CN108560929A CN201810230289.4A CN201810230289A CN108560929A CN 108560929 A CN108560929 A CN 108560929A CN 201810230289 A CN201810230289 A CN 201810230289A CN 108560929 A CN108560929 A CN 108560929A
Authority
CN
China
Prior art keywords
fixedly connected
building construction
support device
motor
telescopic rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810230289.4A
Other languages
Chinese (zh)
Inventor
曾婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU WISDOM TECHNOLOGY Co Ltd
Original Assignee
CHENGDU WISDOM TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU WISDOM TECHNOLOGY Co Ltd filed Critical CHENGDU WISDOM TECHNOLOGY Co Ltd
Priority to CN201810230289.4A priority Critical patent/CN108560929A/en
Publication of CN108560929A publication Critical patent/CN108560929A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G2025/047Shores or struts; Chocks telescopic which telescoping action effected by a piston

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of building construction support devices, including pedestal, fixation is connected with first motor on the pedestal, and it is fixedly connected with hydraulic telescopic rod on first motor output end, the first motor output end fixing sleeve is connected to turntable, the one end of the hydraulic telescopic rod far from pedestal, which is fixed, is plugged with slotting axis, and it inserts movable sleeve on axis and is connected to axle sleeve, the axle sleeve both sides have been respectively fixedly connected with flap, and two flaps mutually from one end be respectively equipped with threaded rod, it is equipped with cutting ferrule on two threaded rods, and placing box has been respectively fixedly connected with it on two cutting ferrules, the second motor is fixedly connected in the hydraulic telescopic rod, and second motor output end be fixedly connected with the first inserted link.The present invention sets the lifting gear that can freely control by setting support device in support device, and freely bottom building construction and high-rise object building construction material are transmitted and are transported by the present apparatus, the apparatus structure is simple, simple operation, convenient for improving working efficiency.

Description

A kind of building construction support device
Technical field
The present invention relates to support device technical field, specially a kind of building construction support device.
Background technology
Building construction in the construction process, is needed by auxiliary tool, and construction material is sling from building bottom end to upper layer Building, general people can use loop wheel machine, but can increase building cost in this way, in consideration of it, it is proposed that a kind of building construction branch Support arrangement is for solving the above problems.
Invention content
It is mentioned above in the background art to solve the purpose of the present invention is to provide a kind of building construction support device Problem.
To achieve the above object, the present invention provides the following technical solutions:A kind of building construction support device, including bottom Seat, fixation is connected with first motor on the pedestal, and hydraulic telescopic rod is fixedly connected on first motor output end, and described the One motor output end fixing sleeve is connected to turntable, and the one end of the hydraulic telescopic rod far from pedestal, which is fixed, is plugged with slotting axis, and inserts axis Upper movable sleeve is connected to axle sleeve, and the axle sleeve both sides have been respectively fixedly connected with flap, and two flaps mutually from one end be respectively equipped with Threaded rod is equipped with cutting ferrule on two threaded rods, and has been respectively fixedly connected with placing box, the hydraulic telescopic rod on two cutting ferrules On be fixedly connected with the second motor, and the second motor output end is fixedly connected with the first inserted link, activity in the hydraulic telescopic rod Grafting is there are two the second inserted link, and fixing sleeve is connected to first gear on first inserted link, fixing sleeve respectively on two the second inserted links Be connected to the intermeshing second gear of first gear, be respectively fixedly connected with draught line, and draught line on two the second inserted links Be wound on two the second inserted links, two draught lines mutually from one end be individually fixed on two cutting ferrules.
Preferably, the turntable is actively plugged on pedestal, and rotatable 0 °~360 ° of turntable.
Preferably, the turntable both sides have been fixedly connected with conductor loop, and activity runs through two conductor loops to draught line respectively.
Preferably, movable whorl is connected on two flaps two threaded rods respectively, and activity respectively on two threaded rods It is socketed with cutting ferrule.
Preferably, the placing box bottom side internal box wall both ends have been fixedly connected with spring, and two springs are fixedly connected on It is same to shelve on plate.
Compared with prior art, the beneficial effects of the invention are as follows:
The present invention sets the lifting gear that can freely control by setting support device in support device, and the present apparatus is used for house Bottom building construction and high-rise object building construction material are freely transmitted and are transported by the present apparatus by building, the apparatus structure Simply, simple operation, convenient for improving working efficiency.
Description of the drawings
Fig. 1 is sectional view when the present invention is not used;
Fig. 2 is sectional view when the present invention uses.
In figure:1 pedestal, 2 first motors, 3 turntables, 4 conductor loops, 5 draught lines, 6 first inserted links, 7 second inserted links, 8 first Gear, 9 second gears, 10 hydraulic telescopic rods, 11 slotting axis, 12 threaded rods, 13 axle sleeves, 14 cutting ferrules, 15 placing boxes, 16 springs, 17 Shelve plate, 18 flaps.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig.1-2, a kind of building construction support device, including pedestal 1 is fixed on pedestal 1 to be connected with the first electricity Machine 2, and hydraulic telescopic rod 10 is fixedly connected on 2 output end of first motor, 2 output end fixing sleeve of first motor is connected to turntable 3 Turntable 3 is actively plugged on pedestal 1, and 3 rotatable 0 °~360 ° of turntable, can freely adjust 15 position in the horizontal direction of placing box It sets, the one end of hydraulic telescopic rod 10 far from pedestal 1, which is fixed, is plugged with slotting axis 11, and inserts movable sleeve on axis 11 and be connected to axle sleeve 13, axis Cover 13 both sides and be respectively fixedly connected with flap 18, and two 18 phases of flap from one end be respectively equipped with threaded rod 12, two screw threads Movable whorl is connected on two flaps 18 bar 12 respectively, and movable sleeve is connected to cutting ferrule 14 respectively on two threaded rods 12, two It is equipped with cutting ferrule 14 on threaded rod 12, and has been respectively fixedly connected with placing box 15 on two cutting ferrules 14, case in 15 bottom side of placing box Wall both ends have been fixedly connected with spring 16, and two springs 16 be fixedly connected on it is same shelve on plate 17, when flap 18 rotates, Placing box 15 tilts, and material falls in one side in placing box 15, and extruding shelves plate 17, makes its inclination, material is avoided to pour out, hydraulic pressure is stretched The second motor is fixedly connected on contracting bar 10, and the second motor output end is fixedly connected with the first inserted link 6, in hydraulic telescopic rod 10 Activity grafting is there are two the second inserted link 7, and fixing sleeve is connected to first gear 8 on the first inserted link 6, solid respectively on two the second inserted links 7 Surely be socketed with 8 intermeshing second gear 9 of first gear, be respectively fixedly connected with draught line 5 on two the second inserted links 7, And draught line 5 is wound on two the second inserted links 7, two 5 phases of draught line from one end be individually fixed on two cutting ferrules 14, turn 3 both sides of disk have been fixedly connected with conductor loop 4, and activity runs through two conductor loops 4 to draught line 5 respectively, and cylinder sets conductor loop 4 convenient for drawing Lead position after placing box 15 declines.
Operation principle:By starting the second motor, the first inserted link 6 is set to be rotated clockwise, first gear 8 drives two Second gear 9 rotates, to make two the second inserted link 7 rotations, to make 5 unwrapping wire of side draught line, other side draught line 5 receive Line will load onto material positioned at the placing box 15 of bottom, restart the second motor, so that the first inserted link 6 is rotated counterclockwise, make to put 5 take-up of draught line more than line, few 5 unwrapping wire of draught line of unwrapping wire, makes the placing box 15 for being placed with material rise to corresponding Story height, then by startup first motor 2, carried out the rotation of horizontal position, be on correct position, it can be by object Material takes out and is used, recyclable back and forth to carry out this operation.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (5)

1. a kind of building construction support device, including pedestal(1), it is characterised in that:The pedestal(1)Upper fixation is connected with One motor(2), and first motor(2)Hydraulic telescopic rod is fixedly connected on output end(10), the first motor(2)Output end Fixing sleeve is connected to turntable(3), the hydraulic telescopic rod(10)Far from pedestal(1)One end fix be plugged with slotting axis(11), and insert Axis(11)Upper movable sleeve is connected to axle sleeve(13), the axle sleeve(13)Both sides have been respectively fixedly connected with flap(18), and two flaps (18)Mutually from one end be respectively equipped with threaded rod(12), two threaded rods(12)On be equipped with cutting ferrule(14), and two cutting ferrules (14)On be respectively fixedly connected with placing box(15), the hydraulic telescopic rod(10)On be fixedly connected with the second motor, and second Motor output end is fixedly connected with the first inserted link(6), the hydraulic telescopic rod(10)There are two the second inserted links for upper activity grafting (7), first inserted link(6)Upper fixing sleeve is connected to first gear(8), two the second inserted links(7)Upper fixing sleeve respectively be connected to and First gear(8)Intermeshing second gear(9), two the second inserted links(7)On be respectively fixedly connected with draught line(5), and Draught line(5)It is wound in two the second inserted links(7)On, two draught lines(5)Mutually from one end be individually fixed in two cutting ferrules (14)On.
2. a kind of building construction support device according to claim 1, it is characterised in that:The turntable(3)Activity is inserted It is connected to pedestal(1)On, and turntable(3)Rotatable 0 °~360 °.
3. a kind of building construction support device according to claim 1, it is characterised in that:The turntable(3)Both sides are equal It is fixedly connected with conductor loop(4), and draught line(5)Activity runs through two conductor loops respectively(4).
4. a kind of building construction support device according to claim 3, it is characterised in that:Two threaded rods(12)Respectively Movable whorl is connected to two flaps(18)On, and two threaded rods(12)Upper movable sleeve respectively is connected to cutting ferrule(14).
5. a kind of building construction support device according to claim 3, it is characterised in that:The placing box(15)Bottom side Internal box wall both ends have been fixedly connected with spring(16), and two springs(16)It is fixedly connected on and same shelves plate(17)On.
CN201810230289.4A 2018-03-20 2018-03-20 A kind of building construction support device Withdrawn CN108560929A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810230289.4A CN108560929A (en) 2018-03-20 2018-03-20 A kind of building construction support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810230289.4A CN108560929A (en) 2018-03-20 2018-03-20 A kind of building construction support device

Publications (1)

Publication Number Publication Date
CN108560929A true CN108560929A (en) 2018-09-21

Family

ID=63532843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810230289.4A Withdrawn CN108560929A (en) 2018-03-20 2018-03-20 A kind of building construction support device

Country Status (1)

Country Link
CN (1) CN108560929A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109823963A (en) * 2019-01-18 2019-05-31 广州城建职业学院 A kind of hanging device of assembled architecture prefabricated components
CN111894304A (en) * 2020-08-05 2020-11-06 海南众汇建设工程有限公司 Constructional engineering steel construction support equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109823963A (en) * 2019-01-18 2019-05-31 广州城建职业学院 A kind of hanging device of assembled architecture prefabricated components
CN109823963B (en) * 2019-01-18 2020-02-07 广州城建职业学院 Hoisting equipment for prefabricated components of fabricated building
CN111894304A (en) * 2020-08-05 2020-11-06 海南众汇建设工程有限公司 Constructional engineering steel construction support equipment

Similar Documents

Publication Publication Date Title
CN108122660A (en) A kind of power construction transformer mounting bracket
CN108560929A (en) A kind of building construction support device
CN207467892U (en) A kind of cable windings frame that can quickly wind
CN203461639U (en) Cable winder for travelling offshore crane
CN110240005A (en) A kind of back twist stranded wire apparatus of planetary coil winding machine
CN207010074U (en) A kind of power grid maintenance equipment
CN209190983U (en) A kind of gypsum board manufacture edge banding apparatus
CN208267386U (en) A kind of building construction support device
CN208168430U (en) A kind of architectural engineering support device
CN109794959A (en) A kind of part processing automatic loading and unloading robot gripper structure
CN109533996A (en) A kind of automation Palletizer for automobile batteries
CN205397692U (en) It is quick and even book yarn device
CN205471967U (en) Automatic wire binding machine for electric power engineering
CN208761858U (en) A kind of pipe winding device for the sebific duct fixed frame and fixed frame that anti-hydralic hose damages
CN207651978U (en) A kind of branch line differentiation clamping plate easy to use
CN212687196U (en) Cable winding device
CN207353678U (en) A kind of outdoor power distribution cabinet of easy access
CN216672515U (en) Incoming and outgoing line clamping device for power distribution engineering
CN207945448U (en) A kind of automation equipment pedestal
CN108347124A (en) A kind of threephase asynchronous pedestal
CN107640654A (en) A kind of control wire collection apparatus for being easy to lifting
CN105896360A (en) Suspension device for processing electrical equipment
CN203877653U (en) Wire stranding coil capable of respectively or simultaneously winding and unwinding cables
CN208948782U (en) A kind of chuck handling apparatus
CN102774712B (en) Power cable transfer loading and unloading method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180921

WW01 Invention patent application withdrawn after publication