CN108569776A - A kind of power plant automatic feeding formula full guard accurate oxygen-adding device and oxygenation method - Google Patents

A kind of power plant automatic feeding formula full guard accurate oxygen-adding device and oxygenation method Download PDF

Info

Publication number
CN108569776A
CN108569776A CN201810469334.1A CN201810469334A CN108569776A CN 108569776 A CN108569776 A CN 108569776A CN 201810469334 A CN201810469334 A CN 201810469334A CN 108569776 A CN108569776 A CN 108569776A
Authority
CN
China
Prior art keywords
oxygenation
air
flow
power plant
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810469334.1A
Other languages
Chinese (zh)
Inventor
曹杰玉
刘玮
李俊菀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Thermal Power Research Institute Co Ltd
Original Assignee
Xian Thermal Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Thermal Power Research Institute Co Ltd filed Critical Xian Thermal Power Research Institute Co Ltd
Priority to CN201810469334.1A priority Critical patent/CN108569776A/en
Publication of CN108569776A publication Critical patent/CN108569776A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F5/00Softening water; Preventing scale; Adding scale preventatives or scale removers to water, e.g. adding sequestering agents

Abstract

A kind of power plant automatic feeding formula full guard accurate oxygen-adding device and oxygenation method; the air provided using wind turbine is as oxygenation oxygen sources; and compressed air is set to boost to the stress levels of needs by booster pump; i.e. compressed air pressure is more than oxygenation point pressure, the oxygenation requirement that realization draining system, water supply system and condensate system automatic feeding, water-steam system are protected comprehensively;PLC control cabinet is according to water sample (hydrophobic, water supply, condensed water) flow and quasi- control water sample dissolved oxygen concentration value, coarse adjustment is carried out to flow control valve, fine tuning is carried out further according to water sample dissolved oxygen meter practical measurement signals and quasi- control water sample dissolved oxygen concentration value, since flow control valve working media is atmospheric air, the adjusting of flow-rate adjustment valve opening also carries out under normal pressure operating mode, it is not influenced by gas compressibility during both air flow modulation, realizes that accurate oxygenation is adjusted.

Description

A kind of power plant automatic feeding formula full guard accurate oxygen-adding device and oxygenation method
Technical field
The present invention relates to power plant heat power equipment corrosion protection technology field more particularly to a kind of power plant automatic feeding formulas Full guard accurate oxygen-adding device and oxygenation method.
Background technology
For prevent water supply system, the accelerated corrosion of HP heater drainage system flow and its bring it is a series of to unit operation not Profit influences, and super (super-) critical unit is apparent using the necessity of combined water treatment.However, due to worrying superheater, again Hot device oxide skin problem, the country still have many super (super-) critical units not use oxygenated treatment.
Full guard combined water treatment refers to and carries out oxygenation to condensed water, water supply, HP heater drainage system respectively.Keep dissolving Oxygen concentration meets water supply, the passivation of HP heater drainage system requires, can take into account stokehold water supply system, high-pressure heater vapour side it is anti- Corruption concentrates the risk to fall off simultaneously because the concentration of oxygen is close to zero in superheated steam there is no superheater oxide skin is promoted.Cause This, full guard combined water treatment is to solve supercritical unit water-steam system corrosion and scaling, improves unit operation economy most For the oxygenated treatment method of safety.
Traditional aeration device is mainly made of oxygen cylinder, bus-bar, oxygen flux control equipment, oxygen conveying pipe line etc.. A collection of oxygen cylinder is stored between oxygenation and constitutes major hazard source, increases operational safety risk.Operations staff needs inspection gas cylinder Pressure, periodic replacement gas cylinder carry out airtight test after replacing gas cylinder every time, and operation and maintenance amount is big.Traditional aeration device Oxygenation method be that oxygen-adding amount is carried out under the conditions of supply gas pressure using the pressure difference between gas cylinder and oxygenation point as oxygenation power It adjusts, due to the features such as gas has compressibility, and oxygenation flow is small, oxygenation pressure is high, oxygenation control accuracy is very poor, on the one hand It increases operation maintenance personnel and frequently adjusts workload, the extra oxygen of another aspect water supply enters vapour system, increases promotion Steam side oxide skin concentrates the risk peeled off, and is unfavorable for the safety and economic operation of unit.
Therefore, exploitation is a kind of can realize that automatic feeding, automatic and accurate oxygenation are adjusted, water-steam system is protected comprehensively Aeration device and oxygenation method become and ensure unit safety economical operation, reduce the work of operation maintenance personnel to the maximum extent Measure technical barrier urgently to be resolved hurrily.
Invention content
The purpose of the present invention is to provide a kind of power plant automatic feeding formula full guard that is safe and reliable, economic, saving trouble is smart True aeration device and oxygenation method, the air provided using wind turbine keep compression empty as oxygenation oxygen sources, and by booster pump Gas lift is depressed into the stress level of needs, i.e., compressed air pressure is more than oxygenation point pressure, realize draining system, water supply system and Condensate system automatic feeding, the comprehensively requirement of protection oxygenation;PLC control cabinet according to water sample (hydrophobic, water supply, condensed water) flow with And quasi- control water sample dissolved oxygen concentration value, coarse adjustment is carried out to flow control valve, it is molten further according to water sample (hydrophobic, water supply, condensed water) It solves oxygen table practical measurement signals and quasi- control water sample dissolved oxygen concentration value carries out fine tuning, since flow control valve working media is normal It presses air, the adjusting of flow-rate adjustment valve opening also to be carried out under normal pressure operating mode, can not pressed by gas during both air flow modulation Contracting influences, and realizes that accurate oxygenation is adjusted.
In order to achieve the above objectives, the technical solution adopted by the present invention is as follows:
A kind of power plant automatic feeding formula full guard accurate oxygen-adding device, the aeration device include and wind turbine 1 and air The oxygenation pipeline 3 that purifier 2 connects, air pass through the air-supplying valve on oxygenation pipeline 3 after air cleaning unit 2 Tri- roads 4 Fen Wei are disposed with first flow regulating valve 5-1, the first air flow meter 6-1, first on first via oxygenation pipeline Booster pump 7-1, first pressure gauge 8-1 and the first oxygenation shut-off valve 9-1 are disposed with second flow on the second road oxygenation pipeline Regulating valve 5-2, the second air flow meter 6-2, the second booster pump 7-2, second pressure gauge 8-2 and the second oxygenation shut-off valve 9-2, the Third flow control valve 5-3, third air flow meter 6-3, third booster pump 7-3, are disposed on three road oxygenation pipelines Three pressure gauge 8-3 and third oxygenation shut-off valve 9-3, the first oxygenation shut-off valve 9-1, the second oxygenation shut-off valve 9-2, third oxygenation close Disconnected valve 9-3 is respectively connected to power plant draining system oxygenation point 10-1, feed water supply system of power plant oxygenation point by oxygenation pipeline 3 10-2 and power plant condensate system oxygenation point 10-3, the power plant downstreams draining system oxygenation point 10-1, feed water supply system of power plant The oxygenation downstreams point 10-2 and the power plant downstreams condensate system oxygenation point 10-3 are respectively arranged with hydrophobic flowmeter 11-1, hydrophobic Dissolved oxygen meter 12-1, feed meter 11-2, water supply dissolved oxygen meter 12-2 and condensing water flow meter 11-3, condensed water dissolved oxygen Table 12-3 further includes and wind turbine 1, first flow regulating valve 5-1, second flow regulating valve 5-2, third flow control valve 5-3, One air flow meter 6-1, the second air flow meter 6-2, third air flow meter 6-3, the first booster pump 7-1, the second booster pump 7-2, third booster pump 7-3, hydrophobic flowmeter 11-1, hydrophobic dissolved oxygen meter 12-1, feed meter 11-2, water supply dissolved oxygen meter 12-2, condensing water flow meter 11-3 and the PLC control cabinet 13 of condensed water dissolved oxygen meter 12-3 connections.
The wind turbine 1 is that converting operation wind turbine or fixed frequency run wind turbine.
The first booster pump 7-1, the second booster pump 7-2, third booster pump 7-3 are single stage supercharging pump or multi-stage booster Pump, air pressure is more than power plant draining system oxygenation point 10-1, feed water supply system of power plant oxygenation point 10-2, power plant after supercharging The pressure of condensate system oxygenation point 10-3.
The accurate oxygenation method of the power plant automatic feeding formula full guard accurate oxygen-adding device, PLC control cabinet 13 are logical It crosses the work of control wind turbine 1 and generates air, the air that wind turbine 1 generates passes through 2 He of air cleaning unit being mounted on oxygenation pipeline 3 It is divided into three tunnels after air-supplying valve 4, PLC control cabinet 13 is according to hydrophobic flowmeter 12-1, feed meter 12- on each road oxygenation pipeline 2, the hydrophobic, water supply of condensing water flow meter 12-3 feedbacks, condensed water flow respectively to first flow regulating valve 5-1, second The aperture of adjustable valve 5-2 and third flow control valve 5-3 carry out coarse adjustment so that the first air flow meter 6-1, the second air stream Gauge 6-2 and third air flow meter 6-3 shows the air mass flow Q that each road is addedairFor correspondence is hydrophobic, water supply and condensation flow Measure QwaterIt is multiplied by the hydrophobic, water supply of quasi- control and condensed water dissolved oxygen concentration value Coxygen5~10 times, i.e. Qair=Qwater× Coxygen× (5~10) consume, PLC control cabinet since dissolved oxygen exists in each draining system, water supply system and condensate system 13 measure dredging for feedback according to hydrophobic dissolved oxygen meter 12-1, water supply dissolved oxygen meter 12-2 and condensed water dissolved oxygen meter 12-3 are practical Water, water supply, condensed water dissolved oxygen concentration respectively to first flow regulating valve 5-1, second flow regulating valve 5-2 and third flow The aperture of regulating valve 5-3 carries out fine tuning, and the dissolved oxygen concentration for controlling hydrophobic, water supply and condensed water is desired value Coxygen, simultaneously PLC control cabinet 13 is by controlling the first booster pump 7-1, the second booster pump 7-2 and the 7-3 work of third booster pump so that the first pressure Air pressure is respectively greater than the hydrophobic system in power plant after the supercharging that power table 8-1, second pressure gauge 8-2 and third pressure gauge 8-3 are shown The pressure of system oxygenation point 10-1, feed water supply system of power plant oxygenation point 10-2 and power plant condensate system oxygenation point 10-3, it is real Draining system on the oxygenation pipeline of the roads Xian Ge, water supply system and condensate system be continuous, reliably and accurately oxygenation.
The working media of the first flow regulating valve 5-1, second flow regulating valve 5-2 and third flow control valve 5-3 Adjusting for atmospheric air, flow-rate adjustment valve opening also carries out under normal pressure, not by gas compressibility during flow-rate adjustment It influences, degree of regulation is high.
Compared to the prior art, the present invention has the following advantages:
(1) comparing traditional aeration device uses pure oxygen, the present invention to use air as oxygen sources, and oxygenation fortune is greatly improved Row safety;
(2) it compares traditional aeration device and needs inspection storage pressure, periodic replacement gas cylinder, replace the laggard promoting the circulation of qi of gas cylinder every time Close property inspection, the present invention realize oxygenation automatic feeding, need not replace gas cylinder, greatly reduce operations staff's maintenance workload;
(3) poor compared to traditional aeration device oxygenation method control accuracy, operations staff adjusts heavy workload, and water supply is extra Oxygen enters vapour system and increases the risk for promoting steam side oxide skin to concentrate peeling, is unfavorable for the safety and economic operation of unit, this Invention flow control valve working media is atmospheric air, and the adjusting of flow-rate adjustment valve opening also carries out under normal pressure operating mode, air It is not influenced by gas compressibility during flow-rate adjustment, realizes that accurate oxygenation is adjusted.
Description of the drawings
Fig. 1 is power plant automatic feeding formula full guard accurate oxygen-adding device schematic diagram of the present invention.
Specific implementation mode
Invention is further described in detail below in conjunction with the accompanying drawings.
As shown in Figure 1, a kind of power plant automatic feeding formula full guard accurate oxygen-adding device of the present invention, the aeration device packet The oxygenation pipeline 3 being connect with wind turbine 1 and air cleaning unit 2 is included, air is after air cleaning unit 2 by being mounted on oxygen-adding tube Tri- roads 4 Fen Wei of air-supplying valve on road 3 are disposed with first flow regulating valve 5-1, the first air on first via oxygenation pipeline Flowmeter 6-1, the first booster pump 7-1, first pressure gauge 8-1 and the first oxygenation shut-off valve 9-1, on the second road oxygenation pipeline successively Second flow regulating valve 5-2, the second air flow meter 6-2, the second booster pump 7-2, second pressure gauge 8-2 and second is provided with to add Oxygen shut-off valve 9-2 is disposed with third flow control valve 5-3, third air flow meter 6-3, on the oxygenation pipeline of third road Three booster pump 7-3, third pressure gauge 8-3 and third oxygenation shut-off valve 9-3, the first oxygenation shut-off valve 9-1, the second oxygenation shut-off valve 9-2, third oxygenation shut-off valve 9-3 by oxygenation pipeline 3 be respectively connected to power plant draining system oxygenation point 10-1, power plant to Water system oxygenation point 10-2 and power plant condensate system oxygenation point 10-3, the power plant downstreams draining system oxygenation point 10-1, hair Power plant's water supply system oxygenation downstreams point 10-2 and the power plant downstreams condensate system oxygenation point 10-3 are respectively arranged with hydrophobic stream Gauge 11-1, hydrophobic dissolved oxygen meter 12-1, feed meter 11-2, water supply dissolved oxygen meter 12-2 and condensing water flow meter 11- 3, condensed water dissolved oxygen meter 12-3 further includes and wind turbine 1, first flow regulating valve 5-1, second flow regulating valve 5-2, third stream Adjustable valve 5-3, the first air flow meter 6-1, the second air flow meter 6-2, third air flow meter 6-3, the first booster pump 7-1, the second booster pump 7-2, third booster pump 7-3, hydrophobic flowmeter 11-1, hydrophobic dissolved oxygen meter 12-1, feed meter 11- 2, water supply dissolved oxygen meter 12-2, condensing water flow meter 11-3 and the PLC control cabinet 13 of condensed water dissolved oxygen meter 12-3 connections.
As the preferred embodiment of the present invention, the wind turbine 1 is that converting operation wind turbine or fixed frequency run wind turbine.
As the preferred embodiment of the present invention, the first booster pump 7-1, the second booster pump 7-2, third booster pump 7- 3 be single stage supercharging pump or multi-stage booster pump, and air pressure is more than power plant draining system oxygenation point 10-1 after supercharging, power plant is given The pressure of water system oxygenation point 10-2, power plant condensate system oxygenation point 10-3.
As shown in Figure 1, the accurate oxygenation method of power plant automatic feeding formula full guard accurate oxygen-adding device of the present invention, starts Preceding each valve of system is closed.Air-supplying valve 4 is opened, wind turbine 1, the sky that wind turbine 1 generates are started by PLC control cabinet 13 Gas by oxygenation pipeline 3 air cleaning unit 2 and air-supplying valve 4 after be divided into three tunnels, PLC control cabinet 13 is according to each It is hydrophobic flowmeter 12-1 on the oxygenation pipeline of road, feed meter 12-2, the hydrophobic of condensing water flow meter 12-3 feedbacks, water supply, solidifying The flow born water is respectively to the aperture of first flow regulating valve 5-1, second flow regulating valve 5-2 and third flow control valve 5-3 Carry out coarse adjustment so that the first air flow meter 6-1, the second air flow meter 6-2 and third air flow meter 6-3 show that each road adds The air mass flow Q enteredairFor correspondence is hydrophobic, water supply and condensing water flow QwaterIt is multiplied by the hydrophobic, water supply of quasi- control and condensation water dissolution Oxygen concentration value Coxygen5~10 times, i.e. QAir=Qwater×Coxygen× (5~10), since dissolved oxygen is in each draining system, water supply There is consumption in system and condensate system, PLC control cabinet 13 is according to hydrophobic dissolved oxygen meter 12-1, water supply dissolved oxygen meter 12-2 and coagulates Bear water the practical hydrophobic, water supply for measuring feedback of dissolved oxygen meter 12-3, the dissolved oxygen concentration of condensed water is respectively adjusted first flow The aperture of valve 5-1, second flow regulating valve 5-2 and third flow control valve 5-3 carry out fine tuning, control hydrophobic, water supply and condensation The dissolved oxygen concentration of water is desired value Coxygen, while PLC control cabinet 13 is by controlling the first booster pump 7-1, the second booster pump 7- 2 and third booster pump 7-3 works so that the supercharging that first pressure gauge 8-1, second pressure gauge 8-2 and third pressure gauge 8-3 are shown Air pressure is respectively greater than power plant draining system oxygenation point 10-1, feed water supply system of power plant oxygenation point 10-2 and power plant afterwards The pressure of condensate system oxygenation point 10-3 realizes that draining system on each road oxygenation pipeline, water supply system and condensate system connect Continuous, reliably and accurately oxygenation.
The working media of the first flow regulating valve 5-1, second flow regulating valve 5-2 and third flow control valve 5-3 Adjusting for atmospheric air, flow-rate adjustment valve opening also carries out under normal pressure, not by gas compressibility during flow-rate adjustment It influences, degree of regulation is high.

Claims (5)

1. a kind of power plant automatic feeding formula full guard accurate oxygen-adding device, it is characterised in that:The aeration device includes and wind The oxygenation pipeline (3) of machine (1) and air cleaning unit (2) connection, air is after air cleaning unit (2) by being mounted on oxygenation Air-supplying valve (4) on pipeline (3) is divided into three tunnels, be disposed on the first via oxygenation pipeline first flow regulating valve (5-1), First air flow meter (6-1), the first booster pump (7-1), first pressure gauge (8-1) and the first oxygenation shut-off valve (9-1), second Second flow regulating valve (5-2), the second air flow meter (6-2), the second booster pump (7- are disposed on the oxygenation pipeline of road 2), second pressure gauge (8-2) and the second oxygenation shut-off valve (9-2) are disposed with third flow tune on the oxygenation pipeline of third road Save valve (5-3), third air flow meter (6-3), third booster pump (7-3), third pressure gauge (8-3) and third oxygenation shut-off valve (9-3), the first oxygenation shut-off valve (9-1), the second oxygenation shut-off valve (9-2), third oxygenation shut-off valve (9-3) pass through oxygenation pipeline (3) it is solidifying that power plant draining system oxygenation point (10-1), feed water supply system of power plant oxygenation point (10-2) and power plant are respectively connected to Bear water system oxygenation point (10-3), the downstream power plant draining system oxygenation point (10-1), feed water supply system of power plant oxygenation point (10- 2) downstream and the downstream power plant condensate system oxygenation point (10-3) are respectively arranged with hydrophobic flowmeter (11-1), hydrophobic dissolving Oxygen table (12-1), feed meter (11-2), water supply dissolved oxygen meter (12-2) and condensing water flow meter (11-3), condensation are water-soluble Oxygen table (12-3) is solved, further includes and wind turbine (1), first flow regulating valve (5-1), second flow regulating valve (5-2), third flow Regulating valve (5-3), the first air flow meter (6-1), the second air flow meter (6-2), third air flow meter (6-3), first Booster pump (7-1), the second booster pump (7-2), third booster pump (7-3), hydrophobic flowmeter (11-1), hydrophobic dissolved oxygen meter (12- 1), feed meter (11-2), water supply dissolved oxygen meter (12-2), condensing water flow meter (11-3) and condensed water dissolved oxygen meter The PLC control cabinet (13) of (12-3) connection.
2. power plant automatic feeding formula full guard accurate oxygen-adding device according to claim 1, it is characterised in that:The wind Machine (1) is that converting operation wind turbine or fixed frequency run wind turbine.
3. power plant automatic feeding formula full guard accurate oxygen-adding device according to claim 1, it is characterised in that:Described One booster pump (7-1), the second booster pump (7-2), third booster pump (7-3) are that single stage supercharging pumps or multi-stage booster pumps, after supercharging Air pressure is more than power plant draining system oxygenation point (10-1), feed water supply system of power plant oxygenation point (10-2), power plant condensation The pressure of water system oxygenation point (10-3).
4. the accurate oxygenation side of claims 1 to 3 any one of them power plant automatic feeding formula full guard accurate oxygen-adding device Method, it is characterised in that:PLC control cabinet (13) generates air by controlling wind turbine (1) work, and the air that wind turbine (1) generates passes through It is divided into three tunnels, PLC control cabinet (13) basis after air cleaning unit (2) and air-supplying valve (4) on oxygenation pipeline (3) Hydrophobic flowmeter (12-1) on each road oxygenation pipeline, feed meter (12-2), condensing water flow meter (12-3) feedback it is hydrophobic, Water supply, condensed water flow respectively to first flow regulating valve (5-1), second flow regulating valve (5-2) and third flow-rate adjustment The aperture of valve (5-3) carries out coarse adjustment so that the first air flow meter (6-1), the second air flow meter (6-2) and third air stream Gauge (6-3) shows the air mass flow Q that each road is addedairFor correspondence is hydrophobic, water supply and condensing water flow QwaterQuasi- control is multiplied by dredge Water, water supply and condensed water dissolved oxygen concentration value Coxygen5~10 times, i.e. Qair=Qwater×Coxygen× (5~10), due to molten It solves oxygen and there is consumption in each draining system, water supply system and condensate system, PLC control cabinet (13) is according to hydrophobic dissolved oxygen meter (12-1), water supply dissolved oxygen meter (12-2) and condensed water dissolved oxygen meter (12-3) actually measure the hydrophobic of feedback, water supply, condensed water Dissolved oxygen concentration respectively to first flow regulating valve (5-1), second flow regulating valve (5-2) and third flow control valve (5- 3) aperture carries out fine tuning, and the dissolved oxygen concentration for controlling hydrophobic, water supply and condensed water is desired value Coxygen, while PLC control cabinet (13) it is worked by controlling the first booster pump (7-1), the second booster pump (7-2) and third booster pump (7-3) so that first pressure Air pressure is respectively greater than power plant and dredges after the supercharging of table (8-1), second pressure gauge (8-2) and third pressure gauge (8-3) display Water system oxygenation point (10-1), feed water supply system of power plant oxygenation point (10-2) and power plant condensate system oxygenation point (10-3) Pressure, realize that draining system on each road oxygenation pipeline, water supply system and condensate system be continuous, reliably and accurately oxygenation.
5. the accurate oxygenation method of power plant automatic feeding formula full guard accurate oxygen-adding device according to claim 4, It is characterized in that:The first flow regulating valve (5-1), second flow regulating valve (5-2) and third flow control valve (5-3) work It is atmospheric air to make medium, and the adjusting of flow-rate adjustment valve opening also carries out under normal pressure, can not by gas during flow-rate adjustment Comperssibility influence, degree of regulation are high.
CN201810469334.1A 2018-05-16 2018-05-16 A kind of power plant automatic feeding formula full guard accurate oxygen-adding device and oxygenation method Pending CN108569776A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810469334.1A CN108569776A (en) 2018-05-16 2018-05-16 A kind of power plant automatic feeding formula full guard accurate oxygen-adding device and oxygenation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810469334.1A CN108569776A (en) 2018-05-16 2018-05-16 A kind of power plant automatic feeding formula full guard accurate oxygen-adding device and oxygenation method

Publications (1)

Publication Number Publication Date
CN108569776A true CN108569776A (en) 2018-09-25

Family

ID=63572635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810469334.1A Pending CN108569776A (en) 2018-05-16 2018-05-16 A kind of power plant automatic feeding formula full guard accurate oxygen-adding device and oxygenation method

Country Status (1)

Country Link
CN (1) CN108569776A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110217900A (en) * 2019-04-18 2019-09-10 西安热工研究院有限公司 A kind of automatic oxygenation of power plant water supply and the collaboration precise control device and method of ammonification
CN110510723A (en) * 2019-08-05 2019-11-29 安徽安庆皖江发电有限责任公司 Thermal power generation unit
CN111348759A (en) * 2020-04-07 2020-06-30 西安热工研究院有限公司 High-pressure-rise hydrophobic automatic oxygenation system and oxygenation method
CN112591955A (en) * 2020-11-22 2021-04-02 西安热工研究院有限公司 Automatic oxygen source system and oxygen generation method for feedwater oxygenation treatment process
CN112919648A (en) * 2021-03-15 2021-06-08 中国大唐集团科学技术研究院有限公司华中电力试验研究院 System and method for treating feed water and ozone of thermal generator set
CN113149119A (en) * 2021-03-10 2021-07-23 华电电力科学研究院有限公司 Accurate oxygenation control system of thermal power factory condensate water
CN113983451A (en) * 2021-11-26 2022-01-28 广东大唐国际潮州发电有限责任公司 Thermal power plant oxygenation system based on automatic oxygenation device closed-loop adjustment and adjustment method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2889518A1 (en) * 2005-08-02 2007-02-09 Sarl Aquatique De La Moine Sar Waste water treatment system comprises a container having a treatment unit to treat drainage water in a supply and a module having two compartments associated with a water supply and an exit
US20140042104A1 (en) * 2012-03-20 2014-02-13 Z (P) Epc Electric Power Research Institute Process for feed-water oxygenating treatment in boiler in power station
CN103880230A (en) * 2014-03-26 2014-06-25 西安热工研究院有限公司 Segmental oxidation treatment system and treatment method of thermodynamic system of novel coal-fired power plant
CN205398244U (en) * 2016-02-18 2016-07-27 西安热工研究院有限公司 Automatic oxygen equipment that adds of power plant condensate water
CN208345865U (en) * 2018-05-16 2019-01-08 西安热工研究院有限公司 A kind of power plant automatic feeding formula full guard accurate oxygen-adding device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2889518A1 (en) * 2005-08-02 2007-02-09 Sarl Aquatique De La Moine Sar Waste water treatment system comprises a container having a treatment unit to treat drainage water in a supply and a module having two compartments associated with a water supply and an exit
US20140042104A1 (en) * 2012-03-20 2014-02-13 Z (P) Epc Electric Power Research Institute Process for feed-water oxygenating treatment in boiler in power station
CN103880230A (en) * 2014-03-26 2014-06-25 西安热工研究院有限公司 Segmental oxidation treatment system and treatment method of thermodynamic system of novel coal-fired power plant
CN205398244U (en) * 2016-02-18 2016-07-27 西安热工研究院有限公司 Automatic oxygen equipment that adds of power plant condensate water
CN208345865U (en) * 2018-05-16 2019-01-08 西安热工研究院有限公司 A kind of power plant automatic feeding formula full guard accurate oxygen-adding device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐刚华 等: "超超临界百万机组全保护加氧技术应用研究", 中国电机工程学会电厂化学2016年学术年会, pages 82 *
齐保同 等: "提高锅炉自动加氧控制装置的精度研究", 热力发电, vol. 42, no. 5, pages 88 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110217900A (en) * 2019-04-18 2019-09-10 西安热工研究院有限公司 A kind of automatic oxygenation of power plant water supply and the collaboration precise control device and method of ammonification
CN110217900B (en) * 2019-04-18 2023-10-13 西安热工研究院有限公司 Cooperative precise control device and method for automatic oxygenation and ammonia addition of power plant water supply
CN110510723A (en) * 2019-08-05 2019-11-29 安徽安庆皖江发电有限责任公司 Thermal power generation unit
CN111348759A (en) * 2020-04-07 2020-06-30 西安热工研究院有限公司 High-pressure-rise hydrophobic automatic oxygenation system and oxygenation method
CN112591955A (en) * 2020-11-22 2021-04-02 西安热工研究院有限公司 Automatic oxygen source system and oxygen generation method for feedwater oxygenation treatment process
CN112591955B (en) * 2020-11-22 2022-08-26 西安热工研究院有限公司 Automatic oxygen source system for feedwater oxygenation treatment process and oxygen generation method
CN113149119A (en) * 2021-03-10 2021-07-23 华电电力科学研究院有限公司 Accurate oxygenation control system of thermal power factory condensate water
CN112919648A (en) * 2021-03-15 2021-06-08 中国大唐集团科学技术研究院有限公司华中电力试验研究院 System and method for treating feed water and ozone of thermal generator set
CN113983451A (en) * 2021-11-26 2022-01-28 广东大唐国际潮州发电有限责任公司 Thermal power plant oxygenation system based on automatic oxygenation device closed-loop adjustment and adjustment method

Similar Documents

Publication Publication Date Title
CN108569776A (en) A kind of power plant automatic feeding formula full guard accurate oxygen-adding device and oxygenation method
CN207279601U (en) A kind of high-temperature condensation water recovery system
CN107905858A (en) Final stage safe traffic Monitoring and control system and method
CN208345865U (en) A kind of power plant automatic feeding formula full guard accurate oxygen-adding device
CN205899402U (en) Automatic oxygen controlgear that adds of boiler feed water
CN106745406A (en) A kind of power plant condensate polishing treatment operation control optimization device and method
CN108868923A (en) A kind of threeway jet stream pressure and temperature reducing control system for heat supply network heat supply
JP3978856B2 (en) Liquefied natural gas vaporization equipment
CN209800272U (en) Backflow adjusting device suitable for liquid ring pump of thermal power plant
CN205398244U (en) Automatic oxygen equipment that adds of power plant condensate water
CN204154563U (en) PTA Equipment oxidation reaction tail gas on-line checkingi sample gas pretreating system
CN208704529U (en) A kind of Mobile Online's cleaning device suitable for condenser
CN213177697U (en) Short-flow natural gas gathering and transportation system
CN210568346U (en) Energy collecting device of deaerator of dry quenching boiler
CN209558322U (en) A kind of oxygen-eliminating device dead steam recovery system
CN201087833Y (en) High temperature steam oxidation test device
CN209355357U (en) A kind of Make-up Water for Heating System
JP2696124B2 (en) Steam turbine equipment
CN209508303U (en) The safe circulatory system of the air port Ou Yelu cooling water channel open circuit
CN208687699U (en) A kind of air suspended type flash vessel steam discharge working medium and residual neat recovering system
CN207990591U (en) A kind of preposition pump control system of feed pump
CN209539411U (en) A kind of balance of steam device jumped for more sucking condensing turbines after vehicle
CN206447585U (en) A kind of power plant condensate polishing treatment operation control optimization device
CN213714905U (en) Automatic dewatering device for process gas on-line analysis sample
CN215831670U (en) Condensed water flash evaporation pressure-boosting steam supply energy-saving equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination