains the water flow of the water heater, and the control water heater goes out water state.
Scheme 8, the cooperative control system according to scheme 7, which is characterized in that first control module by directly or The mode connect determines the demand temperature set information of the water equipment.
Scheme 9, the cooperative control system according to scheme 7, which is characterized in that the cooperative control system further includes:
First flow sensor is used to detect the flow of inlet water of the water equipment;
Second flow sensor is used to detect the water flow of the water heater.
Scheme 10, the cooperative control system according to any one of scheme 1 to 6, which is characterized in that the server is high in the clouds Server or physical server,
The physical server is set to the water equipment, the water heater, backstage or operating terminal.
Scheme 11, the cooperative control system according to any one of scheme 1 to 6, which is characterized in that the water equipment is to wash Clothing machine or dish-washing machine, and/or
The water heater is gas heater.
The cooperative control method of scheme 12, a kind of water equipment and water heater, the water equipment can connect with the water heater It is logical, which is characterized in that this method includes the following steps:
During water equipment is intake, the flow of inlet water of the water equipment is obtained;
During water equipment is intake, the water flow of the water heater is obtained;
The water flow of the flow of inlet water and the water heater of the water equipment is compared, and the use is controlled according to comparing result The operation of wetting system and/or the water heater.
Scheme 13, the cooperative control method according to scheme 12, which is characterized in that this method further includes:
Before water equipment water inlet, the demand temperature set information of the water equipment is obtained;
Before water equipment water inlet, the water flow of the water heater is obtained;
The water equipment is controlled according to the water flow of the demand temperature set information of the water equipment and the water heater And/or the operation of the water heater.
Scheme 14, the cooperative control method according to scheme 13, which is characterized in that before water equipment water inlet, The water flow of the water heater is more than in the case of zero:
Prompt message is sent out, which is used to determine whether for the water equipment to be switched to the state of delay water inlet, and And
The selection whether water equipment is not switched to the state of delay water inlet or does not make switching in preset time When, control the water equipment water inlet;And/or
When the water equipment is switched to the state of delay water inlet, the water equipment pause water inlet is controlled, and according to default The heat is arranged until when to get the water flow of the water heater be zero in the water flow of water heater described in interval acquiring The leaving water temperature of hydrophone is the demand temperature, and controls the water equipment water inlet.
Scheme 15, the cooperative control method according to scheme 13, which is characterized in that before water equipment water inlet, In the case of the water flow of the water heater is equal to zero and does not set demand temperature, it is not heat shape that the water heater, which is arranged, State, and control the water equipment water inlet;And/or
In the case of the water flow of the water heater is equal to zero and has set demand temperature, going out for the water heater is set Coolant-temperature gage is the demand temperature, and controls the water equipment water inlet.
Scheme 16, the cooperative control method according to scheme 13, which is characterized in that during the water equipment is intake: When the water flow of the water heater is equal to the flow of inlet water of the water equipment, keep the water equipment into watery State;And/or
When the water flow of the water heater is more than the flow of inlet water of the water equipment, prompt message is sent out, prompt letter Breath is used to determine whether for the water equipment to be switched to the state of delay water inlet.
Scheme 17, the cooperative control method according to scheme 16, which is characterized in that when the water equipment is not switched to delay The state of water inlet or do not made in preset time switching whether selection when, control the water equipment and keep into watery State;And/or
When the water equipment is switched to the state of delay water inlet, the water equipment pause water inlet is controlled, and according to default The heat is arranged until when to get the water flow of the water heater be zero in the operating status of water heater described in interval acquiring The leaving water temperature of hydrophone is the demand temperature, and controls the water equipment water inlet.
Scheme 18, the cooperative control method according to any one of scheme 12 to 17, which is characterized in that the water equipment Demand temperature set information can be determined by direct or indirect mode.
Scheme 19, the cooperative control method according to any one of scheme 12 to 17, which is characterized in that the water equipment is Washing machine or dish-washing machine, and/or
The water heater is gas heater.
Description of the drawings
Fig. 1 is the main flow schematic diagram of the cooperative control method of the present invention;
Fig. 2A is that the cooperative control method of the present invention washes the detail flowchart of fill phase in laundry owner;
Fig. 2 B are detail flowchart of the cooperative control method in the washing machine rinsing inflow stage of the present invention;
Fig. 3 is the structural schematic diagram of the cooperative control system of the present invention.
Specific implementation mode
The preferred embodiment of the present invention described with reference to the accompanying drawings.It will be apparent to a skilled person that this A little embodiments are used only for explaining the technical principle of the present invention, it is not intended that limit the scope of the invention.For the ease of It describes, is described in detail by taking washing machine as an example in present embodiment.It will be readily appreciated by those skilled in the art that the present invention Water equipment is not limited only to washing machine, other water equipments, such as dish-washing machine are also suitable.
Since the water equipment that existing pot-type boiler usually requires to supply multiple points uses, and different usage scenarios There is different demands to water heater.For example, when user need using washing machine when, and other users be used the water heater into Row is taken a shower.But water temperature and the demand water temperature of washing machine used in taking a shower are often inconsistent.So, following two be there is The problem of aspect:
On the one hand, if current shower water temperature is higher than the demand water temperature of washing machine, if that being supplied according to shower water temperature To washing machine, the clothing in washing machine may be damaged because of high temperature;And if adjusting hot water according to washing machine demand water temperature Device output water temperature can make bath water temperature drop low, user experience is caused to be deteriorated.
If on the other hand, current shower water temperature is less than the demand water temperature of washing machine, if that according to shower water temperature Washing machine is supplied, the clothing in washing machine may not be washed clean because of low temperature;And if according to washing machine demand water temperature tune Whole water heater output water temperature can be such that shower water temperature increases, and user is caused scald equivalent risk occur.
In order to avoid the above problem, the present invention realizes intelligent hot water laundry by Collaborative Control water heater and washing machine Purpose.The specific method of the present invention is described in detail below.
As shown in Figure 1, the method for the present invention includes the following steps:
S110, before washing machine inflow, obtain the demand temperature set information of washing machine;
S120, before washing machine inflow, obtain the water flow of water heater;
S130, washing machine and/or heat are controlled according to the demand temperature set information of washing machine and the water flow of water heater The operation of hydrophone;
S140, during washing machine inflow, in real time obtain washing machine flow of inlet water and water heater water flow;
S150, compare washing machine flow of inlet water and water heater water flow, and according to comparing result control washing machine And/or the operation of the water heater.
In above-mentioned steps S110, demand temperature set information may include either with or without setting demand temperature and setting Determine set specific temperature value etc. in the case of demand temperature.The demand temperature set information can by directly or The mode connect determines.Specifically, for having set the situation of demand temperature, user, can be direct when using washing machine The demand temperature of washing machine is inputted, then the demand temperature is transferred to server.Or user use washing machine when, can also Other washing informations (the kinds of laundry information of such as washing mode, washing) for inputting washing machine, by control module (claim The first control module in book) it is determined indirectly (such as according to the calculating of other aforementioned washing informations or reckoning according to the washing information Go out) the demand temperature of washing machine, and the demand temperature is transmitted to server.In addition to this, it is any other it is rational, can obtain The mode of the demand temperature of the setting of washing machine is got, the present invention is applicable in.
In the step s 120, going out for water heater can be obtained by being set to the second flow sensor of water heater mouth Water flow, according to the water flow of water heater, it can be determined that go out current water heater and be in seizure condition (if water heater mouth Have flow, illustrate that water heater is in seizure condition) or free state (if water heater mouth illustrates hot water without flow Device is in free state).In step S140, can also in real time it be obtained by the second flow sensor of water heater mouth While the water flow of water heater, laundry is obtained in real time by being set to the first flow sensor at Water Inlet of Washing Machine The flow of inlet water of machine.
The control strategy of step S130 is described in detail referring to Fig. 2A and Fig. 2 B.Fig. 2A is the collaboration of the present invention Control method washes the detail flowchart of fill phase in laundry owner;Fig. 2 B are that the cooperative control method of the present invention is floated in washing machine Wash the detail flowchart of fill phase.
As shown in Figure 2 A, it is washed the stage in master, after washing machine booting, sets washing machine procedure and start washing machine.At this time may be used To obtain the water flow A of washing parameter (being specifically demand temperature set information) and water heater of washing machine by server. According to the demand temperature set information of washing machine, judge whether washing machine sets demand temperature, and in machine set In the case of demand temperature, the demand temperature value of washing machine is obtained.
In the present embodiment, after server obtains the water flow A of water heater:
As A > 0, in illustrating that water heater is used, it is possibly used for taking a shower, washes one's hands.In order to avoid using water heater Water temperature it is different and the risk brought, server can send out prompt message to washing machine or operating terminal, user carries according to this Show that information chooses whether to make washing machine delay water inlet.It intakes or does not make a choice in preset time when user's selection is not delayed When, server does not change the setting of water heater, directly controls washing machine inflow, and the inlet valve for such as controlling washing machine is opened, laundry Machine starts to intake.When user selects delay water inlet, server controls washing machine pause water inlet, then every prefixed time interval (such as 1 minute) obtains a water outlet of water heater flow, until when water outlet of water heater flow A=0, executes and operates in next step.
As the water flow A=0 of water heater, illustrate that water heater is in unused state.At this point, whether judging washing machine Set demand temperature.In the case of washing machine has set demand temperature, the need to washing machine of water heater are arranged in server Temperature is sought, and controls water intake valve of washing machine opening, starts to intake.In the case of washing machine does not set demand temperature, washing machine It is that heated condition, washing machine do not start to intake that water heater, which is arranged,.Such as control water intake valve of washing machine is opened, and starts to intake.
During water inlet, the water inlet flow B that server obtains washing machine (can be by being set to Water Inlet of Washing Machine The second flow sensor at place obtains), the water inlet flow B of washing machine and the water outlet flow A of water heater are compared, according to comparison As a result strategy control as follows is taken:
If A=B, illustrate that only washing machine is using water heater, then washing machine continues to intake;If A>B illustrates there be other User, at this point, server sends out prompt message, prompts the user whether selection washing machine delay water inlet using water heater.If User's selection is delayed into water washing, and server sends out pause water inlet instruction to washing machine, waits for that water outlet of water heater flow becomes A=again 0 (hot water device is in unused state), then start to intake.If user's selection is not delayed into water washing, washing machine is kept When advancing water state.
Washing machine has been executed after master washes and has been dehydrated, and the rinsing inflow stage is entered after dehydration.It should be noted that usually Master washes the stage to improve the washing effect of washing powder, needs the water of water heater supply washing machine proper temperature.And in rinsing rank Duan Tongchang only needs to be rinsed using normal-temperature water.
As shown in Figure 2 B, in the rinsing inflow stage, there is still a need for the water flow A for obtaining water heater for server.
If the water flow A of water heater>0, server sends out prompt message, prompts the user whether selection washing machine delay Water inlet.If user does not select delay to intake or do not make a choice at the appointed time, it is current that server does not change water heater State, washing machine start to intake.Such as water intake valve of washing machine is opened, water heater is exported with the water temperature of current water heater to laundry Machine.If user's selection is delayed into water washing, server sends out pause water inlet instruction to washing machine, while often spending the predetermined time (such as 1 Minute) a water outlet of water heater flow information is obtained, when water outlet of water heater flow A=0, carry out next step operation.
If the water flow A=0 of water heater, server controls water heater do not heat, water intake valve of washing machine is opened, and is started Water inlet.During washing machine rinsing inflow, the water inlet flow B of washing machine and the water outlet flow of water heater can also be compared A is controlled according to the above control strategy.After the completion of entire laundry cycles, the shutdown of server controls water heater or It is restored to the water heater setting before laundry.
In the preferred embodiment of the above method, water heater is gas heater.In addition it is also necessary to explanation, heat The water outlet flow A of hydrophone illustrates water heater shutdown or standby when being 0;When the water outlet flow A of water heater is more than 0, illustrate heat Hydrophone exports water outward, that is, is in use state.Since water heater supply multiple spot uses, the water outlet of water heater If mouthful flow A is equal to the water inlet flow of washing machine, illustrate that water heater only supplies use in washing machine water;And if water heater goes out Mouth of a river flow is more than the water inlet flow of washing machine, then illustrates that water heater also supplies other equipment water.
It should be noted that above-mentioned " server sends out prompt message, prompts the user whether selection washing machine delay water inlet " Instruction can remind user respectively every time, then be selected by users, can also set program in advance (can pass through laundry Machine, server, operating terminal etc. set or manually set automatically), and then when there is prompt message, automatically selected by program. For example, after being set as the program of automatic time delay in advance, every washing machine conflicts with other equipment generation, and (washing machine is set with other It is standby simultaneously using the situation of water heater), the pause water inlet of procedure auto-control washing machine, wait for without other be further continued for after water into Water.After user is arranged in advance is not delayed water inlet, every water inlet conflict stage, washing machine does not have to pause and intakes, but does not change Water heater temperature is arranged, the hot water directly currently exported using water heater.Other stages are run to for washing machine, such as washing, When dehydration, rinsing etc. do not have to the stage of water inlet, to ensure user, other (are such as taken a shower) with water, server controls water heater parameter Parameter setting before being restored to laundry is set, it is ensured that does not influence use of the user to water heater.
In the preferred embodiment of the above method, water equipment is not limited to washing machine, can also be dish-washing machine etc. other Water equipment, water heater is preferably by gas heater, but it can be other kinds of water heater, such as electric heater.
In addition, the invention also provides the cooperative control systems of a kind of washing machine and water heater.As shown in figure 3, the system Including washing machine, water heater and server, washing machine can be connected to by inlet valve with water heater, and the server can obtain The flow of inlet water of washing machine and the water flow of water heater.During washing machine inflow, server compares the water inlet of washing machine The water flow of flow and water heater, and according to the operation of comparing result control washing machine and/or water heater.
Preferably, which further includes the first control module and the second control module.Wherein, the first control module can be set It is placed in washing machine, such as mobile phone, tablet operating terminal can also be set to, server is obtained by first control module and done washing The demand temperature set information of machine, and control washing machine into water state, such as inflow temperature and flow etc..Second control mould Block can be set on water heater, can also be set to such as mobile phone, tablet operating terminal, and server can pass through the second control Module obtains the water flow of water heater, and control water heater goes out water state, such as leaving water temperature etc..It needs to illustrate It is that the operating terminal in the present invention is any terminal except washing machine and water heater, can is that mobile phone, tablet etc. are mobile eventually End, can also be other fixed terminals, such as be set to metope or the intelligent operation panel of other fixed positions.Operating terminal can To be that in the form of multiple positions are fixed in dispersion, can also be integrated in one.
Preferably, the first control module determines the demand temperature setting letter of water equipment in a manner of directly or indirectly Breath, and it is transmitted to server.Specifically, when user is using laundry machine washing, the demand temperature of washing machine can be directly inputted, then The demand temperature is transmitted to server by the first control module;Or user uses when doing washing machine washing, inputs its of washing machine His washing information (such as washed kinds of laundry information), is calculated by first control module according to other washing informations The demand temperature of washing machine, and it is transmitted to server.
Preferably, the present invention can detect the flow of inlet water of washing machine by first flow sensor, and pass through second Flow sensor detects the water flow of water heater.
The control strategy of the system can refer to above, and in this not go into detail.In addition, server in the system can be with It is cloud virtual server can also be proximal end physical server, as physical server, laundry generator terminal, heat can be set to Hydrophone end, backstage or operating terminal.These evolutions are all formal adjustment, have no effect on the basic principle of the present invention And protection domain.And the water equipment of the present invention is not limited only to washing machine, can also be other water equipments such as dish-washing machine.
In conclusion the present invention uses heat by the coordination control to water equipment and water heater, meeting water equipment While water, avoids multiple water equipments and lead to the problem of conflict when using water heater.By taking washing machine as an example, by washing The coordination of clothing machine and water heater controls, and on the one hand avoids that rotary drum washing machine can not heat, roller washing machine heats slow problem, Shorten washing time while so that clothing is cleaned.On the other hand, when supplying use in washing machine water using water heater, according to water heater Operating status and washing machine demand temperature information, take above-mentioned control strategy to adjust washing machine inflow, so as to avoid When user runs washing machine while using water heater (as taken a shower), caused by shower is different with washing of drum type washing machine temperature Outlet water temperature of water heater is fluctuated, and then influences to take a shower and experience (such as temperature is excessively high scald risk), do not wash clean clothes, temperature The problems such as spending high damage clothes.Technical scheme of the present invention greatly improves the usage experience of user.
So far, it has been combined preferred embodiment shown in the drawings and describes technical scheme of the present invention, still, this field Technical staff is it is easily understood that protection scope of the present invention is expressly not limited to these specific implementation modes.Without departing from this Under the premise of the principle of invention, those skilled in the art can make the relevant technologies feature equivalent change or replacement, these Technical solution after change or replacement is fallen within protection scope of the present invention.

Claims (10)

1. the cooperative control system of a kind of water equipment and water heater, the water equipment can be connected to the water heater, It being characterized in that, the cooperative control system further includes server,
The server can obtain the water flow of the flow of inlet water and the water heater of the water equipment, and
During the water equipment is intake, the server compares the flow of inlet water of the water equipment and the water heater Water flow, and control according to comparing result the operation of the water equipment and/or the water heater.
2. cooperative control system according to claim 1, which is characterized in that the server, which can also obtain, described uses water The demand temperature set information of equipment, and
Before water equipment water inlet, the server is according to the demand temperature set information of the water equipment and described The water flow of water heater controls the operation of the water equipment and/or the water heater.
3. cooperative control system according to claim 2, which is characterized in that before water equipment water inlet, if institute The water flow for stating water heater is more than zero:
Then the server sends out prompt message, the prompt message be used to determine whether the water equipment being switched to be delayed into The state of water, and
The selection whether water equipment is not switched to the state of delay water inlet or does not make switching in preset time When, water equipment water inlet described in the server controls;And/or
When the water equipment is switched to the state of delay water inlet, water equipment pause water inlet described in the server controls, And the water flow of the water heater is obtained according to predetermined interval, until when to get the water flow of the water heater be zero, The leaving water temperature that the water heater is arranged in the server is the demand temperature, and controls the water equipment water inlet.
4. cooperative control system according to claim 2, which is characterized in that before water equipment water inlet, if institute The water flow for stating water heater is equal to zero, then the server carries out such as according to the demand temperature set information of the water equipment Lower operation:
When not setting demand temperature, it is not heated condition that the water heater, which is arranged, in the server, and controls and described set with water Standby water inlet;And/or
When having set demand temperature, the leaving water temperature that the water heater is arranged in the server is the demand temperature, and is controlled Make the water equipment water inlet.
5. cooperative control system according to claim 2, which is characterized in that during the water equipment is intake:
When the water flow of the water heater is equal to the flow of inlet water of the water equipment, the water equipment is still maintained It is current into water state;And/or
When the water flow of the water heater is more than the flow of inlet water of the water equipment, the server sends out prompt letter Breath, the prompt message are used to determine whether for the water equipment to be switched to the state of delay water inlet.
6. cooperative control system according to claim 5, which is characterized in that when the water equipment be not switched to be delayed into When the state of water or selection whether do not make switching in preset time, water equipment described in the server controls is still Keep current into water state;And/or when the water equipment is switched to the state of delay water inlet, the server control The water equipment pause water inlet is made, and obtains the water flow of the water heater according to predetermined interval, until getting described When the water flow of water heater is zero, the leaving water temperature that the water heater is arranged in the server is the demand temperature, and is controlled Make the water equipment water inlet.
7. cooperative control system according to any one of claim 1 to 6, which is characterized in that the cooperative control system Further include:
First control module, is set to the water equipment and/or operating terminal, and the server is controlled by described first Module obtains the flow of inlet water of the demand temperature set information and the water equipment of the water equipment, and the control use Wetting system into water state;
Second control module, is set to the water heater and/or operating terminal, and the server controls mould by described second Block obtains the water flow of the water heater, and the control water heater goes out water state.
8. cooperative control system according to claim 7, which is characterized in that first control module by directly or The mode connect determines the demand temperature set information of the water equipment.
9. cooperative control system according to claim 7, which is characterized in that the cooperative control system further includes:
First flow sensor is used to detect the flow of inlet water of the water equipment;
Second flow sensor is used to detect the water flow of the water heater.
10. cooperative control system according to any one of claim 1 to 6, which is characterized in that the server is high in the clouds Server or physical server,
The physical server is set to the water equipment, the water heater, backstage or operating terminal.
CN201710134750.1A 2017-03-08 2017-03-08 Cooperative control system and method for water consumption equipment and water heater Active CN108572568B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710134750.1A CN108572568B (en) 2017-03-08 2017-03-08 Cooperative control system and method for water consumption equipment and water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710134750.1A CN108572568B (en) 2017-03-08 2017-03-08 Cooperative control system and method for water consumption equipment and water heater

Publications (2)

Publication Number Publication Date
CN108572568A true CN108572568A (en) 2018-09-25
CN108572568B CN108572568B (en) 2022-06-28

Family

ID=63577826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710134750.1A Active CN108572568B (en) 2017-03-08 2017-03-08 Cooperative control system and method for water consumption equipment and water heater

Country Status (1)

Country Link
CN (1) CN108572568B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020078193A1 (en) * 2018-10-16 2020-04-23 青岛海尔洗衣机有限公司 Control method and control system for water appliances
CN112575549A (en) * 2020-11-28 2021-03-30 珠海格力电器股份有限公司 Water inlet system, control method, control device, storage medium and washing machine
CN113485139A (en) * 2021-07-14 2021-10-08 无锡小天鹅电器有限公司 Whole-house linkage-based clothes washing control method and device, household appliance and server
CN115478582A (en) * 2022-09-23 2022-12-16 珠海格力电器股份有限公司 Whole-house water use control method, device and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2420311Y (en) * 2000-03-18 2001-02-21 吴涛 Full automatic washing machine matched with water heater
CN101315207A (en) * 2008-06-17 2008-12-03 广东万家乐燃气具有限公司 Automatic control pre-heating central water supply system of gas burning water heater
CN205540159U (en) * 2016-01-25 2016-08-31 胡宇祥 Intelligence house leak protection water system based on thing networking
US20160348297A1 (en) * 2015-05-28 2016-12-01 General Electric Company Method for supplying heated water from a water heater appliance to a washing machine appliance

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2420311Y (en) * 2000-03-18 2001-02-21 吴涛 Full automatic washing machine matched with water heater
CN101315207A (en) * 2008-06-17 2008-12-03 广东万家乐燃气具有限公司 Automatic control pre-heating central water supply system of gas burning water heater
US20160348297A1 (en) * 2015-05-28 2016-12-01 General Electric Company Method for supplying heated water from a water heater appliance to a washing machine appliance
CN205540159U (en) * 2016-01-25 2016-08-31 胡宇祥 Intelligence house leak protection water system based on thing networking

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020078193A1 (en) * 2018-10-16 2020-04-23 青岛海尔洗衣机有限公司 Control method and control system for water appliances
CN111061320A (en) * 2018-10-16 2020-04-24 青岛海尔洗衣机有限公司 Control method and control system of water household appliance
CN111061320B (en) * 2018-10-16 2022-06-24 青岛海尔洗衣机有限公司 Control method and control system of water household appliance
CN112575549A (en) * 2020-11-28 2021-03-30 珠海格力电器股份有限公司 Water inlet system, control method, control device, storage medium and washing machine
CN113485139A (en) * 2021-07-14 2021-10-08 无锡小天鹅电器有限公司 Whole-house linkage-based clothes washing control method and device, household appliance and server
CN115478582A (en) * 2022-09-23 2022-12-16 珠海格力电器股份有限公司 Whole-house water use control method, device and system

Also Published As

Publication number Publication date
CN108572568B (en) 2022-06-28

Similar Documents

Publication Publication Date Title
CN108572568A (en) The cooperative control system and method for water equipment and water heater
CN104131442B (en) Washing machine long-range control method and system
CN107435206B (en) Washing machine control method and washing machine
CN107435207B (en) Internet of things washing machine control method and washing machine
CN102021807B (en) Garment steamer and intelligent control method thereof
CN106319837B (en) Method for setting washing program according to preset electric energy and washing machine
CN108572567A (en) The cooperative control system and method for water equipment and water heater
US10073422B2 (en) Demand response adaptor for connecting a device to a demand response system or home automation system
CN108572566B (en) Cooperative control system and method for water consumption equipment and water heater
CN108572570A (en) The cooperative control system and method for water equipment and water heater
CN103215789B (en) One kind laundry water-supply control and device
CN112176640A (en) Control method of washing machine
CN107881703A (en) A kind of washing machine rinses method for controlling water level
CN108571824A (en) The cooperative control system and method for water equipment and water heater
CN108572569B (en) Cooperative control system and method for water consumption equipment and water heater
CN207922377U (en) Heating hot water supply apparatus, heating terminal installation and hot-water heating system
CN108950980B (en) Washing machine and steam washing method thereof
EP1396687B1 (en) Method and system for the optimal exploitation of thermal energy available in the form of hot water
CN111866036A (en) Control method of clothes treatment system based on Internet of things
CN111397764B (en) Boiling detection method and device
CN112176639B (en) Control method of washing machine
CN109990477A (en) Electric heater and its control method, system and server
CN110106660A (en) Household appliance control method and household electrical appliance
JP2013162286A (en) Energy source control system and energy source control method
CN111764093B (en) Washing machine control method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220519

Address after: 201617 t-14, 1f, No. 18, Lane 945, changta Road, Shihudang Town, Songjiang District, Shanghai

Applicant after: Shanghai Haier washing Electric Appliance Co.,Ltd.

Applicant after: Haier Smart Home Co., Ltd.

Address before: 266101 Haier Industrial Park, 1 Haier Road, Laoshan District, Shandong, Qingdao

Applicant before: QINGDAO HAIER WASHING MACHINE Co.,Ltd.

GR01 Patent grant
GR01 Patent grant