CN108565808A - A kind of cable for built single time anchor support draws lower special pole - Google Patents

A kind of cable for built single time anchor support draws lower special pole Download PDF

Info

Publication number
CN108565808A
CN108565808A CN201810610366.9A CN201810610366A CN108565808A CN 108565808 A CN108565808 A CN 108565808A CN 201810610366 A CN201810610366 A CN 201810610366A CN 108565808 A CN108565808 A CN 108565808A
Authority
CN
China
Prior art keywords
cross
arm
seating
cable
anchor support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810610366.9A
Other languages
Chinese (zh)
Inventor
唐勇
王宇坤
束俊峰
林其友
程凯
宋浩然
尹雪超
周转
杜伟
杨进
金先墨
任刚
沈六六
杨晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Huadian Engineering Consulting and Design Co Ltd
Wuhu Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
Anhui Huadian Engineering Consulting and Design Co Ltd
Wuhu Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Huadian Engineering Consulting and Design Co Ltd, Wuhu Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical Anhui Huadian Engineering Consulting and Design Co Ltd
Priority to CN201810610366.9A priority Critical patent/CN108565808A/en
Publication of CN108565808A publication Critical patent/CN108565808A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/20Spatial arrangements or dispositions of lines or cables on poles, posts or towers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

A kind of cable for built single time anchor support draws lower special pole.Including shaft, lower layer's cross-arm, upper layer cross-arm, A seating cable termination and A seating arrester, the upper layer cross-arm is placed in the top of shaft, both sides cross-arm is arranged in parallel circuit direction, lower layer's cross-arm is placed in the lower section of upper layer cross-arm, with built circuit four side cross-arms are arranged in 60 degree of angles, four side cross-arms are distributed in X-type, the upper layer cross-arm ending is separately installed with A seating cable eventually and A seating arrester, cross-arm ending of the lower layer's cross-arm towards a side phase conductor fix A seating cable termination and A seating arrester respectively.The present invention is suitble to be close to anchor support construction, does not change and draws downside anchor support stress, and the dismounting for avoiding old tower is rebuild, and compared with newly-built straight line, anchor support, construction cost is greatly reduced, reduces floor space.

Description

A kind of cable for built single time anchor support draws lower special pole
【Technical field】
Under drawing the present invention relates to ultra-high-tension power transmission line technical field, especially a kind of cable for built single time anchor support Special pole.
【Background technology】
In the Practical Project under overhead transmission line cable draws, influenced by line route, ambient enviroment etc. factor, Cable draws lower point and possibly is present at circuit center, built the shaft tower positions such as nearby, especially near built anchor support when, create resistance to It opens type cable termination tower and forms small isolated shelves with built anchor support, built anchor support both sides unbalanced tensile force is made to increase, it is difficult to is full Sufficient use condition need to remove reconstruction;Newly-built linear type cable termination is influenced each other with built anchor support by pole and tower foundation, between two towers Away from should not be excessively close, and newly-built tangent tower utilization rate be high, serious waste of resources, and overall aesthetics is poor.
It is therefore proposed that a kind of cable for built single time anchor support draws lower special pole, influenced most on built anchor support On the basis of small, under realizing that single back line cable draws.
【Invention content】
The main purpose of the present invention is to provide a kind of cables for built single time anchor support to draw lower special pole, is suitble to tight Anchor support construction is pasted, does not change and draws downside anchor support stress, the dismounting for avoiding old tower is rebuild, with newly-built straight line, anchor support phase Than construction cost is greatly reduced, reduces floor space.
To achieve the above object, the technical solution that the present invention takes is:
A kind of cable for built single time anchor support draws lower special pole, including shaft, lower layer's cross-arm, upper layer cross-arm, seat Formula cable termination and A seating arrester, the upper layer cross-arm are placed in the top of shaft, and both sides cross-arm, institute are arranged in parallel circuit direction The lower section that lower layer's cross-arm is placed in upper layer cross-arm is stated, arranges four side cross-arms in 60 degree of angles with built circuit, four side cross-arms are in X-type point Cloth, the upper layer cross-arm ending are separately installed with A seating cable eventually with A seating arrester, and lower layer's cross-arm is towards a side phase The cross-arm ending of conducting wire fixes A seating cable termination and A seating arrester respectively.
Further, it is connected with conducting wire or copper coin between the upper layer cross-arm A seating cable termination and A seating arrester.
Further, lower layer's cross-arm is located at available wire between the A seating cable termination and A seating arrester of the same side Or copper coin connection.
Compared with prior art, beneficial effects of the present invention:1) cable draws lower special pole and is suitble to be close to anchor support construction;2) Realize that single loop T connects, cut-offs and the multiple functions such as reconfiguration;3) do not change and draw downside anchor support stress, avoid the dismounting of old tower It rebuilds;4) compared with newly-built straight line, anchor support, construction cost is greatly reduced, reduces floor space;5) dry cable terminal is used Structure is compared, and it is more extensive to be applicable in voltage class.
【Description of the drawings】
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is that the present invention coordinates wiring schematic diagram with built single loop strain insulator steel tower.
【Specific implementation mode】
To make the technical means, the creative features, the aims and the efficiencies achieved by the present invention be easy to understand, with reference to Specific implementation mode, the present invention is further explained.
A kind of cable for built single time anchor support as shown in Figs. 1-2 draws lower special pole, including shaft 1, lower layer's cross Load 2, upper layer cross-arm 3, A seating cable termination 5 and A seating arrester 4.
The upper layer cross-arm 3 is placed in the top of shaft 1, and both sides cross-arm is arranged in parallel circuit direction;Lower layer's cross-arm 2 is set In the lower section of upper layer cross-arm 3, arranges that four side cross-arms, four side cross-arms are distributed in X-type in 60 degree of angles with built circuit, be conducive to cross-arm Fixation is easily installed on shaft 1, it is advantageously ensured that between cross-arm ending A seating cable termination 5, A seating arrester 4, shaft 1 Electrical distance is conducive to that upper layer cross-arm 3 is coordinated to fix A seating cable termination 5, A seating arrester 4, is effectively compressed whole height.
3 ending of upper layer cross-arm installs A seating cable termination 5 and A seating arrester 4, A seating cable termination 5 and seat respectively Available wire or copper coin connect between formula arrester 4, under the drawing for middle phase conductor.
2 taper of the lower layer's cross-arm installation A seating cable termination 5 and A seating arrester 4, the cross towards a side phase conductor It carries on a shoulder pole ending and fixes A seating cable termination 5 and A seating arrester 4 respectively, A seating cable termination 5 and the A seating for being located at the same side are lightning-arrest Available wire or copper coin connect between device 4, under the drawing for side phase conductor.
1 height of shaft of the present invention, cross-arm length are by electrical distance, cross-arm between A seating cable termination 5 and A seating arrester 4 Parameter that electrical distance, A seating cable termination 5 and A seating arrester 4 between built single loop tension tower conducting wire are arranged etc. is certainly It is fixed.
When built single loop strain insulator steel tower T connects, reconfiguration scheme when, as shown in Fig. 2, in built single loop circuit anchor support one A base cable is created between the phase line of side and draws lower special pole, and middle phase conductor, which is connected to cable, to be drawn at the cross-arm of lower special pole upper layer At cable termination, side phase conductor is connected at the cable termination of cable Yin Xia special poles lower layer cross-arm.
When built single loop strain insulator steel tower cut-offs scheme, between the phase line of built single loop circuit anchor support two sides A base cable is created respectively and draws lower special pole, and middle phase conductor, which is connected to cable, draws cable termination at the cross-arm of lower special pole upper layer Place, side phase conductor is connected at the cable termination of cable Yin Xia special poles lower layer cross-arm, while by built single loop line tension Tower wire jumper is unlocked.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by repair Change, equivalent replacement, improvement etc., should be included within the scope of the present invention.

Claims (3)

1. a kind of cable for built single time anchor support draws lower special pole, it is characterised in that:Including shaft, lower layer's cross-arm, on Layer cross-arm, A seating cable termination and A seating arrester, the upper layer cross-arm are placed in the top of shaft, parallel circuit direction arrangement two Side cross-arm, lower layer's cross-arm are placed in the lower section of upper layer cross-arm, and four side cross-arms, four side cross-arms are arranged in 60 degree of angles with built circuit It is distributed in X-type, the upper layer cross-arm ending is separately installed with A seating cable eventually with A seating arrester, and lower layer's cross-arm is towards one The cross-arm ending of side phase conductor fixes A seating cable termination and A seating arrester respectively.
2. special pole according to claim 1, it is characterised in that:The upper layer cross-arm A seating cable termination and A seating are lightning-arrest It is connected with conducting wire or copper coin between device.
3. special pole according to claim 1, it is characterised in that:The A seating cable that lower layer's cross-arm is located at the same side is whole Available wire or copper coin connection between end and A seating arrester.
CN201810610366.9A 2018-06-14 2018-06-14 A kind of cable for built single time anchor support draws lower special pole Pending CN108565808A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810610366.9A CN108565808A (en) 2018-06-14 2018-06-14 A kind of cable for built single time anchor support draws lower special pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810610366.9A CN108565808A (en) 2018-06-14 2018-06-14 A kind of cable for built single time anchor support draws lower special pole

Publications (1)

Publication Number Publication Date
CN108565808A true CN108565808A (en) 2018-09-21

Family

ID=63553792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810610366.9A Pending CN108565808A (en) 2018-06-14 2018-06-14 A kind of cable for built single time anchor support draws lower special pole

Country Status (1)

Country Link
CN (1) CN108565808A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012078073A1 (en) * 2010-12-10 2012-06-14 Открытое Акционерное Общество "Федеральная Сетевая Компания Единой Энергетической Системы" (Оао "Фск Еэс") Transition tower for an overhead electrical transmission line into a power cable, and overhead electrical transmission line having such a tower
CN105178678A (en) * 2015-09-07 2015-12-23 安徽华电工程咨询设计有限公司 Two-circuit line breaking and four-circuit cable leading-down tower
CN206220619U (en) * 2016-09-26 2017-06-06 安徽华电工程咨询设计有限公司 A kind of single time overhead transmission line cable T joint draws lower anchor support
CN208479112U (en) * 2018-06-14 2019-02-05 国网安徽省电力有限公司芜湖供电公司 A kind of cable for built single time anchor support draws lower special pole

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012078073A1 (en) * 2010-12-10 2012-06-14 Открытое Акционерное Общество "Федеральная Сетевая Компания Единой Энергетической Системы" (Оао "Фск Еэс") Transition tower for an overhead electrical transmission line into a power cable, and overhead electrical transmission line having such a tower
CN105178678A (en) * 2015-09-07 2015-12-23 安徽华电工程咨询设计有限公司 Two-circuit line breaking and four-circuit cable leading-down tower
CN206220619U (en) * 2016-09-26 2017-06-06 安徽华电工程咨询设计有限公司 A kind of single time overhead transmission line cable T joint draws lower anchor support
CN208479112U (en) * 2018-06-14 2019-02-05 国网安徽省电力有限公司芜湖供电公司 A kind of cable for built single time anchor support draws lower special pole

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵晖;: "复用架空输电线路杆塔的电缆引下方式研究", 计算机产品与流通, no. 05, pages 114 - 115 *

Similar Documents

Publication Publication Date Title
CN203654846U (en) Steel pipe pole used for cable terminal of electric transmission line
CN209924551U (en) Double-loop cable terminal tower
CN208479112U (en) A kind of cable for built single time anchor support draws lower special pole
CN201460375U (en) Four-loop upright umbrella type pylon
CN200976471Y (en) DC dual-polar vertical arrangement F-shaped transmission line series iron tower
CN108756428A (en) It is a kind of to be used to make somebody a mere figurehead the bearing platform type narrow base tower under double-circuit line cable T joint draws
CN201953131U (en) 220kV one-tower double-loop straight corner penetrating tower
CN105155907A (en) Strain tower
CN208479133U (en) A kind of cable for built double back anchor support draws lower facility
CN204754412U (en) Same terminal pole of two telegram in reply cables at present of unilateral cross arm
CN108565808A (en) A kind of cable for built single time anchor support draws lower special pole
CN206908257U (en) A kind of power network is grid-connected to use fixed equipment
CN107386771B (en) A kind of 110kV overhead transmission line front and back cable type double back steel pipe rod-type terminal tower
CN208479134U (en) A kind of cable for built single time anchor support draws lower facility
CN205583618U (en) Single loop distribution overhead line junction pole and wiring structure thereof
CN202435030U (en) Connection structure between smoothing reactor of extra-high voltage converter station
CN204343772U (en) Narrow base cable shoe steel tube tower under four return cable
CN106555499A (en) Existing single loop strain insulator steel tower cable draws lower beam
CN208267510U (en) A kind of double loop heteropleural T connects linear tension tower
CN106972439B (en) A kind of transmission line of electricity vertical arrangement conducting wire cut-offs connection pattern and method under drawing
CN205857887U (en) Electrical network supporting construction
CN105119228A (en) A double-loop overhead transmission line overhead single-loop phase modulation wiring rod and a wiring structure
CN211530688U (en) Suspension type circuit structure based on high-voltage transmission tower
CN108616103A (en) A kind of cable for built single time anchor support draws lower facility
CN204850640U (en) With tower pair return circuits strain insulator tower

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination