A kind of pouring machine of the bridge construction with recycling function
Technical field
The filling with recycling function the present invention relates to a kind of bridge construction pouring machine more particularly to a kind of bridge construction
Seam machine.
Background technology
Bridge construction builds the process of bridge according to design content;Refer mainly to bridge Construction Technology and construction organization, construction
The contents such as management, construction quality.
The contracting seam of bridge pavement needs to carry out joint filling with elastic polyurethane base joint grouting glue, prevents rainwater snow-broth from entering roadbed, mesh
Preceding is usually that manually base joint grouting glue is poured into container, then manually holds container and carries out encapsulating, people to the contracting seam of bridge pavement
Work holds container and is easy to overflow in making base joint grouting glue stitch from contracting to the contracting seam progress encapsulating of bridge pavement, can so cause resource unrestrained
Take, influence the beauty of bridge, therefore there is an urgent need for research and develop a kind of to economize on resources, can improve bridge aesthetics, easy to operate
Pouring machine of the bridge construction with recycling function.
Invention content
(1) technical problems to be solved
The present invention in order to overcome it is artificial hold container encapsulating carried out to the contracting seam of bridge pavement be easy that base joint grouting glue is made to stitch from contracting
Middle spilling can so result in waste of resources, and influence the beautiful disadvantage of bridge, the technical problem to be solved in the present invention is to provide one
Kind can economize on resources, can improve bridge aesthetics, pouring machine of the easy to operate bridge construction with recycling function.
(2) technical solution
In order to solve the above technical problem, the present invention provides the cementation of fissures of such a bridge construction with recycling function
Machine includes arc case, idler wheel, knob, the first connecting plate, the first drawing liquid pump, the first inlet tube, the first outlet tube, nozzle,
Two connecting plates, connecting rod, scraper bowl, the second drawing liquid pump, the second outlet tube, the second inlet tube and third inlet tube, arc bottom portion
The equal rotary type in the left and right sides be connected with idler wheel, the top of arc case right side is connected with knob, the top of arc case left side
It is connected with the first connecting plate, the left side at the top of the first connecting plate is equipped with the first drawing liquid pump, first is connected on the first drawing liquid pump
The end of inlet tube, the first inlet tube is located in arc case, and the first outlet tube is connected on the first drawing liquid pump, the first outlet tube
End is connected with nozzle, and the left side of the first connecting plate is connected with the second connecting plate, the left side connection of the second connecting plate trailing flank
There are connecting rod, the lower part of connecting rod to be connected with scraper bowl, groove, the left side at the top of the second connecting plate are provided among the bottom in scraper bowl
Second drawing liquid pump is installed, the second outlet tube is connected on the second drawing liquid pump, the end of the second outlet tube is located at the upper of arc case
It is square, it is connected with the second inlet tube on the second drawing liquid pump, the end of the second inlet tube is located in the scraper bowl on rear side of groove, the second feed liquor
Third inlet tube is connected on pipe, the end of third inlet tube is located in the scraper bowl on front side of groove.
Preferably, further include having fixed block, slide bar, sliding sleeve, the first spring, link block, L-shaped bar, collecting box and web plate, draw
The arc case right side of side is connected with fixed block on hand, and the right side of fixed block is connected with slide bar, and slide bar is equipped with sliding sleeve, slide bar
It is equipped with the first spring, the right end of the first spring and the left side of sliding sleeve connect, the left end of the first spring and the right side of fixed block
Face connects, and is connected with link block at the top of sliding sleeve, L-shaped bar is connected at the top of link block, the left end of L-shaped bar is connected with collection
The bottom installation by adhering of case, collecting box has web plate.
Preferably, further include having bearing block, shaft, rocking handle and stirring blade, the embedded peace in lower part of arc case right side
Equipped with bearing block, it is connected with shaft on bearing block, the right end of shaft is connected with rocking handle, evenly spaced in the shaft in arc case
It is connected with multiple stirring blades.
Preferably, further include having the first fixed pulley, brace, the second fixed pulley, strut, guide sleeve, rack, pedestal, the second bullet
The right end of spring, gear and drawstring, slide bar is connected with the first fixed pulley, and the bottom of fixed block is connected with brace, and the right end of brace connects
It is connected to the second fixed pulley, the arc case right side on the upside of bearing block is connected with strut, and the right end of strut is connected with guide sleeve, in guide sleeve
Equipped with rack, the arc case right side below bearing block is connected with pedestal, is connected between the top of pedestal and the bottom of rack
The right part of second spring, shaft is connected with gear, and wheel and rack engages, and drawstring, the end of drawstring are connected at the top of rack
The second fixed pulley is first bypassed, further around the first fixed pulley is crossed, is finally connect with the right side of link block.
Preferably, further include having inclined plate, third spring and copper ball, the top of rack leading flank is connected with inclined plate, inclined plate
Left side is connected with third spring, and the left end of third spring is connected with copper ball.
Operation principle:When needing to carry out the cementation of fissures with base joint grouting glue, the present invention is first manually moved to the position of setting, makes spray
Head is located at the surface for the seam that contracts, while the groove of scraper bowl being made to be on same vertical horizontal line with contracting seam, then manually to arc
Base joint grouting glue is poured into case, then manually starts the first drawing liquid pump and the base joint grouting glue in arc case is drawn through the first inlet tube,
Nozzle is then pushed by the first outlet tube, finally base joint grouting glue is injected in contracting seam by nozzle, while manually pulling with hand drawing
Hand makes the present invention move right, and the present invention, which moves right, so that scraper bowl is moved right by connecting rod, and scraper bowl moves right energy
The base joint grouting glue of contracting seam will be overflowed by reaching, in scraper bowl.Manually starting the second drawing liquid pump makes the second inlet tube and third inlet tube pair
Base joint grouting glue in scraper bowl is drawn, and then base joint grouting glue is pushed into arc case by the second outlet tube, can so save money
Source prevents the wasting of resources, artificial to close the first drawing liquid pump and the second drawing liquid pump after the completion of the cementation of fissures.So by the present invention in that
Base joint grouting glue is injected in contracting seam by nozzle, and scraper bowl moves right, can be by the base joint grouting glue scraper bowl of spilling, and passes through second
Base joint grouting glue in scraper bowl can be transmitted back in arc case by drawing liquid pump, therefore can be economized on resources, can be improved bridge aesthetics, behaviour
Facilitate.
Because further including having fixed block, slide bar, sliding sleeve, the first spring, link block, L-shaped bar, collecting box and web plate, knob
The arc case right side of upside is connected with fixed block, and the right side of fixed block is connected with slide bar, and slide bar is equipped with sliding sleeve, on slide bar
Equipped with the first spring, the right end of the first spring and the left side of sliding sleeve connect, the left end of the first spring and the right side of fixed block
It connecting, is connected with link block at the top of sliding sleeve, L-shaped bar is connected at the top of link block, the left end of L-shaped bar is connected with collecting box,
The bottom installation by adhering of collecting box has web plate.After base joint grouting glue is pushed into collecting box by the second outlet tube, L-shaped is manually pushed to the left
Bar, L-shaped bar, which is moved to the left, can make to slide over through link block to be moved to the left on slide bar, and the first spring compresses therewith, then artificial
L-shaped bar is unclamped, L-shaped bar can be made to move right reset under the action of the first spring force, L-shaped bar, which moves left and right, can make receipts
Header moves left and right, and can be so filtered to the base joint grouting glue in collecting box, the sandstone in base joint grouting glue are stopped, base joint grouting glue with
Drop downward into arc case, so as to prevent the sandstone in base joint grouting glue from falling into arc case, and then can prevent first
Drawing liquid pump blocks.
Because further including having bearing block, shaft, rocking handle and stirring blade, the lower part installation by adhering of arc case right side has
Bearing block, is connected with shaft on bearing block, and the right end of shaft is connected with rocking handle, evenly spaced connection in the shaft in arc case
There are multiple stirring blades.Rocking handle is manually shaken with hands while the cementation of fissures, rocking handle rotation drives shaft rotation, shaft rotation to drive
Stirring blade rotates, and stirring blade rotation can be stirred the base joint grouting glue in arc case, so as to make cementation of fissures effect more
It is good.
Because further include have the first fixed pulley, brace, the second fixed pulley, strut, guide sleeve, rack, pedestal, second spring,
The right end of gear and drawstring, slide bar is connected with the first fixed pulley, and the bottom of fixed block is connected with brace, and the right end of brace is connected with
Second fixed pulley, the arc case right side on the upside of bearing block are connected with strut, and the right end of strut is connected with guide sleeve, is equipped in guide sleeve
Rack, the arc case right side below bearing block are connected with pedestal, second are connected between the top of pedestal and the bottom of rack
Spring, the right part of shaft are connected with gear, wheel and rack engagement, are connected with drawstring at the top of rack, the end of drawstring first around
The second fixed pulley is crossed, further around the first fixed pulley is crossed, is finally connect with the right side of link block.Link block moves left through drawstring
Rack is set to move up, second spring is upheld therewith, can under the action of second spring elastic force when link block moves right
Rack is set to move down reset, rack, which moves up and down, can be such that gear positive and negative alternate rotates, gear positive and negative alternate rotation band turn
Axis positive and negative alternate rotates, and is so not required to manually shake with hands rocking handle rotation, so as to reduce the amount of labour.
Because further including having inclined plate, third spring and copper ball, the top of rack leading flank is connected with inclined plate, the left side of inclined plate
Face is connected with third spring, and the left end of third spring is connected with copper ball.Rack, which moves up and down, drives inclined plate to move up and down, on inclined plate
Lower movement makes copper ball move up and down by third spring, and copper ball, which moves up and down, to beat arc case, can so prevent
Only cementation of fissures gluing is on the inner wall of arc case, so as to improve the utilization to base joint grouting glue.
(3) advantageous effect
By the present invention in that base joint grouting glue is injected in contracting seam by nozzle, scraper bowl moves right, can be by the base joint grouting glue of spilling
In scraper bowl, and base joint grouting glue in scraper bowl can be transmitted back in arc case by the second drawing liquid pump, can be saved to reach
About resource, bridge aesthetics, easy to operate effect can be improved.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the overlooking structure diagram of scraper bowl of the present invention.
Fig. 3 is the left view structural representation of scraper bowl of the present invention.
Fig. 4 is second of main structure diagram of the present invention.
Fig. 5 is the third main structure diagram of the present invention.
Fig. 6 is the 4th kind of main structure diagram of the present invention.
Fig. 7 is the 5th kind of main structure diagram of the present invention.
Label in attached drawing be:1- arc casees, 2- idler wheels, 3- knobs, the first connecting plates of 4-, the first drawing liquid pumps of 5-, 6- the
One inlet tube, the first outlet tubes of 7-, 8- nozzles, the second connecting plates of 9-, 10- connecting rods, 11- scraper bowls, 12- grooves, 13- second take out
Liquid pump, the second outlet tubes of 14-, the second inlet tubes of 15-, 16- third inlet tubes, 17- fixed blocks, 18- slide bars, 19- sliding sleeves, 20-
First spring, 21- link blocks, 22-L shape bars, 23- collecting boxs, 24- web plates, 25- bearing blocks, 26- shafts, 27- rocking handles, 28- are stirred
Mix blade, the first fixed pulleys of 29-, 30- braces, the second fixed pulleys of 31-, 32- struts, 33- guide sleeves, 34- racks, 35- pedestals,
36- second springs, 37- gears, 38- drawstrings, 39- inclined plates, 40- third springs, 41- copper balls.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of pouring machine of the bridge construction with recycling function includes arc case 1, idler wheel 2, draws as shown in figs. 1-7
Hand 3, the first connecting plate 4, the first drawing liquid pump 5, the first inlet tube 6, the first outlet tube 7, nozzle 8, the second connecting plate 9, connecting rod
10, scraper bowl 11, the second drawing liquid pump 13, the second outlet tube 14, the second inlet tube 15 and third inlet tube 16,1 bottom of arc case
The equal rotary type in the left and right sides is connected with idler wheel 2, and the top of 1 right side of arc case is connected with knob 3,1 left side of arc case it is upper
Portion is connected with the first connecting plate 4, and the left side at 4 top of the first connecting plate is equipped with the first drawing liquid pump 5, is connected on the first drawing liquid pump 5
There are the first inlet tube 6, the end of the first inlet tube 6 to be located in arc case 1, the first outlet tube 7 be connected on the first drawing liquid pump 5,
The end of first outlet tube 7 is connected with nozzle 8, and the left side of the first connecting plate 4 is connected with the second connecting plate 9, the second connecting plate 9
Connecting rod 10 is connected on the left of trailing flank, the lower part of connecting rod 10 is connected with scraper bowl 11, is provided among the bottom in scraper bowl 11
The left side of groove 12,9 top of the second connecting plate is equipped with the second drawing liquid pump 13, and the second outlet tube is connected on the second drawing liquid pump 13
14, the end of the second outlet tube 14 is located at the top of arc case 1, is connected with the second inlet tube 15 on the second drawing liquid pump 13, and second
The end of inlet tube 15 is located in the scraper bowl 11 of 12 rear side of groove, and third inlet tube 16, third are connected on the second inlet tube 15
The end of inlet tube 16 is located in the scraper bowl 11 of 12 front side of groove.
Embodiment 2
A kind of pouring machine of the bridge construction with recycling function includes arc case 1, idler wheel 2, draws as shown in figs. 1-7
Hand 3, the first connecting plate 4, the first drawing liquid pump 5, the first inlet tube 6, the first outlet tube 7, nozzle 8, the second connecting plate 9, connecting rod
10, scraper bowl 11, the second drawing liquid pump 13, the second outlet tube 14, the second inlet tube 15 and third inlet tube 16,1 bottom of arc case
The equal rotary type in the left and right sides is connected with idler wheel 2, and the top of 1 right side of arc case is connected with knob 3,1 left side of arc case it is upper
Portion is connected with the first connecting plate 4, and the left side at 4 top of the first connecting plate is equipped with the first drawing liquid pump 5, is connected on the first drawing liquid pump 5
There are the first inlet tube 6, the end of the first inlet tube 6 to be located in arc case 1, the first outlet tube 7 be connected on the first drawing liquid pump 5,
The end of first outlet tube 7 is connected with nozzle 8, and the left side of the first connecting plate 4 is connected with the second connecting plate 9, the second connecting plate 9
Connecting rod 10 is connected on the left of trailing flank, the lower part of connecting rod 10 is connected with scraper bowl 11, is provided among the bottom in scraper bowl 11
The left side of groove 12,9 top of the second connecting plate is equipped with the second drawing liquid pump 13, and the second outlet tube is connected on the second drawing liquid pump 13
14, the end of the second outlet tube 14 is located at the top of arc case 1, is connected with the second inlet tube 15 on the second drawing liquid pump 13, and second
The end of inlet tube 15 is located in the scraper bowl 11 of 12 rear side of groove, and third inlet tube 16, third are connected on the second inlet tube 15
The end of inlet tube 16 is located in the scraper bowl 11 of 12 front side of groove.
Further include having fixed block 17, slide bar 18, sliding sleeve 19, the first spring 20, link block 21, L-shaped bar 22,23 and of collecting box
1 right side of arc case of web plate 24,3 upside of knob is connected with fixed block 17, and the right side of fixed block 17 is connected with slide bar 18, sliding
Bar 18 is equipped with sliding sleeve 19, and slide bar 18 is equipped with the first spring 20, and the right end of the first spring 20 is connect with the left side of sliding sleeve 19,
The left end of first spring 20 is connect with the right side of fixed block 17, and the top of sliding sleeve 19 is connected with link block 21, link block 21
Top is connected with L-shaped bar 22, and the left end of L-shaped bar 22 is connected with collecting box 23, and the bottom installation by adhering of collecting box 23 has web plate
24。
Embodiment 3
A kind of pouring machine of the bridge construction with recycling function includes arc case 1, idler wheel 2, draws as shown in figs. 1-7
Hand 3, the first connecting plate 4, the first drawing liquid pump 5, the first inlet tube 6, the first outlet tube 7, nozzle 8, the second connecting plate 9, connecting rod
10, scraper bowl 11, the second drawing liquid pump 13, the second outlet tube 14, the second inlet tube 15 and third inlet tube 16,1 bottom of arc case
The equal rotary type in the left and right sides is connected with idler wheel 2, and the top of 1 right side of arc case is connected with knob 3,1 left side of arc case it is upper
Portion is connected with the first connecting plate 4, and the left side at 4 top of the first connecting plate is equipped with the first drawing liquid pump 5, is connected on the first drawing liquid pump 5
There are the first inlet tube 6, the end of the first inlet tube 6 to be located in arc case 1, the first outlet tube 7 be connected on the first drawing liquid pump 5,
The end of first outlet tube 7 is connected with nozzle 8, and the left side of the first connecting plate 4 is connected with the second connecting plate 9, the second connecting plate 9
Connecting rod 10 is connected on the left of trailing flank, the lower part of connecting rod 10 is connected with scraper bowl 11, is provided among the bottom in scraper bowl 11
The left side of groove 12,9 top of the second connecting plate is equipped with the second drawing liquid pump 13, and the second outlet tube is connected on the second drawing liquid pump 13
14, the end of the second outlet tube 14 is located at the top of arc case 1, is connected with the second inlet tube 15 on the second drawing liquid pump 13, and second
The end of inlet tube 15 is located in the scraper bowl 11 of 12 rear side of groove, and third inlet tube 16, third are connected on the second inlet tube 15
The end of inlet tube 16 is located in the scraper bowl 11 of 12 front side of groove.
Further include having fixed block 17, slide bar 18, sliding sleeve 19, the first spring 20, link block 21, L-shaped bar 22,23 and of collecting box
1 right side of arc case of web plate 24,3 upside of knob is connected with fixed block 17, and the right side of fixed block 17 is connected with slide bar 18, sliding
Bar 18 is equipped with sliding sleeve 19, and slide bar 18 is equipped with the first spring 20, and the right end of the first spring 20 is connect with the left side of sliding sleeve 19,
The left end of first spring 20 is connect with the right side of fixed block 17, and the top of sliding sleeve 19 is connected with link block 21, link block 21
Top is connected with L-shaped bar 22, and the left end of L-shaped bar 22 is connected with collecting box 23, and the bottom installation by adhering of collecting box 23 has web plate
24。
Further include having bearing block 25, shaft 26, rocking handle 27 and stirring blade 28, the lower part of 1 right side of arc case is embedded
Bearing block 25 is installed, shaft 26 is connected on bearing block 25, the right end of shaft 26 is connected with rocking handle 27, turns in arc case 1
It is evenly spaced on axis 26 to be connected with multiple stirring blades 28.
Embodiment 4
A kind of pouring machine of the bridge construction with recycling function includes arc case 1, idler wheel 2, draws as shown in figs. 1-7
Hand 3, the first connecting plate 4, the first drawing liquid pump 5, the first inlet tube 6, the first outlet tube 7, nozzle 8, the second connecting plate 9, connecting rod
10, scraper bowl 11, the second drawing liquid pump 13, the second outlet tube 14, the second inlet tube 15 and third inlet tube 16,1 bottom of arc case
The equal rotary type in the left and right sides is connected with idler wheel 2, and the top of 1 right side of arc case is connected with knob 3,1 left side of arc case it is upper
Portion is connected with the first connecting plate 4, and the left side at 4 top of the first connecting plate is equipped with the first drawing liquid pump 5, is connected on the first drawing liquid pump 5
There are the first inlet tube 6, the end of the first inlet tube 6 to be located in arc case 1, the first outlet tube 7 be connected on the first drawing liquid pump 5,
The end of first outlet tube 7 is connected with nozzle 8, and the left side of the first connecting plate 4 is connected with the second connecting plate 9, the second connecting plate 9
Connecting rod 10 is connected on the left of trailing flank, the lower part of connecting rod 10 is connected with scraper bowl 11, is provided among the bottom in scraper bowl 11
The left side of groove 12,9 top of the second connecting plate is equipped with the second drawing liquid pump 13, and the second outlet tube is connected on the second drawing liquid pump 13
14, the end of the second outlet tube 14 is located at the top of arc case 1, is connected with the second inlet tube 15 on the second drawing liquid pump 13, and second
The end of inlet tube 15 is located in the scraper bowl 11 of 12 rear side of groove, and third inlet tube 16, third are connected on the second inlet tube 15
The end of inlet tube 16 is located in the scraper bowl 11 of 12 front side of groove.
Further include having fixed block 17, slide bar 18, sliding sleeve 19, the first spring 20, link block 21, L-shaped bar 22,23 and of collecting box
1 right side of arc case of web plate 24,3 upside of knob is connected with fixed block 17, and the right side of fixed block 17 is connected with slide bar 18, sliding
Bar 18 is equipped with sliding sleeve 19, and slide bar 18 is equipped with the first spring 20, and the right end of the first spring 20 is connect with the left side of sliding sleeve 19,
The left end of first spring 20 is connect with the right side of fixed block 17, and the top of sliding sleeve 19 is connected with link block 21, link block 21
Top is connected with L-shaped bar 22, and the left end of L-shaped bar 22 is connected with collecting box 23, and the bottom installation by adhering of collecting box 23 has web plate
24。
Further include having bearing block 25, shaft 26, rocking handle 27 and stirring blade 28, the lower part of 1 right side of arc case is embedded
Bearing block 25 is installed, shaft 26 is connected on bearing block 25, the right end of shaft 26 is connected with rocking handle 27, turns in arc case 1
It is evenly spaced on axis 26 to be connected with multiple stirring blades 28.
Further include have the first fixed pulley 29, brace 30, the second fixed pulley 31, strut 32, guide sleeve 33, rack 34, pedestal 35,
The right end of second spring 36, gear 37 and drawstring 38, slide bar 18 is connected with the first fixed pulley 29, and the bottom of fixed block 17 is connected with
The right end of brace 30, brace 30 is connected with the second fixed pulley 31, and 1 right side of arc case of 25 upside of bearing block is connected with strut
32, the right end of strut 32 is connected with guide sleeve 33, and rack 34 is equipped in guide sleeve 33, and 1 right side of arc case of 25 lower section of bearing block connects
It is connected to pedestal 35, is connected with second spring 36 between the top and the bottom of rack 34 of pedestal 35, the right part of shaft 26 is connected with
Gear 37, gear 37 are engaged with rack 34, and the top of rack 34 is connected with drawstring 38, and the end of drawstring 38 first bypasses second and slides calmly
Wheel 31 is finally connect with the right side of link block 21 further around the first fixed pulley 29 is crossed.
Further include having inclined plate 39, third spring 40 and copper ball 41, the top of 34 leading flank of rack is connected with inclined plate 39, inclined plate
39 left side is connected with third spring 40, and the left end of third spring 40 is connected with copper ball 41.
Operation principle:When needing to carry out the cementation of fissures with base joint grouting glue, the present invention is first manually moved to the position of setting, makes spray
First 8 are located at the surface of contracting seam, while making the groove 12 of scraper bowl 11 with contracting seam on same vertical horizontal line, then manually to
Base joint grouting glue is poured into arc case 1, then manually start the first drawing liquid pump 5 through the first inlet tube 6 to the base joint grouting glue in arc case 1 into
Row is drawn, and is then pushed into nozzle 8 by the first outlet tube 7, finally base joint grouting glue is injected in contracting seam by nozzle 8, while artificial
Pulling with hand knob 3 makes the present invention move right, and the present invention, which moves right, so that scraper bowl 11 is moved right by connecting rod 10,
Scraper bowl 11, which moves right, can will overflow the base joint grouting glue of contracting seam, in scraper bowl 11.Manually starting the second drawing liquid pump 13 makes second
Inlet tube 15 and third inlet tube 16 draw the base joint grouting glue in scraper bowl 11, then by the second outlet tube 14 by base joint grouting glue
It is pushed into arc case 1, can so economize on resources, prevent the wasting of resources, it is artificial to close the first drawing liquid pump 5 after the completion of the cementation of fissures
With the second drawing liquid pump 13.So by the present invention in that base joint grouting glue is injected in contracting seam by nozzle 8, scraper bowl 11 moves right, can
By in the base joint grouting glue scraper bowl 11 of spilling, and base joint grouting glue in scraper bowl 11 can be transmitted back to by arc case by the second drawing liquid pump 13
In 1, therefore it can economize on resources, bridge aesthetics can be improved, is easy to operate.
Because further including having fixed block 17, slide bar 18, sliding sleeve 19, the first spring 20, link block 21, L-shaped bar 22, collecting box
23 and web plate 24,1 right side of arc case of 3 upside of knob is connected with fixed block 17, and the right side of fixed block 17 is connected with slide bar
18, slide bar 18 is equipped with sliding sleeve 19, and slide bar 18 is equipped with the first spring 20, the left side of the right end and sliding sleeve 19 of the first spring 20
Connection, the left end of the first spring 20 are connect with the right side of fixed block 17, and the top of sliding sleeve 19 is connected with link block 21, link block
21 top is connected with L-shaped bar 22, and the left end of L-shaped bar 22 is connected with collecting box 23, and the bottom installation by adhering of collecting box 23 has
Web plate 24.Second outlet tube 14 after in base joint grouting glue push-in collecting box 23, will manually push L-shaped bar 22 to the left, and L-shaped bar 22 is to moving to left
Kinetic energy is enough to make sliding sleeve 19 be moved to the left on slide bar 18 through link block 21, and the first spring 20 compresses therewith, then artificial to unclamp L-shaped
Bar 22 can make L-shaped bar 22 move right reset under the action of the first 20 elastic force of spring, and L-shaped bar 22, which moves left and right, to be made
Collecting box 23 moves left and right, and can be so filtered to the base joint grouting glue in collecting box 23, the sandstone in base joint grouting glue are stopped, and fills
Seam glue is dropped downward into therewith in arc case 1, so as to prevent the sandstone in base joint grouting glue from falling into arc case 1, and then can be prevented
Only the first drawing liquid pump 5 is blocked.
Because further including having bearing block 25, shaft 26, rocking handle 27 and stirring blade 28, the lower part of 1 right side of arc case is embedding
Enter formula and bearing block 25 is installed, be connected with shaft 26 on bearing block 25, the right end of shaft 26 is connected with rocking handle 27, in arc case 1
Shaft 26 on evenly spaced be connected with multiple stirring blades 28.Rocking handle 27, rocking handle are manually shaken with hands while the cementation of fissures
27 rotations drive shaft 26 to rotate, and the rotation of shaft 26 drives stirring blade 28 to rotate, and the rotation of stirring blade 28 can be to arc case 1
Interior base joint grouting glue is stirred, so as to keep the cementation of fissures better.
Because further including having the first fixed pulley 29, brace 30, the second fixed pulley 31, strut 32, guide sleeve 33, rack 34, bottom
Seat 35, second spring 36, gear 37 and drawstring 38, the right end of slide bar 18 are connected with the first fixed pulley 29, the bottom of fixed block 17
It is connected with brace 30, the right end of brace 30 is connected with the second fixed pulley 31, and 1 right side of arc case of 25 upside of bearing block is connected with
The right end of strut 32, strut 32 is connected with guide sleeve 33, and rack 34,1 right side of arc case of 25 lower section of bearing block are equipped in guide sleeve 33
Face is connected with pedestal 35, and second spring 36 is connected between the top and the bottom of rack 34 of pedestal 35, and the right part of shaft 26 connects
It is connected to gear 37, gear 37 is engaged with rack 34, and the top of rack 34 is connected with drawstring 38, and the end of drawstring 38 first bypasses second
Fixed pulley 31 is finally connect with the right side of link block 21 further around the first fixed pulley 29 is crossed.Link block 21 moves left through drawing
Rope 38 makes rack 34 move up, and second spring 36 is upheld therewith, when link block 21 moves right, in 36 elastic force of second spring
Under the action of rack 34 can be made to move down reset, rack 34, which moves up and down, can be such that 37 positive and negative alternate of gear rotates, gear
The rotation of 37 positive and negative alternates drives the rotation of 26 positive and negative alternate of shaft, is so not required to manually shake with hands the rotation of rocking handle 27, so as to
Reduce the amount of labour.
Because further including having inclined plate 39, third spring 40 and copper ball 41, the top of 34 leading flank of rack is connected with inclined plate 39,
The left side of inclined plate 39 is connected with third spring 40, and the left end of third spring 40 is connected with copper ball 41.Rack 34 moves up and down band
Dynamic inclined plate 39 moves up and down, and inclined plate 39 makes copper ball 41 move up and down up and down through third spring 40, and copper ball 41 moves up and down
Arc case 1 can be beaten, so can prevent cementation of fissures gluing on the inner wall of arc case 1, so as to improve to filling
Stitch the utilization of glue.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.