CN108561300A - Feed pump operation method and system - Google Patents

Feed pump operation method and system Download PDF

Info

Publication number
CN108561300A
CN108561300A CN201810270982.4A CN201810270982A CN108561300A CN 108561300 A CN108561300 A CN 108561300A CN 201810270982 A CN201810270982 A CN 201810270982A CN 108561300 A CN108561300 A CN 108561300A
Authority
CN
China
Prior art keywords
pump
aperture
primary
feed pump
scoop tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810270982.4A
Other languages
Chinese (zh)
Inventor
王磊
李建宇
何宇宁
乔溢
秦庆恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
Beijing Guohua Electric Power Co Ltd
Original Assignee
China Shenhua Energy Co Ltd
Beijing Guohua Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Energy Co Ltd, Beijing Guohua Electric Power Co Ltd filed Critical China Shenhua Energy Co Ltd
Priority to CN201810270982.4A priority Critical patent/CN108561300A/en
Publication of CN108561300A publication Critical patent/CN108561300A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B49/00Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00
    • F04B49/02Stopping, starting, unloading or idling control

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Control Of Positive-Displacement Pumps (AREA)

Abstract

The present invention provides a kind of feed pump operation method and systems, belong to feed pump running technology field.The feed pump operation method includes:In the case of primary Feed Pump Trip, connection opens the auxiliary feed water pump being in the primary feed pump of tripping on same active section;And the aperture of the corresponding scoop tube of the auxiliary feed water pump that opens is adjusted and joined according to aperture of the corresponding scoop tube of the primary feed pump in the primary Feed Pump Trip.It realizes and starts another feed pump rapidly in the case of a water supply failure of pump, substantially increase water supply system operational reliability and set steady.

Description

Feed pump operation method and system
Technical field
The present invention relates to feed pump running technology fields, more particularly to a kind of feed pump operation method and system.
Background technology
3 50% electrically driven feed pumps are usually used in existing water supply system, and are run in such a way that dual-purpose one is standby.Unit exists When underload, it is two electric pump low speed operations under normal circumstances, is highly detrimental to the energy saving of motor, will certainly cause to a certain degree Waste.
Also, feed pump is run by the way of standby using dual-purpose one at present, stand-by pump connection opens too slowly, and the big interlocking of feed pump can not Input needs to run two electric pumps at present when 50% load of unit, and the allowance of water supply pump motor is larger, single to pump peak load work Under condition (180MW), motor still has allowance, can be seen that it is linear preferable from the relation curve of coupling device scoop tube aperture and rotating speed, Scoop tube maximum opening only has 73.72%, so still there is very big allowance.Thus, using the existing feed pump method of operation, can cause Station service power consumption rate is higher to cannot be satisfied the normal production run requirement of unit.
In addition, electrically driven feed pump is the large electricity consumer in power plant, electricity consumption accounts for 30% or more of station-service electricity, and unit has Long period is in the underrun stage.During underrun, feedwater flow is less, be susceptible to two feed pumps rob it is negative Lotus runs and the unstable security risk of system occurs.
Invention content
The object of the present invention is to provide a kind of feed pump operation method and systems, start auxiliary feed water pump rapidly for solving The problem of.
To achieve the goals above, the present invention provides a kind of feed pump operation method, this method includes:In primary water supply In the case of pump tripping, connection opens the auxiliary feed water pump being in the primary feed pump of tripping on same active section;And according to institute Aperture of the corresponding scoop tube of primary feed pump in the primary Feed Pump Trip is stated to adjust the reserve feed opened with connection Pump the aperture of corresponding scoop tube.
Preferably, this method further includes:The aperture for monitoring the corresponding scoop tube of the primary feed pump in real time, to obtain State aperture of the corresponding scoop tube of primary feed pump in tripping.
Preferably, the aperture according to the corresponding scoop tube of the primary feed pump in the primary Feed Pump Trip come The aperture of adjustment scoop tube corresponding with the auxiliary feed water pump that opens is joined includes:In the case of the primary Feed Pump Trip, The aperture for the corresponding scoop tube of the auxiliary feed water pump that adjustment connection opens is predetermined aperture;And it primary is given according to the described of tripping Aperture of the corresponding scoop tube of water pump in the primary Feed Pump Trip adjusts opening for the corresponding scoop tube of the auxiliary feed water pump Degree.
Preferably, the corresponding scoop tube of the primary feed pump of the basis and tripping is in the primary Feed Pump Trip Aperture include come the aperture for adjusting the corresponding scoop tube of the auxiliary feed water pump:It trips in a primary water supply pump operation In the case of, the aperture for the corresponding scoop tube of the auxiliary feed water pump that adjustment connection opens is that the corresponding scoop tube of the primary feed pump exists Aperture when the primary Feed Pump Trip;And wherein primary Feed Pump Trip in two primary water supply pump operations In the case of, the aperture that adjusts the corresponding scoop tube of the auxiliary feed water pump be one in two primary feed pumps it is primary to Higher value in the aperture of the corresponding scoop tube of two primary feed pumps described in when water pump trips.
Preferably, this method further includes:In the case that there is two auxiliary feed water pumps in a primary water supply pump operation, The switching signal for monitoring two auxiliary feed water pumps in real time, in the case of the primary Feed Pump Trip, connection opens described two Switching signal is the auxiliary feed water pump to close a floodgate in platform auxiliary feed water pump.
Correspondingly, the present invention also provides a kind of feed pump operating system, which includes:Control device, in master In the case of Feed Pump Trip, connection opens the auxiliary feed water pump being in the primary feed pump of tripping on same active section;And Opening adjusting device, for being adjusted according to aperture of the corresponding scoop tube of the primary feed pump in the primary Feed Pump Trip The aperture of whole scoop tube corresponding with the auxiliary feed water pump that opens of connection.
Preferably, which further includes:First monitoring device, for monitoring the corresponding scoop tube of the primary feed pump in real time Aperture, to obtain the corresponding scoop tube of the primary feed pump tripping when aperture.
Preferably, the opening adjusting device is additionally operable to:In the case of the primary Feed Pump Trip, adjustment connection opens The aperture of the corresponding scoop tube of the auxiliary feed water pump is predetermined aperture;And according to corresponding with the primary feed pump of tripping Aperture of the scoop tube in the primary Feed Pump Trip adjusts the aperture of the corresponding scoop tube of the auxiliary feed water pump.
Preferably, the corresponding scoop tube of the primary feed pump of the basis and tripping is in the primary Feed Pump Trip Aperture include come the aperture for adjusting the corresponding scoop tube of the auxiliary feed water pump:It trips in a primary water supply pump operation In the case of, the aperture for the corresponding scoop tube of the auxiliary feed water pump that adjustment connection opens is that the corresponding scoop tube of the primary feed pump exists Aperture when the primary Feed Pump Trip;And wherein primary Feed Pump Trip in two primary water supply pump operations In the case of, the aperture that adjusts the corresponding scoop tube of the auxiliary feed water pump be one in two primary feed pumps it is primary to Higher value in the aperture of the corresponding scoop tube of two primary feed pumps described in when water pump trips.
Preferably, which further includes:Second monitoring device, for standby with two in a primary water supply pump operation In the case of with feed pump, the switching signal of two auxiliary feed water pumps is monitored in real time, in the primary Feed Pump Trip In the case of, it is the auxiliary feed water pump to close a floodgate that connection, which opens switching signal in two auxiliary feed water pumps,.
Through the above technical solutions, the present invention by the primary Feed Pump Trip the case where second line of a couplet open and be in same work with it Make the auxiliary feed water pump in section and aperture when according to primary Feed Pump Trip is corresponding come the auxiliary feed water pump adjusted with connection opens The aperture of scoop tube realizes and starts another feed pump rapidly in the case of a water supply failure of pump, substantially increases water supply System operation reliability and set steady.
The other feature and advantage of the embodiment of the present invention will be described in detail in subsequent specific embodiment part.
Description of the drawings
Attached drawing is further understood to the embodiment of the present invention for providing, an and part for constitution instruction, under The specific implementation mode in face is used to explain the embodiment of the present invention together, but does not constitute the limitation to the embodiment of the present invention.Attached In figure:
Fig. 1 is the flow chart of feed pump operation method provided by the invention;
Fig. 2 is the schematic diagram of 11 pump self-starting provided by the invention;
Fig. 3 is the schematic diagram of 12 pump self-starting provided by the invention;
Fig. 4 is the schematic diagram of 13 pump (A switches) self-starting provided by the invention;
Fig. 5 is the schematic diagram of 13 pump (B switches) self-starting provided by the invention;
Fig. 6 is the block diagram of feed pump operating system provided by the invention.
Specific implementation mode
The specific implementation mode of the embodiment of the present invention is described in detail below in conjunction with attached drawing.It should be understood that this The described specific implementation mode in place is merely to illustrate and explain the present invention embodiment, is not intended to restrict the invention embodiment.
Fig. 1 is the flow chart of feed pump operation method provided by the invention, as shown in Figure 1, this method includes:
Step 101, in the case of primary Feed Pump Trip, connection is opened is in same active section with the primary feed pump of tripping On auxiliary feed water pump;And
Step 102, according to aperture of the corresponding scoop tube of primary feed pump in primary Feed Pump Trip adjust and join The aperture of the corresponding scoop tube of auxiliary feed water pump opened.
The primary feed pump being currently running may include a feed pump, can also include two feed pumps, and the present invention carries The feed pump operation method of confession further includes:It is below 55% in unit load, start one feed pump of operation;In machine Group load starts two feed pumps of operation in the case of 55% to 100%.That is, in unit load less than 55% In the case of, the primary feed pump that is currently running includes a feed pump, more than or equal to 55% and is being less than in unit load Or in the case of being equal to 100%, the primary feed pump being currently running may include two feed pumps.In this way, when there is feed pump When the case where fault trip, can quickly join and open auxiliary feed water pump, at the same can ensure well the Water Level Control of Steam ± Within the scope of 100mm, once connection opens failure, the realization of unit electric pump RB functions is not influenced.But those skilled in the art should manage Solution, the primary feed pump no matter being currently running include that a feed pump or two feed pumps break down under normal circumstances Primary feed pump is one, that is to say, that if the primary feed pump being currently running includes two feed pumps, this two feed pumps It will not break down simultaneously under normal circumstances.
Under normal circumstances, for the case where there are 3 feed pumps, there are following several situations:
Primary feed pump is 11 pumps, and auxiliary feed water pump is 12 pumps, then in the case of 11 pump tripping, connection opens 12 pumps;
Primary feed pump is 11 pumps, and auxiliary feed water pump is 13 pumps, then in the case of 11 pump tripping, connection opens 13 pumps;
Primary feed pump is 12 pumps, and auxiliary feed water pump is 13 pumps, then in the case of 12 pump tripping, connection opens 13 pumps;
Primary feed pump is 12 pumps, and auxiliary feed water pump is 11 pumps, then in the case of 12 pump tripping, connection opens 11 pumps;
Primary feed pump is 13 pumps, and auxiliary feed water pump is 12 pumps, then in the case of 13 pump tripping, connection opens 12 pumps;
Primary feed pump is 13 pumps, and auxiliary feed water pump is 11 pumps, then in the case of 13 pump tripping, connection opens 11 pumps.
Feed pump operation method provided by the invention further includes:There are two in a primary water supply pump operation spare to give In the case of water pump, the switching signal of two auxiliary feed water pumps is monitored in real time, the primary Feed Pump Trip the case where Under, it is the auxiliary feed water pump to close a floodgate that connection, which opens switching signal in two auxiliary feed water pumps,.Therefore, a kind of situation of any of the above In, two auxiliary feed water pumps can be set, with primary feed pump be 13 pump, auxiliary feed water pump be 12 pump for, can also will 11 pumps are used as auxiliary feed water pump, and the switching signal of monitoring in real time 11 pump and 12 pumps, in the case of 13 pump tripping, if together When or almost simultaneously 12 pump switching signals be tripping, then directly connection open 11 pumps (i.e. switching signal be combined floodgate reserve feed Pump).
For the case where there are 3 feed pumps, in primary feed pump including a feed pump, auxiliary feed water pump including two In the case of feed pump, there are following several situations (wherein to assume the pump of feed pump 11 in the A active sections of 6KV active sections, feed pump 12 pumps are in the B active sections of 6KV active sections, and the pump of feed pump 13 is each on the A active sections and B active sections of 6KV active sections, and there are one open It closes):
Primary feed pump is 11 pumps, and auxiliary feed water pump includes 12 pumps and 13 pumps, then in the case of 11 pump tripping, connection opens Switch of 13 pumps on A active sections if 13 pump connection open failure, then joins and opens 12 pumps, under normal circumstances, failure is opened in 13 pump connection It is delayed 2 seconds to join again afterwards and opens 12 pumps;
Primary feed pump is 12 pumps, and auxiliary feed water pump includes 11 pumps and 13 pumps, then in the case of 12 pump tripping, connection opens Switch of 13 pumps on B active sections if 13 pump connection open failure, then joins and opens 11 pumps, under normal circumstances, failure is opened in 13 pump connection It is delayed 2 seconds to join again afterwards and opens 11 pumps;
Primary feed pump is 13 pumps, and auxiliary feed water pump includes that 11 pumps and 12 pumps want root then in the case of 13 pump tripping 11 pumps and 12 pumps are opened to join according to the active section of 13 pump works, if 13 pumps are operated in active section A before tripping, are jumped in 13 pumps After lock, connection opens 11 pumps, under normal circumstances, opens unsuccessfully to be delayed 2 seconds to join again afterwards in 11 pump connection and opens 12 pumps, if 13 pump works before tripping Make in active section B, then after 13 pump trippings, connection opens 12 pumps, under normal circumstances, opens unsuccessfully to be delayed afterwards in 12 pump connection and joins again for 2 seconds Open 11 pumps.
In addition, if primary feed pump includes two feed pumps, auxiliary feed water pump includes a feed pump, and there are following several Kind situation (wherein assume that feed pump 11 pumps the A active sections in 6KV active sections, feed pump 12 pumps the B active sections in 6KV active sections, The pump of feed pump 13 is each on the A active sections and B active sections of 6KV active sections, and there are one switches):
Primary feed pump is 11 pumps and 13 pumps, and auxiliary feed water pump is 12 pumps, then in the case of 11 pumps or 13 pump tripping, Connection opens 12 pumps;
Primary feed pump is 12 pumps and 13 pumps, and auxiliary feed water pump is 11 pumps, then in the case of 12 pumps or 13 pump tripping, Connection opens 11 pumps;
Primary feed pump is 11 pumps and 12 pumps, and auxiliary feed water pump is 13 pumps, and such case is different from both the above situation, by It is each there are one switching on A active sections and B active sections in 13 pumps, open same work so may be implemented preferentially to join in this case The switch of section, specifically, in the case of 11 pump tripping, connection opens switch of 13 pumps on A active sections, in the feelings of 12 pump trippings Under condition, connection opens switch of 13 pumps on B active sections.
The connection being enumerated above under several different situations of primary feed pump and auxiliary feed water pump opens mode, art technology Personnel should be appreciated that in the case of primary Feed Pump Trip, can send out trip signal, in the present invention, in order to ensure tripping Signal can be received, and can continue to send trip signal for a period of time, such as persistently send trip signal 3 seconds.
Below in conjunction with the accompanying drawings respectively distich open 11 pumps, 12 pump, 13 pump (A switches), 13 pump (B switches) logic theories progress It illustrates.
Fig. 2 is the schematic diagram of 11 pump self-starting provided by the invention, as shown in Fig. 2, for 12 pumps or the single pump operation of 13 pumps, Situation of 11 pumps in singly pump is spare, that is, run as primary feed pump there are one feed pump in 12 pumps and 13 pumps, and Only 11 pumps are used as auxiliary feed water pump, in this case, as shown in Fig. 2, if 12 pumps and 13 pumps are not in operating status, Then 11 pump connection open (self-starting).For 12 pumps or the 13 single pump operations of pump, situation of 11 pumps in double pump is spare, that is, 12 pumps and Run as primary feed pump there are one feed pump in 13 pumps, 11 pumps pumped with 12 pumps and 13 in another feed pump collectively as Auxiliary feed water pump is pumped to join and is opened if 13 pump (A switches) not running and 13 pump (B switches) connection open failure, 11 in this case (self-starting).For 12 pumps and 13 pump double pump operations, situation of 11 pumps in singly pump is spare, if 12 pumps and 13 pumps are not in Operating status, then 11 pumps, which join, opens (self-starting).
Fig. 3 is the schematic diagram of 12 pump self-starting provided by the invention, as shown in figure 3, the principle of 12 pump self-startings and 11 pumps The principle of self-starting is similar, can be with 11 pump self-starting principle in reference chart 2, in this to 12 pump self-starting rationales in Fig. 3 It will not go into details.
Fig. 4 is the schematic diagram of 13 pump (A switches) self-starting provided by the invention, and 13 pumps (A switches) are 13 pumps in A works here Make the upper switch of section, as shown in figure 4, for 11 pumps or the single pump operation of 12 pumps, situation of 13 pumps in singly pump is spare, that is, It is being run as primary feed pump there are one feed pump in 11 pumps and 12 pumps, and only 13 pumps are used as auxiliary feed water pump, this In the case of, as shown in figure 4, in the case where 11 pumps are not in operating status, 13 pump (A switches) self-startings.For 11 pumps or 12 Feed pump is as primary water supply there are one pumping during list pump operation, situation of 13 pumps in double pump is spare, that is, 11 pumps are pumped with 12 Pump is being run, and another feed pump in 13 pumps and 11 pumps and 12 pumps is collectively as auxiliary feed water pump, in this case, if 11 Not running is pumped, then 13 pump (A switches) self-starting.Situation in singly pump is spare is pumped for 11 pumps and 12 pump double pump operations, 13, such as The pump of fruit 11 is not in operating status, then 13 pump (A switches) self-starting.
Fig. 5 is the schematic diagram of 13 pump (B switches) self-starting provided by the invention, and 13 pumps (B switches) are 13 pumps in B works here Make the upper switch of section, as shown in figure 5, the principle class of the principle of 13 pump (B switches) self-startings and 13 pump (A switches) self-startings It seemingly, can be with 13 pump (A switches) self-starting principle in reference chart 4, in this to 13 pump (B switches) self-starting rationales in Fig. 5 It will not go into details.
Mainly elaborate that the primary Feed Pump Trip the case where second line of a couplet opens several situations of auxiliary feed water pump above, it is main below It is set forth in connection and opens control of the auxiliary feed water pump in the process to the aperture of the corresponding scoop tube of auxiliary feed water pump.
The aperture of scoop tube needs to track the aperture that primary feed pump corresponds to scoop tube after being opened due to auxiliary feed water pump connection, so Feed pump operation method provided by the invention further includes:The aperture of the corresponding scoop tube of the primary feed pump is monitored in real time, to Obtain aperture of the corresponding scoop tube of the primary feed pump in tripping.It should be noted that including two in primary feed pump In the case of feed pump, need to monitor the aperture of the corresponding scoop tube of two feed pumps included by primary feed pump in real time.
Meet the normal operation of unit to ensure that the connection auxiliary feed water pump that opens can quickly contribute, scoop tube needs to use The mode of stand-by heat, once that is, auxiliary feed water pump is put into, corresponding scoop tube needs to be predisposed to predetermined aperture, after auxiliary feed water pump connection opens The aperture of scoop tube is reached purpose aperture by scoop tube with certain rate.Therefore, volume described above is according to primary feed pump pair Aperture of the scoop tube answered in primary Feed Pump Trip adjusts and the aperture of the corresponding scoop tube of the auxiliary feed water pump that opens of connection includes: In the case of primary Feed Pump Trip, the aperture for the corresponding scoop tube of auxiliary feed water pump that adjustment connection opens is predetermined aperture;According to Aperture of the scoop tube corresponding with the primary feed pump of tripping in primary Feed Pump Trip adjusts the corresponding spoon of auxiliary feed water pump The aperture of pipe.Wherein, in the case where the aperture of the corresponding scoop tube of auxiliary feed water pump has been predetermined aperture, reserve feed is adjusted When pumping the aperture of corresponding scoop tube, tracking desired value can be reached with given pace, given pace here for example can be 2.5%/second.Wherein predetermined aperture for example can be 30%.
Specifically, aperture according to scoop tube corresponding with the primary feed pump of tripping in primary Feed Pump Trip is adjusted The aperture of the corresponding scoop tube of whole auxiliary feed water pump includes:In the case of tripping in a primary water supply pump operation, adjustment The aperture for joining the corresponding scoop tube of auxiliary feed water pump opened is the corresponding scoop tube of primary feed pump opening in primary Feed Pump Trip Degree;In two primary water supply pump operations in the case of a wherein primary Feed Pump Trip, adjustment auxiliary feed water pump is corresponding Two primary feed pumps are corresponding when the aperture of scoop tube is a primary Feed Pump Trip in two primary feed pumps Higher value in the aperture of scoop tube.
In other words, in the case where a primary water supply pump operation trips, auxiliary feed water pump connection opens rear corresponding The aperture of the tracking desired value of the aperture of scoop tube corresponding scoop tube when being primary Feed Pump Trip.In two primary water supply pump operations And in the case of a wherein primary Feed Pump Trip, two primary feed pumps in a primary Feed Pump Trip are obtained first Scoop tube aperture, compare the aperture of the scoop tube of two primary feed pumps, auxiliary feed water pump joins the aperture for opening rear corresponding scoop tube Tracking desired value be a primary Feed Pump Trip when two primary feed pumps scoop tube span in higher value.
Fig. 6 is the block diagram of feed pump operating system provided by the invention, as shown in fig. 6, the system includes control device 601 With opening adjusting device 602, control device 601 be used in the case of primary Feed Pump Trip, connection open with trip it is primary to Water pump is in the auxiliary feed water pump on same active section;Opening adjusting device 602 is used for according to the corresponding scoop tube of primary feed pump Aperture in primary Feed Pump Trip adjusts and joins the aperture of the corresponding scoop tube of the auxiliary feed water pump that opens.
In addition, feed pump operating system provided by the invention further includes the first monitoring device and the second monitoring device (in figure It is not shown), the first monitoring device is used to monitor the aperture of the corresponding scoop tube of primary feed pump in real time, to obtain primary feed pump Aperture of the corresponding scoop tube in tripping, the second monitoring device are used to have two in a primary water supply pump operation and spare give In the case of water pump, the switching signal of two auxiliary feed water pumps is monitored in real time, and in the case of primary Feed Pump Trip, connection opens two Switching signal is the auxiliary feed water pump to close a floodgate in platform auxiliary feed water pump.
It should be noted that feed pump operating system provided by the invention detail and benefit with it is provided by the invention Feed pump operation method is similar, and in this, it will not go into details.
The optional embodiment of the embodiment of the present invention is described in detail above in association with attached drawing, still, the embodiment of the present invention is simultaneously The detail being not limited in the above embodiment can be to of the invention real in the range of the technology design of the embodiment of the present invention The technical solution for applying example carries out a variety of simple variants, these simple variants belong to the protection domain of the embodiment of the present invention.
It is further to note that specific technical features described in the above specific embodiments, in not lance In the case of shield, it can be combined by any suitable means.In order to avoid unnecessary repetition, the embodiment of the present invention pair Various combinations of possible ways no longer separately illustrate.
It will be appreciated by those skilled in the art that it is that can pass through to implement the method for the above embodiments Program is completed to instruct relevant hardware, which is stored in a storage medium, including some instructions are used so that single Piece machine, chip or processor (processor) execute all or part of step of each embodiment the method for the application.And it is preceding The storage medium stated includes:USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory The various media that can store program code such as (RAM, Random Access Memory), magnetic disc or CD.
In addition, arbitrary combination can also be carried out between a variety of different embodiments of the embodiment of the present invention, as long as it is not The thought of the embodiment of the present invention is violated, disclosure of that of the embodiment of the present invention is equally should be considered as.

Claims (10)

1. a kind of feed pump operation method, which is characterized in that this method includes:
In the case of primary Feed Pump Trip, connection opens the reserve feed being in the primary feed pump of tripping on same active section Pump;And
The institute opened with connection is adjusted according to aperture of the corresponding scoop tube of the primary feed pump in the primary Feed Pump Trip State the aperture of the corresponding scoop tube of auxiliary feed water pump.
2. according to the method described in claim 1, it is characterized in that, this method further includes:
The aperture for monitoring the corresponding scoop tube of the primary feed pump in real time exists to obtain the corresponding scoop tube of the primary feed pump Aperture when tripping.
3. method according to claim 1 or 2, which is characterized in that described according to the corresponding scoop tube of the primary feed pump Aperture in the primary Feed Pump Trip includes come the aperture for adjusting and joining the corresponding scoop tube of the auxiliary feed water pump that opens:
In the case of the primary Feed Pump Trip, the aperture for the corresponding scoop tube of the auxiliary feed water pump that adjustment connection opens is pre- Determine aperture;And
According to aperture of the scoop tube corresponding with the primary feed pump of tripping in the primary Feed Pump Trip to adjust State the aperture of the corresponding scoop tube of auxiliary feed water pump.
4. according to the method described in claim 3, it is characterized in that, the basis is corresponding with the primary feed pump of tripping Aperture of the scoop tube in the primary Feed Pump Trip include come the aperture for adjusting the corresponding scoop tube of the auxiliary feed water pump:
In the case of tripping in a primary water supply pump operation, adjustment joins the corresponding scoop tube of the auxiliary feed water pump opened Aperture be aperture of the corresponding scoop tube of the primary feed pump in the primary Feed Pump Trip;And
In two primary water supply pump operations in the case of a wherein primary Feed Pump Trip, the auxiliary feed water pump pair is adjusted Two primary water supply described in when the aperture for the scoop tube answered is a primary Feed Pump Trip in two primary feed pumps Pump the higher value in the aperture of corresponding scoop tube.
5. according to the method described in claim 1, it is characterized in that, this method further includes:
In the case that there is two auxiliary feed water pumps in a primary water supply pump operation, two reserve feeds are monitored in real time The switching signal of pump, in the case of the primary Feed Pump Trip, connection opens switching signal in two auxiliary feed water pumps and is The auxiliary feed water pump of combined floodgate.
6. a kind of feed pump operating system, which is characterized in that the system includes:
Control device, in the case of primary Feed Pump Trip, connection to open and the primary feed pump of tripping is in same work Auxiliary feed water pump in section;And
Opening adjusting device, for the aperture according to the corresponding scoop tube of the primary feed pump in the primary Feed Pump Trip To adjust and the aperture of the corresponding scoop tube of the auxiliary feed water pump that opens of connection.
7. system according to claim 6, which is characterized in that the system further includes:
First monitoring device, the aperture for monitoring the corresponding scoop tube of the primary feed pump in real time are described primary to obtain Aperture of the corresponding scoop tube of feed pump in tripping.
8. the system described according to claim 6 or 7, which is characterized in that the opening adjusting device is additionally operable to:
In the case of the primary Feed Pump Trip, the aperture for the corresponding scoop tube of the auxiliary feed water pump that adjustment connection opens is pre- Determine aperture;And
According to aperture of the scoop tube corresponding with the primary feed pump of tripping in the primary Feed Pump Trip to adjust State the aperture of the corresponding scoop tube of auxiliary feed water pump.
9. system according to claim 8, which is characterized in that the basis is corresponding with the primary feed pump of tripping Aperture of the scoop tube in the primary Feed Pump Trip include come the aperture for adjusting the corresponding scoop tube of the auxiliary feed water pump:
In the case of tripping in a primary water supply pump operation, adjustment joins the corresponding scoop tube of the auxiliary feed water pump opened Aperture be aperture of the corresponding scoop tube of the primary feed pump in the primary Feed Pump Trip;And
In two primary water supply pump operations in the case of a wherein primary Feed Pump Trip, the auxiliary feed water pump pair is adjusted Two primary water supply described in when the aperture for the scoop tube answered is a primary Feed Pump Trip in two primary feed pumps Pump the higher value in the aperture of corresponding scoop tube.
10. system according to claim 6, which is characterized in that the system further includes:
Second monitoring device is supervised in real time in the case of for having two auxiliary feed water pumps in a primary water supply pump operation The switching signal for surveying two auxiliary feed water pumps, in the case of the primary Feed Pump Trip, connection open described two it is spare Switching signal is the auxiliary feed water pump to close a floodgate in feed pump.
CN201810270982.4A 2018-03-29 2018-03-29 Feed pump operation method and system Pending CN108561300A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810270982.4A CN108561300A (en) 2018-03-29 2018-03-29 Feed pump operation method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810270982.4A CN108561300A (en) 2018-03-29 2018-03-29 Feed pump operation method and system

Publications (1)

Publication Number Publication Date
CN108561300A true CN108561300A (en) 2018-09-21

Family

ID=63533310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810270982.4A Pending CN108561300A (en) 2018-03-29 2018-03-29 Feed pump operation method and system

Country Status (1)

Country Link
CN (1) CN108561300A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111678120A (en) * 2020-06-02 2020-09-18 哈尔滨沃华智能发电设备有限公司 Control method for joint start of steam feed pump and trip electric pump of 330MW subcritical unit
CN114576150A (en) * 2022-02-28 2022-06-03 国能神东煤炭集团有限责任公司 Emulsion pump operation control method and system and storage medium
CN114688005A (en) * 2022-02-22 2022-07-01 西安热工研究院有限公司 Automatic control method for quickly starting standby electric pump

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5938696A (en) * 1982-08-27 1984-03-02 株式会社東芝 Atomic power plant feedwater facility
JPH09133786A (en) * 1995-11-13 1997-05-20 Toshiba Eng Co Ltd Makeup water facility for nuclear power plant
CN205155927U (en) * 2015-04-29 2016-04-13 大唐桂冠合山发电有限公司 A feedwater governing system for angering power boiler
CN106704212A (en) * 2016-12-29 2017-05-24 中国能源建设集团华北电力试验研究院有限公司 Undisturbed switching control method for standby pump of electrically-driven feed pumps

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5938696A (en) * 1982-08-27 1984-03-02 株式会社東芝 Atomic power plant feedwater facility
JPH09133786A (en) * 1995-11-13 1997-05-20 Toshiba Eng Co Ltd Makeup water facility for nuclear power plant
CN205155927U (en) * 2015-04-29 2016-04-13 大唐桂冠合山发电有限公司 A feedwater governing system for angering power boiler
CN106704212A (en) * 2016-12-29 2017-05-24 中国能源建设集团华北电力试验研究院有限公司 Undisturbed switching control method for standby pump of electrically-driven feed pumps

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王海涛: ""印尼INDRAMAYU330MV机组模拟量控制系统分析及改进"", 《热力发电》 *
赵奕州等: ""600MW直接空冷机组给水泵联锁控制策略的改进"", 《热力发电》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111678120A (en) * 2020-06-02 2020-09-18 哈尔滨沃华智能发电设备有限公司 Control method for joint start of steam feed pump and trip electric pump of 330MW subcritical unit
CN114688005A (en) * 2022-02-22 2022-07-01 西安热工研究院有限公司 Automatic control method for quickly starting standby electric pump
CN114576150A (en) * 2022-02-28 2022-06-03 国能神东煤炭集团有限责任公司 Emulsion pump operation control method and system and storage medium

Similar Documents

Publication Publication Date Title
CN108561300A (en) Feed pump operation method and system
US9543748B2 (en) Fault protection system for a power system of dynamically positioned vessel
CN102340165B (en) Electrodynamic force vehicle power supply management system
US9590549B2 (en) Torque control for a wind turbine generator in case of fault
CN105406580B (en) A kind of electric power system and method
CN106300638A (en) A kind of low-voltage power down overrun control and control method
JP2003244840A (en) Load-leveling device
JP2014168328A (en) Self-sustained operation system and method of distributed power supply
CN105552857A (en) Working condition judgment method applied to relay protection device of pumped-storage unit
CN103132558A (en) Intelligent water supply system
CN113395017A (en) Pumped-storage system, control method and storage medium
JP2009204255A (en) Water supply device for steam generator
CN106505566B (en) Avoid the control method and system that occurrence of large-area has a power failure after partial electric grid off-the-line
CN109149626A (en) Operation control method, device and system of generator set
JP2713074B2 (en) Converter control device
CN110943470B (en) Control method for transient energy dissipation system of extra-high voltage alternating current and direct current power grid
CN203942470U (en) The startup control circuit of a kind of pumped storage unit SFC
CN107701524B (en) A kind of energy feedback system of TBM hybrid-driven cutterhead
CN109017738A (en) A kind of brake fluid system and its apparatus for controlling pump
CN104467165A (en) Intelligent transformer backup power supply automatic switching device regulating method based on load optimization
CN115102217A (en) Method for determining stable operation domain of MMC at receiving end of LCC-MMC hybrid cascaded direct-current power grid
CN114233615A (en) Condensate pump switching control method and device, electronic equipment and storage medium
CN105840473B (en) Pump energy-saving safety operating method is coagulated when generating set underload
CN102121262A (en) Dual-variable-frequency water supply system without negative pressure
CN205375151U (en) Control transformer dormancy control structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180921